1 - 691-18-109WL B500 USP 800 - Full Dwg Set w Addendum.pdf
PDF 45 MB Posted
- Solicitation number
- 36C25820B0011
About this file
This notice solicits proposals for a construction project to upgrade a pharmacy cleanroom at a Department of Veterans Affairs medical center in Los Angeles, California. The project involves demolishing existing structures and performing work in accordance with USP 800 Pharmacy standards, including preparing the site for construction operations. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses. Interested offerors are encouraged to attend an upcoming site visit. The construction contract is expected to be a firm-fixed price agreement with an 18-month period of performance from notice to proceed. The project cost is estimated between $2 million and $5 million. Proposals are due in April 2020 in response to a forthcoming solicitation to be issued by the VA's Network Contracting Office located in Phoenix, Arizona.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND FLOOR
PHARMACY
B-500
P A
R K
I N
G
L
O T
FOURTH FLOOR
PHARMACY
NORTH LOBBY
ENTRANCE
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved: Project Director
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
B-500 IV CLEANROOM
COMPLIANCE
691-18-109WL
B-500
ADDENDUM 01
Rev. Date Description
1 06.25.2020 Addendum 01
JB / AKJC / CG / LW
/ FS
18801.07
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
May 18, 2020
West Los Angeles Medical Center
11301 Wilshire Boulevard, West Los Angeles, CA 90073
B-500 IV CLEANROOM COMPLIANCE WITH
USP 800
DEPARTMENT OF VETERANS AFFAIRS
MEDICAL CENTER
LOS ANGELES, CALIFORNIA
· VA STANDARDS FOR CONSTRUCTION INCLUDES BUT NOT LIMITED TO FOLLOWING:
·· PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
·· PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
·· PG-18-4 STANDARD DETAILS AND CAD STANDARDS
·· PG-18-5 EQUIPMENT GUIDE LIST
·· H-18-8 SEISMIC DESIGN HANDBOOK
·· PG-18-9 SPACE PLANNING CRITERIA, AND VA-SPACE & EQUIPMENT PLANNING
SYSTEM
·· PG-18-10 DESIGN MANUALS (BY DISCIPLINE)
·· PG-18-12 DESIGN GUIDES (GRAPHICAL, BY FUNCTION)
·· PG-18-14 ROOM FINISHES, DOOR, AND HARDWARE SCHEDULE
·· PG-18-15 MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS
·· PG-18-17 ENVIRONMENTAL PLANNING GUIDANCE
· 2018 INTERNATIONAL BUILDING CODE (IBC)
· 2018 INTERNATIONAL MECHANICAL CODE (IMC)
· 2018 INTERNATIONAL PLUMBING CODE (IPC)
· 2018 INTERNATIONAL FIRE CODE (IFC)
· 2018 INTERNATIONAL ENERGY CONSERVATION CODE
· 2018 INTERNATIONAL EXISTING BUILDING CODE
· 2018 INTERNATIONAL GREEN CONSTRUCTION CODE (IGCC)
· NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
· NATIONAL ELECTRIC CODE (NEC), AND ALL LOCAL AMENDMENTS THERE TO OR
OTHERWISE
· NATIONAL ELECTRICAL MANUFACTURER’S ASSOCIATION (NEMA)
· INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)
· AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
· UNDERWRITERS LABORATORIES, INC. (UL)
· ALL LOCAL AGENCIES HAVING JURISDICTION
VA LOS ANGELES CAMPUS
GENERAL
GI001 TITLE SHEET
GI-002 ABBREVIATIONS, GENERAL NOTES & APPLICABLE STANDARDS
GI-003 PROJECT PHASING SEQUENCE
STRUCTURAL
S-001 GENERAL NOTES
S-111 PARTIAL GROUND INTERSTITIAL & WALKWAY FRAMING PLANS
S-131 PARTIAL PENTHOUSE LEVEL FRAMING PLANS
S-801 DETAILS
S-802 DETAILS
ARCHITECTURAL
AE-000 OVERALL GROUND FLOOR REFERENCE PLAN
AE-004 OVERALL 4TH FLOOR REFERENCE PLAN
AE-100 REFERENCE AS-BUILT GROUND FLOOR PLANS
AE-101 REFERENCE AS-BUILT GROUND FLOOR REFLECTED CEILING PLAN
AE-104 REFERENCE AS-BUILT 4TH FLOOR PLANS
AE-105 REFERENCE AS-BUILT ROOF PLAN
AD-200a GROUND FLOOR DEMOLITION FLOOR PLANS (PHASE 1) AD-200b GROUND FLOOR DEMOLITION FLOOR PLANS (PHASE 2) AD-200c GROUND FLOOR DEMOLITION FLOOR PLANS (PHASE 4)
AD-204 4TH FLOOR DEMOLITION FLOOR PLANS (PHASE 3)
AD-300a GROUND FLOOR CEILING DEMOLITION PLAN (PHASE 1) AD-300b GROUND FLOOR CEILING DEMOLITION PLAN (PHASE 2) AE-200a GROUND FLOOR RENOVATION FLOOR PLAN (PHASE 1) AE-200b GROUND FLOOR RENOVATION FLOOR PLAN (PHASE 2) AE-200c GROUND FLOOR RENOVATION FLOOR PLAN (PHASE 4)
AE-204 4TH FLOOR RENOVATION FLOOR PLAN (PHASE 3)
AE-205 ROOF RENOVATION PLAN
AE-300a GROUND FLOOR REFLECTED CEILING PLAN (PHASE 1) AE-300b GROUND FLOOR REFLECTED CEILING PLAN (PHASE 2)
AE-400 INTERIOR ELEVATIONS
AE-800 DOOR & INTERIOR FINISH SCHEDULES
AE-900 INTERIOR DETAILS
AE-901 INTERIOR DETAILS
AQ-200 GROUND FLOOR EQUIPMENT PLANS
AQ-400 4TH FLOOR EQUIPMENT PLAN
AQ-800 EQUIPMENT SCHEDULE
FIRE ALARM
FA-000 FIRE ALARM COVER SHEET
FA-001 FIRE ALARM GROUND FLOOR DEMO AND RENOVATION PLANS - PHASE 1
FA-002 FIRE ALARM GROUND FLOOR DEMO AND RENOVATION PLANS - PHASE 2
FA-003 FIRE ALARM GROUND FLOOR DEMO AND RENOVATION PLANS - PHASE 3
FA-004 GROUND FLOOR INTERSTITIAL FIRE ALARM RENOVATION PLAN
FA-005 GROUND FLOOR INTERSTITIAL FIRE ALARM OVER-ALL PLAN
FA-006 POINT TO POINT, BATTERY & VOLTAGE DROP CALCS GROUND FLOOR
FA-007 FOURTH FLOOR FIRE ALARM DEMOLITION PLAN
FA-008 FOURTH FLOOR FIRE ALARM RENOVATION PLAN
FA-009 FOURTH FLOOR FIRE ALARM OVER-ALL PLAN
FA-010 FOURTH FLOOR FIRE ALARM INTERSTITIAL PLAN
FA-011 POINT TO POINT TO POINT, BATTERY & VOLTAGE DROP CALCS 4TH FLOOR
