About this file

This document appears to be the table of contents for a set of specifications and contract documents related to a VA Medical Center construction project in Palo Alto, California. It covers a wide range of construction and engineering disciplines, including civil, structural, mechanical, electrical, and specialty systems. The specifications are organized by division and section, providing detailed requirements for items such as demolition, concrete, steel, roofing, HVAC, plumbing, electrical, communications, and landscaping. The document also includes references to several appendices containing additional information like geotechnical reports and stormwater pollution prevention plans. Overall, this appears to be a comprehensive set of contract documents for the construction and renovation work at the VA Medical Center.

The related federal contract opportunity appears to be a solicitation from the Department of Veterans Affairs to develop a maintenance management plan. The solicitation number is 36C26124Q0843, and it is seeking services to create a maintenance management plan for the VA facility. No additional details on the specific requirements, response dates, or pricing terms are provided in the information given.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DZ--Develop Maintenance Management Plan Solicitation Amendment | Change of Site Visit, Response date and add attachments, newest first.
File Type Posted
36C26124Q0843 0001.docx DOCX document
P01 - PWS Attachment 14 - Quality Assurance Surveillance Plan.pdf PDF
P01 - PWS Attachment 2 - Building 500 Scope.pdf PDF
P01 - PWS Attachment 4 - Building 710 Scope.pdf PDF
P01 - PWS Attachment 6c - Building 500 Drawings - Part 03.pdf PDF
P01 - PWS Attachment 8 - Building 615 Drawings.pdf PDF
P01 - PWS Attachment 6b - Building 500 Drawings - Part 02.pdf PDF
P01 - PWS Attachment 6d - Building 500 Drawings - Part 04.pdf PDF
P01 - PWS Attachment 6e - Building 500 Drawings - Part 05.pdf PDF
P01 - PWS Attachment 9a - Building 710 Drawings - Vol 01.pdf PDF
P01 - PWS Attachment 16a - Building 530 Scope.pdf PDF
P01 - PWS Attachment 1 - Building 100 G-wing Scope.pdf PDF
P01 - PWS Attachment 5a - Building 100 G-wing Drawings - Part 01.pdf PDF
P01 - PWS Attachment 5b - Building 100 G-wing Drawings - Part 02.pdf PDF
P01 - PWS Attachment 6a - Building 500 Drawings - Part 01.pdf PDF
P01 - PWS Attachment 7 - Building 603 Drawings.pdf PDF
P01 - PWS Attachment 9b - Building 710 Drawings - Vol 02.pdf PDF
P01 - PWS Attachment 16b - Building 530 Scope.pdf PDF
36C26124Q0843 DEVELOP MAINTENANCE MANAGEMENT PLAN.pdf PDF
36C26124Q0843_3.docx DOCX document
Past Performance Surveys.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Medical Center, Palo Alto, California Proj. No. 640-424 Loop Road and Site Utilities, Radiology Consolidation, Parking Structure 2

ADDENDUM NO. 04 TOC - 1

28 OCT 2013

TABLE OF CONTENTS

VOLUME 1: DIVISION 01 - GENERAL REQUIREMENTS

VOLUME 2: LOOP ROAD AND SITE UTILITIES

VOLUME 3: LOOP ROAD AND SITE UTILITIES (CONTINUED)

VOLUME 4: RADIOLOGY CONSOLIDATION

VOLUME 5: RADIOLOGY CONSOLIDATION (CONTINUED)

VOLUME 6: PARKING STRUCTURE 2

VOLUME 7 APPENDICES

VOLUME 1 OF 7 DIVISION 01 – GENERAL REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 010000 - GENERAL REQUIREMENTS (Add#02) ......................10/07/2013

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

SECTION 013216.13 - NETWORK ANALYSIS SCHEDULES

SECTION 013323 - SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION 014219 - REFERENCE STANDARDS

SECTION 015719 - TEMPORARY ENVIRONMENTAL CONTROLS

SECTION 015816 - TEMPORARY INTERIOR SIGNAGE

SECTION 016000 - PRODUCT REQUIREMENTS

SECTION 017000 - EXECUTION REQUIREMENTS

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT

SECTION 017700 - CLOSEOUT PROCEDURES

VOLUME 2 OF 7 LOOP ROAD AND SITE UTILITIES

DIVISION 00 - SPECIAL SECTIONS

SECTION 000115.01 - LIST OF DRAWING SHEETS – LOOP ROAD

AND SITE UTILITIES (Add#01) (Add#02) .....................10/07/2013

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 014529.01 - TESTING LABORATORY SERVICES - LOOP ROAD AND SITE UTILITIES

