About this file

This package includes construction documents and specifications for the revitalization of dormitory halls and walls at the Veterans Affairs Medical Center in Temple, Texas. The project scope involves demolishing existing interior finishes, ceilings, flooring and fixtures in specified areas of Wings A and B, and rebuilding to include new wall finishes, flooring, lighting, and bathroom renovations per the design plans. The construction is intended to upgrade older dormitory spaces and improve accessibility and conditions for veterans. The project number is 674-23-250 and is estimated at $5 million. Bids are due by January 2023 with work to be completed within 18 months of award. The solicitation is designated for SDVOSB/VOSB priority and is being procured using FAR Part 36 construction procedures by the VA's Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
36C25724B0009 0009.docx DOCX document
36C25724B0009 0008.docx DOCX document
36C25724B0009 0007.docx DOCX document
36C25724B0009 0006.docx DOCX document
36C25724B0009 0005.docx DOCX document
Plumbing Fixture Schedule.pdf PDF
Lighting Fixtures.pdf PDF
36C25724B0009 0004.docx DOCX document
36C25724B0009 0003.docx DOCX document
Specifications_CTX Revitalize Dom Halls and Walls.pdf PDF
Exit lights Dom.pdf PDF
Vanity Lighting.pdf PDF
36C25724B0009 0002.docx DOCX document
A-117.pdf PDF
P12.pdf PDF
P6.pdf PDF
Combined Files-Electrical.pdf PDF
AE-101.pdf PDF
AD-100.pdf PDF
P11.pdf PDF
A-100.pdf PDF
P5.pdf PDF
A-103.pdf PDF
AS-100.pdf PDF
A-109.pdf PDF
P9.pdf PDF
A-115.pdf PDF
A-110.pdf PDF
AS-102.pdf PDF
AE-100.pdf PDF
A-111.pdf PDF
A-104.pdf PDF
P1.pdf PDF
A-112.pdf PDF
AD-103.pdf PDF
A-105.pdf PDF
AE-102.pdf PDF
Attendance Roster.pdf PDF
A-106.pdf PDF
A-101.pdf PDF
C-001.pdf PDF
A-102.pdf PDF
P2.pdf PDF
P4.pdf PDF
A-113.pdf PDF
A-108.pdf PDF
A-116.pdf PDF
AD-101.pdf PDF
A-107.pdf PDF
A-114.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE II

PHASE III

PHASE V

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN SCOPE

PHASE I

PHASE IV

PHASE V

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/17/2023

2:11:49 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A a nd B w in g si te p la n.

rv t

PHASE MAP REFERBISH INTERIOR

FINISHES

TB AO

C-001

1/16" = 1'-0"1 Level 1

1/16" = 1'-0"2 Level 2

674-23-250

TEMPLE, TX

UP

UP

UP

39 SF

BATH

1A100

150 SF

1 BED

1A101

197 SF

2 BED

1A102

45 SF

BATH

1A103

201 SF

2 BED

1A104

202 SF

2 BED

1A105

31 SF

C. LINEN

1A106

33 SF

S. LINEN

1A107

45 SF

BATH

1A108

201 SF

2 BED

1A109

137 SF

QUIET

ROOM

1A110

202 SF

2 BED

1A111

45 SF

BATH

1A112

201 SF

2 BED

1A113

410 SF

BATH

1A119

201 SF

2 BED

1A116

45 SF

BATH

1A117

201 SF

2 BED

1A118

201 SF

2 BED

1A120

45 SF

BATH

1A121

201 SF

2 BED

1A122

410 SF

MULTI-PURPOSE

1A123

201 SF

2 BED

1A124

45 SF

BATH

1A125

201 SF

2 BED

1A126

125 SF

GROUP

ROOM

1A127

39 SF

BATH

1A128

152 SF

1 BED

1A129

199 SF

2 BED

1A130

45 SF

BATH

1A131

201 SF

2 BED

1A132

202 SF

2 BED

1A133

45 SF

BATH

1A134

202 SF

2 BED

1A135

202 SF

2 BED

1A136

45 SF

BATH

1A138

201 SF

2 BED

1A140

202 SF

2 BED

1A141

45 SF

BATH

1A143

202 SF

2 BED

1A144

202 SF

2 BED

1A145

45 SF

BATH

1A146

201 SF

2 BED

1A147

40 SF

IDF

1A148

202 SF

2 BED

1A149

45 SF

BATH

1A151

139 SF

MECH.

1A110A

202 SF

2 BED

1A152

154 SF

1 BED

1A153

44 SF

BATH

1A154

479 SF

PATIENT

STORE

1A155

46 SF

ELE.

