32 31 19 08 GEN O and M Foundation Fence Decorative Metal Fences and Gates.pdf

PDF 16 MB Posted

Attached to
Z1DA--554-24-107 Repair RMR North and South Gates and Fencing (VA-24-00029547)
Solicitation number
36C25924R0056
Issued by

About this file

This solicitation is for repair and replacement of perimeter fencing and gates at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The contractor shall replace 11 damaged fence panels and assemblies, associated fence posts, and one sliding entry gate. Temporary fencing must be installed during work. The contractor must submit material certifications and installation plans for approval. The work must be completed within 120 days, with the gate replacement completed within 12 consecutive hours on a weekend. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The contractor will be responsible for safety, permits, insurance, and supplying all necessary equipment and labor to complete the work according to specifications.

View the file

Other files

File Type Posted
S04-554-24-107 Pre-Bid Attendance.pdf PDF
Questions Responded.docx DOCX document
36C25924R0056 0001.docx DOCX document
36C25924R0056.docx DOCX document
North Gate Edge Damage.jpg JPG image
32 31 19 05 SITE Security Fencing Shop Drawings and Product Data.pdf PDF
South Entrance Damaged Fence and Pedestrian Gate.jpg JPG image
North Gate Controls Label 1.jpg JPG image
North Entrance Damaged Fence 2.jpg JPG image
EXISTING 323119 - Decorative Metal Fences _ Gates.pdf PDF
013323 Shop Drawings.docx DOCX document
S22- 852.219-75 LOS Certification.docx DOCX document
260511 Requirements for Electrical Installations 02.docx DOCX document
014500 Quality Control.docx DOCX document
32 31 19 09 GEN As Builts Foundation Fence Decorative Metal Fence and Gates.pdf PDF
260511 Requirements for Electrical Installations.docx DOCX document
017419 Construction Waste Management.doc DOC document
013526 Safety Requirements.docx DOCX document
UPDATED 323140 High Security Fences and Gates.docx DOCX document
014500 Quality Control 02.docx DOCX document
010000 General Requirements.docx DOCX document
North Entrance Damaged Fence 1.jpg JPG image
North Gate Controls Label 2.jpg JPG image
32 31 19 06 SITE Security Fences and Gates Sliding Gates.pdf PDF
014219 Reference Standards.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fax: 303.930.9001

303.930.9000Tel:

Kiewit - Turner a Joint Venture

Suite A-300 7200 S. Alton Way

Englewood, CO 80112

Job: 15387 - Replacement Medical Center Facility

Product Data

Sample

Other

Shop Drawing

Resubmittal

First Submittal X

VA Proj #:

To: H+L Architecture 1755 Blake Street

Suite 400

Denver, CO 80202

DESCRIPTIONSpecificationSUBMITTAL

ItemQuantity Section Sub./SupplierNo. Mfgr.

ACTION

DCBA E

Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008

Review Cycle: 001

Attn: Chuck Adkisson

1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a

Joint Venture

01 573

ACTION TAKEN

CONTRACTOR'S SIGNATURE:

CONTRACTOR'S NOTES:

DATE: 7/12/2011

Reviewed Only for Revisions to

Reviewed: Incorporate Changes

Reviewed=

A

B

C

Previous Submittal

Revise and Resubmit=D

Rejected =E

ARCHITECT/ENGINEER RESPONSE:

REMARKS:

BY: DATE:

Expedition f_sb_pks_01a

VA101CFM-C-0100

Cc: Tim Pogany, U.S. Dept. of Veterans Affairs

Received By ___________________

Date _______________ jeff.wallerstedt Rectangle

John.Poulicek Text Box 32 31 19

John.Poulicek

X

John.Poulicek Text Box GEN-O&M_Foundation Fence_Decorative Metal Fences and Gates

John.Poulicek Text Box X

John.Poulicek Text Box Foundation Fence

John.Poulicek Text Box 32 31 19-008

John.Poulicek Text Box 1/31/2018

John.Poulicek Text Box 2/14/2018 jeff.wallerstedt Rectangle jeff.wallerstedt Text Box Kiewit-Turner Submittal No.

Kathie.Holt Typewritten Text

Marie.Funseth Text Box

COE - 1

John.Poulicek Text Box

REQUESTED RETURN DATE:

Jacqueline.Cipriani Text Box Jennifer Williams, U.S. Dept. of Veterans Affairs

Jacqueline.Cipriani Text Box

VA101F-15-C-0005

marie.funseth Text Box 13611 E. Colfax Avenue 2nd Floor Aurora, CO 80045

Jeff.Luberski Stamp

Jeff.Luberski Text Box

Jeff.Luberski Text Box

DEPARTMENT OF THE ARMY

Jeff.Luberski Text Box

Jeff.Luberski Text Box Omaha District Corps of Engineers

Jeff.Luberski Text Box 13611 East Colfax Avenue 2nd Floor

Jeff.Luberski Text Box Aurora, CO 80045

Jeff.Luberski Text Box

Jeff.Luberski Text Box W9128F-16-C-0003

Jeff.Luberski Text Box

Jeff.Luberski

Peter Sturdivant

KIEWIT-TURNER

a Joint Venture

☐ REVIEWED – NO COMMENTS MADE

☐ REVIEWED WITH COMMENTS

☐ RESUBMITTAL REQUIRED

DATE ___________ SIGNED ___________________________

SUBMITTAL # __________________________________

These shop drawings / submittals have been review in accordance with the provisions of the Contract Documents.

Kiewit-Turner’s review shall not serve to relieve

Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.

Eric.Murphy Text Box 1/31/2018

Eric.Murphy Text Box 32 31 19-008

Eric.Murphy Text Box Kevin lee

Eric.Murphy

X

Kiewit-Turner a Joint Venture

Project Name:

Subcontractor Name: Submittal Date:

Contact Name: E-mail: Return By Date:

Contact Phone(s): Review Days: 7

Number: Name:

N/A Y N Y X

X

M e e ts

A ll

S p e c

R e q u ir e m e n ts

E x c e p ti o n s o r

V a ri a n c e s f ro m S p e c

A p p ro v e r

In fo rm a ti o n

N e e d e d

I n

T h is P a c k a g e

Foundation Fence Decorative Metal Fences and Gates - O&M

Submittal Type

Submittal Item Description Manufacturer

Specification Section: 32 31 19 Decorative Metal Fences and Gates - O&M

S p e c

S u b m it ta l

P a ra g ra p h

S p e c

P ro d u c t

P a ra g ra p h

S p e c if ie d o r L is te d

M a n u fa c tu re r?

Submittal is in Compliance

Submittal is in Compliance with Variances from Specifications Kevin Lee Signature

SUBMITTAL INDEX & COVER SHEET

Department of Veteran's Affairs

Replacement Medical Center

Kiewit-Turner 01/30/18

Kevin Lee

808-520-1685

Reviewed By DateKevin Lee 1/30/2018

7200 S. Alton Way, Suite A-300, Englewood, CO 80112

Phone: 303-930-9000 FAX: 303-930-9001

Kevin.Lee@Kiewitturner.com 02/06/18

SubmittalIndexForm_041009 Page 1 of 1 mailto:Kevin.Lee@Kiewitturner.com

O & M REVIEW CHECKLIST

1. Trade Engineer Responsibility

INITIALS DATE

Division Specific Manuals KL 11/6/17

Digital PDF. (Cannot Be Paper Or Scanned Copy) KL 11/6/17

Searchable Document (If Not, KT to Perform OCR) KL 11/6/17

Table of Contents – Specific to O&M

File Name Convention: Division #_Subcontractor_Part #.pdf

Individual PDFs 100 MB or Less

Bookmarked by Sub Section

Name:

