P01 - PWS Attachment 8 - Building 615 Drawings.pdf
PDF 8 MB Posted
- Attached to
- Z1DZ--Develop Maintenance Management Plan Solicitation Amendment | Change of Site Visit, Response date and add attachments Federal contract opportunity
- Solicitation number
- 36C26124Q0843
About this file
This document contains architectural drawings for the Chiller Building Foundation and Roof Plan as part of the Polytrauma and Blind Rehabilitation Center project. The drawings provide details on the concrete foundation and roof framing, including dimensions, column locations, slab reinforcement, and construction notes. Key elements include a chiller crane rail, cooling tower platform, pipe rack framing, and panel elevations for the concrete tilt-up wall panels. The drawings indicate this is part of a construction project for the Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.882.7718 www.smithgroup.com
1412 VAN NESS AVE., 2ND FLOOR
SAN FRANCISCO, CA 94109
T 415.777.3737 F 415.777.3476 www.dpsf.com
Associate Architect:
The Design Partnership LLP
Architects + Planners
L o g i n
K
E N
T
P
A R
S H
A L
D r a w i n g
F i l e S
G I z P
P
E
S d w g
P l o t t i n g
D a t e
A
M a s t s a v e d b y
T h u r s d a y
M a y
A
M
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.882.7718 www.smithgroup.com
1412 VAN NESS AVE., 2ND FLOOR
SAN FRANCISCO, CA 94109
T 415.777.3737 F 415.777.3476 www.dpsf.com
Associate Architect:
The Design Partnership LLP
Architects + Planners
L o g i n
K
E N
T
P
A R
S H
A
D r a w i n g
F i l e S
G I z P
P
E
S d w g l o t t i n g
D a t e
M a s t s a v e d b y
T u e s d a y
S e p t e m b e r
P
M
C1 C2 C3 C4
CA
CB
25' - 0" 30' - 0" 25' - 0"
0"
PANEL CA-2
P.
J.
PANEL CB-2
P.
J.
P.
J.
P.
J.
P.J.
P.J.
P.J.
P.J.
P.J.
P.J.
W8x40 COLUMN, TYPICAL
SEE 48/SS7.1.2 FOR BASE
PLATE INFO.
BOLLARDS, S.A.D.
SS2.1.1
SS5.1.1
SS5.1.1
TYP.
SS5.1.1
TYP.
SS5.1.1
SS5.1.1
SL
OP
E S.
A.
D.
SS5.1.1
TYP.
SS5.1.1
TYP.
SS7.1.1
TYP.
SS7.1.1
TYP.
SS2.1.1
TYP.
SS5.1.1
SS5.1.1
TYP.
TYP.
TYP.
TYP.
SS5.1.1
TYP.
SS2.1.1
FOR FRAMING
LOCATION, S.A.D.
SS5.1.1
COOLING
TOWER
PIPE RACK16
SS5.1.1
TYP.
T.O. FTG.
ELEV.=-2'-6"
1' - 6" 1' - 8"
83' - 2"
3'
- 6
2'
- 0
EQ
EQ
1' - 0"1' - 0"
2' - 0"
EQ.
EQ
EQ
EQ
2'
- 0
EQ. EQ.
TYP
TY
P
2'
- 6
2'
- 6
TYP
2' - 6"
TYP
2' - 6"
TYP
2' - 6"
TYP
2' - 6"
4'
- 2
1'
- 6
TYP
6' - 0"
TY
P.
2'
- 6
"TY
P
5'
- 6
TY
P
2'
- 6
1'
- 8
TYP
3' - 0"
PA
NE
L C 4-
PA
NE
L C
4-
PA
NE
L C 1-
PA
NE
L C
1-
PANEL CB-1 PANEL CB-3
PANEL CA-1 PANEL CA-3
TYP.
C1 C2 C3 C4
CA
CB
S5
0"
25' - 0" 30' - 0" 25' - 0"
W10x32 CRANE RAIL
T.O.S. EL.=+12'-0"
1/4 " P
ER
F
T.
S
LO
PE
D
OW
N
T.O.S. EL. =+20'-11 3/4"
T.O.S. EL.=+20'-1"
SS5.1.1 TYP.
SS5.1.1
TYP.
TYP.
SS7.1.1
SS5.1.1
TYP.
