This is a Request for Proposal (RFP) and contract award form for construction services to upgrade security camera systems at three Veterans Affairs facilities. The Department of Veterans Affairs, Veterans Integrated Service Network 20, seeks a single contractor to perform professional construction services for Project 653-25-103, which involves updating and upgrading security camera hardware and software systems at Roseburg Veterans Affairs Medical Center in Oregon, North Bend Community Based Outpatient Clinic, and Brookings Community Based Outpatient Clinic. The work encompasses repairs, upgrades, and installation of video surveillance systems with the capability to connect to federal and non-federal locations and communicate across multiple networked sites. The contract is a firm fixed-price award with a 180-calendar-day performance period from issuance of Notice to Proceed.

This is a 100% total service-disabled veteran-owned small business (SDVOSB) set-aside under NAICS code 238220 with a $45 million size standard. Electronic proposals are due by 10:00 AM PDT on May 11, 2026, with a mandatory site visit on April 20, 2026, and request for information deadline of April 24, 2026. The Government will evaluate proposals using a best-value tradeoff approach based on three factors: Technical capability (demonstrating recent and relevant experience with secured satellite video surveillance systems and ability to manage multiple subcontractors), Past Performance (assessed through CPARS reports or completed reference forms), and Price (evaluated for reasonableness). Offerors must submit three separate volumes—Technical, Past Performance, and Price—each limited to 30 pages, and must provide three to five completed projects with minimum 50% completion status. Contractors must be certified by the SBA as an SDVOSB at proposal submission and time of award, comply with limitations on subcontracting requirements (85% for general construction), obtain required performance and payment bonds, and maintain minimum insurance coverage including general liability of $500,000 per occurrence and workers' compensation of $100,000 employer's liability.

View the file

Other files

File Type Posted
36C26026R0025 0006.docx DOCX document
36C26026R0025 0005.docx DOCX document
36C26026R0025 0004.docx DOCX document
36C26026R0025 0003.docx DOCX document
RFI for Update Secuity Camera Responses.pdf PDF
Security Camera Site Visit Sign In .pdf PDF
36C26026R0025 0002.docx DOCX document
36C26026R0025 0001.docx DOCX document
General Decision Number OR20260066 01 23 2026.pdf PDF
STATEMENT OF WORK ROSEBURG VAMC NORTH BEND BROOKINGS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26026R0025 X 03-30-2026

TBD

653-25-103 36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661 Toni J Knight toni.knight@va.gov Request for Proposal for Project 653-25-103 Update Security Cameras at Roseburg VAMC, North Bend and Brookings CBOC 913 NW Garden Valley Blvd, Roseburg, OR 97471 See Statement of Work (SOW), Specifications and Drawings attached for details of this requirement.

VAAR 836.204 | Disclosure of the magnitude of construction projects is between $1,000,000.00 and $2,000,000.00 This is a 100% Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside.

North American Industry Classification System (NAICS) code for this action is 238220 with a size standard of $ 45.0M This is a brand name or equal requirement.

Contractor must be certified by the SBA as a SDVOSB at the time of proposal submission to be eligible for award.

Site Visit Information is as follows:

Contracting Office Representative: Mr. Brian Renzi at Brian.Renzi@va.gov Location: Roseburg VA Medical Center 913 NW Garden Valley Blvd, Roseburg OR 97471 Site Visit attendees will meet at Building 10/Engineering Conference Room on April 20, 2026 at 10AM PST

Please send RFI to the Contract Specialist: toni.knight@va.gov by 10 AM PST on April 24, 2026 The Government affords no guarantee that questions (RFI's) submitted after the aforementioned date and time will be answered. Responses to RFI will be provided via Amendment tentatively May 1, 2026.

Electronic Proposals are due no later than the Date and Time listed in Block 13 (below).

Proposals will be evaluated in accordance with the evaluation factors listed with this solicitations.

Incomplete offers or non responsive offers may not be substantially considered further.

Any and all FAR or VAAR clauses listed on the supporting documentation, IE provisions, in full or in reference, included in the Solicitation or contract. FAR and VAAR clauses or provisions found in the solicitation or contract shall prevail.

*************************************************IMPORTANT**************************************************************

X X X

10AM

PDT

05-11-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661 Dept of Veterans Affairs http://www.fsc.va.gov/einvoice.asp FMS-VA-2(101) Financial Services Center

PO BOX 149971

Austin

TX

78714-9971

SANDRA SNEDIKER

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE5
ITEM INFORMATION5
A.4 DELIVERY SCHEDULE5
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS7
2.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)12
2.2 52.228-1 BID GUARANTEE (SEP 1996)13
2.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)13
2.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)15
2.5 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)17
2.6 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)17
2.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)17
2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)18
2.9 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)19
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)23
REPRESENTATIONS AND CERTIFICATIONS24
3.1 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)24
3.2 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)25
3.3 SUPPLEMENTAL INSURANCE REQUIREMENTS34
GENERAL CONDITIONS36
4.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)36
4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)39
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION)40
4.4 52.223-20 AEROSOLS (MAY 2024)43
4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025)43
4.6 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025)48
4.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)50
4.8 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)50
4.9 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)50
4.10 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)50
4.11 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023)51
4.12 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)60
4.13 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)60
4.14 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)63
4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)65
4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)65
4.17 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)65
4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)68
4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)69
4.20 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019)70
4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)71
4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)71
4.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)72
4.24 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)73
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)74
4.26 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018)75

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

The Contractor shall provide all labor, materials and equipment for the construction services needed to complete this project. All work shall meet SOW, drawings, and specification requirements. The purpose of this project is to upgrade the security camera system by improving the function of Police surveillance for the Roseburg Veteran Affairs Medical Center (VAMC), North Bend Community Based Outpatient Clinic CBOC, and Brookings CBOC. The CBOCs fall under the domain of the Roseburg VAMC. This work will include repairs and upgrades to the security camera hardware and software system. Work shall include all such disciplines of work that will be required to install the systems and components for this project. All work shall meet SOW, drawings, and specification requirements provided by the VA and the Engineering design firm of record as well as any applicable manufacturers’ installation methods and procedures. All measurements, room square footage and quantities are estimated and shall be verified by the contractor.

GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE
0001
SHIP TO:
Roseburg VA Medical Center

913 NW Garden Valley Blvd Roseburg, OR 97471

1.00
180 Days Post NTP
MARK FOR:
Brain Renzi

Certain attachments associated with this solicitation contain Controlled Unclassified Information (CUI).

· By requesting or accessing these documents, interested parties acknowledge that they will:

· Use the information solely for the purpose of responding to this solicitation

· Safeguard the information from unauthorized disclosure

· Not distribute, release, reproduce, or disclose information outside their organization without prior written approval from the Government

· Ensure any internal personnel accessing the information understand these restrictions

· Vendors requesting access to the controlled documents must acknowledge acceptance of these conditions in their request. (Enter this acceptance into the Reason for Access).

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

INSTRUCTIONS TO OFFERORS FOR PROPOSAL PREPARATION

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. A COMPLETE PROPOSAL SHALL CONSIST OF THE FOLLOWING

OVERVIEW

Intent: The intent of this solicitation (please note that the words solicitation and request for proposal (RFP) may be used synonymously throughout the solicitation documents) is to select one contractor to provide professional construction services for Project Number 653-25-103, Update Security Cameras at Roseburg VAMC, North Bend and Brookings CBOC, Solicitation 36C26026R0025 in accordance with the attached SOW, specifications and drawings. The period of performance is 180 calendar days from issuance of the Notice to Proceed.

Completed Representations and Certifications. Provisions or clauses incorporated by full text and/or reference in this solicitation requiring completion by the offeror must be completed and submitted with the offer.

Method of Award: The Government intends to use the “Best Value” tradeoff process source selection approach in accordance with FAR Overhaul 15.103-1. A firm fixed price award will be made to the responsive, responsible offeror whose offer/proposal is determined to be the best value to the Government based on all factors outlined in this Solicitation (36C26026R0025).

Nonresponsive/Unacceptable Proposal: Offerors must comply with all detailed instructions in this Solicitation for format and data content of the proposal. Proposals that do not comply with the detailed instructions for the format and data content of the proposal may be considered unacceptable and may render the Offeror ineligible for award.

Evaluation definitions: Recent - The project ended within the last five calendar years issuance of solicitation. Relevant – Similar in scope of this project with a minimum project value of $750,000.00.

INSTRUCTIONS FOR PROPOSAL PREPARATION AND SUBMISSION

These instructions prescribe the format and other essential information for preparation/development and presentation of proposal data to ensure the submission of necessary information for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. In order for proposals to receive full consideration for award, offerors should ensure that the information furnished in support of the proposal is factual, accurate, and complete.

Proposal shall be submitted in three (3) separate Volumes: Volume I - Technical, Volume II - Past Performance and Volume III– Price with strict adherence to the format, data, and other requirements of this Solicitation.

Written proposals shall be prepared on standard 8.5 x 11-inch paper (charts may be landscaped but must be on 8.5 x 11-inch paper), text lines shall be single-spaced, and shall have a font size no smaller than Microsoft Word Times New Roman 12-point font. Type that is smaller will be considered illegible. All pages of each proposal shall be appropriately numbered and identified with the RFP number. For ease of reviews, consecutive page numbering is required. Page limit for Volume I and Volume II will be 30 pages each (totaling 60 pages combined), anything in excess will not be evaluated.

Indexing: Each Volume shall contain a “Table of Contents” for that volume. The “Table of Contents” shall identify major areas, paragraphs and subparagraphs by number and title as well as by page number and volume locations. Table of Contents are not included in the page limit.

Offerors responding to this Solicitation with a proposal/offer to provide the Work set forth in the Solicitation documents should limit submissions to data essential for evaluation of proposals, so that a minimum of time and monies will have been expended in preparing information required herein. However, failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP shall be deemed nonresponsive and considered unacceptable. Offerors are reminded of their responsibility to submit a proposal that is orderly and sufficiently documented that will enable the Government to easily understand and perform a thorough and fair evaluation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged. In order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly address all of the evaluation criteria factors described in the Solicitation.

The Government will not pay for any costs incurred in preparation and submission of proposals.

VAAR 852.219-75 (JAN 2023) (DEVIATION) is incorporated into the solicitation. Return the ENTIRE clause, in full text, with your proposal. Review paragraph (d) to ensure a complete understanding of the requirement; AND complete the certification, inserting name of offeror in BOTH fill in's, printed name of signee, printed title of signee, signature, date and company name and address. This certification MUST be completed properly and returned with your proposal.

**ALL PROPOSALS MUST BE SUBMITTED ELECTRONICALLY; NO HARD COPY OR FACSIMILE PROPOSALS WILL BE ACCEPTED**

PROPOSAL EVALUATION AND SUBMISSION REQUIREMENTS

EVALUATION FACTOR VOLUME I

EVALUATION FACTOR ONE - TECHNICAL

Technical evaluation is to ensure the selected contractor possesses the necessary capabilities to perform the work successfully. The Offer shall demonstrate recent and relevant experience in construction, renovation, maintenance and minor repair services related to the repair, upgrade/incorporation as well as installation of the Video Surveillance System. The Government will assign a rating for technical experience and shall be evaluated on the recent and the relevancy of the projects submitted, as well as how the offeror executed and managed the projects The Offeror shall provide a minimum of three (3) maximum of five (5) projects that are at least 50% complete. The potential contractor must be able to successfully meet the project’s technical requirements based on the following technical evaluation criteria:

· The Contractor shall submit projects that show experience incorporating and/or installing a secured satellite video surveillance systems that has the capability to connect to federal and/or nonfederal locations. Experience shall show the ability to install video surveillance capable of communicating with primary and secondary locations within the same network utilized by agency/entity.

· Government may consider subcontractors as part of the technical evaluation for the video surveillance system portion only. There must be a subcontractor teaming agreement submitted with the proposal signed by both parties.

· The Contractor shall show experience of managing multiple subcontractors on a single project.

· Contractor shall present additional experience that will include:

· Commissioning of the secured Video Surveillance System.

· Training agency/entity personnel on the Video Surveillance System to include verifying login credentials.

Technical Rating Table

Rating
Description
Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

EVALUATION FACTOR VOLUME II

EVALUATION FACTOR II– PAST PERFORMANCE

Past performance is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. The list of projects provided under Evaluation Factor One -Technical, will have past performance reviewed. Offeror shall provide past performance by using one or more of the following manners:

· Complete in its entirety the attached form titled “Past Performance Reference Form” to provide past performance reference information for all projects listed under Evaluation Factor One -Technical. Past Performance Reference Form shall be included in the proposal submission. Incomplete forms may result in the Past Performance Reference Form not being considered for evaluation. The list of projects provided under Evaluation Factor One - Technical, will have past performance reviewed. Offeror shall provide past performance by using one or more of the following manners:

· Potential Contractor will provide a printout of the last completed CPARS report for the project.

· Potential Contractor shall complete in its entirety the attached form titled “Past Performance Reference Form” to provide past performance reference information for all projects listed under Factor 1.

· Government may consider subcontractors as part of the past performance evaluation for the video surveillance system portion only. There must be a subcontractor teaming agreement submitted with the proposal signed by both parties.

Incomplete forms may result in the Past Performance Reference Form not being considered for evaluation.

While evaluating past performance, the Government evaluation team will not be limited to reviewing the past performance information provided in this proposal and reserves the right to review other available past performance information to assess past performance. Technical evaluators and the Contracting Officer can use their personal knowledge of the contractor’s prior VA contracts to assist with past performance evaluations.

If an offeror does not have any past performance, a neutral rating will be given for this evaluation factor.

Past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. It considers that each offeror demonstrates recent and relevant record of performance in providing services that met the contract requirements. The Government will assign the rating based on the following: past performance relevancy and/or performance confidence assessment rating. The Government shall assign each offeror a rating from the tables below after evaluating the offeror's recent past performance, focusing on performance that is relevant to the contract requirements. There are two aspects to the past performance evaluation:

Past Performance Relevancy Table

Relevancy Rating: The offeror’s past performance will be evaluated to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection. To be considered relevant, the work performed must be completed within the last 5 years. Relevancy rating will assess past performance effort involving similar scope and magnitude of effort and complexities that this solicitation requires.

Rating
Definition
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessments Performance Confidence Rating. The offeror’s past performance evaluation will evaluate contractors to determine how well the contractor performed on the past performance contracts and the expectation that the offeror will be able to successfully perform the required effort for this project by rating a performance confidence assessment.

Rating
Description
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

EVALUATION FACTOR VOLUME III

EVALUATION FACTOR III – PRICE

It is NOT the only factor for this requirement. Price will be evaluated on the basis of its fair and reasonableness to the Government. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. A firm fixed price award will be made to the highest technically rated qualified construction contractor at a fair and reasonable price whose offer conforms to the solicitation, and which results in the best value to the Government, all factors considered.

The following shall be included within the proposals:

· Offerors shall complete in its entirety, the “Offeror” portion of the Standard Form (SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF 1442 is required to have an original signature. Valid electronic signatures are acceptable.

· Offerors shall provide all price information necessary to provide a meaningful basis for Government's analysis and evaluation of price for the project. The Government is not and does not intend to request certified pricing data. Offerors may be required, during the evaluation process to provide sufficient price information that will enable the Government to perform an accurate evaluation.

· The Government will evaluate the total price identified in the Price Schedule for Line ITEM 0001 Project 653-25-103 Update Security Cameras at Roseburg VAMC, North Bend and Brookings CBOC – Construction

Prices will be evaluation for reasonableness utilizing one or more of the price analysis techniques set forth in FAR Overhaul 15.404-1 (a) and (b)(1)(5) and the following:

· Total Price: The total evaluated price will be the sum of all Contract Line-Items.

· Reasonableness: A price is reasonable if, in its nature or amount, it does not exceed what would be incurred by an ordinarily prudent person in the conduct of normal competitive business.

Prompt payment discounts will not be considered in the evaluation of offers.

2.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT—REGISTRATION (DEVIATION)
NOV 2025
52.214-34
SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE
APR 1991
52.214-35
SUBMISSION OF OFFERS IN U.S. CURRENCY
APR 1991
52.215-1
INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION
NOV 2021

2.2 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be percent of the bid price or , whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

FAR Number
Title
Date
52.228-17
INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)
FEB 2021
52.229-11
TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION
JUN 2020
852.233-70
PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
OCT 2018
852.239-75
INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE
FEB 2023

2.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

(a) Definitions. As used in this provision— "Administrative proceeding" means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

"Federal contracts and grants with total value greater than $10,000,000" means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

"Principal" means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in—

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

(End of Provision)

2.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)

(a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services as defined in Federal Acquisition Regulation 2.101.

(b) Certification. [Offeror shall check either (1) or (2).] _____ (1) The Offeror certifies that—

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; or

(2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of noncompliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.

(4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.

(d) Do not submit an offer unless—

(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or

(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has—

(i) Waived application under U.S.C. 2593e(d) or (e); or

(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).

(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification.

(End of Provision)

2.5 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.6 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) (a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Toni Knight

Hand-Carried Address:

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 Mailing Address:

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.9 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this provision— Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.

Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.

Marginalized populations of Sudan means—

(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and

(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.

Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

Sensitive technology—

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

(b) Procedures.

(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”

(2) FASCSA Orders.

(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.

(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).

(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.

(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)—

(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and

(2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services, except as waived by the solicitation, or as disclosed in paragraph (g).

(d) FASCSA Representation. By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and…