SECTION 018111.01 - SUSTAINABLE DESIGN REQUIREMENTS - LOOP ROAD AND SITE

UTILITIES

LEED PRODUCT DATA SUBMITTAL FORM

LEED REQUIREMENTS SCORECARD

SECTION 019100.01 - GENERAL COMMISSIONING REQUIREMENTS – LOOP ROAD AND SITE

UTILITIES (Add#01) ...................................09/18/2013

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

ADDENDUM NO. 04 TOC - 2

DIVISION 02 - EXISTING CONDITIONS

SECTION 024100 – DEMOLITION (Add#01) ...............................09/18/2013

SECTION 028213.13 - GLOVEBAG ASBESTOS ABATEMENT

SECTION 028213.31 - ASBESTOS ABATEMENT: STEAM TUNNEL TAR PAPER JACKETING

DIVISION 03 - CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE (Add#01) ...................09/18/2013

SECTION 034100 - PRECAST STRUCTURAL CONCRETE FOR STEAM TRENCHES AND

VAULTS (Add#01) ......................................09/18/2013

SECTION 034713 - TILT-UP CONCRETE (Add#01) .........................09/18/2013

DIVISION 04 - MASONRY

SECTION 047210 - STONE VENEER WALL (Add#01) .........................09/18/2013

DIVISION 05 - METALS

SECTION 051200 - STRUCTURAL STEEL FRAMING (Add#01) .................09/18/2013

SECTION 053600 - COMPOSITE METAL DECKING

SECTION 055000 - METAL FABRICATIONS (Add#01) ........................09/18/2013

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

SECTION 061000 - ROUGH CARPENTRY (Add#01) ..........................09/18/2013

SECTION 062000 - FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 071326 - SELF-ADHERING SHEET WATERPROOFING

SECTION 071352 - MODIFIED BITUMINOUS SHEET WATERPROOFING

SECTION 071900 - WATER REPELLENTS

SECTION 072113 - THERMAL INSULATION (Add#01) ........................09/18/2013

SECTION 072200 - ROOF AND DECK INSULATION

SECTION 072613.13 - CONCRETE SLAB APPLIED VAPOR RETARDER (Add#01) ..09/18/2013

SECTION 075216.13 - STYRENE-BUTADIENE-STYRENE MODIFIED BITUMINOUS MEMBRANE

ROOFING, COLD-APPLIED

SECTION 076000 - FLASHING AND SHEET METAL

SECTION 077100 - ROOF SPECIALTIES

SECTION 078400 - FIRESTOPPING

SECTION 079200 - JOINT SEALANTS

VHAPALHannaC Cross-Out

ADDENDUM NO. 04 TOC - 3

DIVISION 08 - OPENINGS

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES (Add#01) ............09/18/2013

SECTION 083300 - COILING DOORS AND GRILLES

SECTION 085113 - ALUMINUM WINDOWS

SECTION 087100 - DOOR HARDWARE (Add#01) ............................09/18/2013

SECTION 087113.11 - LOW ENERGY POWER ASSIST DOOR

OPERATORS (Add#01)....................................09/18/2013

SECTION 088000 - GLAZING (Add#01) ..................................09/18/2013

SECTION 089000 - LOUVERS AND VENTS

DIVISION 09 - FINISHES

SECTION 090600 - SCHEDULE FOR FINISHES (Add#01) ....................09/18/2013

SECTION 092216 - NON-STRUCTURAL METAL FRAMING

SECTION 092900 - GYPSUM BOARD (Add#01) .............................09/18/2013

SECTION 093013 - CERAMIC/PORCELAIN TILING

SECTION 095100 - ACOUSTICAL CEILINGS

SECTION 096513 - RESILIENT BASE AND ACCESSORIES

SECTION 096516.13 - LINOLEUM FLOORING (Add#01) .....................09/18/2013

SECTION 096723.60 - RESINOUS (URETHANE AND EPOXY MORTAR)