Kevin Lee

Signature:

Date:

11/6/17

3. BIM Team Responsibility

INITIALS DATE

File Name Convention: Division #_Subcontractor_Part #.pdf KL 11/6/17

Table of Contents – Specific to O&M KL 11/6/17

Searchable Document (If Not, KT to Perform OCR) KL 11/6/17

Bookmarked by Sub Section KL 11/6/17

Name:

Signature:

Date:

Note: When you have completed this O&M Review Checklist for a given submittal, archive the document at the follow location: F:\01_Final_Deliverable_Acquisition_Processing_Training\02_O&Ms + Training Files +CxA -

Processing-Training\Submittal-Content Processing\O&M Review Checklists - Archive

Subcontractor: Foundation Fence and Nasatka Barrier

Date Received: 11/6/17

KT Submittal Number: 323119

Division: 32

Kevin.Lee Typewritten Text

KL

Kevin.Lee Typewritten Text

KL

Kevin.Lee Typewritten Text

KL

Kevin.Lee Typewritten Text

KL

Kevin.Lee Typewritten Text 11/6/17

Kevin.Lee Typewritten Text 11/6/17

Kevin.Lee Typewritten Text 11/6/17

Kevin.Lee Typewritten Text

VS-GSLG

Slide Gate Operator Installation Guide

PRINTER’S INSTRUCTIONS:

INSTR,INSTL,VS-GSLG - GTO P/N: P1255 X6 - INK: BLACK - MATERIAL: 20 LB. MEAD BOND - SIZE: 8.500” X 11.000” - SCALE: 1-1 - FOLDING: ALBUM-FOLD - BINDING: SADDLE-STITCH

Linear PRO Access (800)543-4283 • www.linearproaccess.com

Operator models contained in this manual conform to UL325 standard for use in

Class I, II, III, and IV applications

Table of Contents Pre-installation Information

Before You Begin Always Check the Gate’s Action Gate Operator Classifications Approved Obstruction Detection Devices

Safety Information and Warnings Regulatory Warnings

Wiring Specifications AC Power Wiring DC Control and Accessory Wiring

Mounting Pad Installation Gate Preparation Mounting Specifications

Operator Preparation Vent Plug Installation

Gate Bracket and Chain Assembly Chain Supports

Operator Setup Controller Access Manual Disconnect AC Power Connection Earth Ground Open and Close Limit Adjustment Limit Nuts Rough Adjustment Limit Nuts Fine Adjustment Setting Speeds using LSO-2 & LSC-2 Torque Limiter Adjustment

Controller Features Indicator Descriptions Terminal Descriptions Operator Accessory Connections Basic Controller Programming

Programming Overview Entering Programming Mode Exiting Programming Mode Programming Keystrokes Left or Right Hand Operation Dual Gate Enable Auto Close Timer Run Alarm and Pre-start Alarm Maximum Open Direction Current Setting Maximum Close Direction Current Setting

Advanced Controller Programming Entering Advanced Programming Mode Maximum Run Time Single Button Input Setup Stagger Mode Stagger Delay Time Auxiliary Relay Mode Reverse Delay Time Brake Delay Time Constant Pressure Mode Shadow Loop Open Prevention Reset Cycle Count Maintenance Alert Trigger Mid-travel Stop Position Anti-tailgate Enable Radio Enable Antenna Installation Radio Transmitter Learn Radio Transmitter Delete MGT Obstacle Transmitter Learn MGT Obstacle Transmitter Delete Motor Type Selection Reset Controller to Factory Defaults

Loop Layout Illustration Safety Edge Layout Illustration #1 Safety Edge Layout Illustration #2 Photoeye Installation Illustration Picket Gate Installation Track Gate Installation Dual Gate Installations Optional In-Cabinet Heater Gate Operation

Open Button Close Button Stop Button Single Input Fire Department Input Open Input

Open Obstruction Close Obstruction Reverse Input Open Loop Reverse Loop Shadow/Reset Loop

Operation Indications Power-up Display Idle Condition Last Gate Position/Condition Pre-start Delay Reverse Delay Run Timer

Error Indications Entrapment COMM LINK Connection Failure MGT Obstacle Transmitter Trouble Maximum Run Time Exceeded

Troubleshooting Contacting Technical Support Operator fails to start Motor operates, but gate does not move Motor sounds like it is working harder than normal Limit switch getting out of time Gate stopping part way open or closed Gate staying open with automatic system How to Order Replacement Parts

Model VS-GSLG Exploded View Controller Parts List Preventative Maintenance

General Lubrication 6-Month Preventative Maintenance

FCC Notice Variable Speed Drive Programming

Programming the Hitachi Inverter Gate Operator Installation Checklist

ONLY QUALIFIED TECHNICIANS

SHOULD WORK ON

LINEAR SLIDE GATE

OPERATORS

WARNING

WARNING

CONTROLS INTENDED FOR USER ACTIVATION MUST BE

LOCATED AT LEAST SIX FEET (6') AWAY FROM ANY MOVING

PART OF THE GATE AND WHERE THE USER IS PREVENTED

FROM REACHING OVER, UNDER, AROUND OR THROUGH THE

GATE TO OPERATE THE CONTROLS. OUTDOOR OR EASILY

ACCESSIBLE CONTROLS SHALL HAVE A SECURITY FEATURE

TO PREVENT UNAUTHORIZED USE.

VS-GSLG Slide Gate Operator Installation Guide - 1 - P1255 Revision X6 11-04-2016

Pre-installation Information

Before You Begin...

Before unpacking, inspect the carton for exterior damage . If you find damage, advise the delivery carrier of a potential claim . Inspect your package carefully . You can check your accessory box parts with the enclosed packing slip for your convenience . Claims for shortages will be honored for only 30 days from the date of shipment .

Before installing the operator, read this manual completely to ensure all requirements for proper installation are present . Verify that the voltage to be used matches the voltage of the operator .

If you have any questions about the requirements for proper installation of this gate operator contact technical support at 800-421-1587 .

Always Check the Gate’s Action It’s very important before installing the gate operator to make sure the gate slides is free and level throughout the entire opening distance. If the gate does not seem to operate properly, it may affect the operator performance or greatly shorten the life of the unit. The gate should also be designed so that airflow is ample to prevent wind resistance and drag.

Gate Operator Classifications All gate operators can be divided into one of four different classifications, depending on their design and usage . Install this gate operator only when the operator is appropriate for the construction and usage class as defined below:

• Class I Residential Vehicular Gate Operator A vehicular gate operator intended for use in a home or for one to four single family dwellings with a common garage or parking area associated with these dwellings.

• Class II Commercial / General Access Vehicular Gate Operator A vehicular gate operator intended for use in a commercial location or building such as a multi-family housing unit of five or more single family units, hotel, retail store or other building servicing the general public.

• Class III Industrial / Limited Access Vehicular Gate Operator A vehicular gate operator intended for use in an industrial location or building such as a factory or loading dock area or other location not intended to service the general public.

• Class IV Restricted Access Vehicular Gate Operator A vehicular gate operator intended for use in a guarded industrial location or building such as an airport security area or other restricted access locations not servicing the general public, in which unauthorized access is prevented via supervision by security personnel.

Approved Obstruction Detection Devices The following contact or non-contact obstruction detection devices have been approved for use with this slide gate operator as part of a UL325 compliant installation:

• Contact Edges Miller Edge Models MGO20, MGR20, MGS20, ME120

• Photoeyes MMTC Model IR-55 (165’ range - P/N 2520-441) MMTC Model E3K (28’ range - P/N 2520-031)

Safety Information and Warnings

Regulatory Warnings Read the following before beginning to install this slide gate operator:

THE FOLLOWING FORMATS ARE USED FOR SAFETY NOTES

IN THESE INSTRUCTIONS.

