This file is a Price Schedule Breakdown Form for a Department of Veterans Affairs (VA) contract (Solicitation Number 36C25726R0016) for an NRM Upgrade Utility project located in Grand Prairie, Texas. The document provides a comprehensive line-item pricing template organized by Construction Specification Institute (CSI) divisions, including categories such as General Requirements, Facility Services, Site & Infrastructure, and Process Equipment. Despite the detailed breakdown, all current line items are marked with $0.00, suggesting this is a template for potential bidders to complete.

The contract is issued by the Veterans Health Administration's Veterans Integrated Service Network 17, with the specific project identified as VA-26-00004529. The pricing instructions emphasize that this is a fixed-price contract, with field office overhead and general conditions to be applied once to the contract and any subsequent changes. Key contractual notes include that the line-item price breakdown is for informational purposes only and does not constitute separate billable deliverables, and that awardees are responsible for ensuring formula accuracy in calculating subtotals and contract totals.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
549-23-723

NRM Upgrade Utility Grand Prairie - Grand Prairie, TX 75051 *instruction provided in the instructions tab

CLIN 0001
RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General RequirementsN/A$0.00
Division Item 2 Existing ConditionsN/A$0.00
Division Item 3 ConcreteN/A$0.00
Division Item 4 MasonryN/A$0.00
Division Item 5 MetalsN/A$0.00
Division Item 6 Woods, Plastic and CompositesN/A$0.00
Division Item 7 Thermal and Moisture ProtectionN/A$0.00
Division Item 8 OpeningsN/A$0.00
Division Item 9 FinishesN/A$0.00
Division Item 10 SpecialtiesN/A$0.00
Division Item 11 EquipmentN/A$0.00
Division Item 12 FurnishesN/A$0.00
Division Item 13 Special ConstructionN/A$0.00
Division Item 14 Conveying EquipmentN/A$0.00
Facility Services SubgroupN/A$0.00
Division Item 21 Fire SuppressionN/A$0.00
Division Item 22 PlumbingN/A$0.00
Division Item 23 Heating, Ventilating and A/CN/A$0.00
Division Item 25 Integrated AutomationN/A$0.00
Division Item 26 ElectricalN/A$0.00
Division Item 27 CommunicationsN/A$0.00
Division Item 28 Electronic Safety & SecurityN/A$0.00
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00
Division Item 33 UtilitiesN/A$0.00
Division Item 34 TransportationN/A$0.00
Division Item 35 Waterway & Marine ConstructionN/A$0.00
Process Equipment Subgroup$0.00
Division Item 40 Process InterconnectionsN/A$0.00
Division Item 41 Material Processing & Handling EquipmentN/A$0.00
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/A$0.00
Division Item 43 Process Gas & Liquid HandlingN/A$0.00
Division Item 44 Pollution & Waste Control EquipmentN/A$0.00
Division Item 45 Industry Specific Mfg. EquipmentN/A$0.00
Division Item 46 Water & Wastewater EquipmentN/A$0.00
Division Item 48 Electrical Power GenerationN/A$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00