About this file

36C25819B0020 0009 36C25819B0020 0009.docx

View the file

Other files

File Type Posted
36C25819B0020-0010000.docx DOCX document
36C25819B0020-0008000.docx DOCX document
36C25819B0020-0007000.docx DOCX document
36C25819B0020-0007001.pdf PDF
36C25819B0020-0007002.pdf PDF
36C25819B0020-0006011.docx DOCX document
36C25819B0020-0005001.pdf PDF
36C25819B0020-0005002.pptx PPTX presentation
36C25819B0020-0005000.docx DOCX document
36C25819B0020-0004013.pdf PDF
36C25819B0020-0004001.pdf PDF
36C25819B0020-0004000.docx DOCX document
36C25819B0020-0004012.pdf PDF
36C25819B0020-0004016.pdf PDF
36C25819B0020-0004007.pdf PDF
36C25819B0020-0004004.pdf PDF
36C25819B0020-0004015.pdf PDF
36C25819B0020-0004006.pdf PDF
36C25819B0020-0004003.pdf PDF
36C25819B0020-0004005.pdf PDF
36C25819B0020-0004010.pdf PDF
36C25819B0020-0004014.pdf PDF
36C25819B0020-0004008.pdf PDF
36C25819B0020-0004002.pdf PDF
36C25819B0020-0004009.pdf PDF
36C25819B0020-0004011.pdf PDF
36C25819B0020-0003001.pdf PDF
36C25819B0020-0003000.docx DOCX document
36C25819B0020-0002000.docx DOCX document
36C25819B0020-0001001.pdf PDF
36C25819B0020-0001002.pdf PDF
36C25819B0020-0001000.docx DOCX document
36C25819B0020-003.pdf PDF
36C25819B0020-026.docx DOCX document
36C25819B0020-007.pdf PDF
36C25819B0020-004.pdf PDF
36C25819B0020-025.doc DOC document
36C25819B0020-022.docx DOCX document
36C25819B0020-021.doc DOC document
36C25819B0020-008.pdf PDF
36C25819B0020-017.docx DOCX document
36C25819B0020-002.pdf PDF
36C25819B0020-019.docx DOCX document
36C25819B0020-016.docx DOCX document
36C25819B0020-009.pdf PDF
36C25819B0020-015.pdf PDF
36C25819B0020-024.docx DOCX document
36C25819B0020-001.docx DOCX document
36C25819B0020-010.pdf PDF
36C25819B0020-018.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A0009

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-20-2019 605-20-206 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders

36C25819B0020 05-08-2019

X X

TBD

X one

The Purpose of A0009 is too:

1. Publish RFI's Answers f rom Previous RFI's Follow Ups.

2. No Addtional RFI's Will be Answered.

Justin Hicks Branch Chief RFI. From A0008 Q: The “pan deck repair” of “40 square feet” has no work scope. Are we to sawcut the deck concrete, remove it, replace the pan deck seal and repour the concrete? Other RFI’s have stated there shall be no mismatch of concrete material and this won’t be possible with new and old concrete side-by-side. If the pan deck is to be resealed with mastic from below, please let the bidders know in either case.

A: Treat the corroded or rusted pan deck material, cut out if need be, then repair/patch with similar material. All pan deck repairs will be done in the interstitial area. Repairing of the waterproofing material in between the pan deck and the gyp board will also have to be done from the interstitial space. The purpose of this is to verify integrity of pan deck, to patch and prevent further corrosion/rusting of the pan deck.