WARNING

This type of warning note is used to indicate possible mechanical hazards that may cause serious injuries or death.

CAUTION

This type of warning note is used to indicate the possibility of damage to the gate or gate operator.

WARNING

This type of warning note is used to indicate possible electrical shock hazards that may cause serious injuries or death.

IMPORTANT INSTALLATION SAFETY INSTRUCTIONS

WARNING

TO REDUCE THE RISK OF SEVERE INJURY OR DEATH

TO PERSONS, REVIEW THESE INSTALLATION SAFETY

STEPS BEFORE PROCEEDING

1. READ AND FOLLOW ALL INSTALLATION INSTRUCTIONS.

2. Read the yellow “Safety Instructions” brochure enclosed with the packet of information. If any pages are missing or are unreadable, or you do not have the safety instructions, please call Linear at 1‑800‑421‑1587 to request additional copies.

3. ALL ELECTRICAL CONNECTIONS TO THE POWER SUPPLY MUST

BE MADE BY A LICENSED ELECTRICIAN AND MUST OBSERVE ALL

NATIONAL AND LOCAL ELECTRICAL CODES.

4. A separate power‑disconnect switch should be located near the operator so that primary power can be turned off when necessary.

5. Install the enclosed warning signs on both sides of the gate. A minimum of two (2) WARNING SIGNS shall be installed, one on each side of the gate where easily visible.

6. Never reach between, through or around the fence to operate the gate.

7. Never connect a button station within reach of the gate or on the side of the gate operator.

8. Do not adjust the operator controller’s current sensing feature too high. It should be adjusted high enough to keep the gate from falsely triggering the sensing, but no higher than necessary for the gate to operate. DO NOT DEFEAT THE PURPOSE OF THIS FUNCTION!

9. You must install all required safety equipment.

10. UL325 Compliance requires the use of contact edges or photoelectric controls on all automatic or remotely‑controlled gate operators.

11. The operator is intended for installation only on gates used for vehicles. Pedestrians must be supplied with a separate access opening. The pedestrian access opening shall be designed to promote pedestrian usage. Locate the gate such that persons will not come into contact with the vehicular gate during the entire path of travel of the vehicular gate.

VS-GSLG Slide Gate Operator Installation Guide - 2 - P1255 Revision X6 11-04-2016

Wiring Specifications Refer to the following steps for details on power and accessory wiring for the operator .

AC Power Wiring

1. Find the listing on this page corresponding to the model, voltage and horsepower rating of your operator.

2. The distance shown in the table is measured in feet from the operator to the power source. DO NOT EXCEED THE MAXIMUM DISTANCE. These calculations have been based on standard 115 V and 230 V supplies with a 10% drop allowable. If your supply is under the standard rating, the runs listed may be longer than what your application will handle, and you should not run wire too near the maximum distance for the gauge of wire you are using.

3. When large-gauge wire is used, a separate junction box (not supplied) may be needed for the operator power connection.

4. Wire length calculations are based on the National Electrical Code, Article 430 and have been carefully determined based on motor inrush, brake solenoids, and operator requirements.

5. Connect power in accordance with local codes. The green ground wire must be properly connected.

6. Wire insulation must be suitable to the application.

7. Electrical outlets are supplied in all 115 VAC models for convenience with occasional use or low power consumption devices only. If you choose to run dedicated equipment from these devices, it will decrease the distance for maximum length and the charts will no longer be accurate.

DC Control and Accessory Wiring

1. All control devices are now 24 VDC, which can be run up to 2000 feet with 14 AWG wire.

2. Control wiring must be run in a separate conduit from power wiring.

Running them together may cause interference and faulty signals in some accessories.

3. A three-wire shielded conductor cable is required to connect two operators together for dual operation. You must use Belden 8760 Twisted Pair Shielded Cable (or equivalent) only – P/N 2500-1982, per foot). See Page 24 for details of this connection. Note: The shield wire should be connected in both the operators.

WARNING

ALL AC ELECTRICAL CONNECTIONS TO THE POWER SOURCE AND

THE OPERATOR MUST BE MADE BY A LICENSED ELECTRICIAN

AND MUST OBSERVE ALL NATIONAL AND LOCAL ELECTRICAL

CODES.

USE COPPER WIRE ONLY!

MODEL VS-GSLG SINGLE PHASE POWER WIRING

VOLTS & HP MAXIMUM DISTANCE (FEET) WIRE GAUGESINGLE DUAL

115 VOLTS

1/2-HP

222 111 12 354 177 10 566 283 8 900 450 6

1430 715 4

115 VOLTS

3/4-HP

178 89 12 282 141 10 450 255 8 716 358 6

1140 570 4

115 VOLTS

1-HP

160 80 12 254 127 10 406 203 8 646 323 6

1026 513 4

208 VOLTS

1/2-HP

760 380 12 1200 600 10 1924 962 8 3060 1830 6 4864 2432 4

208 VOLTS

3/4-HP

604 302 12 958 478 10 1526 763 8 2424 1212 6 3856 1928 4

208 VOLTS

1-HP

544 272 12 864 432 10 1374 686 8 2184 1092 6 3476 1738 4

230 VOLTS

1/2-HP

894 447 12 1422 711 10 2264 1132 8 3600 1800 6 5724 2862 4

230 VOLTS

3/4-HP

710 355 12 1128 564 10 1796 898 8 2852 1426 6 4538 2269 4

230 VOLTS

1-HP

640 320 12 1016 508 10 1616 808 8 2570 1285 6 4090 2045 4

MODEL VS-GSLG THREE PHASE POWER WIRING

VOLTS & HP MAXIMUM DISTANCE (FEET) WIRE GAUGESINGLE DUAL

208 VOLTS

1/2-HP

1142 571 12 1816 908 10 2890 1445 8

208 VOLTS

3/4-HP

920 460 12 1464 732 10 2330 1165 8

208 VOLTS

1-HP

714 357 12 1136 568 10 1804 902 8

230 VOLTS

1/2-HP

1344 672 12 2137 1069 10 3400 1700 8

230 VOLTS

3/4-HP

1084 542 12 1723 862 10 2741 1371 8

230 VOLTS

1-HP

840 420 12 1336 668 10 2124 1062 8

460 VOLTS

1/2-HP

3841 1921 12 6106 3053 10 9712 4856 8

460 VOLTS

3/4-HP

3279 1640 12 5212 2606 10 8291 4146 8

460 VOLTS

1-HP

2689 1345 12 4274 2437 10 6798 3399 8

VS-GSLG Slide Gate Operator Installation Guide - 3 - P1255 Revision X6 11-04-2016

Mounting Pad Installation The gate operator mounts bolted to posts secured in concrete footings . The posts support the operator and prevent it from moving during operation . For optional pad mounting instructions, see Linear drawing #2700-360 .

Gate Preparation Before installing, make sure the gate rolls or slides freely, and that all exposed rollers are properly covered . The gate must be covered with fabric with openings no larger than 2-1/4” in size, to a minimum height of 72” above ground level . On picket-style gates, if pickets are spaced less than 2-1/4” apart, mesh is optional .

Mounting Specifications Use two 3 - 3-1/2” OD galvanized posts and secure with concrete footings as shown, length to be determined by local codes, frost line depth and soil conditions .

Attach the operator with the U-bolts, side plates and hardware provided . Four 3/16” side plates go on the outside top and bottom, two 1/2” side plates go on the inside top, and two 3/16” side plates go on the inside bottom (see the illustration at right) .

To assemble the drive chain and gate brackets, refer to Page 4 . Make sure that the chain sag does not exceed recommended sizes and that the chain does not come into contact with the moving parts of the gate or ground .