PLUMBING
P-001 PLUMBING GENERAL NOTES, LEGEND, AND SCHEDULES
PD401 PLUMBING ENLARGED DEMOLITION PLANS - GROUND FLOOR WASTE, VENT, AND WATER
PD441 PLUMBING ENLARGED DEMOLITION PLANS - FOURTH FLOOR WASTE, VENT, AND WATER
PL171 PLUMBING PLANS - ROOF WASTE, VENT, AND WATER
PL401 PLUMBING ENLARGED PLANS - GROUND FLOOR WASTE, VENT, AND WATER
PL402 PLUMBING ENLARGED PLANS - GROUND FLOOR WASTE, VENT, AND WATER
PL441 PLUMBING ENLARGED PLANS - FOURTH FLOOR WASTE, VENT, AND WATER
P-501 PLUMBING DETAILS
MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
M-002 MECHANICAL GENERAL, SHOP DRAWING, AND PROJECT NOTES, AND MECHANICAL
STAGING PROCESS
M-003 MECHANICAL PRE-TAB PLAN - GROUND FLOOR
M-004 MECHANICAL PRE-TAB PLAN - FOURTH FLOOR
MD101 MECHANICAL DEMOLITION PLAN - GROUND FLOOR INTERSTITIAL
MD141 MECHANICAL DEMOLITION PLAN - FOURTH FLOOR INTERSTITIAL
MD171 MECHANICAL DEMOLITION PLAN - ROOF
MD401 MECHANICAL ENLARGED DEMOLITION PLANS - GROUND FLOOR AND INTERSTITIAL
MD441 MECHANICAL ENLARGED DEMOLITION PLANS - FOURTH FLOOR AND INTERSTITIAL
M-101 MECHANICAL ZONING PLANS - GROUND FLOOR
M-141 MECHANICAL ZONING PLAN - FOURTH FLOOR
MH101 MECHANICAL PLAN - GROUND FLOOR INTERSTITIAL
MH111 MECHANICAL PLAN - FIRST FLOOR INTERSTITIAL
MH121 MECHANICAL PLAN - SECOND FLOOR
MH141 MECHANICAL PLAN - FOURTH FLOOR INTERSTITIAL
MH171 MECHANICAL PLANS - ROOF
MH401 MECHANICAL ENLARGED PLANS - GROUND FLOOR AND INTERSTITIAL
MH402 MECHANICAL ENLARGED PLANS - GROUND FLOOR AND INTERSTITIAL
MH441 MECHANICAL ENLARGED PLANS - FOURTH FLOOR AND INTERSTITIAL
MP161 MECHANICAL PIPING PLAN - SIXTH FLOOR INTERSTITIAL
MP171 MECHANICAL PIPING PLAN - ROOF
MP401 MECHANICAL ENLARGED PIPING PLAN - GROUND FLOOR INTERSTITIAL
MP441 MECHANICAL ENLARGED PIPING PLAN - FOURTH FLOOR INTERSTITIAL
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
MI601 MECHANICAL CONTROLS AND DIAGRAMS
MI602 MECHANICAL CONTROLS AND DIAGRAMS
MI603 MECHANICAL CONTROLS AND DIAGRAMS
MI604 MECHANICAL CONTROLS AND DIAGRAMS
MI605 MECHANICAL CONTROLS
M-901 MECHANICAL PHOTOS
M-902 MECHANICAL PHOTOS
ELECTRICAL
E-0.1 GENERAL NOTES AND SYMBOLS
E-1.0 GROUND FLOOR LIGHTING PLAN
E-2.0 GROUND FLOOR POWER PLAN
E-3.0 FOURTH FLOOR LIGHTING PLAN
E-4.0 FOURTH FLOOR POWER PLAN
E-5.0 HVAC POWER PLAN
E-6.0 INTERSTITIAL POWER PLAN
E-7.0 ACCESS CONTROL PLAN
E-8.0 ROOF HVAC POWER PLAN
E-9.0 GROUND FLOOR SINGLE LINE DIAGRAM
E-10.0 FOURTH FLOOR, ROOF, AND PENTHOUSE SINGLE LINE DIAGRAM
E-11.0 SCHEDULES
E-12.0 ELECTRICAL DETAILS
VICINITY MAP
PHASING NOTES
1. PROVIDE A DETAILED AND COMPREHENSIVE PHASING PLAN FOR HOSPITAL'S APPROVAL. AS A MINIMUM, THE COMPREHENSIVE PHASING PLAN SHALL CONSIDERS THE FOLLOWING:
· PHASING PLAN FOR EACH DISCIPLINE.
· PROJECT SCHEDULE.
· INFECTION CONTROL REQUIREMENTS.
· HOSPITAL'S OPERATIONAL REQUIREMENTS.
· EQUIPMENT PROCUREMENT PERIODS.
2. REFER TO PHASING PLANS AND/OR OTHER TRADES PHASING REQUIREMENTS.
3. COORDINATE ALL REQUIRED SHUTDOWNS WITH THE FACILITY PRIOR TO COMMENCEMENT OF WORK. BUILDING SERVICES SHALL NOT BE INTERRUPTED UNLESS APPROVED BY THE FACILITY. ANY
REQUIRED SHUTDOWN SHALL BE COORDINATED WITH AND APPROVED BY THE FACILITY. PROVIDE MINIMUM 30 DAY NOTIFICATION, IN WRITING, IN ADVANCE OF SHUTDOWN.
4. COORDINATE PHASING OF ALL DEMOLITION AND INSTALLATION WITH ALL TRADES. REVIEW RENOVATION DRAWINGS TO VERIFY AND DETERMINE EXTENT OF, AND SCHEDULING FOR, ALL
DEMOLITION PRIOR TO PERFORMING ANY WORK.
5. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS PRIOR TO DEVELOPMENT OF PHASING
PLANS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION.
6. MECHANICAL SYSTEMS SHALL BE REQUIRED TO BE TESTED AND BALANCED AT EACH STAGE.
· PHASE 1: GROUND FLOOR STERILE IV COMPOUNDING AND IV STORAGE ROOMS: MODIFY WALLS, CEILINGS, FINISHES, EQUIPMENT, POWER, LIGHTING, DATA, SECURITY, HVAC PIPING, PLUMBING, DUCTWORK, AND RELATED WORK AS REQUIRED PER THE CONTRACT DOCUMENTS TO CONVERT THE TRAINING LOCKER ROOM AREA AND TRAINING ADMIN AREA INTO A STERILE IV COMPOUNDING ROOM AND IV STORAGE ROOM. REFER TO PHASE 4 BELOW FOR ADDITIONAL WORK REQUIRED IN THIS AREA UNDER PHASE 4 FOR CONVERSION OF THE ROOM TO AN OFFICE.
· PHASE 2: GROUND FLOOR - PHARMACY: MODIFY GROUND FLOOR WALLS, CEILINGS, FINISHES, EQUIPMENT, POWER, LIGHTING, DATA, SECURITY, HVAC PIPING, PLUMBING, ROOFING, STRUCTURAL SUPPORTS, AND DUCTWORK, AND RELATED WORK, AND APPURTENANCES AS INDICATED IN THE CONTRACT DOCUMENTS TO CONVERT THE OFFICES AND STORAGE INTO A STERILE AND HAZARDOUS COMPOUNDING PHARMACY AND TO CONVERT THE STERILE IV COMPOUNDING ROOM INTO AN UNCLASSIFIED CONTAINMENT SEGREGATED COMPOUNDING AREA WITH A DEDICATED HAZARDOUS DRUG (BACILLUS CALMETTE-GUERIN, (BCG)) COMPOUNDING ASEPTIC CONTAINMENT ISOLATOR (ACI) HOOD ROOM.
· PHASE 3: FOURTH FLOOR - PHARMACY: MODIFY FOURTH FLOOR WALLS, CEILINGS, FINISHES, EQUIPMENT, POWER, LIGHTING, DATA, SECURITY, HVAC PIPING, PLUMBING, ROOFING, STRUCTURAL SUPPORT, DUCTWORK AND RELATED WORK, AND APPURTENANCES AS INDICATED IN THE CONTRACT DOCUMENTS TO CONVERT THE PATIENT ROOM, VESTIBULE, AND
HOUSEKEEPING CLOSET INTO A STERILE AND HAZARDOUS COMPOUNDING PHARMACY.
