About this file

36C25819B0020 0002 36C25819B0020 0002.docx

View the file

Other files

File Type Posted
36C25819B0020-0010000.docx DOCX document
36C25819B0020-0009000.docx DOCX document
36C25819B0020-0008000.docx DOCX document
36C25819B0020-0007000.docx DOCX document
36C25819B0020-0007001.pdf PDF
36C25819B0020-0007002.pdf PDF
36C25819B0020-0006011.docx DOCX document
36C25819B0020-0005001.pdf PDF
36C25819B0020-0005002.pptx PPTX presentation
36C25819B0020-0005000.docx DOCX document
36C25819B0020-0004013.pdf PDF
36C25819B0020-0004001.pdf PDF
36C25819B0020-0004000.docx DOCX document
36C25819B0020-0004012.pdf PDF
36C25819B0020-0004016.pdf PDF
36C25819B0020-0004007.pdf PDF
36C25819B0020-0004004.pdf PDF
36C25819B0020-0004015.pdf PDF
36C25819B0020-0004006.pdf PDF
36C25819B0020-0004003.pdf PDF
36C25819B0020-0004005.pdf PDF
36C25819B0020-0004010.pdf PDF
36C25819B0020-0004014.pdf PDF
36C25819B0020-0004008.pdf PDF
36C25819B0020-0004002.pdf PDF
36C25819B0020-0004009.pdf PDF
36C25819B0020-0004011.pdf PDF
36C25819B0020-0003001.pdf PDF
36C25819B0020-0003000.docx DOCX document
36C25819B0020-0001001.pdf PDF
36C25819B0020-0001002.pdf PDF
36C25819B0020-0001000.docx DOCX document
36C25819B0020-003.pdf PDF
36C25819B0020-026.docx DOCX document
36C25819B0020-007.pdf PDF
36C25819B0020-004.pdf PDF
36C25819B0020-025.doc DOC document
36C25819B0020-022.docx DOCX document
36C25819B0020-021.doc DOC document
36C25819B0020-008.pdf PDF
36C25819B0020-017.docx DOCX document
36C25819B0020-002.pdf PDF
36C25819B0020-019.docx DOCX document
36C25819B0020-016.docx DOCX document
36C25819B0020-009.pdf PDF
36C25819B0020-015.pdf PDF
36C25819B0020-024.docx DOCX document
36C25819B0020-001.docx DOCX document
36C25819B0020-010.pdf PDF
36C25819B0020-018.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A0002

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-17-2019 605-20-206 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders

36C25819B0020

X X X

TBD

X one

The Purpose of A0002 is too:

1. Publised RFI's 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13,14, 15, 16, and 17 .

Justin Hicks Branch Chief

1. Project Description on page 62 of solicitation is for “construction of Operating Room #8 and supporting surgical spaces in the main building” Please clarify scope of work.

A: That was in error, this project is for the Patio and drains repairs located 2SE, 2SW and Library patio drains, at Loma Linda VA Health Care System.

1. RFI deadline In Block 10 of solicitation states RFI’s due no later than 9am April 30th. Page 65 state RFI’s due no later than 9am April 29th. Please clarify RFI cut-off date.

A: RFI due date or cutoff date is Tuesday, April 30, 2019 @ 9:00am.

1. Please clarify what work is to be performed in ICU4 Room 2D-63. This room is listed as Attachment C in the Solicitation and shaded on page 15 of the solicitation. It is adjacent to Courtyard CY02-3. Courtyard CY02-3 is not listed in the scope of work for repairs.

A: No work on the ICU Room 2D-63, see answer to 1 above for work to be performed. See revised SOW published with Amendment A0001

1. Two (2) wage determinations were provided. Please clarify which is to be used.

A: General Decision Number: CA190026 02/15/2019 CA26or latest upgrade at time of award.

1. Please provide the General Requirements specifications listed in the specifications table of contents on page 10 of the solicitation.

A: Review all attachments that were published for this solicitation. See revised SOW published with Amendment A0001

1. Please provide the Firestopping specification listed in the specifications table of contents on page 10 of the solicitation.

A: ATSM # E814, and UL 1479 compliant. See revised SOW published with Amendment A0001

1. Please add the Division 22 specifications provided to the specifications table of contents to ensure everyone has the correct documents.

A: See revised SOW published with Amendment A0001

1. Specification 22 05 12 General Motor Requirements for Plumbing Equipment was issued with project documents. Please provide location(s) where motors are to be replaced.

A: No motors are being replaced. Specification should not have been included. See revised SOW published with Amendment A0001

1. Specification 22 34 00 Fuel-Fired Domestic Water Heaters was provided with project documents. Please provide location(s) for new water heaters. Are these to replace existing? If not, is there a gas line that can be used within 10’ of heater location? If more than 10’ how long of a run will a new gas line need to be run?

A: No Water heaters are being replaced. See revised SOW published with Amendment A0001

1. Specification 22 66 00 Chemical Waste Systems for Laboratory and Healthcare Facilities was provided with project documents. Please provide location(s) for Chemical Waste Systems.

A: This does not impact chemical waste systems. See revised SOW published with Amendment A0001

1. Is commissioning a requirement of this project? Specification 22 08 00 Commissioning of Plumbing Systems was provided. The spec references 01 91 00 General Commissioning Requirements which was not provided.

A: No, does not need to be commissioned.

1. Specification 22 40 00 Plumbing Fixtures lists water closets, urinals, lavatories, sinks and laundry tubs, etc. Please clarify scope of work.

A: Drain lines are the only plumbing that is being completed. See revised SOW published with Amendment A0001

1. Many of the provided specifications “Related Work” lists 09 91 00 Painting. If painting is part of the project scope, please provide the specification.

A: From SOW “Perform corrosion control actions on beams below courtyards. Mechanical removal of corrosion and re-application of red zinc oxide primer to 4 mils.”

14. This solicitation has a SOW, specifications, and as-built drawings, but no actual construction drawings. Section C, Subpart C, Item #5-B states that the Contractor shall prepare all required documents for review and approval by the VA. What does this mean? Does this paragraph intend to direct the Contractor to prepare design drawings for this project?

A: Yes, wants shop/line drawings of the work performed.

If so, will the VA provide the specific requirements and schedule of deliverables for any design effort required of the Contractor?

A: No, schedule of deliverables or specific requirements will be required.

15. The Scope of Work part 3 instructs the Contractor to install new valves and timers for an irrigation system and to plant “new shrubs/bushes” in accordance with the VALLMC Landscape Plan. Is the Contractor to design the landscaping for this project?

A: See revised SOW published with Amendment A0001. Contractor to provide landscaping design based on the Loma Linda Master Landscaping Plan. See Attached.

16. Will the VA provide a sketch of what is required, and the plant species being requested? Will the VA provide the VALLMC Landscape Plan?

A: The plant species are defined in the Loma Linda Master Landscape Plan, see attached.

17. The Scope of Work, Part ii-2 instructs the Contractor to perform corrosion control on the beams below the Courtyard. Are these beams fully accessible?

A: Yes, they are accessible in the interstitial below the courtyards.

Will the contractor expect to encounter any Asbestos or Lead-Based paint on this project?

A: No