Figure 2. Post Mounting Specifications

WARNING

The operator is intended for installation only on gates used for vehicles. Pedestrians must be supplied with a separate access opening. The pedestrian access opening shall be designed to promote pedestrian usage. Locate the gate such that persons will not come into contact with the vehicular gate during the entire path of travel of the vehicular gate.

WARNING

The gate must be installed in a location so that enough clearance is supplied between the gate and adjacent structures when opening and closing to reduce the risk of entrapment.

Figure 1. Side Plate Installation

VS-GSLG Slide Gate Operator Installation Guide - 4 - P1255 Revision X6 11-04-2016

Operator Preparation

Vent Plug Installation In order to keep gear oil from spilling out during shipping, gear reducers used in gate operators have either a solid plug, or a sealed vent plug, installed at the factory .

For operators with a solid plug, replace the solid plug with the vent plug provided (see Figure 3) .

With the vent plug installed, remove the vent plug’s breather pin to allow the gear box to vent (see Figure 3) .

Gate Bracket and Chain Assembly

✓ NOTE: The item numbers shown in these illustrations are for reference only. For the actual part numbers, refer to the parts lists in the rear of this manual.

Assemble a gate bracket (1) to the front edge of the gate, using two U-bolts (2), and mounting hardware (3) . Before tightening down completely, be sure the bracket is parallel to the gate . Tighten the U-bolt hardware the rest of the way, then screw the square head bolts (4) into the threaded holes in the gate plate until they bottom out against the gate .

These will help keep the bracket from twisting on the pipe .

Additional mounting holes have been provided in the gate bracket for installer convenience .

Slide a threaded chain pin (5) through the bracket as shown, with spring (6), flat washer (10), and two hex nuts (7) . Attach one end of the drive chain (8) to the chain pin using master link (9) and begin unrolling the chain toward the operator .

Remove the rain cover from the back of the slide gate operator . Carefully thread the drive chain under the first idler, over the drive sprocket, and then under the last idler .

Make sure you feed most of the chain through the idlers and sprocket before attaching the chain to the back end of the gate .

Assemble the other gate bracket on the rear edge of the gate, using the same process as the front gate bracket .

Once this is done, take the other chain pin, spring and jam nuts and assemble with the end of drive chain and the other master link .

At this point you should be able to adjust the chain tension by tightening the jam nuts on each end . Approximately 1/4” to 3/8” of slack per foot of drive chain is acceptable.

Make sure the chain does not drag on the ground, across the gate rollers or the idler frame of the operator .

Chain Supports When necessary, due to the length of the gate and chain, chain supports should be added to the gate at equally spaced distances to allow the chain to sag as little as possible . A bolt located one inch below the chain line should be adequate .

REMOVE THE

SOLID PLUG

WITH AN ALLEN

WRENCH

INSTALL THE VENT PLUG

(IF NOT ALREADY INSTALLED)

REMOVE THE

BREATHER PIN

GEAR

REDUCER

Figure 3. Vent Plug Installation

GATE PIPE SHOWN

FOR REFERENCE ONLY

Figure 4. Mounting Gate Bracket to Gate

Figure 5. Chain Pin and Chain Assembly

NOTE: IDLER CONFIGURATION

MAY APPEAR DIFFERENT DEPENDING

ON THE SLIDE OPERATOR MODEL

DRIVE

SPROCKET

DRIVE SPROCKET

IDLER

WHEEL

IDLER WHEEL

CHAIN

PATH

CHAIN

PATHIDLER WHEEL

Figure 6. Chain Path

VS-GSLG Slide Gate Operator Installation Guide - 5 - P1255 Revision X6 11-04-2016

Operator Setup

Controller Access The Controller is protected by a plastic dust cover . To remove the dust cover, loosen the cover’s wing-screw and lift the cover off (see Figure 7) .

Manual Disconnect The manual disconnect shifter lever and the locking lever is illustrated in Figure 8 . They can be found at the center and to the left inside the operator cabinet . (The handle of each has been finished in easy to spot red firm-grip coating .)

To disconnect the unit for manual operation, grasp the handle of the spring-loaded shifter lever and pull it directly toward you until the spring-loaded locking lever snaps into place behind it . This action disengages the pinned shifter block from the drive mechanism and holds the block in the disengaged position .

To re-engage the operator, move the locking lever to the right, releasing the spring-loaded shifter lever to snap back into the engaged position .

AC Power Connection All Linear gate operators are supplied with a power disconnect switch to turn on and off the power available to the operator . Following wiring specifications on Page 2, incoming power should be brought into the operator and connected to the labeled pigtails from the disconnect box .

A wiring connections print can also be found on the label inside the cover of the operator .

Proper thermal protection is supplied with the operator . The motor contains a thermal overload protector to guard from overheating the motor due to overload or high-frequency operation . This overload protector will reset automatically after the motor cools down .

Earth Ground Install a ground rod and connect it to the operator’s frame in every gate operator installation . A good earth ground is necessary to allow the Controller’s built-in surge and lightning protection circuitry to work effectively . The physical bolting of the operator to the mounting posts is not sufficient for a good earth ground .

✓ NOTE: Do not splice the ground wire. Use a single piece of solid copper 12 AWG wire between the ground rod and the operator.

1. Install an 8-foot long copper ground rod next to the operator mounting pad within three feet of the operator.

2. Use a clamp to connect a solid copper 12 AWG ground wire to the ground rod.

3. Route the ground wire to the operator.

4. Connect the ground wire to the operator’s frame.

Figure 7. Controller Access

Figure 9. Power Disconnect Box Wiring

Figure 8. Manual Disconnect Lever

LOOSEN KNOB

TO REMOVE

CONTROLLER

COVER

MANUAL DISCONNECT

SHIFTER LEVER

PULL TO DISENGAGE

LOCKING LEVER

PUSH TO RIGHT TO

RE-ENGAGE OPERATOR

TO MANUALLY MOVE THE GATE,

PULL SHIFTER LEVER TO

DISENGAGE THE DRIVE TRAIN

GATE LIMIT SETTINGS WILL

NOT BE AFFECTED WHEN

GATE IS MANUALLY MOVED

PULL

PUSH

110 VOLT

OPERATOR

POWER

DISCONNECT

BOX

BLACK

220 VOLT

OPERATOR

POWER

DISCONNECT

BOX

WHITE

GREEN

BLACK

WHITE

GREEN

HOT

NEUTRAL

GROUND

HOT

HOT

GROUND

WARNING

ALL AC ELECTRICAL CONNECTIONS TO THE POWER SOURCE AND

THE OPERATOR MUST BE MADE BY A LICENSED ELECTRICIAN AND

MUST OBSERVE ALL NATIONAL AND LOCAL ELECTRICAL CODES

VS-GSLG Slide Gate Operator Installation Guide - 6 - P1255 Revision X6 11-04-2016

Operator Setup (cont.)

Open and Close Limit Adjustment The limit nuts are not preset at the factory and must be adjusted for the gate in each installation . The limit switches are activated by two threaded nylon rotary limit nuts which are attached to a threaded limit shaft driven by a chain and sprockets from the main drive shaft . REMOVE THE CARDBOARD FILLER

BEFORE ADJUSTING THE LIMIT NUTS.

The Controller is factory setup for right-hand installations .

The OPEN limit switches are the ones closer to the front of the operator . In left-hand installations, the CLOSE limit switches are the ones closer to the front of the operator (see Figures 10 & 11) .

Limit Nuts Rough Adjustment Before running the operator, set the limit nuts as follows:

1. With the gate connected to the gate operator in a mid-travel position, turn the power disconnect switch OFF.

2. To adjust the limit nuts, press down on the detent plate and rotate the limit nut along the threaded shaft (see Figure 12).