· PHASE 4: GROUND FLOOR OFFICE: MODIFY WALLS, CEILINGS, FINISHES, EQUIPMENT, POWER, LIGHTING, DATA, SECURITY, HVAC PIPING, PLUMBING, DUCTWORK, AND RELATED WORK AND APPURTENANCES AS REQUIRED PER THE CONTRACT DOCUMENTS TO CONVERT THE STERILE IV COMPOUNDING ROOM INTO AN OFFICE.
PROJECT DIRECTORY
OWNER: DEPARTMENT OF VETERANS AFFAIRS
LOS ANGELES MEDICAL CENTER
CONTACT: ROSS MANOUKIAN
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
OFFICE: (818) 891-7711 EXT. 38053
MECHANICAL SC ENGINEERS, INC.
ENGINEER
CONTACT: JEREMY CLIFTON, PE
17075 VIA DEL CAMPO,
SAN DIEGO, CA 92127
OFFICE: (858) 946-0333
ARCHITECT MA ARCHITECT
CONTACT: STEVE McCASLIN, AIA
20695 S WESTERN AVE., SUITE 204
TORRANCE, CA 90501
OFFICE: (650) 485-9012
STRUCTURAL GSSI STRUCTURAL ENGINEERS
ENGINEER
CONTACT: WILLIAM SCHELL, PE
5550 BALTIMORE DRIVE, SUITE 100
LA MESA, CA 91942
OFFICE: (619) 687-3810
ELECTRICAL TANNER ENGINEERING
ENGINEER
CONTACT: ROCKY TANNER, PE
5250 JACKSON DRIVE, SUITE 200
LA MESA, CA 91942
OFFICE: (619) 713-1400
SCOPE OF WORK
THE INTENT OF THE PROJECT IS TO RENOVATE EXISTING CLEAN ROOMS TO PROVIDE USP 800 COMPLIANCE CLEAN ROOM AT GROUND FLOOR AND FOURTH FLOOR PHARMACY AREAS OF BUILDING 500.
PROJECT SCOPE INCLUDES FOLLOWING :
· PROVIDE SEPARATE HAZARDOUS DRUGS AND INTRAVENOUS COMPOUNDING PREPARATION ROOMS ON GROUND FLOOR AND FOURTH FLOOR.
· PROVIDE BUFFER, ANTE, AND STORAGE ROOMS IN COMPLIANCE WITH THE USP 800.
SHEET INDEX
KEY PLAN
CODES AND STANDARDS
TRUE
NORTH
VA WEST LOS ANGELES
INFECTION CONTROL NOTES
1. OBTAIN REVIEW OF INFECTION CONTROL PLAN FOR PROJECT BEFORE WORK BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
5. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES PRIOR TO START OF WORK.
6. WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE
WORK SITE.
7. WET MOP OR HEPA VACUUM THE SPACE DAILY.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREAS AND REPLACE OR CLEAN
WHEN NO LONGER EFFECTIVE.
9. DIRECT CONSTRUCTION AND DEBRIS TRAFFIC AWAY FROM PATIENT CARE AND PHARMACY
AREAS.
10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT AREA IS
THOROUGHLY CLEANED.
11. VACUUM WORK AREA WITH HEPA FILTERED EQUIPMENT.
12. WET MOP AREA WITH HOSPITAL APPROVED DISINFECTANT.
13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING DIRT AND DEBRIS;
WET WIPE OR HEPA VACUUM BARRIERS PRIOR TO REMOVAL.
14. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
15. DURING DEMOLITION, DUST PRODUCING WORK OR WORK IN THE CEILING, DISPOSABLE
SHOE COVERS & COVERALLS MUST BE WORN & REMOVED IN THE ANTEROOM WHEN
LEAVING THE WORK AREA.
PROJECT
NORTH
GI001
TITLE SHEET
AB
A
ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
ACP
AD
ACOUSTICAL CEILING PANEL
AREA DRAIN
ADDL ADDITIONAL
ADH
ADDITIONAL
ADHESIVE
ADJ
AFF
ADJACENT
AFG
ABOVE FINISH FLOOR
AFS
ABOVE FINISH GRADE
AGGR
ABOVE FINISH SLAB
ALUM
AGGREGATE
ALT
ALUMINUM
ANOD
ALTERNATE
APPROX
ANODIZED
ARCH
APPROXIMATE(LY)
ACS PNL ACCESS PANEL
ARCHITECT(URAL)
ASPH ASPHALT
AVG AVERAGE
BB
B
BULLETIN BOARD
BD BOARD
BTWN
BLDG
BETWEEN
BUILDING
BM
BOT
BENCHMARK
BOTTOM
BITUM BITUMINOUS
BOS BOTTOM OF STEEL
BRG BEARING
BSMT BASEMENT
CAB
C
CABINET
CB CATCH BASIN
CCT
CG
CUBICLE CURTAIN TRACK
CORNER GUARD
CEM
CER
CEMENT, CEMENTITIOUS
CERAMIC
CCTV CLOSED CIRCUIT TELEVISION
CH BD CHALKBOARD
CI CAST IRON
CJ CONTROL JOINT
CL
CLG
CLR
CMU
CNTR
COL
CONC
CONF
CONN
CONSTR
CONT
CONTR
CORR
CPT
CSK
CSP
CSWK
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COUNTER
COLUMN
CONCRETE
CONFERENCE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CARPET
COUNTERSUNK
COMBINATION STANDPIPE
CASEWORK
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DBL ACT DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIM PT DIMENSION POINT
DISP DISPENSER
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DSP DRY STANDPIPE
DT DRAPERY TRACK
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EG EDGE GUARD
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXC EXCAVATED
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FURN FURNITURE
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
GVL GRAVEL
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
ID
I
INSIDE DIAMETER
JAN
J
JANITOR
KG
K
KILOGRAM
L
L
LENGTH, LONG
M
M
METERS
(N)
N
NEW
P
QT
Q
QUARRY TILE
R
R
RISER
S SOUTH
T
T
TREAD
W
W
WEST
XFMR
X
TRANSFORMER
YD
Y
YARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCAND INCANDESCENT
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INTR INTERIOR
INV INVERT
IVT INTRAVENOUS TRACK
JST JOIST
JT JOINT
KIT KITCHEN
KPL KICK PLATE
KS KNEE SPACE
LAB LABORATORY
LAM LAMINATE, LAMINATION
LAV LAVATORY
LB POUND
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
LG LENGTH
LIN LINEAR
LL LEAD LINED
LPT LOW POINT
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVR LOUVER
HW HOT WATER
S
MACH MACHINE
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MM MILLIMETERS
MO MASONRY OPENING
MOD MODULE, MODULAR
MTD MOUNTED
MTG MOUNTING
MVBL MOVABLE
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOICE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNEU PNEUMATIC
PNL PANEL
PNL BD PANEL BOARD
PNT PAINT
PORT PORTABLE
PP PUSH PLATE
PPM PARTS PER MILLION
PR PAIR
PRCST PRECAST
PREP PREPARATION
PREFAB PREFABRICATION
PRKG PARKING
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PTS PNEUMATIC TUBE STATION
PVC POLYVINYL CHLORIDE
PVG PAVING
PVMT PAVEMENT
PWR POWER
QTR QUARTER
QTY QUANTITY
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RESIL RESILIENT
RET RETURN
REV REVISION
RF RESILIENT FLOORING
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RWL RAIN WATER LEADER
SAF
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SD STORM DRAIN
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEP SEPARATION OR SEPARATE
SEP JT SEPARATION JOINT
SHT SHEET, SHEETING
SHWR SHOWER
SHV SHELVES, SHELVING
SIM SIMILAR
SK SINK
SMS SHEET METAL SCREW
SP SPACE, SPACED, SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SS SANITARY SEWER
