Price Breakdown Worksheet_2.pdf

PDF 95 KB Posted

Attached to
Solicitation 36C25725R0064, Update CLC HVAC System, Project# 671-22-198
Solicitation number
36C25725R0064
Issued by

About this file

This document is a Price Breakdown Worksheet template for a construction project, designed to detail costs across multiple construction divisions. The worksheet provides a comprehensive breakdown structure with 33 distinct divisions, including categories like General Requirements, Concrete, Masonry, Electrical, HVAC, Fire Suppression, and Utilities. Each division has columnar spaces to itemize Material, Labor, Equipment, and Total costs, allowing for granular financial tracking of a construction project's expenses. Additional rows are included for calculating subtotal costs, general liability/insurance, overhead and profit, bonding, and the final project total cost.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL LABOR EQUIPMENT TOTAL

DIVISION 01: GENERAL REQUIREMENTS

DIVISION 02: EXISTING CONDITIONS

DIVISION 03: CONCRETE

DIVISION 04: MASONRY

DIVISION 05: METALS

DIVISION 06: WOOD, PLASTICS & COMPOSITES

DIVISION 07: THERMAL & MOISTURE PROTECTION

DIVISION 08: OPENINGS

DIVISION 09: FINISHES

DIVISION 10: SPECIALTIES

DIVISION 11: EQUIPMENT

DIVISION 12: FURNISHINGS

DIVISION 13: SPECIAL CONSTRUCTION

DIVISION 14: CONVEYING EQUIPMENT

DIVISION 21: FIRE SUPPRESSION

DIVISION 22: PLUMBING

DIVISION 23: HVAC

DIVISION 25: INTEGRATED AUTOMATION

DIVISION 26: ELECTRICAL

DIVISION 27: COMMUNICATIONS

DIVISION 28: ELECTRONIC SAFETY AND SECURITY

DIVISION 31: EARTHWORK

DIVISION 32: EXTERIOR IMPROVEMENTS

DIVISION 33: UTILITIES

SUBTOTAL COST:

GENERAL LIABILITY / INSURANCE:

OVERHEAD & PROFIT:

BOND:

PROJECT TOTAL COST:

Price Breakdown Worksheet

File details come from the government source that posted it. Updated .