SS5.1.1
SS7.1.2
SS7.1.2
W
X4
W
X4
W
X4
W
X4
W14X43
W14X43
T.O.S. EL.=+10'-6", TYP.
TYP.
TYP.
P.
J.
P.
J. P.
J.
P.
J.
P.
J.
P.
J.
W14X43
W14X43W14X43
W14X43
0"
P.J.
P.J. P.J.
P.J.
1' - 6" 1' - 8"
83' - 2"
W30X90 W30X90W30X90
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W
X9
(S
W30X90 W30X90 W30X90
2"
6'
- 3
T.O.S. EL.=+2'-0"
SS7.1.1
.16
W 8X
31W 8X
W8X31
W8X31
C1 C2 C3 C4
CA
SS7.1.1 T.O.S. EL.=+3'-0"13
1' - 3"
5'
10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
W8X31 W8X31
W8X31
W 8X
W 8X
W 8X
W 8X
W 8X
W 8X
W 8X
C1 C2
CA
25' - 0"
T.O.S. EL.=+8'-0"
BRACING BELOW, TYP.
SS7.1.1 TYP.
W21X62
W
X6
W
X6
W
X6
W16X26W16X26
W21X62
TRUE NORTH
PROJ. NORTH
34°
3801 Miranda Ave., Palo Alto CA
CENTERS FOR AMBULATORY CARE,
POLYTRAUMA AND BLIND REHABILITATION
Polytrauma and Blind Rehabilitation Center
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Construction and Facilities Management
640-424
Seals and Signatures on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.908.0862 www.smithgroup.com
The Design Partnership LLP Architects + Planners
1412 VAN NESS AVE., 2ND FLOOR
SAN FRANCISCO, CA 94109
T 415.777.3737 F 415.777.3476 www.dpsf.com
DEGENKOLB ENGINEERS
235 Montgomery Street, Suite 500 San Francisco, CA 94104
415.392.6952 Phone
415.981.3157 Fax
www.degenkolb.com
Department of Veterans Affairs
CONSTRUCTION DOCUMENTS
CHILLER BUILDING FOUNDATION
AND ROOF PLAN
SS2.1.1
20 SEPT 2011 KAJ MAM
1/8" = 1'-0"
34 FOUNDATION PLAN
1/8" = 1'-0"
52 ROOF FRAMING PLAN
SHEET NOTES:
1. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF OPENINGS IN WALLS.
2. SEE THE FOLLOWING DRAWINGS FOR DETAILS NOT SPECIFICALLY REFERENCED:
SF1.1.1 & SF1.1.2TYPICAL CONCRETE DETAILS
SF1.2.1 & SF1.2.2TYPICAL STEEL AND METAL DECK DETAILS
SF1.3.1 TYPICAL METAL DECK DETAILS
SF1.1.3 CONCRETE TILT-UP PANEL TYPICAL DETAILS
3. TOP OF FOOTING IS 0'-9" BELOW TOP OF SLAB, UNLESS OTHERWISE NOTED.
4. TOP OF SLAB ELEVATION AT GROUND LEVEL = 0'-0" UNLESS OTHERWISE NOTED. TOP
OF STEEL ELEVATIONS NOTED ARE RELATIVE TO TOP OF GROUND LEVEL SLAB. SEE
CIVIL DWG. SHEET CS1.5.2 FOR SLAB ELEVATIONS.
5. PROVIDE SHEAR STUDS @ 12"O.C. AT ALL BEAMS SUPPORTING CONCRETE ON METAL
DECK, UNLESS OTHERWISE NOTED. SEE TYPICAL DETAILS FOR STUD PLACEMENT
REQUIREMENTS.
6. PROVIDE SLAB ON GRADE BLOCKOUTS FOR COLUMNS PER TYPICAL DETAIL, UNLESS
OTHERWISE NOTED.
7. SEE: SHEET SS3.1.1 FOR WALL PANEL ELEVATION (CX-#).
DETAIL 54/SS7.1.1 FOR METAL DECK SCHEDULE (S#).
DETAIL 48/SS7.1.2 FOR COLUMN BASE PLATE SCHEDULE & DETAILS.
8. SEE ARCH. DWG. SHT. AS2.1.1 FOR SLAB & HOUSEKEEPING PAD DIMENSIONS
KEY NOTES:
1 TURN GRADE BEAM AND REINFORCING DOWN AND EXTEND TO COLUMN FTG. BELOW.
HOOK GRADE BEAM LONGITUDINAL REINFORCING INTO FTG.