1A139

199 SF

STAIRS

S1-1

94 SF

HEALTH

TECH

1A156

168 SF

NURSE

OFFICE

1A157

46 SF

HAC

1A137

895 SF

CORRIDER

C1-6

757 SF

CORRIDOR

C1-21003 SF

CORRIDOR

C1-1

877 SF

CORRIDOR

C1-3

NOT IN

SCOPE

NOT IN

SCOPE

PHASE V

187 SF

MULTI-LIVING

2A200

50 SF

BATH

2A201

247 SF

MULTI-LIVING

2A202

40 SF

BATH

2A203

172 SF

2 BED

2A204

201 SF

2 BED

2A205

30 SF

C. LIN.

2A206

33 SF

S. LIN.

2A207

45 SF

BATH

2A208

201 SF

2 BED

2A209

137 SF

MECH

2A210A

201 SF

2 BED

2A211

45 SF

BATH

2A212

201 SF

2 BED

2A213

69 SF

BATH

2A21448 SF

HAC

2A215

202 SF

2 BED

2A216

45 SF

BATH

2A217

201 SF

2 BED

2A218

119 SF

BATH

2A219

202 SF

2 BED

2A220

45 SF

BATH

2A221

201 SF

2 BED

2A222

418 SF

MULTI-PURP

2A223

199 SF

2 BED

2A224

45 SF

BATH

2A2225

203 SF

2 BED

2A226

121 SF

CORR

C2-3

39 SF

BATH

2A228

153 SF

1 BED

2A229

198 SF

2 BED

2A230

45 SF

BATH

2A231

201 SF

2 BED

2A232

201 SF

2 BED

2A233

45 SF

BATH

2A234

201 SF

2 BED

2A235

201 SF

2 BED

2A236

73 SF

BATH

2A237

45 SF

BATH

2A238

48 SF

ELE.

2A239

201 SF

2 BED

2A240

201 SF

2 BED

2A241

121 SF

BATH

2A242

45 SF

BATH

2A243

201 SF

2 BED

2A244

201 SF

2 BED

2A245

45 SF

BATH

2A246

201 SF

2 BED

2A247

201 SF

2 BED

2A249

158 SF

LOUNGE

2A250

45 SF

BATH

2A251

201 SF

2 BED

2A252

153 SF

1 BED

2A253

44 SF

BATH

2A254

157 SF

1 BED

2A255

66 SF

BATH

2A256

160 SF

1 BED

2A257

43 SF

BATH

2A219A

55 SF

BATH

2A219B

44 SF

BATH

2A212A

54 SF

BATH

2A212B

141 SF

QUIET

ROOM

2A210

199 SF

STAIRS

S2-1

40 SF

COMM

2A248

NOT IN

SCOPE

PHASE V

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:38:18 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING DEMO LEVEL 1 & 2 REVITALIZE DOM

HALLS AND WALLS

TB AO

AD-100

1/8" = 1'-0"1 LEVEL 1 DEMO

1/8" = 1'-0"2 LEVEL 2 DEMO

NOTES

1) DEMO EXISTING INTEROR FLOORING, CEILING

TILES, WALL FINISHES, LIGHT FIXTURES AND

UTILITY EQUIPMENT ( TOILETS, SINKS, SHOWERS,

BATHS,).

674-23-250

150 SF

1 BED

1B100

39 SF

BATH

1B101

198 SF

2 BED

1B102

45 SF

BATH

1B103

201 SF

2 BED

1B104

201 SF

2 BED

1B105

34 SF

H.A.C.

1B106

30 SF

S. LINEN

1B107

45 SF

BATH

1B108

202 SF

2 BED

1B109

134 SF

QUIET

ROOM

1B110

201 SF

2 BED

1B111

45 SF

BATH

1B112

201 SF

2 BED

1B113

67 SF

BATH

1B114

46 SF

H.A.C.

1B115

201 SF

2 BED

1B116

45 SF

BATH

1B117

202 SF

2 BED

1B118

115 SF

BATH

1B119

201 SF

2 BED

1B120

45 SF

BATH

1B121

202 SF

2 BED

1B122

399 SF

MULTI-PURPOSE

1B123

201 SF

2 BED

1B124

45 SF

BATH

1B125

201 SF

2 BED

1B126

154 SF

1 BED

1B129

37 SF

BATH

1B128

115 SF

LOUNGE

1B127

199 SF

2 BED

1B130

45 SF

BATH

1B131

202 SF

2 BED

1B132

201 SF

2 BED

1B133

45 SF

BATH

1B134

202 SF

2 BED

1B135

202 SF

2 BED

1B136

67 SF

BATH

1B137

45 SF

BATH

1B138

45 SF

ELEC.