3. Adjust the OPEN limit nut until it is about 1/2” from activating the LSO-2 OPEN limit switch.

4. Adjust the CLOSE limit nut until it is about 1/2” from activating the LSC-2 CLOSE limit switch.

Limit Nuts Fine Adjustment After finishing the rough limit nut adjustments, run the operator to set the fine limit adjustment .

1. Turn the power disconnect switch ON.

2. Stand clear of any moving parts and press the OPEN button.

3. After the gate opens, press the CLOSE button.

4. Observe the gate in both directions as it runs through each complete cycle. Adjust the open or close limit nuts again if necessary. Fine levels of adjustment can be made by adjusting a few teeth on the nut at a time. If the gate stops during travel, you may need to adjust the Open or Close Current Setting or the Maximum Run Timer (see Pages 13-14).

Setting Speeds using LSO-2 & LSC-2 Limit switches LSO-2 and LSC-2 control when the operator accelerates to maximum speed and decelerates to minimum speed . It is recommended that LSO-2 and LSC-2 are adjusted first so the gate slows to near stop before hitting LSO-1 or LSC-1 as these will apply the brake upon activation .

Adjust LSO-2 and LSC-2 by slightly loosening the two screws which hold them in place and sliding toward or away from the center of the limit box . Care must be taken not to adjust too close to the center as the limit nut may travel past the switch and start accelerating at the end of the cycle .

PRESS DETENT

PLATE DOWN

ROTATE

LIMIT NUT

Figure 12. Setting the Limits

LIMIT

SHAFT

FRONT OF

OPERATOR

CLOSE LIMIT

SWITCH (LSC-2)

OPEN LIMIT

SWITCH (LSO-2)

CLOSE LIMIT

SWITCH (LSC-1)

OPEN LIMIT

SWITCH (LSO-1)

CLOSE LIMIT NUT

OPEN LIMIT NUT

RIGHT-HAND

INSTALLATION

LSC-2 & LSO-2

CONTROL MOTOR

SPEED RAMP UP & DOWN

LSC-1 & LSO-1

CONTROL GATE

FULL OPEN AND CLOSE

Figure 10. Limit Box Assembly (Right-hand Installation)

LIMIT

SHAFT

FRONT OF

OPERATOR

OPEN LIMIT

SWITCH (LSO-2)

CLOSE LIMIT

SWITCH (LSC-2)

OPEN LIMIT

SWITCH (LSO-1)

CLOSE LIMIT

SWITCH (LSC-1)

OPEN LIMIT NUT

CLOSE LIMIT NUT

LEFT-HAND

INSTALLATION

LSO-2 & LSC-2

CONTROL MOTOR

SPEED RAMP UP & DOWN

LSO-1 & LSC-1

CONTROL GATE

FULL OPEN AND CLOSE

Figure 11. Limit Box Assembly (Left-hand Installation)

CAUTION

If the operator is installed in a left-hand installation. Set the Controller to left-hand operation BEFORE running the operator for the fine setting of the limit cams. Failure to do so will result in over-shooting the limit switches, and may cause damage to the operator and/or gate. Refer to programming on Page 12.

VS-GSLG Slide Gate Operator Installation Guide - 7 - P1255 Revision X6 11-04-2016

Operator Setup (Cont.)

Torque Limiter Adjustment Before adjusting the torque limiter, make sure the gate is in good working condition . With the gate disconnected from the gate arm, one person should be able to move the gate by hand . Be certain the gate moves freely and without binding throughout its travel .

Torque limiters are set light at the factory . They must be adjusted during installation, preferably after limit cams have been manually set . With the gate arm and gate attached, adjust the torque limiter tight enough to keep it from slipping during normal operation . The inherent entrapment protection (current sensing) feature must activate prior to any slipping of the torque limiter .

✓ NOTE: The open and close current sensing may need to be adjusted before performing the following two steps. See Page 13.

To adjust the torque limiter in a Model VS-GSLG:

1. Loosen the set screw on the adjustment nut.

2. Cycle the gate open and closed while observing the torque limiter action. TURN THE OPERATOR POWER DISCONNECT SWITCH

OFF BEFORE MAKING ANY ADJUSTMENTS.

To increase the torque, turn the adjustment nut clockwise one flat, or 1/6 turn, at a time until desired output is obtained.

To reduce the torque, turn the adjustment nut counterclockwise one flat, or 1/6 turn, at a time until desired output is obtained.

3. When finished, tighten the set screw to lock the adjustment nut in place.

Figure 13. Torque Limiter Adjustment

LOOSEN SET SCREW ON

THE ADJUSTMENT NUT

ADJUSTMENT NUT

TO INCREASE TORQUE

TURN ADJUSTMENT NUT

CLOCKWISE ONE FLAT

THEN RE-TEST

TO DECREASE TORQUE

TURN ADJUSTMENT NUT

COUNTERCLOCKWISE

ONE FLAT THEN RE-TEST

TIGHTEN SET SCREW

DURING TESTING

AND WHEN FINISHED !!!

MORE

LESS

VS-GSLG Slide Gate Operator Installation Guide - 8 - P1255 Revision X6 11-04-2016

Controller Features

SHADOW/RESET

PROGRAMMING

BUTTONS

POWER

INDICATORS

DISPLAY

WHIP

ANTENNA

OPERATION

BUTTONS

OPERATION AND

PROGRAMMING

INDICATORS

ANTENNA

CONNECTOR

MOTOR

BOARD

COVER

INPUT

POWER

TERMINALS

ACCESSORY

POWER

TERMINALS

RESET

BUTTON

TERMINALS

SOLAR

PANEL

TERMINALS

BATTERY

TERMINALS

PLUG-IN

LOOP

DETECTOR

CONNECTORS

PRIMARY/

SECONDARY

COMM LINK

TERMINALS

SINGLE

INPUT

TERMINALS

FIRE DEPT

INPUT

TERMINALS

OPEN INPUT

TERMINALS

3-BUTTON

STATION

TERMINALS

OPEN AND CLOSE

OBSTRUCTION

INPUT TERMINALS REVERSE

INPUT

TERMINALS

OPEN LOOP

INPUT TERMINALS

REVERSE LOOP

INPUT TERMINALS

SHADOW/RESET LOOP

INPUT TERMINALS

LIMIT SWITCH

INPUT TERMINALS

ALARM

OUTPUT

TERMINALS

AC MOTOR

OUTPUT

TERMINALS

AUXILIARY

RELAY

TERMINALS

CONTROLLER

TM

Figure 14. Controller Features

VS-GSLG Slide Gate Operator Installation Guide - 9 - P1255 Revision X6 11-04-2016

Indicator Descriptions

INDICATOR DEFINITION INDICATION WHEN LIT

DURING NORMAL OPERATION

INDICATION WHEN LIT

DURING PROGRAMMINGOPERATION PROGRAMMING

24 VOLT INPUT

POWER

LOW VOLTAGE AC POWER IS PRESENT

24 VOLT DC

ACCY POWER

LOW VOLTAGE DC POWER IS PRESENT

OPEN

OPEN SIGNAL PRESENT FROM THE INTERNAL

RECEIVER OR AN EXTERNAL DEVICE

CONNECTED TO THE OPEN INPUT TERMINAL

CLOSE

CLOSE SIGNAL IS PRESENT FROM A DEVICE

CONNECTED TO THE CLOSE INPUT TERMINAL

STOP

STOP INPUT TERMINAL IS OPEN AND

NOT CONNECTED TO COMMON

PROGRAM CONTROLLER IS IN PROGRAMMING MODE

REVERSE DELAY SET SIGNAL FROM REVERSING DEVICE IS PRESENT SET REVERSE DELAY TIME

LOCKOUT ALARM SET

CONTROLS AND OPERATOR ARE LOCKED OUT

BECAUSE OF EXISTING TROUBLE CONDITION

SET RUN ALARM AND PRE-START ALARM

RADIO LEARN

BUILT-IN RECEIVER IS DETECTING A RADIO

SIGNAL FROM A REMOTE CONTROL

TRANSMITTERS CAN BE ENTERED INTO

MEMORY (UP TO 40 TRANSMITTERS)