1/2" = 1'-0"
54 PARTIAL FRAMING PLAN - AIR SEPARATOR
2 LOCATE CRANE RAIL BEAM TO CENTER OVER CHILLER COMPRESSORS BELOW.
COORDINATE WITH MEP DRAWINGS & FINAL CHILLER SELECTION.
1/8" = 1'-0"
42 PARTIAL FRAMING PLAN - PIPE RACK
3 FLOOR SINK BLOCKOUT, TYPICAL. SEE ARCHITECTURAL DRAWINGS FOR SLOPES &
LOCATIONS.
4 6" CONCRETE SLAB ON GRADE WITH #4 @ 12"O.C. E.W.
5 5" CONCRETE SLAB ON GRADE WITH #4 @ 12" O.C. E.W.
6 10" CONCRETE MAT WITH #4 @ 12"O.C. E.W. TOP & BOT.
7 6" HOUSEKEEPING PAD, SEE ARCH. & MEP DRAWINGS FOR LOCATION AND SIZE.
8 CONCRETE CURB, SEE ARCH. DRAWINGS FOR ADDITIONAL INFORMATION.
9 CONSTRUCTION JOINT FOR DELAYED POUR STRIP, SEE DETAILS FOR
ADDITIONAL INFORMATION.
10 LOCATE DELAYED POUR CONST. JOINT AROUND OUTSIDE PERIMETER OF
CURB/WALL.
11 HSS 5x5x1/4 COLUMNS, H.D.G., TYPICAL OF 8 AT COOLING TOWER PLATFORM
12 HSS 4x4x3/16 COLUMNS, H.D.G. TYPICAL OF 14 AT PIPE RACK.
13 ALL FRAMING AND FASTENERS FOR PLATFORM TO BE H.D.G.,TYPICAL.
14 THICKENED SLAB FOR FENCE POST. S.A.D. FOR LOCATION OF POSTS AND DETAIL
36/SS5.1.1 FOR ADDITIONAL INFORMATION.
1/8" = 1'-0"
24 PARTIAL FRAMING PLAN - COOLING TOWER
15 CATWALK DESIGNED BY COOLING TOWER MANUFACTURER.
16 CONTRACTOR TO DETERMINE DIMENSIONS AFTER FINAL SELECTION OF MECH.
EQUIPMENT.
17 STEP FOOTING PER TYPICAL DETAIL.
18 PROVIDE BLOCKOUTS IN SLAB ON GRADE FOR PIPE PENETRATIONS, SEE MEP
DWGS. PROVIDE REINFORCING AROUND OPENINGS PER TYPICAL DETAIL
33/SF1.1.2
C1 C2
6" #4 @ 12"O.C. E.W.
PANEL CA-1
26' - 6"
TYP.
6'
- 8
6'
- 1 0"
6'
- 8
T.O.SLAB
8" 3'
- 1 0"
8"
C2 C3
6"#4 @ 12"O.C. E.W.
TYP.
PANEL CA-2
29' - 10 1/2"
TYP.
3'
- 1
0" 6'
- 8
6'
- 1
0" 6'
- 8
8"
8"
T.O.SLAB
C3 C4
6" #4 @ 12"O.C. E.W.
TYP.
3'
- 1
0" 6'
- 8
6'
- 1
0" 6'
- 8
8"
8"
TYP.
PANEL CA-3
26' - 8"
T.O.SLAB
C1C2
6" #4 @ 12"O.C. E.W.
PANEL CB-1
26' - 6"
TYP.
8" 6'
- 8
6'
- 1
0" 6'
- 8
2'
- 1
T.O.SLAB
C2C3
6" #4 @ 12"O.C. E.W.
PANEL CB-2
29' - 10 1/2"
8" 6'
- 8
6'
- 1
0" 6'
- 8
2'
- 1
TYP.
T.O.SLAB
C3C4
6" #4 @ 12"O.C. E.W.
PANEL CB-3
26' - 8"
TYP.
8" 6'
- 8
6'
- 1
0" 6'
- 8
2'
- 1
T.O.SLAB
CB
PANEL C4-1
19' - 5 5/8"
8" #5 @ 12"O.C. E.W.
TYP.