1B139

202 SF

2 BED

1B140

201 SF

2 BED

1B141

113 SF

BATH

1B142

45 SF

BATH

1B143

202 SF

2 BED

1B144

202 SF

2 BED

1B145

45 SF

BATH

1B146

202 SF

2 BED

1B147

36 SF

IDF

1B148

201 SF

2 BED

1B149

108 SF

LOUNGE

1B150

45 SF

BATH

1B151

203 SF

2 BED

1B152

154 SF

1 BED

1B153

45 SF

BATH

1B154

459 SF

PATIENT

STORAGE

1B155

133 SF

MECH.

1B110A

42 SF

BATH

1B119A

51 SF

BATH

1B119B

41 SF

BATH

1B142A

52 SF

BATH

1B142B

171 SF

COOR.

C1-12

8' - 0 1/4"

NOT IN

SCOPE

PHASE V

188 SF

APARTMENT/

MULTI LIVING

2B200

50 SF

BATH

2B201

247 SF

APARTMENT/

MULTI LIVING

2B202

40 SF

BATH

2B203

173 SF

1 BED

2B204

201 SF

2 BED

2B205

34 SF

C. LIN

2B206

29 SF

S. LIN

2B207

45 SF

BATH

2B208

199 SF

2 BED

2B209

137 SF

QUIET ROOM

2B210

201 SF

2 BED

2B211

45 SF

BATH

2B212

202 SF

2 BED

2B213

69 SF

BATH

2B214

47 SF

H.A.C.

2B215

201 SF

2 BED

2B216

45 SF

BATH

2B217

202 SF

2 BED

2B218

118 SF

BATH

2B219

201 SF

2 BED

2B220

45 SF

BATH

2B221

202 SF

2 BED

2B222

418 SF

MULTI-PURPOSE

ROOM

2B223

201 SF

2 BED

2B224

45 SF

BATH

2B225

201 SF

2 BED

2B226

130 SF

LOUNGE

2B227

40 SF

BATH

2B228

152 SF

1 BED

2B229

198 SF

2 BED

2B230

45 SF

BATH

2B231

202 SF

2 BED

2B232

201 SF

2 BED

2B233

45 SF

BATH

2B234

202 SF

2 BED

2B235

202 SF

2 BED

2B236

72 SF

BATH

2B237

45 SF

BATH

2B238

49 SF

ELE.

2B239

202 SF

2 BED

2B240

201 SF

2 BED

2B241

122 SF

BATH

2B242

45 SF

BATH

2B243

202 SF

2 BED

2B244

202 SF

2 BED

2B245

45 SF

BATH

2B246

202 SF

2 BED

2B247

41 SF

IDF

2B248

201 SF

2 BED

2B249

130 SF

LOUNGE

2B250

45 SF

BATH

2B251

202 SF

2 BED

2B252

155 SF

1 BED

2B253

44 SF

BATH

2B254

160 SF

1 BED

2B255

66 SF

BATH

2B256

157 SF

1 BED

2B257

200 SF

STAIR

55 SF

BATH

2B242B

123 SF

STAIR

S2-8

Not Enclosed

CORRIDOR

C2-14

55 SF

BATH

2B219B

43 SF

BATH

2B242A

NOT IN

SCOPE NOT IN

SCOPE

PHASE V

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:18:59 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING DEMO LEVEL 1 REVITALIZE DOM

HALLS AND WALLS

TB AO

AD-101

1/8" = 1'-0"1 LEVEL 1 DEMO

NOTES

1) DEMO EXISTING INTEROR FLOORING, CEILING TILES, LIGHT

FIXTURES AND UTILITY EQUIPMENT ( TOILETS, SINKS, SHOWERS,

BATHS,) .

674-23-250

1/8" = 1'-0"2 LEVEL 2 DEMO

210 SF

CORRIDOR

C1-15

877 SF

CORRIDOR

C1-3

168 SF

NURSE

OFFICE

1A157

94 SF

HEALTH

TECH

1A156

215 SF

STAIRS

1A164

55 SF

STORAGE

1A160

292 SF

CORRIDOR

C1-16

169 SF

NURSE'S

CONT.