OPEN CURRENT SET

MOTOR CURRENT HAS EXCEEDED THE

OPEN CURRENT SETTING WHILE OPENING

SET MAXIMUM OPEN CURRENT

OPEN OBSTR MGT 2 SET

OPEN OBSTRUCTION TERMINAL CONNECTED

TO COMMON BY BEAM OR SAFETY EDGE, OR

SIGNAL FROM MGT OBSTACLE TRANSMITTER

SET MGT #2 FUNCTION

OPEN RELAY LH/RH SET OPEN RELAY IS ACTIVATED SET LEFT-HAND RIGHT-HAND OPERATION

OPEN LIMIT BRAKE DELAY OPEN LIMIT SWITCH IS ACTIVATED

CLOSE CURRENT SET

MOTOR CURRENT HAS EXCEEDED THE

CLOSE CURRENT SETTING WHILE CLOSING

SET MAXIMUM CLOSE CURRENT

CLOSE OBSTR MGT 1 SET

CLOSE OBSTRUCTION TERMINAL CONNECTED

TO COMMON BY BEAM OR SAFETY EDGE, OR

SIGNAL FROM MGT OBSTACLE TRANSMITTER

SET MGT #1 FUNCTION

CLOSE RELAY AUTO CLOSE SET CLOSE RELAY IS ACTIVATED SET AUTO-CLOSE TIME

CLOSE LIMIT AC DC SET CLOSE LIMIT SWITCH IS ACTIVATED SET MOTOR TYPE

SINGLE SET

SINGLE TERMINAL CONNECTED TO COMMON

BY AN EXTERNAL PUSHBUTTON OR RADIO

SET SINGLE BUTTON INPUT FUNCTION

MAX RUN SET MAXIMUM RUN TIMER HAS BEEN EXCEEDED SET MAXIMUM RUN TIME

COMM LINK SET

DUAL OPERATOR CONNECTION DETECTED,

BLINKS IF CONNECTION HAS FAILED

MAINT ALERT SET MAINTENANCE IS REQUIRED ON OPERATOR SET MAINTENANCE ALERT CYCLE COUNT

"RL" LEFT OR RIGHT

HAND OPERATION

"PM" SINGLE OR

DUAL GATE

"AC" AUTO CLOSE

TIMER

"RP" RUN ALARM

PRE-START ALARM

"OC" MAXIMUM OPEN

CURRENT

"CC" MAXIMUM CLOSE

CURRENT

"AD"

ADVANCED

PROGRAMMING

"RT" MAXIMUM

RUN TIMER

"SB"

SINGLE BUTTON

INPUT SETUP

"SM" STAGGER

MODE

"ST" STAGGER

TIME

"AR" AUXILIARY

RELAY MODE

"RD" REVERSE

DELAY TIME

"CT" RESET CYCLE

COUNT

"MA"

MAINTENANCE ALERT

TRIGGER

"MT" MID-TRAVEL

STOP POSITION

"RA"

RADIO

ENABLE

"TL" LEARN

TRANSMITTERS

"TD"

DELETE

TRANSMITTERS

"ML"

LEARN MGT

TRANSMITTERS

"MD"

ERASE MGT

TRANSMITTERS

"CL"

RESET TO

FACTORY DEFAULTS

"OT"

OBSTRUCTION

DETECTION TYPE, b1, b2

APEX FUNCTION DISPLAY INDICATIONS

MOTOR TYPE

SELECTION"MO"

"CP" CONSTANT

PRESSURE MODE

"SP" SHADOW LOOP

OPEN INHIBIT

"AT" ANTI-TAILGATE

ENABLE

"BD" BRAKE

DELAY TIME

"OO"

OPEN OBSTRUCTION

INPUT ACTIVE "RO"

REMOTE OPEN

OBSTRUCTION ACTIVE "RC"

REMOTE CLOSE

OBSTRUCTION ACTIVE"CO" CLOSE OBSTRUCTION

INPUT ACTIVE

"MM"

MGT MONITIRING

FUNCTION

VS-GSLG Slide Gate Operator Installation Guide - 10 - P1255 Revision X6 11-04-2016

Terminal Descriptions

TERMINAL GROUP FUNCTION

AC N

24 VOLT INPUT

FACTORY CONNECTED TO 24 VAC FROM TRANSFORMER OR

24 VDC FROM CONTINUOUS DUTY DC SUPPLY.AC

DC -

ACCESSORY POWER PROVIDES 24 VOLT DC POWER FOR ACCESSORIES. (.5A MAX)

DC +

RESET

RESET BUTTON FACTORY CONNECTED TO THE CONTROLLER’S RESET BUTTON.

COMMON

C

COMM LINK FOR 3-WIRE NETWORK CONNECTION TO SECOND OPERATOR IN DUAL GATE INSTALLATIONS.B A

COMMON

SINGLE BUTTON INPUT

CONNECT TO NORMALLY OPEN SWITCH FOR SINGLE BUTTON OPERATION. ALTERNATES

BETWEEN OPEN-CLOSE OR OPEN-STOP-CLOSE DEPENDING ON PROGRAMMING.SINGLE

COMMON

FIRE BOX INPUT CONNECT TO NORMALLY OPEN SWITCH IN FIRE BOX FOR FIRE DEPARTMENT ACCESS.

FIRE DEPT

COMMON

OPEN INPUT

CONNECT TO NORMALLY OPEN DEVICES (KEYPAD, CARD READER, KEYSWITCH,

TELEPHONE ENTRY SYSTEM) TO OPEN THE GATE. A CONSTANT OPEN INPUT WILL

OVERRIDE THE MID-TRAVEL STOP AND HALT THE AUTO CLOSE TIMER UNTIL RELEASED.OPEN

OPEN

3-BUTTON

STATION INPUT

CONNECT TO 3-BUTTON STATION FOR OPEN-CLOSE-STOP CONTROL. A CONSTANT OPEN INPUT

WILL OVERRIDE THE MID-TRAVEL STOP AND HALT THE AUTO CLOSE TIMER UNTIL RELEASED.

CLOSE

COMMON

STOP

COM

MONITORED

OPEN

OBSTRUCTION

INPUT

CONNECT TO 10K TERMINATED DEVICES (GATE EDGE, PHOTO BEAM) TO DETECT AN

OBSTRUCTION DURING OPENING. WHILE GATE IS MOVING, ANY OPEN OBSTRUCTION

SIGNAL WILL CAUSE THE GATE TO STOP, REVERSE A SHORT DISTANCE, AND THEN STOP

AGAIN. AT THIS TIME THE AUTO CLOSE TIMER IS DISABLED, AND A RENEWED INPUT

WILL BE REQUIRED TO START THE GATE AGAIN. SHOULD THE GATE BE RESTARTED

AND THE OBSTACLE SIGNAL OCCUR AGAIN PRIOR TO REACHING A LIMIT, THE GATE

WILL STOP AGAIN, LOCKOUT, AND SOUND THE CONTINUOUS TONE ALARM.