SSK SERVICE SINK
SST STAINLESS STEEL
ST STREET
STA STATION
STAG STAGGERED
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
STS SELF-TAPPING STEEL
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SVCE SERVICE
SW SOUTHWEST
SYMM SYMMETRICAL
SYST SYSTEM
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TOP OF CONCRETE, TOP OF CURB
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
THERM THERMAL
THK THICK, THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD GL TEMPERED GLASS
TO TOP OF
TOR TOP OF RAILING
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
UC
U
UNDER COUNTER
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL UTILITY
W/ WITH
W/O WITHOUT
WC WATER CLOSET OR WALL COVERING
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WCHR WHEELCHAIR
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
CCR CARD CONTROL READER
BUR BUILT UP ROOFING SYSTEM
CT CERAMIC TILE
F
F/F FACE TO FACE
FA FIRE ALARM
FAS FIRE ALARM STATION
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FHY FIRE HYDRANT
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF
FSB FOLDING SHOWER BENCH
FSTNR FASTENER
FT FOOT, FEET
OC
O
ON CENTER
PA PUBLIC ADDRESS
OA OVERALL
OD OUTSIDE DIAMETER
OFCI
OFOI
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OVHD OVERHEAD
OZ OUNCE
PART PARTIAL
PBD PARTICLEBOARD
PBX
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PI POINT OF INTERSECTION
PL PLATE
PLAM PLASTIC LAMINIATE
P
PRIVATE TELEPHONE EXCHANGE
OWNER FURNISHED-CONTRACTOR INSTALLED
OWNER FURNISHED-OWNER INSTALLED
VAC
V
VACUUM
VB VALVE BOX
VCT VINYL COMPOSITION TYLE
VERT VERTICAL
VEST VESTIBULE
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
VWC VINYL WALL COVERING
ABBREVIATIONS SYMBOLS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
OH OPPOSITE HAND
HSS HOLLOW STRUCTURAL STEEL
SA SUPPLY AIR
SYMBOLS LEGENDS
SHEET
X
NORTH IDENTIFIER
ELEVATION
IDENTIFIER
KEY NOTE TAG
GRID LINES
CALL-OUT
IDENTIFIER
? PHOTOGRAPH
LOCATIONS
+? CEILING TAG
? WALL TYPE TAG
Sheet # Ref # On Sheet
V/V VA PROVIDED / VA INSTALLED
GENERAL NOTES CONTINUED:
11. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR
EXAMINING CONTRACT DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT WORK IS
BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IT IS NOT INTENDED
THAT THE CONTRACT DOCUMENTS INCLUDE EACH & EVERY SUB-SYSTEM AND/OR SUB-
COMPONENT NECESSARY TO FULLY AND PROPERLY COMPLETE THE WORK. SUB-
SYSTEMS, SUB-COMPONENTS OR DETAILS REQUIRED OR NORMALLY INCLUDED AS TRADE
PRACTICE MAY NOT BE SPECIFICALLY MENTIONED NOR SHOWN.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE
ARCHITECT BEFORE PROCEEDING WITH WORK IN QUESTION OR RELATED WORK.
12. RFI'S (REQUEST FOR INFORMATION) SHALL BE DEFINED AND LIMITED TO A REQUEST FROM
THE CONTRACTOR SEEKING INTERPRETATION OR CLARIFICATION OF THE REQUIREMENTS
OF THE CONTRACT DOCUMENTS. RFI REQUESTS SHALL BE SUBMITTED VIA E-MAIL IN A
TIMELY MANNER, WELL IN ADVANCE OF RELATED WORK, AND ALLOW SUFFICIENT TIME
FOR THE RESOLUTION OF ISSUES RELATING TO THE REQUEST FOR INTERPRETATION OR
CLARIFICATION. RFI REQUESTS SUBMITTED AFTER 3PM OF A BUSINESS DAY WILL NOT BE
CONSIDERED RECEIVED TILL THE FOLLOWING BUSINESS DAY. RFI REQUESTS SHALL BE
NUMBERED IN A SEQUENTIAL MANNER AND CONTAIN A DETAILED DESCRIPTION OF THE
AREAS OF WORK REQUIRING INTERPRETATION OR CLARIFICATION. INCLUDE DRAWING
AND SPECIFICATION REFERENCES, SKETCHES, TECHNICAL DATA, BROCHURES, OR OTHER
SUPPORTING DATA AS DEEMED NECESSARY BY THE ARCHITECT, FOR THE ARCHITECT TO
PROVIDE THE INTERPRETATIONS AND CLARIFICATIONS REQUESTED. THE CONTRACTOR
SHALL INCLUDE A "PROPOSED SOLUTION" TO THE ISSUE REQUIRING INTERPRETATION OR
CLARIFICATION. RFI REQUESTS SHALL NOT CONTAIN SUBMITTALS, SUBSTITUTIONS
REQUESTS, ETC. CONTRACTOR'S REQUESTS FOR INFORMATION MAY BE REJECTED,
WHERE SUCH INFORMATION WAS AVAILABLE TO THE CONTRACTOR FROM A CAREFUL
STUDY AND COMPARISON OF THE CONTRACT DOCUMENTS, FIELD CONDITIONS,
MANUFACTURER’S PRODUCT DATA, OTHER OWNER-PROVIDED INFORMATION,
CONTRACTOR-PREPARED COORDINATION DRAWINGS, OR PRIOR PROJECT
CORRESPONDENCE AND/OR DOCUMENTATION.
13. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRODUCTION ALL
CONSTRUCTION DOCUMENTS BY THE TRADES NEEDED TO COMPLY w/ THE DESIGN INTENT
EXPRESSED WITH THE CONTRACT DOCUMENTS. SHOP DRAWINGS SHOULD INCLUDE
LAYOUT, CONSTRUCTION DETAILS, FABRICATION & ERECTION DRAWINGS, SETTING
DRAWINGS, DIAGRAMMATIC DRAWINGS, AND MATERIAL SCHEDULES. LOCATION AND
ORIENTATION OF ALL ITEMS SHOULD BE CLEARLY INDICATED. THE ARCHITECT'S REVIEW
OF SHOP DRAWINGS SHALL NOT RELIEVE THE GENERAL CONTRACTOR OR
SUBCONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM THE DRAWINGS OR
SPECIFICATIONS UNLESS HE HAS, IN WRITING, AND BROUGHT TO THE ATTENTION OF THE
ARCHITECT SUCH DEVIATIONS AT THE TIME OF THE SUBMISSION, NOR SHALL IT RELIEVE
HIM (GENERAL CONTRACTOR) FROM RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE
SHOP DRAWINGS.
14. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY
SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT WILL
CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR
SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF MATERIALS AND
EQUIPMENT HAVING LONG LEAD TIMES.
15. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT
BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
16. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE
WORK OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING OR PATCHING THAT
MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT TOGETHER.
17. CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CUTTING, FITTING OR PATCHING THAT MAY BE REQUIRED TO COMPLETE WORK OR TO
MAKE ITS SEVERAL PARTS FIT TOGETHER. THE GENERAL CONTRACTOR IS RESPONSIBLE
TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND
SUPPLIERS WITH ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS.
18. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A
CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE
CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO
COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY
OWNER, TENANT, OR BOTH, WHICH ARE UNDER SEPARATE CONTRACT WITH THE OWNER,
TENANT OR BOTH.
19. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE OWNER AND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S
EXPENSE. THE CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE
ARCHITECT AS DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS
WHETHER OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR
NOT FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS
OF CORRECTING SUCH REJECTED WORK, NOT TO BE REIMBURSED, INCLUDING
COMPENSATION FOR THE ARCHITECT'S ADDITIONAL SERVICES MADE NECESSARY
THEREBY.
20. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-
BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ARCHITECT UPON
COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD
DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS,
AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE
CONTRACT DOCUMENTS. **NO EXCEPTION ALLOWED**
21. FINAL COMPLETION CONSTRUCTION PHOTOS: THE CONTRACTOR WILL ENGAGE A
PROFESSIONAL PHOTOGRAPHER TO DOCUMENT THE COMPLETED WORK AFTER INITIAL
PUNCH WALK BY THE ARCHITECT. SUBMIT DIGITAL FILES TO ARCHITECT AS PART OF THE
PROJECT RECORD DOCUMENTS WITH LICENSE FOR USE OF IMAGES BY TEAM ASSOCIATED
WITH THE PROJECT.
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY THE
"INDEX OF DRAWINGS".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE - SEE
"INDEX OF DRAWINGS".
3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT. NO PART OF THE CONTRACT
DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK CONTRARY TO AN
APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.
NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT
WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE,
OR LAW.
4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S SPECIFICATIONS.
5. SCHEDULE CONSTRUCTION WORK HOURS TO ACCOMMODATE THE OPERATION OF THE
HOSPITAL / CLINIC / FACILITY.
6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,
WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE
SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "INDEX
OF DRAWINGS". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.
THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY
THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURE
INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH
OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND
QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.
7. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND
ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS ESTABLISH
AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT NOT ALL,
EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL, ELECTRICAL,
PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE SUPPLEMENTARY TO
ARCHITECTURAL WORKING DRAWINGS. THE WORK DESCRIBED BY THE DRAWINGS OF ANY
ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER
DISCIPLINE OR MANUFACTURER INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE
IN THEMSELVES, OR WITH EACH OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE
COMBINATION OF QUALITY AND QUANTITY OF WORK INDICATED. ANY DISCREPANCY
BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF
THE ARCHITECT FOR CLARIFICATION.
8. THE DRAWINGS ARE INTENDED TO GRAPHICALLY ILLUSTRATE THE OVERALL NATURE OF
THE WORK; THE CONFIGURATION, ARRANGEMENT, AND LOCATION OF THE WORK AND ITS
PARTS; AND THE PHYSICAL DIMENSIONS OF THE WORK - THE DRAWINGS TAKE
PRECEDENCE OVER THE SPECIFICATIONS WITH RESPECT TO INFORMATION OF THIS
NATURE.
9. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND
QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE
WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS
OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL
PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS
WITH RESPECT TO INFORMATION OF THIS NATURE.
10. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
• ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE
MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR
ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR
ASSEMBLY.
• THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN"
MAY VARY FROM THAT SHOWN BY THE DRAWINGS.
• THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY
GOVERNMENT’S REPRESENTATIVE. HOWEVER, THE CONTRACTOR IS RESPONSIBLE
(AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME
FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF
DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.
APPLICABLE STANDARDS: (PER VA PG 18-3 TOPIC 1)
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES
BELOW)
• NFPA 101 LIFE SAFETY CODE
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE
DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF
THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN THE LATEST EDITION OF EACH IN EFFECT AT THE
DATE OF PROJECT SUBMISSION (U.N.O.)
EXIT NOTES AND FIRE DEPARTMENT REQUIREMENTS CONTINUED
6. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN
EGRESS DIRECTION.
7. ALL EXIT DOORS SHALL BE POSITIVE LATCHING.
8. HAND-ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 30” AND 44” ABOVE THE
FLOOR. SEE PLAN AND SCHEDULES FOR SPECIFIC MOUNTING HEIGHTS.
9. PROVIDE PANIC HARDWARE ON EXIT DOORS SERVING ROOMS, CORRIDORS, OR STAIRWAYS HANDLING OCCUPANT LOADS OR 50 OR MORE, FROM ANY GROUP A, E, OR I OCCUPANCY, OR WHEN REQUIRED BY LOCAL FIRE CODE AND AS NOTED ON THE PLANS. ALL PANIC HARDWARE SHALL BE APPROVED AND
LISTED BY THE STATE FIRE MARSHALL.
10. DOOR HARDWARE SHALL NOT PROJECT INTO DOOR CLEAR WIDTH MORE THAN 3 1/2".
11. DOOR OPENING FORCE FOR PUSHING OR PULLING OPEN INTERIOR SWINGING EGRESS DOORS, OTHER THAN FIRE DOORS, SHALL NOT EXCEED 5 LBS. FOR OTHER SWINGING DOORS, AS WELL AS SLIDING AND FOLDING DOORS, THE DOOR LATCH SHALL RELEASE WHEN SUBJECTED TO A 15-LB. FORCE. THE DOOR SHALL BE SET IN MOTION WHEN SUBJECTED TO A 30-LB. FORCE. THE DOOR SHALL SWING TO A FULL- OPEN POSITION WHEN SUBJECT TO A 15-LB. FORCE. APPLIED FORCE SHALL BE MEASURED AT THE
LATCH SIDE OF THE DOOR.
12. POWER-OPERATED DOORS, SUCH AS DOORS WITH A PHOTO-ELECTRIC-ACTUATED MECHANISM TO OPEN
THE DOOR UPON THE APPROACH OF A PERSON, OR DOORS WITH POWER-ASSISTED MANUAL
OPERATION, THE DESIGN SHALL BE SUCH THAT IN THE EVENT OF POWER FAILURE, THE DOOR IS CAPABLE OF BEING OPENED MANUALLY TO PERMIT EGRESS TRAVEL OR CLOSED WHERE NECESSARY TO SAFEGUARD MEANS OF EGRESS. MANUAL OPENING FORCES AS NOTED ABOVE SHALL APPLY TO THESE DOORS. FULL-POWER-OPERATED DOORS SHALL COMPLY WITH BHMA A156.10. POWER-ASSISTED AND
LOW-ENERGY DOORS SHALL COMPLY WITH BHMA A156.19.
13. EVERY DOORWAY WHICH IS LOCATED WITHIN AN ACCESSIBLE PATH OF TRAVEL SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT LESS THAN 3’-0” IN WIDTH AND NOT LESS THAN 6’-8” IN
HEIGHT.
14. WHEN REQUIRED EXIT DOORS AND GATES ARE REQUIRED TO BE ACCESSIBLE FOR THE DISABLED, tHEY MUST SWING IN DIRECTION OF EXIT TRAVEL OVER A 5'-0" X 5'-0" LANDING NOT MORE THAN 1/2" BELOW
THRESHOLD.
15. EXIT DOORS SHALL BE CAPABLE OF OPENING SO THAT THE CLEAR WIDTH OF THE EXIT IS NOT LESS THAN
32”, MEASURED BETWEEN THE FACE OF THE DOOR AND THE OPPOSITE STOP.
16. THE BOTTOM 10” OF ALL DOORS EXCEPT AUTOMATIC AND SLIDING SHALL HAVE A SMOOTH, UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST
WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE USED, A 10” HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS
CONDITION.