ROOM

1A161 98 SF

OFFICE

1A162

120 SF

SUPPLY

ROOM

1A163

243 SF

CORRIDOR

2C-14

PHASE

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:38:41 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 1 DEMO CALL OUT REVITALIZE DOM

HALLS AND WALLS

TB AO

AD-102

1/4" = 1'-0"1 LEVEL 1 DEMO CALL OUT

674-23-250

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:38:51 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 2 DEMO CALL OUT REVITALIZE DOM

HALLS AND WALLS

TB AO

AD-103

1/4" = 1'-0"1 LEVEL 2 DEMO CALL OUT

674-23-250

39 SF

BATH

1A100

150 SF

1 BED

1A101

197 SF

2 BED

1A102

45 SF

BATH

1A103

201 SF

2 BED

1A104

202 SF

2 BED

1A105

31 SF

C. LINEN

1A106

33 SF

S. LINEN

1A107

45 SF

BATH

1A108

201 SF

2 BED

1A109

137 SF

QUIET

ROOM

1A110

202 SF

2 BED

1A111

45 SF

BATH

1A112

201 SF

2 BED

1A113

410 SF

BATH

1A119

201 SF

2 BED

1A116

45 SF

BATH

1A117

201 SF

2 BED

1A118

201 SF

2 BED

1A120

45 SF

BATH

1A121

201 SF

2 BED

1A122

410 SF

MULTI-PURPOSE

1A123

201 SF

2 BED

1A124

45 SF

BATH

1A125

201 SF

2 BED

1A126

125 SF

GROUP

ROOM

1A127

39 SF

BATH

1A128

152 SF

1 BED

1A129

199 SF

2 BED

1A130

45 SF

BATH

1A131

201 SF

2 BED

1A132

202 SF

2 BED

1A133

45 SF

BATH

1A134

202 SF

2 BED

1A135

202 SF

2 BED

1A136

45 SF

BATH

1A138

201 SF

2 BED

1A140

202 SF

2 BED

1A141

45 SF

BATH

1A143

202 SF

2 BED

1A144

202 SF

2 BED

1A145

45 SF

BATH

1A146

201 SF

2 BED

1A147

40 SF

IDF

1A148

202 SF

2 BED

1A149

45 SF

BATH

1A151

139 SF

MECH.

1A110A

202 SF

2 BED

1A152

154 SF

1 BED

1A153

44 SF

BATH

1A154

479 SF

PATIENT

STORE

1A155

46 SF

ELE.

1A139

199 SF

STAIRS

S1-1

94 SF

HEALTH

TECH

1A156

168 SF

NURSE

OFFICE

1A157AE-1008

46 SF

HAC

1A137

AE-100 2

895 SF

CORRIDER

C1-6

757 SF

CORRIDOR

C1-21003 SF

CORRIDOR

C1-1

877 SF

CORRIDOR

C1-3

AE-10012

AE-100

12' - 9 1/2"

1/

2" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 1/2" 12' - 10" 12' - 9 3/4" 12' - 9 1/4" 9' - 11 3/4"

7'

3/

4"

/4

7'

3/

4"

/4

8'

/2 "5' - 0"

1"

1/ 2"

8'

0"

4' - 11 1/4"

9' - 11 3/4"

1/ 2"

5' - 5 3/4" 9' - 3"10' - 1 1/4"10' - 1 1/2"10' - 1"10' - 1 1/2"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1"10' - 1"

5' - 6 3/4"

7'

3/

4"

6' - 6 1/4"

10' - 1"10' - 1 1/4"10' - 1 1/4"10' - 1"10' - 1 1/2"10' - 1 1/4"10' - 1 1/4"10' - 1"10' - 1 1/2"10' - 1 1/4"10' - 1 1/4"10' - 1"9' - 4"

12' - 10 1/2"

10' - 2"

10' - 0"

4' - 8 1/4"

5' - 6 1/4"

12' - 9 1/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 1/2" 12' - 10" 12' - 9 1/2" 12' - 9 3/4" 12' - 9 3/4"

24' - 7 1/4"

7'

15' - 11 3/4"

/4

7' - 9"

/2

7' - 10 1/4"

6' - 1 1/4"

5'

1/

4" 5'

1/ 4"

6'

1/

2"

8'

/4

8'

3/

4"

15' - 10 1/4"

15' - 10 1/4"

7'

1/

2"

110' - 0 3/4"

5'

1/

2"

/2

/2

7'

5"

7'

5"

5' - 4 1/4"

57' - 5 1/4"105' - 3"

4' - 11 3/4"

6'

1/

4"

4'

3/

4"

NOT IN

SCOPE

55 SF

STORAGE

1A160

215 SF

STAIRS

1A164

120 SF

SUPPLY

ROOM

1A163

210 SF

CORRIDOR

C1-15

292 SF

CORRIDOR

C1-16

169 SF

NURSE'S

CONT.

ROOM

1A161

98 SF

OFFICE

1A162

5' - 4 1/4"

8'

1/

2"

PHASE V

NOT IN

SCOPE

A-113

NOTES

R-1: STAIRS IN SCOPE OF WORK.

R-2: ROOM 1A119 BATHROOM IS NOT IN SCOPE OF

WORK. NOT TO BE REMODELED.

