Asbestos Report SARRTP Impact work areas.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 36C25922R0023
About this file
This document contains an asbestos report and related federal contract opportunity. The asbestos report details sample locations, materials, and asbestos content test results from the main hospital building. Samples were taken from floor tiles, pipes, pipe insulation, walls, floor mats, plaster, and mastic in various rooms and areas. The report identifies the presence of chrysotile and amosite asbestos in many of the materials tested.
The related federal contract opportunity is solicitation number 36C25922R0023 to renovate space for a SARRTP Impact program at a Veterans Affairs medical center. The opportunity was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The renovation work will involve asbestos abatement and removal given the presence of asbestos in many materials as documented in the asbestos report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SARRTP Questions Answers 3.docx | DOCX document | |
| 36C25922R0023 0004.docx | DOCX document | |
| Amendment 3 36C25922R0023 0003.docx | DOCX document | |
| 3 Specifications addendum 1.pdf | ||
| 01 SOW Impact for SARTP By work item addendum 1.docx | DOCX document | |
| B1-1st-HOT-Bldg.-1-1st-Floor--HOT-Samples-Rev.0.pdf | ||
| Fourth Floor Arch.pdf | ||
| As builts for Colorado Corridor.pdf | ||
| B1--4th--HOT-Bldg.-1--4th-Floor--HOT-Samples-Rev.0.pdf | ||
| Amendment 2 36C25922R0023 0002.docx | DOCX document | |
| SARRTP Questions Answers.pdf | ||
| S04 -Site Visit Meeting Doc 2.22.docx | DOCX document | |
| Pre Construction Site Visit Attendance.pdf | ||
| Amendment 1 36C25922R0023 0001.docx | DOCX document | |
| 36C25922R0023_1.docx | DOCX document | |
| 3 Plans.pdf | ||
| 3 Specifications.pdf | ||
| Past Performance Questionnaire.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Time (MST) | Sample # | Building | Level | Room # | Test Area Type | Test Area Material | Discipline | Sample Location | Additional Information/ Descriptions | % Asbestos | ACM |
| 1445 | 1 FT 1-1 | #1 Main Hospital | 1 | 1230 | Floor | Vinyl/PVC Tiles | Architectural | S side of threshold | 12'x12" cream moddled | Tile: 2% Chrysotile | Yes |
| 1451 | 1 FT 1-2 | #1 Main Hospital | 1 | 1252 | Floor | Vinyl/PVC Tiles | Architectural | 22' from N wall, 8' from E wall | 12"x12" cream moddled | Tile: 2% Chrysotile, Mastic: 3% Chrysotile | Yes |
| 945 | 1 HP 1-1 | #1 Main Hospital | 1 | 1232 | Pipes | Hardpack Pipe Fitting | Mechanical | E wall, 4'6" from N wall, 10' 6"OTf | 10% Chrysotile, 10% Amosite | Yes | |
| 948 | 1 HP 1-2 | #1 Main Hospital | 1 | 1232 | Pipes | Hardpack Pipe Fitting | Mechanical | E wall, 5' from N wall, 10'" OTF | 10% Chrysotile, 10% Amosite | Yes | |
| 952 | 1 BPI 1-1 | #1 Main Hospital | 1 | 1232 | Pipes | Block Pipe Insulation | Mechanical | E wall, 4'6" from N wall, 9'6" OTF | 10% Chrysotile, 10% Amosite | Yes | |
| 956 | 1 BPI 1-2 | #1 Main Hospital | 1 | 1232 | Pipes | Block Pipe Insulation | Mechanical | E wall, 5' from N wall, 9'6" OTF | 10% Chrysotile, 10% Amosite | Yes | |
| 1104 | 1 TR 1-1 | #1 Main Hospital | 1 | 1236 | Wall | Transite (Asbestos-cement board) | Mechanical | S wall, 1' from W wall, 2' OTF | radiator insulation | 20% Chrysotile | Yes |
| 1107 | 1 TR 1-2 | #1 Main Hospital | 1 | 1236 | Wall | Transite (Asbestos-cement board) | Mechanical | S wall, 1'6" from E wall, 2' OTF | radiator insulation | 20% Chrysotile | Yes |
| 1345 | 1 RFM 1-1 | #1 Main Hospital | 1 | 1218 | Floor | Rubber Floor Mat | Architectural | N side of threshold | light gray | 5% Chrysotile | Yes |
| 1359 | 1 PL 1-2 | #1 Main Hospital | 1 | 1219 | Wall | Plaster | Architectural | N wall, 9'6" OTF, 10'6" from W wall | white | 2% Chrysotile | Yes |
| 1404 | 1 IPM 1-1 | #1 Main Hospital | 1 | 1219 | Wall | Insulation Pin Mastic | Structural | W wall, 10' from S wall, 10'6" OTF | dark brown | 5% Chrysotile | Yes |
| 1408 | 1 IPM 1-2 | #1 Main Hospital | 1 | 1219 | Wall | Insulation Pin Mastic | Structural | W wall, 7' from S wall, 10'6" OTF | dark brown | 5% Chrysotile | Yes |
| 1106 | 1 CA 3-3 | #1 Main Hospital | 1 | 1008 | Floor | Carpet Adhesive | Architectural | SE corner | speckled blue | 3% Chrysotile | Yes |
| 1359 | 1 TR 1-3 | #1 Main Hospital | 2 | corr 2002 | Wall | Transite (Asbestos-cement board) | Architectural | E wall, 5' from S wall | transite wall heater | 30% Chrysotile | Yes |
| 1557 | 1 FT 7-3 | #1 Main Hospital | 4 | 4209 | Floor | Vinyl/PVC Tiles | Architectural | S side of 4210 door frame | 12"x12" off white w/ gray smudge | Mastic: 8% Chrysotile | Yes |
| 1615 | 1 FT 3-4 | #1 Main Hospital | 4 | 4213 | Floor | Vinyl/PVC Tiles | Architectural | W side of N door frame | 12"x12" white w/ brown smudge | Mastic: 8% Chrysotile | Yes |
| 1413 | 1 FT 6-3 | #1 Main Hospital | 4 | 4004 | Floor | Vinyl/PVC Tiles | Architectural | S side of door threshold | 12"x12" off white w/ brown smudge | Tile: 8% Chrysotile, Mastic: 8% Chrysotile | Yes |