17. ALL FIRE-RATED DOOR ASSEMBLIES SHALL BE PROVIDED WITH APPROVED GASKETING MATERIAL INSTALLED TO PROVIDE A SEAL WHERE THE DOOR MEETS THE STOP ON BOTH SIDES AND ACROSS THE
TOP.
18. MANUFACTURERS’ INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE FOR ALL RATED
OPENING ASSEMBLIES.
19. EXIT SIGNS SHALL HAVE MINIMUM 6” HIGH LETTERS ON CONTRASTING BACKGROUND LOCATED AT AND
LEADING TO ALL EXITS.
20. OVERHEAD EMERGENCY EXIT WAY LIGHTING SHALL BE PROVIDED GIVING A VALUE OF ONE (1)
FOOTCANDLE AT FLOOR LEVEL AND POWERED BY THE BUILDING’S ELECTRICAL SYSTEM AND AN
EMERGENCY GENERATOR OR STORAGE BATTERY BACK-UP SYSTEM WHERE THE OCCUPANT LOAD
EXCEEDS 500 FOR A2 AND 2.1 OCCUPANCY. CONFORM TO ALL OTHER BUILDING, FIRE, AND eLECTRICAL
CODE REQUIREMENTS FOR EMERGENCY EXIT LIGHTING.
21. AISLES SHALL BE MINIMUM 44” WIDE LEADING TO EXITS WITHIN EACH TENANT SPACE.
22. A CLEAR AREA, 3 FEET IN FRONT OF ALL ELECTRICAL PANELS SHALL BE MAINTAINED.
23. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAMEPROOF IN AN APPROVED MANNER
INCLUDING, BUT NOT LIMITED TO, CURTAINS, DRAPES, SHADES, HANGINGS, ETC.
24. TELEVISION ANTENNA CROSS ARMS OR OTHER ROOF OBSTRUCTIONS SHALL BE LOCATED SEVEN (7)
FEET MINIMUM ABOVE THE ROOF, IF ROOF SLOPE IS LESS THAN 30 DEGREES.
25. ROOF OBSTRUCTIONS SUCH AS RAZOR WIRE, SOLAR PANELS, GUY WIRES, ETC. SHALL NOT PREVENT
FIRE DEPT. ACCESS OR EGRESS.
26. MAXIMUM FLAME SPREAD CLASS RATING FOR EXIT ENCLOSURES AND EXIT PASSAGEWAYS, IN ‘A’ AND ‘B’ OCCUPANCIES, IN FULLY FIRE SPRINKLERED BUILDINGS, SHALL BE CLASS B. CLASS A FLAME SPREAD INDEX = 0-25 AND CLASS B FSI = 26-75. CLASS A AND B MAXIMUM SMOKE DENSITY SHALL BE 0-450. FOR.
SEE TBL.803.9 FOR OTHER OCCUPANCIES AND EXCEPTIONS.
27. EXISTING FIRE ALARM SYSTEM FOR THE BUILDING SHALL REMAIN FULLY OPERATIONAL DURING DEMOLITION AND CONSTRUCTION PROCEDURES. SEE FIRE ALARM PLANS FOR COMPLETE INFORMATION.
COORDINATE ALL MODIFICATIONS, TEMPORARY SHUTDOWNS OR TESTING WITH THE VA AND LOCAL FIRE
MARSHALL OR FIRE PREVENTION AUTHORITY.
28. EXISTING FIRE SPRINKLER AND WET STANDPIPE SYSTEMS FOR THE BUILDING SHALL REMAIN FULLY OPERATIONAL DURING DEMOLITION AND CONSTRUCTION PROCEDURES. SEE FIRE PROTECTION PLANS
FOR COMPLETE INFORMATION. COORDINATE ALL MODIFICATIONS, TEMPORARY SHUTDOWNS, OR
TESTING WITH THE VA AND LOCAL FIRE MARSHALL OR FIRE PREVENTION AUTHORITY.
29. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A-10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PARTS OF THE BUILDING ON EACH FLOOR. PROVIDE 10BC FOR ELECTRICAL
ROOMS, MECHANICAL ROOMS, TRASH ROOMS, AND ELEVATOR MACHINE ROOMS.
30. FIRE DAMPERS OR DOORS SHALL BE PROVIDED AS REQUIRED WHERE DUCTS PENETRATE FIRE-RATED
WALLS OR CEILINGS AND SHALL BE INSTALLED PER IFC SEC. 713 AND NFPA 101.
31. FIRE DAMPERS SHALL BE APPROVED AND LISTED BY THE STATE FIRE MARSHALL. INSTALL STRICTLY IN ACCORDANCE WITH MANUFACTURER’S PRINTED INSTRUCTIONS. LISTING APPROVAL INSTRUCTIONS
SHALL BE MADE AVAILABLE TO THE INSPECTING AUTHORITIES.
32. ACCESS IS REQUIRED WHEN ONE-HOUR FIRE-RATED ASSEMBLIES ENCLOSE MECHANICAL DEVICES AND
MUST BE APPROVED BY THE FIRE DEPARTMENT.
33. PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES, HOT GASES, AND SMOKE WHEN SUBJECTED tO THE REQUIREMENTS OF ASTM-E-814 AND IN COMPLIANCE WITH PROJECT PLANS AND SPECIFICATIONS.
34. PLUMBING, MECHANICAL, AND ELECTRICAL PENETRATIONS, INCLUDING CONDUITS AND PIPING, THROUGH FIRE-RATED WALL, FLOOR, AND CEILING ASSEMBLIES SHALL BE TIGHTLY AND SOLIDLY SEALED WITH FIRESTOPPING COMPLYING WITH IFC SEC. 707 AND 708. WHEN AN ITEM PENETRATES a FIRE BARRIER WALL, THE SECTION PASSING THROUGH THE WALL SURFACE AND THE FIXTURE CONNECTIONS
THERETO SHALL BE ONLY OF METAL. SEE FIRE PROTECTION DETAILS IN THE PLANS.
35. DUCT INSULATION APPLIED TO THE EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION INCLUDING INSULATION, FACING MATERIALS, TAPES, AND
ADHESIVES AS NORMALLY APPLIED PER MANUFACTURER’S INSTRUCTIONS.
36. DRAFTSTOPPING ENCLOSING FLOOR/CEILING SPACES AND ATTIC SPACES NOT TO EXCEED 1000 SQ. FT.
SHALL BE PROVIDED WITHIN CONCEALED FLOOR-CEILING ASSEMBLIES THAT ARE FORMED OF
COMBUSTIBLE MATERIALS.
37. DRAFTSTOPPING ENCLOSING AREAS NOT TO EXCEED 3000 SQ. FT. SHALL BE PROVIDED WITHIN ATTICS, MANSARD OVERHANGS AND SIMILAR CONCEALED SPACES FORMED OF COMBUSTIBLE MATERIALS.
38. SUBMIT TO THE FIRE DEPARTMENT FOR APPROVAL A HAZARDOUS MATERIALS MANAGEMENT PLAN AND
A HAZARDOUS MATERIALS (MSDS) INVENTORY STATEMENT AS OUTLINED IN 2009 IFC.
39. SUBMIT TO THE FIRE DEPARTMENT FOR APPROVAL AN EMERGENCY EVACUATION PLAN. THE PLAN SHALL
BE CONSPICUOUSLY POSTED AND ALL EMPLOYEES SHALL BE TRAINED IN SUCH PROCEDURES.
40. "ELECTRICAL ROOM" SIGN SHALL BE POSTED ON THE OUTSIDE OF ELECTRICAL ROOM DOOR.
41. “FIRE RISER ROOM" SIGN SHALL BE POSTED ON THE OUTSIDE OF THE FIRE RISER ROOM DOOR.