R-3:WING CONNECTION BETWEEN A & B WING IN SCOPE

OF WORK.

R-1

R-2

R-3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:33:03 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING FLOOR PLAN LEVEL1 REVITALIZE DOM

HALLS AND WALLS

TB AO

A-100

1/8" = 1'-0"1 LEVEL 1 NEW CONSTRUCTION

674-23-250

39 SF

BATH

1A100

150 SF

1 BED

1A101

197 SF

2 BED

1A102

45 SF

BATH

1A103

201 SF

2 BED

1A104

202 SF

2 BED

1A105

31 SF

C. LINEN

1A106

33 SF

S. LINEN

1A107

45 SF

BATH

1A108

201 SF

2 BED

1A109

137 SF

QUIET

ROOM

1A110

202 SF

2 BED

1A111

45 SF

BATH

1A112

201 SF

2 BED

1A113

410 SF

BATH

1A119

201 SF

2 BED

1A116

45 SF

BATH

1A117

201 SF

2 BED

1A118

201 SF

2 BED

1A120

45 SF

BATH

1A121

201 SF

2 BED

1A122

410 SF

MULTI-PURPOSE

1A123

201 SF

2 BED

1A124

45 SF

BATH

1A125

201 SF

2 BED

1A126

125 SF

GROUP

ROOM

1A127

39 SF

BATH

1A128

152 SF

1 BED

1A129

199 SF

2 BED

1A130

45 SF

BATH

1A131

201 SF

2 BED

1A132

202 SF

2 BED

1A133

45 SF

BATH

1A134

202 SF

2 BED

1A135

202 SF

2 BED

1A136

45 SF

BATH

1A138

201 SF

2 BED

1A140

202 SF

2 BED

1A141

45 SF

BATH

1A143

202 SF

2 BED

1A144

202 SF

2 BED

1A145

45 SF

BATH

1A146

201 SF

2 BED

1A147

40 SF

IDF

1A148

202 SF

2 BED

1A149

45 SF

BATH

1A151

139 SF

MECH.

1A110A

202 SF

2 BED

1A152 154 SF

1 BED

1A153

44 SF

BATH

1A154

479 SF

PATIENT

STORE

1A155

46 SF

ELE.

1A139

199 SF

STAIRS

S1-1

94 SF

HEALTH

TECH

1A156

168 SF

NURSE

OFFICE

1A157

46 SF

HAC

1A137

PHASE V

LBT WOOD PANELING

FLOOR TILE

NOT IN

SCOPE

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:33:45 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING FLOORING PLAN

LEVEL 1

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-101

1/8" = 1'-0"1 LEVEL 1 FLOORING

674-23-250

TEMPLE, TX

1/4" = 1'-0" Legend 1

NOTES

R-1: ELEC & MECH ROOM SHALL HAVE

TILE AS FLOORING.

R-1

PHASE V

SCOPE

NOT IN

SCOPE

2 X 4 LIGHT FIXTURE

1 X 4 LIGHT FIXTURE

1 X 3 LIGHT FIXTURE WALL

MOUNT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:34:08 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING RCP LEVEL 1 REVITALIZE DOM

HALLS AND WALLS

TB AO

A-102

1/8" = 1'-0"1 RCP LEVEL 1

674-23-250

TEMPLE, TX

1/4" = 1'-0"

LIGHT FIXTURE LEGEND

NOTES

R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE

AS IS TO EXISTING. THE FIXTURE & CEILING GRID SHALL

BE REPLACED AS NEW.

R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS

SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT

FIXTURES. SPECS WILL BE PROVED BY VA.

R-3: OVERHANG AREAS SHALL MATCH EXISITNG

CONDITIONS. REFERBISH CEILING TILES AND DAMAGES

TO AREA.

R-4: HARD LID CEILINGS

R-2

R-1

R-3

R-4

187 SF

MULTI-LIVING

2A200

50 SF

BATH

2A201

247 SF

MULTI-LIVING

2A202

40 SF

BATH

2A203

172 SF

2 BED

2A204

201 SF

2 BED

2A205

30 SF

C. LIN.

2A206

33 SF

S. LIN.

2A207

45 SF

BATH

2A208

201 SF

2 BED

2A209

137 SF

MECH

2A210A

201 SF

2 BED

2A211

45 SF

BATH

2A212

201 SF

2 BED

2A213

69 SF

BATH

2A21448 SF

HAC

2A215

202 SF

2 BED

2A216

45 SF

BATH

2A217

201 SF

2 BED

2A218

119 SF

BATH

2A219

202 SF

2 BED

2A220

45 SF

BATH

2A221

201 SF

2 BED

2A222

418 SF

MULTI-PURP

2A223

199 SF

2 BED

2A224

45 SF

BATH

2A2225

203 SF

2 BED

2A226

121 SF

CORR

C2-3

39 SF

BATH

2A228

153 SF

1 BED

2A229

198 SF

2 BED

2A230

45 SF

BATH

2A231

201 SF

2 BED

2A232

201 SF

2 BED

2A233

45 SF

BATH

2A234

201 SF

2 BED

2A235

201 SF

2 BED

2A236

73 SF

BATH

2A237

45 SF

BATH

2A238

48 SF

ELE.

