Questions Responded.docx
DOCX document 13 KB Posted
- Solicitation number
- 36C25924R0056
About this file
This solicitation is for fence panel and gate replacement services at the Rocky Mountain Regional VA Medical Center campus in Aurora, Colorado. The contractor will remove and replace 11 damaged perimeter fence panels and posts, as well as one sliding entry gate and one pedestrian gate, like-for-like. Temporary fencing must be installed during replacement work. The contractor must submit material certifications and installation plans for approval, and provide a one-year labor and five-year materials warranty. The period of performance is 120 calendar days, with gate replacement to occur on a weekend to minimize impacts. The government intends to award a firm-fixed-price contract. Work hours will be Saturday and Sunday from 7:30am to avoid traffic disruptions, with requests to work other hours considered in writing.
The contractor must provide all labor, equipment, supervision, safety plans and reports to complete the fence and gate replacements. Employees must have OSHA training and wear visible identification. The contractor is responsible for maintaining traffic controls and temporary fencing during work. Material submittals require certification and approval prior to ordering or installation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions 554-24-107 Repair RMR North and South Gates and Fencing.
1-Do you want the exact same gate installed or would you be open to a product by Ameristar?. Could be done (2) 8' tall cantilever gates to close the entrance. It will be more cost effective but will be 2 feet shorter than the fence.
This is not acceptable – gate must be replaced like in kind as existing.
2-Can a double drive gate option for the North Flag entrance can be installed?. with 8' tall gates. ?
A proposal of installing a double drive gate option for the North Flag entrance. The gates will be an Ameristar Traverse II Gate package with new operators. The existing angled fence line to the south of the entrance will be removed and reinstalled parallel to the sidewalk to allow for the installation of a new gate and operator. The gates will meet in the middle with a 4" latching post concreted into the ground. To the west of the latching post a new bollard will be installed to protect the post.
This is not acceptable – gate must be replaced like in kind as existing.