36C25919R0011-0003003.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C25919R0011
About this file
36C25919R0011 0003 C. S02 - Questions and Answers.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25919R0011-0003001.docx | DOCX document | |
| 36C25919R0011-0003002.pdf | ||
| 36C25919R0011-0003000.docx | DOCX document | |
| 36C25919R0011-0002000.docx | DOCX document | |
| 36C25919R0011-0002001.docx | DOCX document | |
| 36C25919R0011-0002002.pdf | ||
| 36C25919R0011-0001002.docx | DOCX document | |
| 36C25919R0011-0001008.pdf | ||
| 36C25919R0011-0001009.docx | DOCX document | |
| 36C25919R0011-0001007.pdf | ||
| 36C25919R0011-0001004.pdf | ||
| 36C25919R0011-0001003.pdf | ||
| 36C25919R0011-0001006.pdf | ||
| 36C25919R0011-0001005.pdf | ||
| 36C25919R0011-009.pdf | ||
| 36C25919R0011-007.pdf | ||
| 36C25919R0011-005.pdf | ||
| 36C25919R0011-001.docx | DOCX document | |
| 36C25919R0011-004.pdf | ||
| 36C25919R0011-006.pdf | ||
| 36C25919R0011-003.pdf | ||
| 36C25919R0011-010.docx | DOCX document | |
| 36C25919R0011-002.pdf | ||
| 36C25919R0011-008.pdf | ||
| 36C25919R0011-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Site visit 3 for Power and HVAC in RMR Auditorium
1. The revised SOW in Amd 3 indicates:
The A/V Control room’ electrical provisions currently consist of circuits NLS9- 47,49,51 for receptacles; while NLS9- 53,55 serve A/V Control Rack equipment. These circuits are derived from Electric Room 01-SV-C37-E9, which is located at column lines 38.5 & B in the Service Level. Panel NHS9 will be the source; while a step-down transformer and a new 120/208 V. panel will be installed to provide the necessary circuits.
A new fan coil unit will be installed to cool this room. Existing ductwork and HVAC piping shall be modified and electrical power installed. Submit RFI for electrical source panel.
A. Refenced verbiage is from an obsolete version of the SOW. The SOW should not have have changed between the first and second/third pre-bid site visit. The SOW from the first site visit conducted on 10/9/18 is correct with RFI clarifications provided after the first site visit.
2. We understand Panel NHS9 is a panel in Electrical Room 01-S-C37-E9, please confirm.
A. See answer to #1 above.
3. We understand VA’s intent is that the new FCU will be powered from Panel NHS9, please confirm.
A. See answer to #1 above.
4. “while a step-down transformer and a new 120/208V panel will be installed to provide the necessary circuits.” We do not understand VA’s intent.
A. See answer to #1 above.
5. Is it in the Contractor’s scope to install a step-down transformer, and a new 120/208V panel? Please clarify.
A. See answer to #1 above.
6. If the Contractor is to install a new panel and a step-down transformer, will this new panel power the new FCU?
A. See answer to #1 above.
7. “Submit RFI for electrical source panel.” We do not understand VA’s intent. Please clarify.
A. See answer to #1 above.
8. Please provide elevation drawings that show the height, floor to deck of the service level, and of the 1st level (Auditorium level).
A. Provided.
9. Per our discussion today, please clarify if a bid security is required.
A. See the solicitation 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000) Payment Bond; Irrevocable Letter of Credit (ILC)
10. If a bid bond is required, you may want to extend the bid till Monday; bid bond takes a couple/few days.
A. The solicitation will not be extended.
11. Is a performance security required? As is the case with the bid security, the SF1442 indicates a performance security is not required.
A. Per the 1442 block 12 is marked (NO) as this an under the SAT project, please see question 9 as so the security’s required.
12. In reference to the original question asked:
Please confirm all notations in red are NIC.
If you look at all plans uploaded for review on this project, they have significant red lines and annotations on them. Please confirm that all clouded and red marks ups on the plans are not in contract (NIC).
A. This are redlines from the original construction. They are not part of this contract.