About this file

This document is a Table of Contents for the Architectural and Engineering (A/E) specifications for the Aquatic Therapy Center and Therapy Center project at the Department of Veterans Affairs Palo Alto Health Care System (VAPAHCS) in Palo Alto, California.

The Table of Contents outlines the various divisions and sections of the A/E specifications, including General Requirements, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Swimming Pool Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Utilities. Key details include the project numbers, facility name and location, and a comprehensive listing of the technical specification sections required for this construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DZ--Develop Maintenance Management Plan Solicitation Amendment | Change of Site Visit, Response date and add attachments, newest first.
File Type Posted
P01 - PWS Attachment 14 - Quality Assurance Surveillance Plan.pdf PDF
36C26124Q0843 0001.docx DOCX document
P01 - PWS Attachment 6b - Building 500 Drawings - Part 02.pdf PDF
P01 - PWS Attachment 6d - Building 500 Drawings - Part 04.pdf PDF
P01 - PWS Attachment 6e - Building 500 Drawings - Part 05.pdf PDF
P01 - PWS Attachment 9a - Building 710 Drawings - Vol 01.pdf PDF
P01 - PWS Attachment 2 - Building 500 Scope.pdf PDF
P01 - PWS Attachment 4 - Building 710 Scope.pdf PDF
P01 - PWS Attachment 6c - Building 500 Drawings - Part 03.pdf PDF
P01 - PWS Attachment 8 - Building 615 Drawings.pdf PDF
P01 - PWS Attachment 3 - Buildings 603 and 615 Scope.pdf PDF
P01 - PWS Attachment 1 - Building 100 G-wing Scope.pdf PDF
P01 - PWS Attachment 5a - Building 100 G-wing Drawings - Part 01.pdf PDF
P01 - PWS Attachment 5b - Building 100 G-wing Drawings - Part 02.pdf PDF
P01 - PWS Attachment 6a - Building 500 Drawings - Part 01.pdf PDF
P01 - PWS Attachment 7 - Building 603 Drawings.pdf PDF
P01 - PWS Attachment 9b - Building 710 Drawings - Vol 02.pdf PDF
P01 - PWS Attachment 16b - Building 530 Scope.pdf PDF
36C26124Q0843 DEVELOP MAINTENANCE MANAGEMENT PLAN.pdf PDF
36C26124Q0843_3.docx DOCX document
Past Performance Surveys.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aquatic Therapy Center and Therapy Center DVA Project Nos.

Building 530 640-370 / 640-CSI-100

VAPAHCS Palo Alto, CA

00 01 00 - 1

TABLE OF CONTENTS

Section 00 01 00

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawings

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements

01 32 16 Network Analysis

01 33 23 Shop Drawings, Product Data, and Samples

01 42 19 Reference Standards

01 45 29 Testing Laboratory Services

01 57 19 Temporary Environmental Protection

01 58 16 Temporary Interior Signs

01 74 19 Construction Waste Management

DIVISION 02 - EXISTING CONDITIONS

Not Used

DIVISION 03 - CONCRETE

03 30 00 Cast-In -Place Concrete

DIVISION 04 - MASONRY

DIVISION 05 - METALS

05 12 00 Structural Steel

05 31 00 Steel Decking

05 36 00 Composite Metal Decking

05 50 00 Metal Fabrications

05 73 13 Glazed Decorative Metal Railing

DIVISION 06 - WOOD AND PLASTIC

06 10 00 Rough Carpentry

06 40 00 Architectural Woodwork

06 61 00 Simulated Stone Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROECTION

07 14 00 Fluid-Applied Waterproofing

07 21 13 Thermal Insulation

07 22 00 Roof and Deck Insulation

07 26 00 Vapor Barrier

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

00 01 00 - 2

07 26 26 Below Grade Vapor Barrier

07 27 26 Fluid-Applied Membrane Air Barrier

07 42 43 Composite Wall Panels

07 42 73 Rain Screen Panel System

07 54 23 Thermoplastic Polyolefin (TPO) Roofing

07 60 00 Flashing and Sheet Metal

07 71 00 Roof Specialties

07 81 00 Applied Fireproofing

07 84 00 Firestopping

07 92 00 Joint Sealants

DIVISION 08 - DOORS AND WINDOWS

08 11 13 Hollow Metal Doors and Frames

08 14 00 Interior Wood Doors

08 31 13 Access Doors and Frames

08 42 29 Automatic Entrances

08 44 13 Glazed Aluminum Curtain Wall

08 44 19 Fire Rated Glazed Curtain Wall

08 71 00 Door Hardware

08 71 03 Installation of Doors and Hardware

08 80 00 Glazing

08 90 00 Louvers

DIVISION 09 - FINISHES

09 06 00 Schedule for Finishes

09 22 16 Non-Structural Metal Framing

09 29 00 Gypsum Board

09 30 13 Ceramic Tiling

09 51 00 Acoustical Ceiling

09 65 13 Resilient Base and Accessories

09 65 19 Resilient Tile Flooring

09 67 23 Epoxy Coating

09 68 00 Carpeting

09 84 33 Acoustical Ceiling Paneling

09 91 00 Painting

DIVISION 10 - SPECIALTIES

10 14 00 Signage

10 21 13 Toilet Compartments

10 26 00 Wall and Door Protection

10 28 00 Toilet, Bath and Laundry Accessories

10 44 13 Fire Extinguisher Cabinets

10 51 16 Wood Lockers

10 71 23 Interior Solar Shades

DIVISION 11 - EQUIPMENT

00 01 00 - 3

DIVISION 12 - FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components

13 11 01 Swimming Pool Excavation

13 11 02 Swimming Pool Concrete

13 11 03 Swimming Pool Shotcrete

13 11 04 Swimming Pool Ceramic Tile

13 11 06 Swimming Pool Equipment

13 11 07 Swimming Pool Mechanical

13 11 08 Swimming Pool Electrical

DIVISION 14 - CONVEYING SYSTEMS

DIVISION 21 – FIRE SUPPRESSION

21 05 11 Common Work Results for Fire Suppression

21 10 00 Water-Based Fire-Suppression Systems

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing

22 05 12 General Motor Requirements for Plumbing Equipment

22 05 19 Meters and gages for Plumbing Piping

22 05 23 General-Duty Valves for Plumbing Piping

22 11 00 Facility Water Distribution

22 13 00 Facility Sanitary Sewerage

22 14 00 Facility Storm Drainage

22 34 00 Fuel-Fired Domestic Water Heaters

22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC and Steam Generation

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing HVAC

23 07 11 HVAC, Plumbing, and Boiler Plant Insulation

23 09 23 Direct-Digital Control System for HVAC

23 11 23 Facility Natural-Gas Piping

23 21 13 Hydronic Piping

23 21 23 Hydronic Pumps

23 25 00 HVAC Water Treatment

23 31 00 HVAC Ducts and Casings

23 34 00 HVAC Fans

23 36 00 Air Terminal Units

23 37 00 Air Outlets and Inlets

23 40 00 HVAC Air Cleaning Devices

00 01 00 - 4

23 51 00 Breechings, Chimneys, and Stacks

23 52 35 Gas Fire Condensing Hot Water Boilers

23 73 00 Indoor Central-Station Air-Handling Units

23 82 16 Air Coils

DIVISION 26 - ELECTRICAL

26 05 11 Requirements for Electrical Installations

26 05 21 Low-Voltage Electrical Power Conductors and Cables (600

Volts and Below)

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33 Raceway and Boxes for Electrical Construction

26 05 41 Underground Electrical Construction

26 05 71 Electrical System Protective Device Study

26 24 11 Distribution Switchboards

26 24 16 Panelboards

26 24 19 Motor-Control Centers

26 27 26 Wiring Devices

26 29 11 Low-Voltage Motor Starters

26 29 21 Disconnect Switches

26 51 00 Interior Lighting

26 56 00 Exterior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 23 00 Video Surveillance

28 31 00 Fire Detection and Alarm

DIVISION 31 – EARTHWORK

31 20 00 Earth Moving

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Landscape Site Concrete

32 84 00 Landscape Irrigation

32 90 00 Landscape Plating and Finish Grading

32 94 00 Miscellaneous Site Furnishings

DIVISION 33 – UTILITIES

33 10 00 Water Utilities

33 30 00 Sanitary sewerage Utilities

33 40 00 Storm Drainage Utilities

33 51 00 Natural-Gas Distribution

DIVISION 34 - TRANSPORTATION

Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

00 01 00 - 5

- - - E N D - - -

File details come from the government source that posted it. Updated .