42. “FIRE ALARM CONTROL PANEL" SIGN SHALL BE POSTED ON THE OUTSIDE OF THE FIRE ALARM CONTROL
PANEL DOOR.
43. “ROOF ACCESS" SIGN SHALL BE POSTED ON THE ROOF ACCESS DOOR.
44. A DURABLE SIGN STATING " THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" SHALL BE PLACED ON OR ADJACENT TO THE FRONT EXIT DOORS OF THE DEPARTMENT. THE SIGN SHALL BE IN
LETTERS NOT LESS THAN ONE INCH HIGH ON A CONTRASTING BACKGROUND.
EXIT NOTES AND FIRE DEPARTMENT REQUIREMENTS
CONTRACTOR SHALL COMPLY WITH APPROVED CONSTRUCTION SAFETY PLAN SUBMITTED TO VA
AND/OR FIRE PREVENTION AUTHORITY, INCLUDING, BUT NOT LIMITED TO, PROVISIONS FOR
TEMPORARY EXITS, EXITWAYS, EGRESS MARKINGS AND SIGNAGE, CONSTRUCTION BARRIERS,
AND FIRE PROTECTION DEVICES.
1. REFER TO CONSTRUCTION BARRIER AND EXIT PLAN FOR EXIT REQUIREMENTS DURING CONSTRUCTION.
2. DO NOT BLOCK EXITS AT ANY TIME.
3. THE CONTRACTOR SHALL PROVIDE PROPER PROTECTION DURING WELDING. FURTHER PROTECTION SHALL BE PROVIDED TO ANY OCCUPANTS AND THE PUBLIC WITH PORTABLE, SOLID, VISION BARRICADES AROUND LOCATION WHERE WELDING IS PERFORMED. PROVIDE SIGNS WARNING AGAINST LOOKING AT
WELDING WITHOUT PROPER EYE PROTECTION OR EQUIVALENT.
4. THE GENERAL CONTRACTOR SHALL PROVIDE PROTECTIONS DURING CONSTRUCTION AND DEMOLITION COMPLYING WITH APPLICABLE SECTIONS OF IBC CHAP. 33, IFC CHAP. 14, AND NFPA CHAPS. 10 &16 FOR
SAFEGUARDS DURING CONSTRUCTION DEMOLITION.
5. EVERY EXIT DOOR SHALL BE OPERABLE FROM INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. PROVIDE PANIC
HARDWARE WHEN REQUIRED BY THE BUILDING AND FIRE CODES AND AS NOTED ON THE PLANS.
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved: Project Director
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
B-500 IV CLEANROOM
COMPLIANCE
MA Arch
GI-002
ABBREVIATIONS, GENERAL NOTES &
APPLICABLE STANDARDS
691-18-109WL
SMc
West Los Angeles Medical Center 11301 Wilshire Boulevard, West Los Angeles, CA 90073
June 12, 2020
B-500
ADDENDUM 01
FULLY SPRINKLERED
PROJECT GENERAL NOTES
FIRE AND LIFE SAFETY CONTINUEDABBREVIATIONS APPLICABLE STANDARDSPROJECT GENERAL NOTES CONTINUED
FIRE AND LIFE SAFETY
Rev. Date Description
1 06.25.2020 Addendum 01
06/30/2020
Exp. 12.31.2021
AE-200a
AE-200b
M
IN
C
L R
PHASE 2 NOTE:
COORDINATE WITH
THE VA CONTRACTING
OFFICER
REPRESENTATIVE.
PROVIDE A
TEMPORARY ACCESS
DOOR ASSEMBLY WITH
PUSHBUTTON
COMBINATION LOCK
FROM THE HALLWAY/
EAST WALL. THE
CONTRACTOR SHALL
DOCUMENT THE
EXISTING CONDITIONS
WITH PLANS AND
PHOTOGRAPHS FOR
RECONSTRUCTION
AND PATCHING OF THE
WALL TO MATCH WITH
THE EXISTING
CONDITIONS.
AE-200c
NORTH
PHASING LEGEND:
AREA OF WORK
PRE-MAUFACTURED MODULAR DEMOUNTABLE PARTITIONS
CONSTRUCTION BARRICADES TO THE UNDERSIDE OF THE
EXISTING CEILING ASSEMBLY. (BASIS OF DESIGN INTENT:
MCCAIN WALL); CONTRACTOR TO COORDINATE WITH VA
CONTRACTING OFFICER REPRESENTATIVE FOR ACCESS TO
THE SPACE.
80 SF
(E) Storage
72 SF
(E) Storage
AE-204
AQ-400
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved: Project Director
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
B-500 IV CLEANROOM
COMPLIANCE
MA Arch
GI-003
PROJECT PHASING SEQUENCE
691-18-109WL
SMc
West Los Angeles Medical Center 11301 Wilshire Boulevard, West Los Angeles, CA 90073
June 12, 2020
B-500
ADDENDUM 01
FULLY SPRINKLERED
1/8" = 1'-0"
Ground Floor Plan (Phase 1) 1/8" = 1'-0"
Ground Floor Plan (Phase 2)
1/8" = 1'-0"
Ground Floor Plan (Phase 4)
KEY PLAN
1/8" = 1'-0"
4th Floor Plan (Phase 3)
1/8" = 1'-0"
4th Floor Plan (Phase 5 - Future)
NOTE:
PHASE 5 INCLUDES REMOVAL OF
EQUIPMENT U3506 FOR INSTALLATION OF
EQUIPMENT IV002
Rev. Date Description
1 06.25.2020 Addendum 01
J J
H H
9 9.1
9.1
9.2
9.2
160 SF
(E) Women's Toilet 0200A
225 SF
(E) Men's Toilet 0201A
1508 SF
(E) Pharmacy
120 SF
(E) Office 0205J
151 SF
(E) Pre-Pack 0205H
219 SF
(E) Chief Office 0205A
222 SF
(E) Safe
0205B 166 SF
(E) Office 0205C
338 SF
(E) Receiving 0204A
207 SF
(E) Work BCMA Room
0205G
329 SF
(E) Training
94 SF
(E) Storage 0205E
204 SF
(E) Office 0205D
78 SF
(E) Ante Room
0205D1
201 SF
(E) Buffer Zone
0205K
X.A X.A
X.B X.B
X.C X.C
X.D X.D
J.2 J.2
X.E X.E
J.3 J.3
J.4X.F X.F
X.1
X.1
X.3
X.3
X.4
X.4
X.5
X.5
175 SF
Stair
PARTITION LEGEND:
NOTE:
-ALL WORK TO COMPLY w/ 2015 IBC
-CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCEMENT OF WORK.
-DIMENSIONS: WALL DIMENSIONS ARE FACE OF FINISHED FACE TO FINISHED FACE UNLESS
NOTED OTHERWISE. WINDOW / DOOR DIMENSIONS ARE TO CENTER LINE OF WINDOW / DOOR.
-ALL MTL. STUDS ARE 4" U.N.O. (MATCH FRAMING OF CURRENT CONDITIONS AS APPLICABLE)
-WHERE DIMENSION IS PRECEEDED BY A (±) SYMBOL, THIS REPRESENTS/ALLOWS A "FLOAT" IN
LAYING OUT THE WORK. CONTRACTOR IS TO NOTIFY ARCHITECT IN WRITING, PRIOR TO
FRAMING, IF DIMENSION EXCEED ±2" FOR DIRECTION ON HOW TO PROCEED.
NEW ACOUSTICAL PARTITION (4" STUD U.N.O.)
NEW NON-RATED (4" STUD U.N.O.)