FLOORING (RES-6) (Add#01) ............................09/18/2013

SECTION 098433 - SOUND-ABSORBING WALL AND CEILING UNITS

SECTION 099100 - PAINTING (Add#01) .................................09/18/2013

SECTION 099654 - POLYVINYLIDENE DIFLUORIDE (PVDF) COATING SYSTEM

DIVISION 10 - SPECIALTIES

SECTION 101400 - SIGNAGE (Add#01) ..................................09/18/2013

SECTION 101400 - SIGNAGE SCHEDULE

SECTION 102600 - WALL AND DOOR PROTECTION

SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION 104413.13 - FIRE EXTINGUISHER MOUNTING BRACKETS

DIVISION 12 - FURNISHINGS

SECTION 122400 - WINDOW SHADES

SECTION 129300 - SITE FURNISHINGS (Add#01) .........................09/18/2013

DIVISION 13 - SPECIAL CONSTRUCTION

SECTION 130541 - SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

DIVISION 21 - FIRE SUPPRESSION

SECTION 210511 - COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS

ADDENDUM NO. 04 TOC - 4

SECTION 212113.13 - HIGH-PRESSURE CARBON-DIOXIDE FIRE-EXTINGUISHING SYSTEMS

DIVISION 22 - PLUMBING

SECTION 220511 - COMMON WORK RESULTS FOR PLUMBING (Add#01) .........09/18/2013

SECTION 220512 - GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING

SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING

SECTION 220711 - PLUMBING INSULATION

SECTION 221100 - FACILITY WATER DISTRIBUTION

SECTION 221123 - DOMESTIC WATER PUMPS

SECTION 221300 - FACILITY SANITARY AND VENT PIPING

SECTION 221329 - SANITARY SEWERAGE PUMPS

SECTION 221400 - FACILITY STORM DRAINAGE

SECTION 223111 - WATER DEIONIZERS

SECTION 223400 - FUEL-FIRED DOMESTIC WATER HEATERS

SECTION 224000 - PLUMBING FIXTURES

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC)

SECTION 230510 - COMMON WORK RESULTS FOR COGENERATION PLANT AND STEAM

GENERATION (Add#01) ..................................09/18/2013

SECTION 230511 - COMMON WORK RESULTS FOR HVAC (Add#01) .............09/18/2013

SECTION 230512 - GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION

EQUIPMENT

SECTION 230541 - NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

SECTION 230551 - NOISE AND VIBRATION CONTROL FOR COGENERATION PLANT

SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 230711 - HVAC AND COGENERATION PLANT INSULATION (Add#01) ...09/18/2013

SECTION 230923 - FACILITY MONITORING AND CONTROL SYSTEM (Add#01) ...09/18/2013

SECTION 231000 - FACILITY FUEL SYSTEMS (Add#01) (Add#02) ...............10/07/2013

SECTION 231123 - FACILITY NATURAL-GAS PIPING

SECTION 231234 - FUEL GAS COMPRESSOR (Add#01) (Add#02) .................10/07/2013

SECTION 232111 - COGENERATION PLANT PIPING SYSTEMS

SECTION 232113 - HYDRONIC PIPING (Add#01) ..........................09/18/2013

SECTION 232123 - HYDRONIC PUMPS

SECTION 232213 - STEAM AND CONDENSATE HEATING PIPING

SECTION 232223 - STEAM CONDENSATE PUMPS

SECTION 232300 - REFRIGERANT PIPING

SECTION 232401 - THERMAL ENERGY STORAGE TANK SYSTEM PERFORMANCE TESTING

SECTION 232500 - HVAC WATER TREATMENT (Add#01) .....................09/18/2013

SECTION 233100 - HVAC DUCTS AND CASINGS (Add#01) ...................09/18/2013

SECTION 233400 - HVAC FANS

SECTION 233700 - OUTLETS AND INLETS

SECTION 234000 - HVAC AIR CLEANING DEVICES

ADDENDUM NO. 04 TOC - 5

SECTION 235011 - COGENERATION PLANT MECHANICAL

EQUIPMENT (Add#01) (Add#02) .............................10/07/2013

SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS (Add#01) .........09/18/2013

SECTION 235235 - HEAT RECOVERY STEAM GENERATOR

(HRSG) (Add#01) (Add#02) .................................10/07/2013

SECTION 236400 - PACKAGED WATER CHILLERS (Add#01) ..................09/18/2013

SECTION 236500 - COOLING TOWERS (Add#01) ...........................09/18/2013

SECTION 238126 - SPLIT-SYSTEM AIR CONDITIONERS (Add#01) ............09/18/2013

SECTION 238500 - THERMAL ENERGY STORAGE TANK SYSTEM

DIVISION 25 - INTEGRATED AUTOMATION

SECTION 256000 - CHP PLANT CONTROL SYSTEM (Add#01) .................09/18/2013

VOLUME 3 OF 7 LOOP ROAD AND SITE UTILITIES (CONTINUED)

DIVISION 26 - ELECTRICAL

SECTION 260346 - POWER EQUIPMENT CENTERS (Add#01) ..................09/18/2013

SECTION 260511 - REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

SECTION 260513 - MEDIUM VOLTAGE CABLES

SECTION 260521 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS

AND BELOW)

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260541 - UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION 260571 - ELECTRICAL SYSTEM PROTECTIVE DEVICE STUDY