O-OBS

C-OBS

MONITORED

CLOSE

OBSTRUCTION

INPUT

CONNECT TO 10K TERMINATED DEVICES (GATE EDGE, PHOTO BEAM) TO DETECT AN

OBSTRUCTION DURING CLOSING. WHILE GATE IS MOVING, ANY CLOSE OBSTRUCTION

SIGNAL WILL CAUSE THE GATE TO STOP, THEN REVERSE AND TRAVEL TO THE FULL

OPEN POSITION. SHOULD A OPEN OBSTRUCTION INPUT OR AN OPEN DIRECTION

INHERENT ENTRAPMENT CONDITION OCCUR PRIOR TO THE GATE REACHING THE

OPEN LIMIT, THE OPERATOR WILL LOCKOUT AND SOUND THE CONTINUOUS TONE

ALARM. IF THE AUTO CLOSE TIMER IS SET, WHEN THE CLOSE OBSTRUCTION INPUT

IS CLEARED, THE GATE WILL CLOSE WHEN THE AUTO CLOSE TIMER EXPIRES.

COM

COM

REVERSE

CONNECT TO NORMALLY OPEN DEVICES TO CAUSE A REVERSAL WHEN THE GATE IS

TRAVELING CLOSED. THE GATE WILL REVERSE TO THE FULL OPEN POSITION.REV

OPEN LOOP

OPEN LOOP

CONNECT TO OPEN LOOP/FREE EXIT LOOP. THE GATE WILL OPEN

WHEN THE LOOP IS TRIGGERED, AND REMAIN OPEN AS LONG AS

THE LOOP IS TRIGGERED. REQUIRES LOOP DETECTOR.OPEN LOOP

REVERSE LOOP

REVERSE LOOP

CONNECT TO REVERSE LOOP. TRIGGERING THE LOOP WILL CAUSE A

REVERSAL WHEN THE GATE IS TRAVELING CLOSED. THE GATE WILL REVERSE

TO THE FULL OPEN POSITION. REQUIRES LOOP DETECTOR.REVERSE LOOP

SHADOW/RESET LOOP

SHADOW/RESET LOOP

CONNECT TO SHADOW/RESET LOOP TO KEEP THE GATE IN ITS FULLY OPEN

POSITION AS LONG AS THE SIGNAL IS PRESENT. USED TO KEEP GATE OPEN

WHILE VEHICLE IS PASSING THROUGH. REQUIRES LOOP DETECTOR.SHADOW/RESET LOOP

ALARM FACTORY CONNECTED TO THE ALARM BEEPER.

N.O.

AUX RELAY

FOR CONNECTION TO AUXILIARY DEVICES (MAGNETIC LOCK, SOLENOID LOCK,

STROBE LIGHT) FOR ACTIVATION (OR DEACTIVATION) DURING GATE OPERATION.

COM

N.C.

24 VOLT SOLAR PANEL NOT USED WITH THIS MODEL OPERATOR.

24 VOLT BATTERY NOT USED WITH THIS MODEL OPERATOR.

VS-GSLG Slide Gate Operator Installation Guide - 11 - P1255 Revision X6 11-04-2016

Operator Accessory Connections

3-BUTTON STATION

KEYSWITCH

FIRE ACCESS SWITCH

SINGLE-CHANNEL RADIO RECEIVER

WIRELESS GATE EDGE SENSOR

MGT

TRANSMITTER

PHOTOEYE FOR REVERSE

PHOTOEYE FOR OPEN OBSTRUCTION (B1)

TELEPHONE ENTRY

KEYPAD

EXTERNAL POWER

SOLENOID LOCK

MAGLOCK

WARNING STROBE OR AUDIBLE SOUNDER

GATE EDGE SENSOR FOR REVERSE (B2)

PHOTOEYE FOR CLOSE OBSTRUCTION (B1)

Figure 15. Operator Accessory Connections

VS-GSLG Slide Gate Operator Installation Guide - 12 - P1255 Revision X6 11-04-2016

Basic Controller Programming

Programming Overview The Controller can be programmed with various options for the operator.

The programming fields are defined as “functions” that have “options”.

To make setup easier for the installer, the Controller’s programming is divided into two groups: basic and advanced. The basic programming group contains the functions commonly used in most slide gate installations. The advanced programming group contains functions less commonly used (i.e. dual gate stagger delay, maximum run timer, etc.).

Entering Programming Mode Enter programming mode by pressing the UP and DOWN buttons together for one second. While in programming mode the PROGRAM indicator will light.

Exiting Programming Mode Exit programming mode at any time by pressing the UP and DOWN buttons together. The Controller will automatically exit programming mode after three minutes of inactivity.

Programming Keystrokes (Typical Programming Method)

While in programming mode, press the UP or DOWN buttons to scroll through the programming functions. When the desired function is displayed press the ENTER button to display the currently set option for the function. When an option is displayed, the decimal points are lit.

To change the option, press and hold the ENTER button for 1 second. To indicate that an option is ready to be changed, the display will flash. While the display is flashing, press the UP or DOWN button to display the other options available for that function.

When the desired option is displayed, press the ENTER button to store it into memory. To select another function, press ENTER, UP, or DOWN.

Left or Right Hand Operation The factory default is for right hand operation (operator on right side of the driveway when viewed from the inside of the gate). For left hand installations, program the Controller for left hand operation.

Dual Gate Enable The factory default is for single gate operation. For dual gate operation, wire the two gate controllers together through the COMM LINK terminals (see Page 24) and enable dual gate operation with this programming step.

✓ NOTE: The Mid-travel Stop feature is disabled when dual gate operation is enabled for paired units.

Auto Close Timer The factory default turns off the Auto Close Timer. The timer can be set from 1 to 59 seconds and from 1 to 9 minutes. When the Auto Close Timer is set, after opening, the gate will wait for the length of the Auto Close Timer then close automatically.

PRESS DOWN AND UP

BUTTONS TOGETHER

FOR ONE SECOND

PROGRAM INDICATOR

WILL LIGHT WHEN SYSTEM

IS IN PROGRAM MODE

PROGRAM

INDICATOR

ANDDOWN UP

ENTERING

PROGRAMMING

FUNCTION

LEFT HAND INSTALLATION

(OPERATOR ON LEFT OF GATE

WHEN VIEWED FROM INSIDE)

RIGHT HAND INSTALLATION

(OPERATOR ON RIGHT OF GATE

WHEN VIEWED FROM INSIDE)

OPTIONS

PRESS UP OR

DOWN TO CYCLE

THROUGH OPTIONS

PRESS ENTER TO

SELECT AN OPTION

LEFT HAND

RIGHT HAND

"RL"

FUNCTION

DUAL GATE INSTALLATION

SINGLE GATE INSTALLATION

OPTIONS

PRESS UP OR

DOWN TO CYCLE

THROUGH OPTIONS

PRESS ENTER TO

SELECT AN OPTION

SINGLE GATE

DUAL GATE

"PM"

PRESS UP OR DOWN

TO SCROLL DISPLAY

THROUGH FUNCTIONS

PRESS ENTER FOR

ONE SECOND TO

SELECT OPTION

(THE DISPLAY

WILL FLASH)

PRESS UP

OR DOWN

TO CHANGE

OPTION

ENTER

PROGRAMMING

KEYSTROKES

SELECT

FUNCTION

CURRENTLY

SET OPTION

OPTION READY

TO CHANGE

PRESS ENTER TO

DISPLAY CURRENTLY

SET OPTION

CHOOSE

OPTION

OR

UP

DOWN

OR

UP

DOWN

OPTION

STORED

PRESS ENTER

TO STORE

OPTION

SELECT

FUNCTION

ENTER ENTER ENTER

OR

UP

DOWN

OR

PRESS UP, DOWN

OR ENTER SELECT

NEXT FUNCTION

FUNCTION

SET TIMER VALUE

1 TO 59 SECONDS

AUTO CLOSE TIMER DISABLED

SET TIMER VALUE

1 TO 9 MINUTES

OPTIONS

PRESS UP OR

DOWN TO CYCLE

THROUGH OPTIONS

PRESS ENTER TO

SELECT AN OPTION

AUTO CLOSE

TIMER

"AC"

VS-GSLG Slide Gate Operator Installation Guide - 13 - P1255 Revision X6 11-04-2016

Basic Controller Programming (Cont.)