2A239

201 SF

2 BED

2A240

201 SF

2 BED

2A241

121 SF

BATH

2A242

45 SF

BATH

2A243

201 SF

2 BED

2A244

201 SF

2 BED

2A245

45 SF

BATH

2A246

201 SF

2 BED

2A247

201 SF

2 BED

2A249

158 SF

LOUNGE

2A250

45 SF

BATH

2A251

201 SF

2 BED

2A252

153 SF

1 BED

2A253

44 SF

BATH

2A254

157 SF

1 BED

2A255

66 SF

BATH

2A256

160 SF

1 BED

2A257

43 SF

BATH

2A219A

55 SF

BATH

2A219B

44 SF

BATH

2A212A

54 SF

BATH

2A212B

141 SF

QUIET

ROOM

2A210

199 SF

STAIRS

S2-1

AE-101

AE-10125

AE-101 19

AE-101 27

AE-10137

AE-10133

AE-101 39

AE-101

12' - 10 1/2" 12' - 8 1/4" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 1/2" 13' - 0" 10' - 6 3/4" 11' - 11 3/4"

8' - 1 3/4"

13' - 6 1/4"

5'

1/

2"

10' - 0"

1/ 4"21

1/

4"

3/ 4"

8'

1/

2"

6' - 7" 5' - 0 1/2"

8'

1/

4"

10' - 1"

3/ 4"

7'

3/

4"

7'

3/

4"

10' - 1 1/4"10' - 1 3/4"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1 3/4"10' - 1 1/4"10' - 0"10' - 2"

8'

/4

5' - 0"5' - 0"

8'

/4

15' - 11 1/2" 6' - 11 1/2"

9'

/4

/2

7' - 0 1/4"

5' - 5 1/4"

5'

1/

2"7'

3/

4"

7'

/4

24' - 9 1/4"

8'

1/

4"

8'

1/

4" 8'

3/ 4"

10' - 1"10' - 1 1/4"10' - 1 1/4"10' - 1"

5' - 0"

9'

1/

4"5' - 0"10' - 1 1/4"10' - 1 1/2"10' - 1 1/4"10' - 1"10' - 1 1/4"10' - 1 1/2"10' - 1 1/4"10' - 1"10' - 1 1/4"

9' - 4 1/4"

4' - 9"

5' - 6 1/4"

7'

/4

4' - 11"

7'

/4

10' - 1" 12' - 9 3/4" 12' - 9 1/2" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 1/2" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 1/2" 12' - 9 3/4" 12' - 9 3/4" 6' - 6" 6' - 8 3/4"

7'

3/

4"

110' - 3 1/4"

6' - 0"

9' - 1"

8' - 10"

6' - 0 3/4"

/4

5'

1/

4" 6'

1/ 2"

5'

1/

2"

7' - 8 1/2" 7' - 11 1/4" 16' - 2 1/2"

/4

43' - 10 1/4"

6'

9"

5' - 0 3/4" 105' - 2 1/2"

9'

1/

4"

6' - 3 3/4" 6' - 4 1/4" 9' - 2 1/4"

5' - 7"5' - 0 1/4"14' - 3 1/4"

4'

2" 4'

1/ 2"

6' - 1 3/4"

9' - 7 3/4"

5'

6"

5'

1/

4"

123 SF

STAIRS

S2-7

40 SF

COMM

2A248

343 SF

CORR

C2-2

138 SF

CORR.

C2-5

180 SF

TV

LOUNGE

A2-227

147 SF

CORRIDOR

2C-7

868 SF

CORR

2C-1

883 SF

CORR.