(E) 1-HOUR RATED BARRIER
(E) ACOUSTICAL / NON-RATED PARTITION
(E) PARTITION TO BE DEMOLISHED
(E) 2-HOUR RATED BARRIER
(E) SMOKE RATED PARTITION
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved: Project Director
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
B-500 IV CLEANROOM
COMPLIANCE
MA Arch
AD-200a
GROUND FLOOR DEMOLITION FLOOR
PLANS (PHASE 1)
691-18-109WL
SMc
West Los Angeles Medical Center 11301 Wilshire Boulevard, West Los Angeles, CA 90073
June 12, 2020
B-500
ADDENDUM 01
FULLY SPRINKLERED
Key Notes
104 GENERAL NOTE: REMOVE EXISITNG FLOORING & PREP SUBSTRATE AS NEEDED
TO RECEIVE NEW FLOORING.
105 REMOVE & DISPOSE OF EXISTING LOCKERS.
106 EXISTING REFRIGERATOR TO BE REMOVED (VERIFY w/ VA DISPOSAL
REQUIREMENTS).
107 REMOVE EXISTING ELECTRICAL FIXTURE(S) / DEVICE(S) AS INDICATED (REFER
TO ELECTRICAL).
118 REMOVE EXISTING PORTION OF PARTITION ASSEMBLY FOR PLACEMENT OF
NEW OPENING.
125 EXISTING DOOR ASSEMBLY TO BE REMOVED & REINSTALLED w/ SWING
REVERSED (REFER TO ASSOCIATED RENOVATION PLAN).
126 REMOVE EXISTING STAFF LOCKERS & RETURN TO VA FOR RELOCATION.
134 REMOVE EXISTING SURFACE MOUNTED CORNER GUARDS.
1/4" = 1'-0"
Ground Floor Plan (Phase 1 Demolition)
KEY PLAN
NOTE:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING AND ABATEMENT OF THE ASBESTOS
AND LEAD IDENTIFIED IN THE KEYNOTES AND ASBESTOS SURVEY REPORT.
Rev. Date Description
1 06.25.2020 Addendum 01
PARTITION LEGEND:
NOTE:
-ALL WORK TO COMPLY w/ 2015 IBC
-CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCEMENT OF WORK.
-DIMENSIONS: WALL DIMENSIONS ARE FACE OF FINISHED FACE TO FINISHED FACE UNLESS
NOTED OTHERWISE. WINDOW / DOOR DIMENSIONS ARE TO CENTER LINE OF WINDOW / DOOR.
-ALL MTL. STUDS ARE 4" U.N.O. (MATCH FRAMING OF CURRENT CONDITIONS AS APPLICABLE)
-WHERE DIMENSION IS PRECEEDED BY A (±) SYMBOL, THIS REPRESENTS/ALLOWS A "FLOAT" IN
LAYING OUT THE WORK. CONTRACTOR IS TO NOTIFY ARCHITECT IN WRITING, PRIOR TO
FRAMING, IF DIMENSION EXCEED ±2" FOR DIRECTION ON HOW TO PROCEED.
NEW ACOUSTICAL PARTITION (4" STUD U.N.O.)
NEW NON-RATED (4" STUD U.N.O.)
(E) 1-HOUR RATED BARRIER
(E) ACOUSTICAL / NON-RATED PARTITION
(E) PARTITION TO BE DEMOLISHED
(E) 2-HOUR RATED BARRIER
(E) SMOKE RATED PARTITION
102102
109 101
J J
H H
9 9.1
9.1
9.2
9.2
X.A X.A
X.B X.B
X.C X.C
X.D X.D
J.2 J.2
X.E X.E
J.3 J.3
J.4X.F X.F
X.1
X.1
X.3
X.3
X.4
X.4
X.5
X.5
P O
R T
IO
N
T O
R E
M A
IN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved: Project Director
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
B-500 IV CLEANROOM
COMPLIANCE
MA Arch
AD-200b
GROUND FLOOR DEMOLITION FLOOR
PLANS (PHASE 2)
691-18-109WL
SMc
West Los Angeles Medical Center 11301 Wilshire Boulevard, West Los Angeles, CA 90073
June 12, 2020
B-500
ADDENDUM 01
FULLY SPRINKLERED
Key Notes
101 REMOVE PARTITIONS & ALL ASSOCIATED UTILITIES AS INDICATED.
102 REMOVE EXISTING PLUMBING FIXTURES AS NOTED AND CAP UTILITES AS
NEEDED (REFER TO PLUMBING).
104 GENERAL NOTE: REMOVE EXISITNG FLOORING & PREP SUBSTRATE AS
NEEDED TO RECEIVE NEW FLOORING.
106 EXISTING REFRIGERATOR TO BE REMOVED (VERIFY w/ VA DISPOSAL
REQUIREMENTS).
107 REMOVE EXISTING ELECTRICAL FIXTURE(S) / DEVICE(S) AS INDICATED
(REFER TO ELECTRICAL).
108 REMOVE & RELOCATE EXISTING TELEPHONE BOX.
109 REMOVE EXISTING AUTOMATIC DOOR ASSEMBLY.
110 REMOVE EXISTING CASEWORK.
111 GENERAL NOTE: REMOVE EXISTING SOLID SURFACE WALL COVERING.
115 EXISTING BIOSAFETY CABINET TO BE REMOVED; GC SHALL ASSIST VA TO
RELOCATE TO STORAGE / LOGISTICS AREA.
117 REMOVE EXISTING DOOR ASSEMBLY.
118 REMOVE EXISTING PORTION OF PARTITION ASSEMBLY FOR PLACEMENT OF
NEW OPENING.
121 EXISTING FREEZER TO BE REMOVED (VERIFY w/ VA DISPOSAL
REQUIREMENTS).
122 EXISTING FREEZER TO BE RELOCATED.
123 EXISTING REFRIGERATOR TO BE RELOCATED.
124 GENERAL NOTE: REMOVE AND DISPOSE OF ALL EXISTING WIRE RACK
SHELVING UNITS.
1/4" = 1'-0"
Ground Floor Plan (Phase 2 Demolition)
KEY PLAN
Rev. Date Description
1 06.25.2020 Addendum 01
-ALL WORK TO COMPLY w/ 2015 IBC
-CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCEMENT OF WORK.
-DIMENSIONS: WALL DIMENSIONS ARE FACE OF FINISHED FACE TO FINISHED FACE UNLESS
NOTED OTHERWISE. WINDOW / DOOR DIMENSIONS ARE TO CENTER LINE OF WINDOW / DOOR.
-ALL MTL. STUDS ARE 4" U.N.O. (MATCH FRAMING OF CURRENT CONDITIONS AS APPLICABLE)
-WHERE DIMENSION IS PRECEEDED BY A (±) SYMBOL, THIS REPRESENTS/ALLOWS A "FLOAT" IN
LAYING OUT THE WORK. CONTRACTOR IS TO NOTIFY ARCHITECT IN WRITING, PRIOR TO
FRAMING, IF DIMENSION EXCEED ±2" FOR DIRECTION ON HOW TO PROCEED.
NEW ACOUSTICAL PARTITION (4" STUD U.N.O.)
NEW NON-RATED (4" STUD U.N.O.)
(E) 1-HOUR RATED BARRIER
(E) ACOUSTICAL / NON-RATED PARTITION
(E) PARTITION TO BE DEMOLISHED
(E) 2-HOUR RATED BARRIER
(E) SMOKE RATED PARTITION
NORTH
J J
H H
9 9.1
9.1
9.2
9.2
X.A X.A
X.B X.B
X.C X.C
X.D X.D
J.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .