About this file

36C25819B0020 36C25819B0020.docx

View the file

Other files

File Type Posted
36C25819B0020-0010000.docx DOCX document
36C25819B0020-0009000.docx DOCX document
36C25819B0020-0008000.docx DOCX document
36C25819B0020-0007000.docx DOCX document
36C25819B0020-0007001.pdf PDF
36C25819B0020-0007002.pdf PDF
36C25819B0020-0006011.docx DOCX document
36C25819B0020-0005001.pdf PDF
36C25819B0020-0005002.pptx PPTX presentation
36C25819B0020-0005000.docx DOCX document
36C25819B0020-0004013.pdf PDF
36C25819B0020-0004001.pdf PDF
36C25819B0020-0004000.docx DOCX document
36C25819B0020-0004012.pdf PDF
36C25819B0020-0004016.pdf PDF
36C25819B0020-0004007.pdf PDF
36C25819B0020-0004004.pdf PDF
36C25819B0020-0004015.pdf PDF
36C25819B0020-0004006.pdf PDF
36C25819B0020-0004003.pdf PDF
36C25819B0020-0004005.pdf PDF
36C25819B0020-0004010.pdf PDF
36C25819B0020-0004014.pdf PDF
36C25819B0020-0004008.pdf PDF
36C25819B0020-0004002.pdf PDF
36C25819B0020-0004009.pdf PDF
36C25819B0020-0004011.pdf PDF
36C25819B0020-0003001.pdf PDF
36C25819B0020-0003000.docx DOCX document
36C25819B0020-0002000.docx DOCX document
36C25819B0020-0001001.pdf PDF
36C25819B0020-0001002.pdf PDF
36C25819B0020-0001000.docx DOCX document
36C25819B0020-003.pdf PDF
36C25819B0020-026.docx DOCX document
36C25819B0020-007.pdf PDF
36C25819B0020-004.pdf PDF
36C25819B0020-025.doc DOC document
36C25819B0020-022.docx DOCX document
36C25819B0020-021.doc DOC document
36C25819B0020-008.pdf PDF
36C25819B0020-017.docx DOCX document
36C25819B0020-002.pdf PDF
36C25819B0020-019.docx DOCX document
36C25819B0020-016.docx DOCX document
36C25819B0020-009.pdf PDF
36C25819B0020-015.pdf PDF
36C25819B0020-024.docx DOCX document
36C25819B0020-010.pdf PDF
36C25819B0020-018.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6.

PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE

DOCUMENTS (

Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV.

8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d) S O

LICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that t ime. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.

36C25819B0020 X 04-09-2019 605-20-206 00262 Department of Veterans Affairs Network Contracting Office 22-G E. Missouri AVe Suite 300 Phoenix AZ 85014 (Same)

Gary Smith 602-795-4511 Contractor Provide all labor, materials, tools, equipment, engineering, supervision, and services to perform repairs to the 2SE, 2SW & Library patios drains at the Jerry L. Pettis Memorial Veterans Medical Center at the VA Loma Linda Healthcare System, 11201 Benton St., Loma Linda, CA 92357 as required by drawings and specifications.

NAICS code: 236220 Bid bonds are to be submitted on form SF24.

All awards a re subject to availability of funds.

Cost range: $500,000.00 - $1,000,000.00

This procurement is 100% set aside for Service Disabled Veteran Owned Business (SDVOSB) in accordance with Public Law (PL) 109-461, 38 United States Code (USC) Section 8127. To be eligible to participate in this procurement, the Contractor shall be registered/enrolled in the following databases at the time of bid subm ission and award:

System for Award Management (SAM): www.sam.gov VetBiz : https://vip.vetbiz.gov - verification is also required.

VETS 4212 (

DoL ): www.dol.gov/vets/vets4212

One-time organized site visit is scheduled for April 17, 2019 at 9:00 a.m. local time @ Room No. MD05 at Loma Linda VA Health Care System.

All Requests for Information (RFI) for this solicitation must be received no later than 9:00 a.m. (local time), April 30, 2019. All questions shall be in writing to the Contracting Officer with the subject line as follows:

36C25819B0020 "Patio Drains". Submission should be by email to gary.smith4@va.gov

The Contractor shall be responsible for the correct title classification of workers and compliance with all applicable wage and hour laws.

Contractors shall include their company's DUNS number in section 14 on page 2 of this Standard Form (SF) 1442.

X X 52.211-10 X no 1:00 p.m.

05-08-2019 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AME

NDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25.

OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUT

HORIZED

31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing of fice.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Enter pricing for all bid items in bid schedule on following page as indicated.

Include the bid schedule with this SF 1442.

00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 X Justin Hicks

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS6
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK7
SECTION E - INSPECTION AND ACCEPTANCE16
SECTION F - DELIVERIES OR PERFORMANCE17
F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)17
F.2 DELIVERY SCHEDULE17
PART II - CONTRACT CLAUSES18
SECTION I - CONTRACT CLAUSES18
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)18
I.2 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995)19
I.3 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)22
I.4 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)22
I.5 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002)23
I.6 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)23
I.7 VAAR 852.236-76 CORRESPONDENCE (APR 1984)24
I.8 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)24
I.9 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)24
I.10 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)24
I.11 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)24
I.12 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)25
I.13 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)25
I.14 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)26
I.15 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)26
I.16 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)26
I.17 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)28
I.18 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)29
I.19 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)29
I.20 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)30
I.21 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)31
I.22 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)31
I.23 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)33
I.24 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)33
I.25 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)35
I.26 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)35
I.27 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)38
I.28 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)39
I.29 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)40
I.30 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002)41
I.31 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)41
I.32 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)42
I.33 SUPPLEMENTAL INSURANCE REQUIREMENTS42
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS44
SECTION J - LIST OF ATTACHMENTS44
[For this Solicitation, there are NO attachments in this Section]44
PART IV - REPRESENTATIONS AND INSTRUCTIONS45
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS45
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)45
K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)48
K.3 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018)49
K.4 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)51
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS52
L.1 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)52
L.2 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)52
L.3 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)53
L.4 52.216-1 TYPE OF CONTRACT (APR 1984)53
L.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)54
L.6 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)54
L.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)55
L.8 52.228-1 BID GUARANTEE (SEP 1996)56
L.9 52.233-2 SERVICE OF PROTEST (SEP 2006)56
L.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)57
L.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)57
SECTION M - EVALUATION FACTORS FOR AWARD59
M.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)59
[For this Solicitation, there are NO provisions in this Section]59
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS60

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

1.2 STATEMENT OF BID ITEM(S)

ITEM I, GENERAL CONSTRUCTION: Provide all labor, materials, tools, equipment, engineering, supervision, and services to perform repairs to the 2SE, 2SW & Library patios drains at the Jerry L. Pettis Memorial Veterans Medical Center (LLVAMC), Loma Linda, California.

Construction – 182 calendar days.

A: TOTAL BASE BID PRICE LABOR ONLY: _______________________________

TOTAL BASE BID PRICE MATERIALS ONLY: ___________________________

TOTAL BASE BID PRICE PROFIT ONLY: _______________________________

TOTAL BASE BID PRICE OVERHEAD ONLY: ___________________________

TOTAL BASE BID COMBINED: _________________________________________

36C25819B0020 Section B

Page 1 of Page 1 of

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

REQUEST FOR Bid for repair service (2SE, 2SW & Library Patio courtyard drains) Project No. 605-20-206

1. OBJECTIVE

A. SCOPE OF WORK

i. General Requirement: Provide all labor, materials, tools, equipment, engineering, supervision, and services to perform repairs to the 2SE, 2SW & Library patios drains at the Jerry L. Pettis Memorial Veterans Medical Center (LLVAMC), Loma Linda, California.

ii. Project Scope:

1. Remove and replace undersized drain lines for the 2SE, 2SW and Library courtyard patios. Existing undersized drain lines are 2” black iron and need to be 4” drain lines. Replace existing inlet drain with appropriate sized inlet.

2. Perform corrosion control actions on beams below courtyards. Mechanical removal of corrosion and re-application of red zinc oxide primer to 4 mils. Inspect and repair rod hanger connections in the interstitial space, Repair pan-deck and make water tight.

3. Remove trees, shrubs, vegetation, dirt and foam filler blocks from planters. Dirt shall be retained and reused. Contractor shall make all necessary repairs to irrigation system piping, drains, and clean-outs to include installation of new valves with battery timers and adjustment/installation of new heads in planter boxes. Tie new valves into existing controllers. Contractor shall seal inside of planter with an epoxy sealant, to ensure water tight seal, and plant new shrubs/bushes in accordance with VALLMC Landscape Plan. Planter boxes shall be restored to presentable condition with waterproofing, dirt, trees, shrubs, and vegetation per attachment B.

A. GENERAL REQUIREMENTS

i. General Installation Professional services:

1. Will include an Infection Control Risk Assessment and Control Implementation Plan.

2. Work Permit issued by VA prior to start of work. [ICRA & ILSM]

3. Certification of all work by licensed trades.

ii. Construction Waste Management, Specification 01 74 19 is to be followed. See References Section 2.

B. CONSTRUCTION BID

i. Bid will be itemized to include:

1. All line items will include materiel, labor and equipment broken out.

2. Line Items (Minimum):

a. Material Quantity List

b. Electrical Services

c. Materials

d. Labor

e. Site remediation C. Specific REQUIREMENTS

i. ENDSTATE PERFORMANCE:

1. All install per VA Standards & Manufactures installation requirements

2. All installation per specifications. [Section D.iv.3.a)

3. Completed work will be inspected by a licensed installer in the appropriate trade.

4. All Infection Control and Interim Life Safety Measures removed.

ii. CONSTRUCTION SCHEDULE

1. General Schedule:

Notice to Proceed
Day 0
(0 days)
Initial Walk thru
Day 1
(1 day)
Installation
Day 181
(180 days)
Certification and Acceptance
Day 182
(1 days)

2. Note: Installation timeline will begin at joint walk thru by client and contractor.

iii. ENVIRONMENTAL/OCCUPATIONAL SAFETY AND HEALTH (EOSH)

1. EXPECTATION: Project shall comply with all applicable EOSH requirements.

2. Regulatory Compliance – EOSH requirements for work performed at the above location can be found in:

a. Volume 29 of the Code of Federal Regulations, Part 1910 – Occupational Safety for General Industry

b. Volume 29 of the Code of Federal Regulations, Part 1926 – Occupational Safety for The Construction Industry

c. Volume 40 of the Code of Federal Regulations – Protection of The Environment

d. Volume 49 of the Code of Federal Regulations, Part 397 – Transportation of Hazardous Materials

3. Specifications

a. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements.

b. A complete list of these specifications can be viewed at the following website: http://www.cfm.va.gov. Specifications which address EOSH requirements include, but are not limited to, the following:

i. SECTION 01 00 00 – General Requirements

ii. SECTION 01 57 19 – Temporary Environmental Controls

iii. SECTION 01 74 19 – Construction Waste Management

4. Reports (See Attachment 6)

a. Daily Inspection Report (Safety)

b. Waste log

5. REFERENCES

A. Attachments:

i. Attachment A: Site Locations

ii. Attachment B: Courtyard Planter Sections

iii. Attachment C: ICU 2SW Room 2D-63 Floorplan

iv. Attachment D: Original Construction Courtyard As-Built Drawings B. The contractor shall prepare all required documents for review and approval by the VA in accordance with standard professional practice and the Department of Veterans Affairs Statement of Work. Preparation of documents shall be in accordance with the latest editions of the following criteria.

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
10-14
01 35 26
Safety Requirements
10-14
01 42 19
Reference Standards
02-15
01 57 19
Temporary Environmental Controls
01-11
01 58 16
Temporary Interior Signage
08-11
01 74 19
Construction Waste Management
09-13

DIVISION 02 – EXISTING CONDITIONS

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 – METALS

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 84 00
Firestopping
10-11

DIVISION 08 OPENINGS

DIVISION 09 – FINISHES

DIVISION 10 – SPECIALTIES

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14– CONVEYING EQUIPEMENT

DIVISION 21- FIRE SUPPRESSION

DIVISION 22 – PLUMBING

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation

C. Pertinent VA Criteria which can be downloaded from the Internet at http://www.cfm.va.gov/TIL including but not limited to:

i. VA Master Construction Specifications

ii. VA Construction Standards

iii. VA Seismic Design Handbook

iv. VA Space Planning Criteria

v. VA Design Manuals

vi. VA CADD Standards

vii. NFPA 101, Life Safety Code

viii. NFPA 70, National Electric Code

ix. NFPA 99, Health Care Facilities

x. NFPA 12, Installation of Sprinkler Systems

xi. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)

xii. AIA Guidelines for Construction and Equipment of Hospital and Medical Facilities

xiii. International Building Codes

xiv. State and Local codes and guidelines (as applicable)

6. CONTRACT DURATION

i. 182 days following NTP

- - - END - - -

ATTACHMENT “B” – COURTYARD SECTIONS

ATTACHMENT “C” – ICU 2SW ROOM

36C25819B0020 Section C

Page 1 of Page 1 of

SECTION E - INSPECTION AND ACCEPTANCE

36C25819B0020 Section E

Page 1 of Page 1 of

FAR Number
Title
Date
52.246-12
INSPECTION OF CONSTRUCTION
AUG 1996

SECTION F - DELIVERIES OR PERFORMANCE

FAR Number
Title
Date
52.242-14
SUSPENSION OF WORK
APR 1984

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 182 days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause) 36C25819B0020 Section F

Page 1 of Page 1 of

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Clause)

FAR Number
Title
Date
52.202-1
DEFINITIONS
NOV 2013
52.203-3
GRATUITIES
APR 1984
52.203-5
COVENANT AGAINST CONTINGENT FEES
MAY 2014
52.203-6
RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT
SEP 2006
52.203-7
ANTI-KICKBACK PROCEDURES
MAY 2014
52.203-8
CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY
MAY 2014
52.203-10
PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY
MAY 2014
52.203-12
LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
OCT 2010
52.203-17
CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
APR 2014
52.203-19
PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
JAN 2017
52.204-4
PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER
MAY 2011
52.204-9
PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
JAN 2011
52.204-10
REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS
OCT 2018
52.204-13
SYSTEM FOR AWARD MANAGEMENT MAINTENANCE
OCT 2018
52.204-14
SERVICE CONTRACT REPORTING REQUIREMENTS
OCT 2016
52.204-18
COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
JUL 2016
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
OCT 2015
52.209-10
PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
NOV 2015
52.215-2
AUDIT AND RECORDS—NEGOTIATION
OCT 2010
52.215-8
ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT
OCT 1997
52.219-8
UTILIZATION OF SMALL BUSINESS CONCERNS
OCT 2018
52.222-3
CONVICT LABOR
JUN 2003
52.222-4
CONTRACT WORK HOURS AND SAFETY STANDARDS—OVERTIME COMPENSATION
MAY 2018
52.222-6
CONSTRUCTION WAGE RATE REQUIREMENTS
AUG 2018
52.222-7
WITHHOLDING OF FUNDS
MAY 2014
52.222-8
PAYROLLS AND BASIC RECORDS
AUG 2018
52.222-9
APPRENTICES AND TRAINEES
JUL 2005
52.222-10
COMPLIANCE WITH COPELAND ACT REQUIREMENTS
FEB 1988
52.222-11
SUBCONTRACTS (LABOR STANDARDS)
MAY 2014
52.222-12
CONTRACT TERMINATION—DEBARMENT
MAY 2014
52.222-13
COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS
MAY 2014
52.222-14
DISPUTES CONCERNING LABOR STANDARDS
FEB 1988
52.222-15
CERTIFICATION OF ELIGIBILITY
MAY 2014
52.222-21
PROHIBITION OF SEGREGATED FACILITIES
APR 2015
52.222-26
EQUAL OPPORTUNITY
SEP 2016
52.222-27
AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION
APR 2015
52.222-37
EMPLOYMENT REPORTS ON VETERANS
FEB 2016
52.222-50
COMBATING TRAFFICKING IN PERSONS
JAN 2019
52.222-54
EMPLOYMENT ELIGIBILITY VERIFICATION
OCT 2015
52.222-55
MINIMUM WAGES UNDER EXECUTIVE ORDER 13658
DEC 2015
52.222-62
PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706
JAN 2017

I.2 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995)

(a) "Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material (If none, insert “None”)
Identification No.

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to—

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(i) Except as provided in paragraph (i)(2) the Contractor shall prepare and submit a sufficient number of Material Safety Data Sheets (MSDS's), meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous materials identified in paragraph (b) of this clause.

(1) For items shipped to consignees, the Contractor shall include a copy of the MSDS with the packing list or other suitable shipping document which accompanies each shipment. Alternatively, the Contractor is permitted to transmit MSDS's to consignees in advance of receipt of shipments by consignees, if authorized in writing by the Contracting Officer.

(2) For items shipped to consignees identified by mailing address as agency depots, distribution centers or customer supply centers, the Contractor shall provide one copy of the MSDS's in or on each shipping container. If affixed to the outside of each container, the MSDS must be placed in a weather resistant envelope.

(End of Clause)

FAR Number
Title
Date
52.223-5
POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION
MAY 2011
52.223-6
DRUG-FREE WORKPLACE
MAY 2001
52.223-11
OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL HYDROFLUOROCARBONS
JUN 2016
52.223-12
MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION EQUIPMENT AND AIR CONDITIONERS
JUN 2016
52.223-15
ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS
DEC 2007
52.223-16
ACQUISITION OF EPEAT®-REGISTERED PERSONAL COMPUTER PRODUCTS
OCT 2015
52.223-17
AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS
AUG 2018
52.223-18
ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING
AUG 2011
52.223-20
AEROSOLS
JUN 2016
52.223-21
FOAMS
JUN 2016
52.225-13
RESTRICTIONS ON CERTAIN FOREIGN PURCHASES
JUN 2008
52.227-1
AUTHORIZATION AND CONSENT
DEC 2007
52.227-2
NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
DEC 2007
52.227-4
PATENT INDEMNITY—CONSTRUCTION CONTRACTS
DEC 2007
52.228-2
ADDITIONAL BOND SECURITY
OCT 1997
52.228-5
INSURANCE—WORK ON A GOVERNMENT INSTALLATION
JAN 1997
52.228-11
PLEDGES OF ASSETS
AUG 2018
52.228-12
PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS
MAY 2014
52.228-14
IRREVOCABLE LETTER OF CREDIT
NOV 2014
52.228-15
PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION
OCT 2010
52.229-3
FEDERAL, STATE, AND LOCAL TAXES
FEB 2013
52.232-5
PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS
MAY 2014
52.232-17
INTEREST
MAY 2014
52.232-23
ASSIGNMENT OF CLAIMS
MAY 2014
52.232-27
PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS
JAN 2017
52.232-33
PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT
OCT 2018
52.232-39
UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS
JUN 2013
52.232-40
PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS
DEC 2013
52.233-1
DISPUTES
MAY 2014
52.233-3
PROTEST AFTER AWARD
AUG 1996
52.233-4
APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM
OCT 2004
52.236-2
DIFFERING SITE CONDITIONS
APR 1984
52.236-3
SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
APR 1984
$
52.236-5
MATERIAL AND WORKMANSHIP
APR 1984
52.236-6
SUPERINTENDENCE BY THE CONTRACTOR
APR 1984
52.236-7
PERMITS AND RESPONSIBILITIES
NOV 1991
52.236-8
OTHER CONTRACTS
APR 1984
52.236-9
PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
APR 1984
52.236-10
OPERATIONS AND STORAGE AREAS
APR 1984
52.236-11
USE AND POSSESSION PRIOR TO COMPLETION
APR 1984
52.236-12
CLEANING UP
APR 1984
52.236-13
ACCIDENT PREVENTION
NOV 1991
52.236-14
AVAILABILITY AND USE OF UTILITY SERVICES
APR 1984
52.236-15
SCHEDULES FOR CONSTRUCTION CONTRACTS
APR 1984
52.236-17
LAYOUT OF WORK
APR 1984
52.236-26
PRECONSTRUCTION CONFERENCE
FEB 1995
52.242-13
BANKRUPTCY
JUL 1995
52.243-4
CHANGES
JUN 2007
52.244-6
SUBCONTRACTS FOR COMMERCIAL ITEMS
JAN 2019
52.248-3
VALUE ENGINEERING—CONSTRUCTION
OCT 2015
52.249-2
TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) ALTERNATE I (SEPT 1996)
APR 2012
52.249-10
DEFAULT (FIXED-PRICE CONSTRUCTION)
APR 1984
52.253-1
COMPUTER GENERATED FORMS
JAN 1991

I.3 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor’s products or services or considers the Contractor’s products or services superior to other products or services.

(End of Clause)

I.4 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

When net changes in original contract price affect the premium of a Corporate Surety Bond by $5 or more, the Government, in determining the basis for final settlement, will provide for bond premium adjustment computed at the rate shown in the bond.

(End of Clause)

FAR Number
Title
Date
852.232-70
PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)
NOV 2018

I.5 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002)

The clause entitled "Performance of Work by the Contractor" in FAR 52.236-1 is supplemented as follows:

(a) Contract work accomplished on the site by laborers, mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be included in establishing the percent of work to be performed by the contractor. Cost of material and equipment installed by such labor may be included. The work by the contractor's executive, supervisory and clerical forces shall be excluded in establishing compliance with the requirements of this clause.

(b) The contractor shall submit, simultaneously with the schedule of costs required by the Payments Under Fixed-Price Construction Contracts clause of the contract, a statement designating the branch or branches of contract work to be performed with his/her forces. The approved schedule of costs will be used in determining the value of a branch or branches, or portions thereof, of the work for the purpose of this article.

(c) If, during the progress of work hereunder, the contractor requests a change in the branch or branches of the work to be performed by his/her forces and the contracting officer determines it to be in the best interest of the Government, the contracting officer may, at his/her discretion, authorize a change in such branch or branches of said work. Nothing contained herein shall permit a reduction in the percentage of work to be performed by the contractor with his/her forces, it being expressly understood that this is a contract requirement without right or privilege of reduction.

(d) In the event the contractor fails or refuses to meet the requirement of the FAR clause at 52.236-1, it is expressly agreed that the contract price will be reduced by 15 percent of the value of that portion of the percentage requirement that is accomplished by others. For the purpose of this clause, it is agreed that 15 percent is an acceptable estimate of the contractor's overhead and profit, or mark-up, on that portion of the work which the contractor fails or refuses to perform, with his/her own forces, in accordance with the FAR clause at 52.236-1.

(End of Clause)

I.6 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)

The clause entitled "Inspection of Construction" in FAR 52.246-12 is supplemented as follows:

(a) Inspection of materials and articles furnished under this contract will be made at the site by the resident engineer, unless otherwise provided for in the specifications.

(b) Final inspection will not be made until the contract work is ready for beneficial use or occupancy. The contractor shall notify the contracting officer, through the resident engineer, fifteen (15) days prior to the date on which the work will be ready for final inspection.

(End of Clause)

I.7 VAAR 852.236-76 CORRESPONDENCE (APR 1984)

All correspondence relative to this contract shall bear Specification Number, Project Number, Department of Veterans Affairs Contract Number, title of project and name of facility.

(End of Clause)

I.8 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)

Any materials, equipment, or workmanship specified by references to number, symbol, or title of any specific Federal, Industry or Government Agency Standard Specification shall comply with all applicable provisions of such standard specifications, except as limited to type, class or grade, or modified in contract specifications. Reference to "Standards" referred to in the contract specifications, except as modified, shall have full force and effect as though printed in detail in specifications.

(End of Clause)

I.9 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)

(a) The work will be under the direction of the Department of Veterans Affairs contracting officer, who may designate another VA employee to act as resident engineer at the construction site.

(b) Except as provided below, the resident engineer's directions will not conflict with or change contract requirements.

(c) Within the limits of any specific authority delegated by the contracting officer, the resident engineer may, by written direction, make changes in the work. The contractor shall be advised of the extent of such authority prior to execution of any work under the contract.

(End of Clause)

I.10 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)

The contractor shall furnish to the resident engineer each day a consolidated report for the preceding work day in which is shown the number of laborers, mechanics, foremen/forewomen and pieces of heavy equipment used or employed by the contractor and subcontractors. The report shall bear the name of the firm, the branch of work which they perform such as concrete, plastering, masonry, plumbing, sheet metal work, etc. The report shall give a breakdown of employees by crafts, location where employed, and work performed. The report shall also list materials delivered to the site on the date covered by the report.

(End of Clause)

I.11 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)

(a) Nothing contained in this contract shall be construed as creating any contractual relationship between any subcontractor and the Government. Divisions or sections of specifications are not intended to control the contractor in dividing work among subcontractors, or to limit work performed by any trade.

(b) The contractor shall be responsible to the Government for acts and omissions of his/her own employees, and of the subcontractors and their employees. The contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material suppliers.

(c) The Government or its representatives will not undertake to settle any differences between the contractor and subcontractors or between subcontractors.

(d) The Government reserves the right to refuse to permit employment on the work or require dismissal from the work of any subcontractor who, by reason of previous unsatisfactory work on Department of Veterans Affairs projects or for any other reason, is considered by the contracting officer to be incompetent or otherwise objectionable.

(End of Clause)

I.12 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)

(a) The contractor shall submit with the schedule of costs, a progress schedule that indicates the anticipated installation of work versus the elapsed contract time, for the approval of the contracting officer. The progress schedule time shall be represented in the form of a bar graph with the contract time plotted along the horizontal axis. The starting date of the schedule shall be the date the contractor receives the "Notice to Proceed." The ending date shall be the original contract completion date. At a minimum, both dates shall be indicated on the progress schedule. The specific item of work, i.e., "Excavation", "Floor Tile", "Finish Carpentry", etc., should be plotted along the vertical axis and indicated by a line or bar at which time(s) during the contract this work is scheduled to take place. The schedule shall be submitted in triplicate and signed by the contractor.

(b) The actual percent completion will be based on the value of installed work divided by the current contract amount. The actual completion percentage will be indicated on the monthly progress report.

(c) The progress schedule will be revised when individual or cumulative time extensions of 15 calendar days or more are granted for any reason. The revised schedule should indicate the new contract completion date and should reflect any changes to the installation time(s) of the items of work affected.

(d) The revised progress schedule will be used for reporting future scheduled percentage completion.

(End of Clause)

I.13 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)

(a) The wage determination decision of the Secretary of Labor is set forth in section GR, General Requirements, of this contract. It is the result of a study of wage conditions in the locality and establishes the minimum hourly rates of wages and fringe benefits for the described classes of labor in accordance with applicable law. No increase in the contract price will be allowed or authorized because of payment of wage rates in excess of those listed.

(b) The contractor shall submit the required copies of payrolls to the contracting officer through the resident engineer or engineer officer, when acting in that capacity. Department of Labor Form WH- 347, Payroll, available from the Superintendent of Documents, Government Printing Office, Washington, DC 20402, may be used for this purpose. If, however, the contractor or subcontractor elects to use an individually composed payroll form, it shall contain the same information shown on Form WH-347, and in addition be accompanied by Department of Labor Form WH-348, Statement of Compliance, or any other form containing the exact wording of this form.

(End of Clause)

I.14 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)

Public Law 107-217 (40 U.S.C. 3172) authorizes the constituted authority of States to apply their workers compensation laws to all lands and premises owned or held by the United States.

(End of Clause)

I.15 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)

The Resident Engineer on all assigned construction projects, or other Department of Veterans Affairs employee if designated in writing by the Contracting Officer, shall serve as Safety Officer and as such has authority, on behalf of the Contracting Officer, to monitor and enforce Contractor compliance with FAR 52.236-13, Accident Prevention. However, only the Contracting Officer may issue an order to stop all or part of the work while requiring satisfactory or corrective action to be taken by the Contractor.

(End of Clause)

I.16 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)

The clauses entitled “Changes” in FAR 52.243-4 and “Differing Site Conditions” in FAR 52.236-2 are supplemented as follows:

(a) Paragraphs (a)(1) through (a)(4) apply to proposed contract changes costing over $500,000.

(1) When requested by the contracting officer, the contractor shall submit proposals for changes in work to the resident engineer. Proposals, to be submitted as expeditiously as possible but within 30 calendar days after receipt of request, shall be in legible form, original and two copies, with an itemized breakdown that will include material, quantities, unit prices, labor costs (separated into trades), construction equipment, etc. (Labor costs are to be identified with specific material placed or operation performed.) The contractor must obtain and furnish with a proposal an itemized breakdown as described above, signed by each subcontractor participating in the change regardless of tier. When certified cost or pricing data are required under FAR Subpart 15.403, the cost or pricing data shall be submitted in accordance with FAR 15.403-5.

(2) When the necessity to proceed with a change does not allow sufficient time to negotiate a modification or because of failure to reach an agreement, the contracting officer may issue a change order instructing the contractor to proceed on the basis of a tentative price based on the best estimate available at the time, with the firm price to be determined later. Furthermore, when the change order is issued, the contractor shall submit a proposal, which includes the information required by paragraph (a)(1), for cost of changes in work within 30 calendar days.

(3) The contracting officer will consider issuing a settlement by determination to the contract if the contractor's proposal required by paragraphs (a)(1) or (a)(2) of this clause is not received within 30 calendar days or if agreement has not been reached.

(4) Bond premium adjustment, consequent upon changes ordered, will be made as elsewhere specified at the time of final settlement under the contract and will not be included in the individual change.

(b) Paragraphs (b)(1) through (b)(11) apply to proposed contract changes costing $500,000 or less:

(1) When requested by the contracting officer, the contractor shall submit proposals for changes in work to the resident engineer. Proposals, to be submitted as expeditiously as possible but within 30 calendar days after receipt of request, shall be in legible form, original and two copies, with an itemized breakdown that will include material, quantities, unit prices, labor costs (separated into trades), construction equipment, etc. (Labor costs are to be identified with specific material placed or operation performed.) The contractor must obtain and furnish with a proposal an itemized breakdown as described above, signed by each subcontractor participating in the change regardless of tier. When certified cost or pricing data or information other than cost or pricing data are required under FAR 15.403, the data shall be submitted in accordance with FAR 15.403-5. No itemized breakdown will be required for proposals amounting to less than $1,000.

(2) When the necessity to proceed with a change does not allow sufficient time to negotiate a modification or because of failure to reach an agreement, the contracting officer may issue a change order instructing the contractor to proceed on the basis of a tentative price based on the best estimate available at the time, with the firm price to be determined later. Furthermore, when the change order is issued, the contractor shall submit within 30 calendar days, a proposal that includes the information required by paragraph (b)(1) for the cost of the changes in work.

(3) The contracting officer will consider issuing a settlement by determination to the contract if the contractor's proposal required by paragraphs (b)(1) or (b)(2) of this clause is not received within 30 calendar days, or if agreement has not been reached.

(4) Allowances not to exceed 10 percent each for overhead and profit for the party performing the work will be based on the value of labor, material, and use of construction equipment required to accomplish the change. As the value of the change increases, a declining scale will be used in negotiating the percentage of overhead and profit. Allowable percentages on changes will not exceed the following: 10 percent overhead and 10 percent profit on the first $20,000; 7-1/2 percent overhead and 7-1/2 percent profit on the next $30,000; 5 percent overhead and 5 percent profit on balance over $50,000. Profit shall be computed by multiplying the profit percentage by the sum of the direct costs and computed overhead costs.

(5) The prime contractor's or upper-tier subcontractor's fee on work performed by lower-tier subcontractors will be based on the net increased cost to the prime contractor or upper-tier subcontractor, as applicable. Allowable fee on changes will not exceed the following: 10 percent fee on the first $20,000; 7-1/2 percent fee on the next $30,000; and 5 percent fee on balance over $50,000.

(6) Not more than four percentages, none of which exceed the percentages shown above, will be allowed regardless of the number of tiers of subcontractors.

(7) Where the contractor's or subcontractor's portion of a change involves credit items, such items must be deducted prior to adding overhead and profit for the party performing the work. The contractor's fee is limited to the net increase to contractor of subcontractors' portions cost computed in accordance herewith.

(8) Where a change involves credit items only, a proper measure of the amount of downward adjustment in the contract price is the reasonable cost to the contractor if he/she had performed the deleted work. A reasonable allowance for overhead and profit are properly includable as part of the downward adjustment for a deductive change. The amount of such allowance is subject to negotiation.

(9) Cost of Federal Old Age Benefit (Social Security) tax and of Worker's Compensation and Public Liability insurance appertaining to changes are allowable. While no percentage will be allowed thereon for overhead or profit, prime contractor's fee will be allowed on such items in subcontractors' proposals.

(10) Overhead and contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor's overhead and/or fee percentage.

(11) Bond premium adjustment, consequent upon changes ordered, will be made as elsewhere specified at the time of final settlement under the contract and will not be included in the individual change.

(End of Clause)

I.17 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)

(a) Signing of the bid shall be deemed to be a representation by the bidder that:

(1) Bidder is a construction contractor who owns, operates, or maintains a place of business, regularly engaged in construction, alteration, or repair of buildings, structures, and communications facilities, or other engineering projects, including furnishing and installing of necessary equipment; or

(2) If newly entering into a construction activity, bidder has made all necessary arrangements for personnel, construction equipment, and required licenses to perform construction work; and

(3) Upon request, prior to award, bidder will promptly furnish to the Government a statement of facts in detail as to bidder's previous experience (including recent and current contracts), organization (including company officers), technical qualifications, financial resources and facilities available to perform the contemplated work.

(b) Unless otherwise provided in this contract, where the use of optional materials or construction is permitted, the same standard of workmanship, fabrication and installation shall be required irrespective of which option is selected. The contractor shall make any change or adjustment in connecting work or otherwise necessitated by the use of such optional material or construction, without additional cost to the Government.

(c) When approval is given for a system component having functional or physical characteristics different from those indicated or specified, it is the responsibility of the contractor to furnish and install related components with characteristics and capacities compatible with the approved substitute component as required for systems to function as noted on drawings and specifications. There shall be no additional cost to the Government.

(d) In some instances it may have been impracticable to detail all items in specifications or on drawings because of variances in manufacturers' methods of achieving specified results. In such instances the contractor will be required to furnish all labor, materials, drawings, services and connections necessary to produce systems or equipment which are completely installed, functional, and ready for operation by facility personnel in accordance with their intended use.

(e) Claims by the contractor for delay attributed to unusually severe weather must be supported by climatological data covering the period and the same period for the 10 preceding years.