2'
- 1
6'
- 8
6'
- 1
0" 6'
- 8
8"
T.O.SLAB
CA
8" #5 @ 12"O.C. E.W.
4-#5 BARS
TYP.
PANEL C4-2
25' - 5 5/8"
TYP.
TYP. T.O.SLAB
6' - 6" 2' - 0"1'
- 0
8"
6'
- 8
6'
- 1 0"
6'
- 8
2'
- 1 0"
8"
SS5.1.1
CB
6"
PANEL C1-1
19' - 5 5/8"
#4 @ 12"O.C. E.W.
TYP.
TYP.
2'
- 1
6'
- 8
6'
- 1
0" 6'
- 8
8"
T.O.SLAB
CA
6"
PANEL C1-2
25' - 5 5/8"
#4 @ 12"O.C. E.W.
TYP.
6'
- 8
6'
- 1 0"
6'
- 8
8"
2' - 0"
1'
- 0
T.O.SLAB
8' - 0"
8"
3801 Miranda Ave., Palo Alto CA
CENTERS FOR AMBULATORY CARE,
POLYTRAUMA AND BLIND REHABILITATION
Polytrauma and Blind Rehabilitation Center
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Construction and Facilities Management
640-424
Seals and Signatures on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
301 BATTERY STREET, 7TH FLOOR
SAN FRANCISCO, CA 94111
T 415.227.0100 F 415.908.0862 www.smithgroup.com
The Design Partnership LLP Architects + Planners
1412 VAN NESS AVE., 2ND FLOOR
SAN FRANCISCO, CA 94109
T 415.777.3737 F 415.777.3476 www.dpsf.com
DEGENKOLB ENGINEERS
235 Montgomery Street, Suite 500 San Francisco, CA 94104
415.392.6952 Phone
415.981.3157 Fax
www.degenkolb.com
Department of Veterans Affairs
CONSTRUCTION DOCUMENTS
CHILLER BUILDING WALL PANEL
ELEVATIONS
SS3.1.1
20 SEPT 2011 KAJ MAM
SHEET NOTES:
1. CONTRACTOR IS TO PROVIDE COMPLETE PANEL SHOP DRAWINGS FOR EVERY
NUMBERED PANEL. SEE SPECIFICATIONS FOR REQUIREMENTS.
2. PANELS SHOWN VIEWED FROM THE INTERIOR.
3. SHIM PANELS AS REQUIRED TO ALIGN. THEN GROUT BELOW ENTIRE WALL LENGTH
TO OBTAIN FULL BEARING.
4. WHERE TRIM BARS SHOWN, OMIT TYP. PANEL REINFORCING. PLACE 1ST TYP. BAR
(1) BAR SPACE MAX. FROM TRIM BARS.
5. PICK POINTS AND PICK POINT REINFORCING ARE NOT SHOWN, SEE
SPECIFICATIONS FOR ADDITIONAL INFO.
6. PANELS TO CURE 7 DAYS MINIMUM AND CONCRETE COMPRESSIVE
STRENGTH TO BE 2000 PSI MIN. BEFORE ERECTING PANELS.
7. CONTRACTOR TO COORDINATE WITH MEP & ARCH. DWGS FOR EXACT
LOCATIONS AND SIZES OF ALL OPENINGS.
KEY NOTES:
SEE SHEET SF1.1.2 FOR TYP. WALL REINFORCING AROUND OPENINGS DETAIL
2 PANEL TO PANEL CONNECTION PLATES PER TYPICAL DETAILS, SHEET SF1.1.3
8. SEE THE FOLLOWING DRAWINGS FOR DETAILS NOT SPECIFICALLY REFERENCED:
SF1.1.3 CONCRETE TILT-UP PANEL TYPICAL DETAILS
1/8" = 1'-0"
44 PANEL CA-1 1/8" = 1'-0"
32 PANEL CA-2
1/8" = 1'-0"
20 PANEL CA-3
1/8" = 1'-0"
21 PANEL CB-1
1/8" = 1'-0"
33 PANEL CB-2
1/8" = 1'-0"
45 PANEL CB-3
1/8" = 1'-0"
23 PANEL C4-1
1/8" = 1'-0"
35 PANEL C4-2
1/8" = 1'-0"
53 PANEL C1-1
1/8" = 1'-0"
47 PANEL C1-2
File details come from the government source that posted it. Updated .