About this file

36C25818B0305 0004 S02 A00004 RFI #27 00 01 10r2 Table of Contents.pdf

View the file

Other files

File Type Posted
36C25818B0305-0005000.docx DOCX document
36C25818B0305-0004001.docx DOCX document
36C25818B0305-0004003.pdf PDF
36C25818B0305-0004000.docx DOCX document
36C25818B0305-0003002.pdf PDF
36C25818B0305-0003004.pdf PDF
36C25818B0305-0003003.pdf PDF
36C25818B0305-0003006.pdf PDF
36C25818B0305-0003007.pdf PDF
36C25818B0305-0003008.pdf PDF
36C25818B0305-0003000.docx DOCX document
36C25818B0305-0003005.pdf PDF
36C25818B0305-0003001.docx DOCX document
36C25818B0305-0002000.docx DOCX document
36C25818B0305-0002001.pdf PDF
36C25818B0305-0001000.docx DOCX document
36C25818B0305-0001001.pdf PDF
36C25818B0305-001.docx DOCX document
36C25818B0305-013.pdf PDF
36C25818B0305-008.pdf PDF
36C25818B0305-005.pdf PDF
36C25818B0305-004.pdf PDF
36C25818B0305-002.pdf PDF
36C25818B0305-009.pdf PDF
36C25818B0305-007.pdf PDF
36C25818B0305-006.pdf PDF
36C25818B0305-003.pdf PDF
36C25818B0305-010.pdf PDF
36C25818B0305-012.pdf PDF
36C25818B0305-014.pdf PDF
36C25818B0305-011.pdf PDF
36C25818B0305-000.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Greater Los Angeles Healthcare Center Los Angeles, California

VA Project 691-14-121WL Renovate B500 1st Floor Canteen

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS

00 01 10 Table of Contents 00 01 15 List of Drawing Sheets

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01 32 16.15 Project Schedules 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 57 19 Temporary Environmental Controls 01 58 16 Temporary Interior Signage 01 74 19 Construction Waste Management 01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 02 82 13.19 Asbestos Wall Joint Compound, Floor Tile and Mastic Abatement 02 83 33.13 Lead Based Paint Removal and Disposal

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete

DIVISION 04 – MASONRY (Not Used)

DIVISION 05 – METALS

05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 75 30 Column Covers

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 06 60 Schedules for Plastic Fabrications 06 10 00 Rough Carpentry 06 20 00 Finish Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

00 01 10-2

07 21 13 Thermal/Acoustical Insulation 07 84 00 Firestopping 07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 31 13 Access Doors and Frames 08 35 00 Side-Folding Grilles - Open Design

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 09 06 00 Schedule for Finishes 09 22 16 Non-Structural Metal Framing 09 27 10 Gypsum Board Accessories 09 29 00 Gypsum Board 09 30 13 Ceramic/Porcelain Tiling 09 51 00 Acoustical Ceilings 09 65 13 Resilient Base and Accessories 09 65 19 Resilient Tile Flooring 09 67 23.60 Resinous Urethane Mortar Flooring (RES-6A) 09 72 16 Vinyl-Coated Fabric Wall Coverings (Murals) 09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10 26 00 Wall and Door Protection 10 28 00 Toilet, Bath, and Laundry Accessories

DIVISION 11 – EQUIPMENT (See Drawings)

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 12 36 00 Countertops 12 36 61.19 Quartz Agglomerate Countertops 12 52 19 Upholstered Seating

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components

DIVISION 14– CONVEYING EQUIPMENT (Not Used)

DIVISION 21- FIRE SUPPRESSION

21 05 11 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

00 01 10-3

22 05 11 Common Work Results for Plumbing 22 05 23 General-Duty Valves for Plumbing Piping 22 07 11 Plumbing Insulation 22 11 00 Facility Water Distribution 22 13 00 Facility Sanitary and Vent Piping 22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 31 00 HVAC Ducts and Casings 23 38 13 Commercial-Kitchen Hoods

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 33 Raceway and Boxes for Electrical Systems 26 05 26 Grounding and Bonding for Electrical Systems 26 09 23 Lighting Controls 26 27 26 Wiring Devices 26 29 21 Enclosed Switches and Circuit Breakers 26 51 00 Interior Lighting DIVISION 27 – COMMUNICATIONS (See drawings) 27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 27 05 33 Raceways and Boxes for Communications Systems 27 08 00 Commissioning of Communications Systems 27 10 00 Control, Communications and Signal Wiring DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (Not Used) DIVISION 31 – EARTHWORK (Not Used) DIVISION 32 – EXTERIOR IMPROVEMENTS (Not Used) DIVISION 33 – UTILITIES (Not Used)

- - - END - - -

File details come from the government source that posted it.