This is Amendment 0002 to Solicitation 36C25926R0056 issued by the Department of Veterans Affairs Network Contracting Office. The amendment extends the response deadline from April 14, 2026 to April 16, 2026 at 10:00 AM CDT and corrects seven previously inaccurate vendor question responses from Amendment 0001.

Key modifications to the solicitation include: (1) contractors must remove and replace insulation from medium and high-pressure steam lines and hot water piping to facilitate the bolt survey; (2) asbestos-containing materials encountered during the survey will be addressed through contract modification or a new contract award at the government's discretion; (3) concealed piping behind walls should be excluded from the survey, with the assumption that bolts on exposed pipe runs will be replaced uniformly; (4) the performance period is extended to 180 calendar days to accommodate the complexity of accessing piping systems in ceilings, chases, and confined spaces; (5) infection control measures are required only for work creating dust in public areas, with mechanical spaces exempt; (6) mechanical as-built and utility drawings are provided; (7) the scope includes both heating water and domestic hot water systems; and (8) bidders should assume 50% insulation replacement for bidding purposes. The underlying requirement is to survey and identify ASTM 307 bolts at the Oklahoma City Veterans Affairs Health Care System and develop a replacement plan to upgrade them to ASTM A193 bolts.

View the file

Other files

File Type Posted
S04 - Site Visit Meeting Doc Bolt Replacement Survey and Replacement Plan.docx DOCX document
36C25926R0056 0001.docx DOCX document
PreBid Sign In Sheet.pdf PDF
Comined Steam.pdf PDF
AE Self-Performed and Subcontracted Worksheet.docx DOCX document
Combined Domestic Water.pdf PDF
S22 - 852.219-75 LOS Certification.docx DOCX document
S02 - Self-Performed and Subcontracted Worksheet.docx DOCX document
36C25926R0056.docx DOCX document
Map to Engineering Trailers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25926R0056 0002

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

None 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111

36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25926R0056 03-19-2026

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-16-2026 10:00 CDT See CONTINUATION Page

This amendment officially and effectively makes the following updates listed below:

1. The answers to vendor questions 1 - 7 on amendment 0001 were found to be incorrect and has been adjusted. (See answers below).

2. The response due date is changed from 04/14/2026 to 04/16/2026 at 10 AM (CT).

3. Provide drawings for heating water and domestic hot water.

4. All other terms and conditions remain unchanged.

CONTINUATION PAGE

Bolt Replacement Survey Vendor Questions and VA’s answers in red.

Question #1: Is the Contractor responsible for removing insulation from medium and high-pressure steam lines and hot water piping to facilitate bolt survey?

Answer #1: Yes, insulation must be removed and replaced.

Question #2: Following completion of the survey, is the Contractor responsible for replacing and/or restoring any insulation that was removed or disturbed during the course of the work?

Answer #2: Yes, insulation must be removed and replaced.

Question #3: If asbestos-containing materials (ACM) are present in an area that impedes surveying the bolts, should the contractor exclude that area? Or will identified ACM be handled through a modification for abatement?

Answer #3: If asbestos is encountered during the survey, a modification to the contract will be completed or a new contract will be awarded at the discretion of the government.

Question #4: How does the VA anticipate surveying concealed pipe behind walls or chases? Should bolts that require wall demo be excluded from the survey?

Answer #4: When the beginning of the pipe is exposed and has been surveyed and requires replacement, it is assumed that all bolts on the pipe run will be the same type of bolt and therefore will need to be replaced.

Question #5: Access to piping systems throughout the facility will be time consuming and require continued coordination. Some areas will need access to ceilings, chases, or in confined spaces. We ask that the period of performance be modified to 180 calendar days for the full survey, reporting, and reviews.

Answer #5: The performance period is hereby adjusted due to the complexity of this requirement to 180 days.

Question #6: Does the VA anticipate the contractor providing any level of infection control during this survey? Often investigative work does not require ICRA measures, however, we need to be certain for bidding purposes.

Answer #6: Infection control measures that create dust in public areas will require ICRA measures. However, removing one ceiling tile at a time within a 50 sq ft area is permitted without ICRA barriers. Mechanical spaces will not require ICRA.

Question #7: Can the VA provide a mechanical as-built or utility drawing of all lines that are to be included in the survey?

Answer #7: The VA does have drawings of the utility lines. See attached Drawings.

Question #8: We noted that there was a domestic water set of drawings. To clarify, does the scope require heating hot water, domestic hot water, or both? If you have drawings of the heating water systems, can you share these?

Answer #8: Heating and domestic water will be required to be assessed. Drawings are attached for heating water and domestic hot water Question #9: Since there is no way of determining the number of bolts that will be replaced and how much insultation will be replaced after the survey, should bidders assume a 50% insulation replacement for bidding purposes?

Answer #9: For the purpose of bidding, please consider a 50% replacement of the insulation.

A.1 List of Attachments See attached document: Combined Heating Water.

See attached document: Combined Domestic Water.

See attached document: 16 Bldg 21 Domestic Water.

File details come from the government source that posted it. Updated .