Run Alarm and Pre-start Alarm The factory default is Run Alarm on and a 3-second Pre-start Alarm. The operator’s beeper will sound 3 seconds before the operator starts. The options are:

• Run Alarm Off and Pre-start Alarm Off

• Run Alarm On and Pre-start Alarm Off

• Run Alarm On and Pre-start Alarm On for 1-9 Seconds

Maximum Open Direction Current Setting To detect obstacles or mechanical problems with the gate, the operator monitors its motor current. If the open current load exceeds the programmed maximum load range number, the operator will stop, reverse a short distance, then stop again. The Auto Close Timer will be disabled, and another open request will be required to start the operator again. If after restart, the overload or an open obstacle happens again before the open limit is reached, the operator will lockout and sound the alarm.

To measure the motor load used during opening, while this function is being displayed, push and hold the OPEN button to fully open the gate.

During movement, the motor current will be displayed as a load number from 0 to 99. This number is useful for troubleshooting but not for setting the motor current. At the end of travel, a different number will flash. This number indicates the range above and below the average motor current during the run. Using the + and - buttons, set the programmed range number so that a minimal force (50-75 lbs.) will activate a reversal should an obstruction occur, but high enough to keep the gate moving under normal conditions without interruption.

Maximum Close Direction Current Setting To detect obstacles or mechanical problems with the gate, the operator monitors its motor current. If the close current load exceeds the programmed maximum load range number, the operator will stop, reverse, and travel to the full open position. Should a open obstruction input or an open direction inherent entrapment condition occur prior to the gate reaching the open limit, the operator will lockout and sound the continuous tone alarm. Another close request will be required to start the operator again. If after restart, the overload or a close obstacle happens again before the close limit is reached, the operator will lockout and sound the alarm. If the auto close timer is set, when the close obstruction input is cleared, the gate will close when the auto close timer expires.

To measure the motor load used during closing, while this function is being displayed, push and hold the CLOSE button to close the gate.

During movement, the motor current will be displayed as a load number from 0 to 99. This number is useful for troubleshooting but not used for setting the motor current. At the end of travel, a different number will flash.

This number indicates the range above and below the average motor current during the run. Using the + and - buttons, set the programmed range number so that a minimal force (50-75 lbs.) will activate a reversal should an obstruction occur, but high enough to keep the gate moving under normal conditions without interruption.

FUNCTION

SUGGESTED MINIMUM NUMBER WILL

FLASH, ADJUST TO THE PROPER FORCE

OPTIONS

MAX CLOSE

CURRENT

PRESS AND HOLD THE CLOSE BUTTON

UNTIL THE OPERATOR RUNS FULLY CLOSED

ENTER PRESS ENTER TO STORE THE FORCE

"CC"

FUNCTION

SUGGESTED MINIMUM NUMBER WILL

FLASH, ADJUST TO THE PROPER FORCE

OPTIONS

MAX OPEN

CURRENT

PRESS AND HOLD THE OPEN BUTTON

UNTIL THE OPERATOR RUNS FULLY OPEN

ENTER PRESS ENTER TO STORE THE FORCE

"OC"

FUNCTION

RUN ALARM ON

PRE-START ALARM OFF

RUN ALARM ON

PRE-START ALARM ON FOR 1 - 9 SECONDS

OPTIONS

RUN ALARM

PRE-START ALARM

PRESS UP OR

DOWN TO CYCLE

THROUGH OPTIONS

PRESS ENTER TO

SELECT AN OPTION

RUN ALARM OFF

PRE-START ALARM OFF"RP"

VS-GSLG Slide Gate Operator Installation Guide - 14 - P1255 Revision X6 11-04-2016

FOR NON-CONTACT SENSOR

FOR CONTACT SENSOR

OPTIONS

"OT"

OBSTRUCTION

DETECTION TYPE

FUNCTION OPTIONS

"OO"

OPEN OBSTRUCTION

INPUT ACTIVE

FUNCTION OPTIONS

"CO"

CLOSE OBSTRUCTION

INPUT ACTIVE

FUNCTION OPTIONS

"RO"

REMOTE OPEN

OBSTRUCTION ACTIVE

FUNCTION OPTIONS

"RC"

REMOTE CLOSE

OBSTRUCTION ACTIVE

Obstruction detection type – b1, b2 B1 is a non-contact sensor such as a photo eye. B2 is a contact sensor such as an edge. This setting affects behavior in the closed direction obstruction detection. If a B2 detector is used, the operator will only allow an input 2 times to continue automatic closing until a closed limit switch is successfully made. The first input while closing will reverse the operator to full open and resume auto close timer behavior if selected. The second input will cause the operator to reverse slightly and lockout.

✓ NOTE: Jumper wire must be cut and DIP switches set to position 5 for the functions below to be active.

Open Obstruction input active – On, Off If a swing gate has no entrapment areas this may be selected as off. This must be on for slide gates.

Close obstruction input active – On, Off Single gates require this to be on. Paired gates can have this off if the other gate has it turned on.

✓ NOTE: The following parameters will only be displayed if Paired Mode is selected ON. The operators must be bot set as paired mode, powered up, and have the communication cable in place to complete this correctly. Obstruction inputs active selection for both operators must all be made from one side. Settings will be automatically transferred to the operator you are not in front of. Do not try to set individually

Remote open obstruction active – On, Off This is used to select if the other operator has the Open Obstruction input active.

Remote Close obstruction active – On, Off In paired mode it is only required to have 1 close device per pair of operators if the only entrapment zone is where the gates meet.

VS-GSLG Slide Gate Operator Installation Guide - 15 - P1255 Revision X6 11-04-2016

Advanced Controller Programming

Entering Advanced Programming Mode To access and program the Advanced Programming functions, for each programming session, Advanced Programming must be enabled.

After exiting programming, the Advanced Programming functions will be available on the programming display during the next programming session unless the operator has run 50 or more cycles. After that, Advanced Programming must be enabled again.

Maximum Run Time The factory default for the Maximum Run Time (MRT) is 99 seconds.

When the operator starts, a timer will begin counting. If a open or close limit is not reached or an obstacle or reversing input is not received before the timer expires, the operator will stop, the unit locks out and the alarm sounds. The timer can be set for 10 to 99 seconds, but should be left at 99 in most applications. Setting it too close to the actual run time may cause the time to expire with changing ambient temperature, gate conditions, etc…

If AC is present and an open or close limit is not reached or an obstacle or reversing input is not received before this timer exceeds MRT, the operator will stop, the unit locks out and the alarm sounds.

Single Button Input Setup This function is used for selecting the operation for single button controls and radio receivers.

The factory default sets the SINGLE input terminal so successive inputs will cycle the operator in OPEN-STOP-CLOSE-STOP order.

Alternately, the SINGLE input can be set to cause the gate to OPEN unless the gate is fully open. If the gate is fully open, the input will cause the gate to CLOSE.

Stagger Mode This function is used in dual gate installations only. The factory default sets the Stagger Mode to OFF. In dual gate installations the two operators communicate through the 3-wire COMM LINK interface.

When using the Stagger Mode, set one operator for delayed opening and the other operator for delayed closing. The Stagger Time programming function (see below) sets the length of the delay.

✓ NOTE: This function will only be displayed if dual gate operation is selected.

Stagger Delay Time This function is used in dual gate installations only.