SECTION 260800 - COMMISSIONING OF ELECTRICAL SYSTEMS

SECTION 260923 - LIGHTING CONTROLS

SECTION 261116 - SECONDARY UNIT SUBSTATIONS

SECTION 261219 - PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS

SECTION 261300 - MEDIUM-VOLTAGE SWITCHGEAR

SECTION 261841 - MEDIUM-VOLTAGE SWITCHES

SECTION 262200 - LOW-VOLTAGE TRANSFORMERS

SECTION 262300 - LOW-VOLTAGE SWITCHGEAR

SECTION 262411 - DISTRIBUTION SWITCHBOARDS

SECTION 262416 - PANELBOARDS

SECTION 262419 - MOTOR-CONTROL CENTERS

SECTION 262511 - BUSWAYS

SECTION 262600 - POWER DISTRIBUTION UNITS FOR UNINTERRUPTIBLE POWER SYSTEMS

SECTION 262713 - ELECTRIC METERING

SECTION 262726 - WIRING DEVICES

SECTION 262911 - MOTOR STARTERS

SECTION 262921 - DISCONNECT SWITCHES

SECTION 263213 - ENGINE-GENERATORS

ADDENDUM NO. 04 TOC - 6

SECTION 263214 - COMBUSTION TURBINE GENERATOR (Add#01) (Add#02) ........10/07/2013

SECTION 263253 - CENTRAL UNINTERRUPTIBLE POWER SUPPLY

SECTION 263623 - AUTOMATIC TRANSFER SWITCHES

SECTION 264100 - FACILITY LIGHTNING PROTECTION

SECTION 264200 - CATHODIC PROTECTION (Add#01) .......................09/18/2013

SECTION 264313 - TRANSIENT-VOLTAGE SURGE SUPPRESSION

SECTION 265100 - INTERIOR LIGHTING

SECTION 265600 - EXTERIOR LIGHTING

SECTION 265700 - CONTINUOUS EMISSIONS MONITORING

SYSTEM (Add#01) (Add#02) .................................10/07/2013

DIVISION 27 - COMMUNICATIONS

SECTION 270511 - REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEM

SECTION 270543 - UNDERGROUND DUCTS AND RACEWAYS FOR COMMUNICATIONS

SECTION 270811 - TESTING FOR COMMUNICATIONS

SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION 271314 - COMMUNICATIONS BACKBONE OSP TWISTED PAIR CABLING

SECTION 271324 - COMMUNICATIONS BACKBONE OSP FIBER CABLING

SECTION 271500 - COMMUNICATIONS HORIZONTAL CABLING

SECTION 274131 - MASTER ANTENNA TV EQUIPMENT AND SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 280000 - BASIC SECURITY REQUIREMENTS (Add#01) ...............09/18/2013

SECTION 280513 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

SECTION 280553 - SECURITY SYSTEM LABELING

SECTION 280800 - SECURITY SYSTEM ACCEPTANCE TESTING

SECTION 281300 - ACCESS AND ALARM MONITORING SYSTEM (Add#01) ........09/18/2013

SECTION 283100 - DETECTION AND ALARM

DIVISION 31 - EARTHWORK

SECTION 312000 - EARTH MOVING

SECTION 312319 - DEWATERING

SECTION 312323.33 - FLOWABLE FILL

SECTION 315100 - EXCAVATION SUPPORT AND PROTECTION

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 320523 - CEMENT AND CONCRETE FOR EXTERIOR

IMPROVEMENTS (Add#01) (Add#02) ...........................10/07/2013

SECTION 321216 - ASPHALT PAVING

SECTION 321723 - PAVEMENT MARKINGS

SECTION 323113 - CHAIN LINK FENCES AND GATES (Add#01) ..............09/18/2013

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

ADDENDUM NO. 04 TOC - 7

SECTION 328400 - PLANTING IRRIGATION (Add#01) ......................09/18/2013

SECTION 329000 - PLANTING (Add#01) (Add#02) ............................10/07/2013

DIVISION 33 - UTILITIES

SECTION 331000 - WATER UTILITIES

SECTION 333000 - SANITARY SEWERAGE UTILITIES (Add#01) ..............09/18/2013

SECTION 334000 - STORM DRAINAGE UTILITIES (Add#01) (Add#04) ............10/28/2013

SECTION 334716.17 - BIORETENTION AREA, SWALE, AND PERMEABLE PAVEMENT DRAINAGE

SECTION 335100 - NATURAL-GAS DISTRIBUTION (Add#01) .................09/18/2013

SECTION 336300 - STEAM AND CHILLED WATER SITE

DISTRIBUTION (Add#01).................................09/18/2013

VOLUME 7 OF 7 APPENDICES

Appendix A - Geotechnical Investigation: Phase 2 Improvements – Packages 1, 2, 3, and 5

Appendix B - Facilities Protection Plan for Hillview-Porter Regional Program Groundwater Remediation Facilities at the Veterans Administration Hospital Property, Palo Alto, Ca.

Appendix C - Stormwater Pollution Prevention Plan

- - - E N D - - -

(Add#01) 18 SEP 2013, Addendum No. 1 (Add#02) 07 OCT 2013, Addendum No. 2 (Add#04) 28 OCT 2013, Addendum No. 4

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

VHAPALHannaC Cross-Out

File details come from the government source that posted it. Updated .