36C25818B0305-0001000.docx
DOCX document 30 KB Posted
- Solicitation number
- 36C25818B0305
About this file
36C25818B0305 0001 36C25818B0305 0001.docx
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO
BE RECEIVED
AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER
IS MODIFIED
TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-11-2018
691-14-121WL
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25818B0305 06-06-2018
X X X Purchase Order No.:
TBD
X one The Purpose of Amendment No.: A00001 Is TO:
1. Publish New Bid Sheet Schedule.
2. Publish New General Condtions.
3. Publish Pre-Solicitation Sign in Sheet.
4. All RFI's need to be submitted by email to gary.smith4@va.gov
Justin Hicks See attached document: S02 NEW 00 00r2 General Requirements.
SF 1442 box #17 continued:
STATEMENT OF BID ITEM(S)
Main Bid Items A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, selective demolition, alterations, canteen equipment installation, mechanical, plumbing, electrical, fire protection, and certain other items.
1. For funding source allocation. Provide a separate cost breakdown for the following items:
a. Material only costs for the following items:
1) Resin Accent and Divider Panels (W-6, W-7)
2) Resin Chair Rail (CH-1)
3) Side-folding Grilles – Open Design (Section 08 35 00)
4) Floor Finish Resilient Flooring: Luxury Vinyl Tile (F-2, F-3)
5) Floor Finish and Integral Cove: Resinous Flooring (F-1, B-2)
6) Wall Base: Solid Vinyl (B-1)
7) Wall Base: Resilient Base (B-3)
8) Wall Finish: Painted Gypsum Board (Impact Resistant and/or Type X) (W-1, W-2, W-3)
9) Wall Finish: Gyp. Board Accessories (Basis of Design: Fry Reglet (R-1, R-2)
10) Wall Finish: Textured Wall (Basis of Design: 3-Form ‘Carve’ (W-8))
11) Wall Finish: Ceramic/Porcelain Tile (W-4, W-5) and Grout (GR-1)
12) Ceiling Finish: Acoustical Ceiling Tile and Grid (C-1)
13) Ceiling Finish: Acoustical Ceiling Tile and Grid (C-5; Kitchen, Room #1459 only)
14) Ceiling Finish: Painted Impact Resistant Type X Gypsum Board (C-2, C-3, C-4)
15) Ceiling and Wall Light Fixtures (A, A1, B, C, C1, D, F, X)
16) Corner Guards (CG-1, CG-2)
17) Column Cover (COL-1)
18) Door Paint (DR-1)
19) Door Frame Paint (HMF-1)
20) Wall Murals: HD Vinyl – Texture Wall Covering (M-1)
21) Solid Surface (SS-1, SS-3)
22) Wall Reveal and Trim: (R-1, R-2)
23) Upholstery for fixed benches (U-1, U-2)
b. Design Build the following:
1) Design and replace existing exhaust duct at hoods X1 and X2 with new stainless-steel exhaust duct with 3M fire wrap. The new duct shall be designed to have minimum velocity for grease exhaust (1800-2500 FPM) and slope down for grease collection and be accessible for duct cleaning and maintenance. Design and replace hood exhaust fans to accommodate the new hood CFM. Provide structural anchorage and bracing for all new work.
2) Utilize AH-16 for the air distribution as part of the make-up system for the kitchen hood. Design and upgrade AH-16 to accommodate the make-up air for the kitchen exhaust including increased CFM. Replace fan motors and VFD as required. Provide power for kitchen exhaust fans. Design and modify existing AH-16 supply air duct and its air distribution to accommodate the make-up air for exhaust hoods. Provide power to AH-16 to accommodate fan motor upgrades. Provide DDC controls which are compatible with existing Hospital DDC control system. Controls shall interlock between exhaust fan and make-up air system, sequence of operation and fire alarm shutdown. Provide power to control panels.
3) Conduct pre-read of the inlet/outlet and AHU system serving the entire Canteen/Cafeteria. Balance the air at conclusion of the construction.
4) Conduct Electrical Panel reading to verify capacity.
2. The Canteen Equipment will be furnished by the Government (Contractor to provide installation including all anchorage, utilities, and accessories as applicable for a fully functional facility).
3. Casework at the Food Court and Starbucks area will be furnished by the Government (Contractor to provide installation including all anchorage, utilities, and accessories as applicable for a fully functional facility).
4. Movable furniture shall be furnished by the Government.
5. Built-in furniture (except items noted above, i.e. Canteen and Food Court casework) shall be furnished and installed by the Contractor (Contractor to coordinate the color and finishes with the Government-furnished movable furniture).
6. Contract completion time shall be:
a. Construction: 270 calendar days
| B. | ITEM 2, ALTERNATE NO.1: Same as ITEM 1, except omit ceiling finishes in Kitchen, Room #1459. |
| C. | ITEM 3, ALTERNATE NO.3: Same as ITEM 2, except omit flooring and base finishes in Staff Dining Room and Conference Room. |
| D. | ITEM 4, ALTERNATE NO.4: Same as ITEM 3, except the project will be executed in one (1) phase. Construction completion time:200 days. |
A: TOTAL BASE BID PRICE LABOR ONLY: _______________________________
TOTAL BASE BID PRICE MATERIALS ONLY: ___________________________
TOTAL BASE BID PRICE PROFIT ONLY: _______________________________
TOTAL BASE BID PRICE OVERHEAD ONLY: ___________________________
TOTAL BASE BID COMBINED: _________________________________________
B: TOTAL BID PRICE LABOR ONLY: _______________________________
TOTAL BID PRICE MATERIALS ONLY: ___________________________
TOTAL BID PRICE PROFIT ONLY: _______________________________
TOTAL BID PRICE OVERHEAD ONLY: ___________________________
TOTAL BID COMBINED: _________________________________________
C: TOTAL BID PRICE LABOR ONLY: _______________________________
TOTAL BID PRICE PROFIT ONLY: _______________________________
D: TOTAL BID PRICE LABOR ONLY: _______________________________
TOTAL BID PRICE PROFIT ONLY: _______________________________
File details come from the government source that posted it.