C2-6

NOT IN

SCOPE

PHASE V

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:35:58 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING FLOOR PLAN LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-103

1/8" = 1'-0"1 LEVEL 2 NEW CONSTRUCTION

674-23-250

187 SF

MULTI-LIVING

2A200

50 SF

BATH

2A201

247 SF

MULTI-LIVING

2A202

40 SF

BATH

2A203

172 SF

2 BED

2A204

201 SF

2 BED

2A205

30 SF

C. LIN.

2A206

33 SF

S. LIN.

2A207

45 SF

BATH

2A208

201 SF

2 BED

2A209

137 SF

MECH

2A210A

201 SF

2 BED

2A211

45 SF

BATH

2A212

201 SF

2 BED

2A213

69 SF

BATH

2A21448 SF

HAC

2A215

202 SF

2 BED

2A216

45 SF

BATH

2A217

201 SF

2 BED

2A218

119 SF

BATH

2A219

202 SF

2 BED

2A220

45 SF

BATH

2A221

201 SF

2 BED

2A222

418 SF

MULTI-PURP

2A223

199 SF

2 BED

2A224

45 SF

BATH

2A2225

203 SF

2 BED

2A226

121 SF

CORR

C2-3

39 SF

BATH

2A228

153 SF

1 BED

2A229

198 SF

2 BED

2A230

45 SF

BATH

2A231

201 SF

2 BED

2A232

201 SF

2 BED

2A233

45 SF

BATH

2A234

201 SF

2 BED

2A235

201 SF

2 BED

2A236

73 SF

BATH

2A237

45 SF

BATH

2A238

48 SF

ELE.

2A239

201 SF

2 BED

2A240

201 SF

2 BED

2A241

121 SF

BATH

2A242

45 SF

BATH

2A243

201 SF

2 BED

2A244

201 SF

2 BED

2A245

45 SF

BATH

2A246

201 SF

2 BED

2A247

201 SF

2 BED

2A249

158 SF

LOUNGE

2A250

45 SF

BATH

2A251

201 SF

2 BED

2A252

153 SF

1 BED

2A253

44 SF

BATH

2A254

157 SF

1 BED

2A255

66 SF

BATH

2A256

160 SF

1 BED

2A257

43 SF

BATH

2A219A

55 SF

BATH

2A219B

44 SF

BATH

2A212A

54 SF

BATH

2A212B

141 SF

QUIET

ROOM

2A210

199 SF

STAIRS

S2-1

123 SF

STAIRS

S2-7

40 SF

COMM

2A248

LBT WOOD PANELING

FLOOR TILE

NOT IN

SCOPE

PHASE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:36:10 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING FLOORING PLAN

LEVEL 2

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-104

1/8" = 1'-0"1 LEVEL 2 FLOORING

674-23-250

TEMPLE, TX

1/4" = 1'-0" Legend 1

NOTES

R-1: ELEC & MECH ROOMS SHALL HAVE TILE

FLOORING.

PHASE V

SCOPE

NOT IN

SCOPE

2 X 4 LIGHT FIXTURE

1 X 4 LIGHT FIXTURE

1 X 3 LIGHT FIXTURE WALL

MOUNT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:36:21 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING RCP LEVEL 2 REVITALIZE DOM

HALLS AND WALLS

TB AO

A-105

1/8" = 1'-0"1 RCP LEVEL 2

674-23-250

TEMPLE, TX

1/4" = 1'-0"

LIGHT FIXTURE LEGEND

NOTES

R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE

AS IS TO EXISTING. THE FIXTURE & CEILING GRID SHALL

BE REPLACED AS NEW.

R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS

SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT

FIXTURES. SPECS WILL BE PROVED BY VA.

R-3: OVERHANG AREAS SHALL MATCH EXISITNG

CONDITIONS. REFERBISH CEILING TILES AND DAMAGES

TO AREA.

R-1

R-2

1B100

39 SF

BATH

1B101

198 SF

2 BED

1B102

45 SF

BATH

1B103

201 SF

2 BED

1B104

201 SF

2 BED

1B105

34 SF

H.A.C.

1B106

30 SF

S. LINEN

1B107

45 SF

BATH

1B108

202 SF

2 BED

1B109

134 SF

QUIET ROOM

1B110

201 SF

2 BED

1B111

45 SF

BATH

1B112

201 SF

2 BED

1B113

67 SF

BATH

1B114

46 SF

H.A.C.

1B115

201 SF

2 BED

1B116

45 SF

BATH

1B117

202 SF

2 BED

1B118

115 SF

BATH

1B119

201 SF

2 BED

1B120

45 SF

BATH

1B121

202 SF

2 BED

1B122

399 SF

MULTI-PURPOSE

1B123

201 SF

2 BED

1B124

45 SF

BATH

1B125

201 SF

2 BED

1B126

154 SF

1 BED

1B129

37 SF

BATH

1B128

115 SF

LOUNGE

1B127

199 SF

2 BED

1B130

45 SF

BATH

1B131

202 SF

2 BED

1B132

201 SF

2 BED

1B133

45 SF

BATH

1B134

202 SF

2 BED

1B135

202 SF

2 BED

1B136

67 SF

BATH

1B137

45 SF

BATH

1B138

45 SF

ELEC.

1B139

202 SF

2 BED

1B140

201 SF

2 BED

1B141

113 SF

BATH

1B142

45 SF

BATH

1B143

202 SF

2 BED

1B144

202 SF

2 BED

1B145

45 SF

BATH

1B146

202 SF

2 BED

1B147

36 SF

IDF

1B148

201 SF

2 BED

1B149

108 SF

LOUNGE

1B150

45 SF

BATH

1B151

203 SF

2 BED

1B152

154 SF

1 BED

1B153

45 SF

BATH

1B154

459 SF

PATIENT

STORAGE

1B155 133 SF

MECH.

1B110A

42 SF

BATH

1B119A

51 SF

BATH

1B119B

41 SF

BATH

1B142A

52 SF

BATH

1B142B

171 SF

COOR.

C1-12

AE-102

AE-102

AE-102

AE-102

AE-102

AE-102

AE-102

AE-102

8' - 0 1/4"

AE-102

8'

1/

4"

26' - 8 3/4"

15' - 11 1/2"

6' - 1 1/4"

4'

/2

5'

1/

4" 5'

/2

4'

3/

4"

57' - 5 1/2"

7'

1/

2"

5' - 4"

10' - 1" 10' - 2" 10' - 1"

6' - 5 1/2" 12' - 10 1/2" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 1/2" 12' - 10" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 1/2" 12' - 10" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 3/4" 10' - 0"

5' - 0"

4' - 7 1/4"

7'

/4

5' - 10"

110' - 8 1/4"

9' - 11 3/4" 12' - 9 1/2" 12' - 9 1/2" 12' - 9 1/2" 12' - 10" 12' - 9 1/2" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 1/2" 12' - 10" 12' - 9 3/4" 12' - 9 1/4"

10' - 1 1/4" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/4" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/4"

9' - 3 1/4"

10' - 1 1/4"

4' - 7 3/4"

5' - 5 3/4" 9' - 3"

10' - 1"4' - 11 1/4"

8'

0"

8'

/2

5' - 0"

8'

/2

5' - 0"

10' - 1" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/4" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/2" 10' - 1 1/4" 10' - 0 3/4"

7' - 10" 7' - 9 1/4"

6' - 0"

9' - 1"

16' - 6 1/2"24' - 9 1/4"

21' - 3 1/4"

3/ 4"

105' - 2 3/4"

6'

1/

2"

5' - 5" 8' - 10"

3'

/4

4'

1/

2"

6' - 1 3/4"

4'

/4

9' - 7 3/4"6' - 3 1/2"5' - 6 3/4"

8'

3/

4"

5' - 6 3/4" 5' - 0 1/4" 7'

1/ 4"

5' - 8 1/4"

5' - 0" 9'

1/ 4"

14' - 3"

14' - 3 1/4"

200 SF

STAIRS

1B - 3

PHASE V

NOT IN

SCOPE

NOTES

R-1: STAIRS IN SCOPE OF WORK.

R-2: ROOM 1A119 BATHROOM IS NOT IN SCOPE OF WORK. NOT TO BE

REMODELED.

R-3:WING CONNECTION BETWEEN A & B WING IN SCOPE OF WORK.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:15:12 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING FLOOR PLAN LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-106

1/8" = 1'-0"1 Level 1

674-23-250

1B100

39 SF

BATH

1B101

198 SF

2 BED

1B102

45 SF

BATH

1B103

201 SF

2 BED

1B104

201 SF

2 BED

1B105

34 SF

H.A.C.

1B106

30 SF

S. LINEN

1B107

45 SF

BATH

1B108

202 SF

2 BED

1B109

134 SF

QUIET

ROOM

1B110

201 SF

2 BED

1B111

45 SF

BATH

1B112

201 SF

2 BED

1B113

67 SF

BATH

1B114

46 SF

H.A.C.

1B115

201 SF

2 BED

1B116

45 SF

BATH

1B117

202 SF

2 BED

1B118

115 SF

BATH

1B119

201 SF

2 BED

1B120

45 SF

BATH

1B121

202 SF

2 BED

1B122

399 SF

MULTI-PURPOSE

1B123

201 SF

2 BED

1B124

45 SF

BATH

1B125

201 SF

2 BED

1B126

154 SF

1 BED

1B129

37 SF

BATH

1B128

115 SF

LOUNGE

1B127

199 SF

2 BED

1B130

45 SF

BATH

1B131

202 SF

2 BED

1B132

201 SF

2 BED

1B133

45 SF

BATH

1B134

202 SF

2 BED

1B135

202 SF

2 BED

1B136

67 SF

BATH

1B137

45 SF

BATH

1B138

45 SF

ELEC.

1B139

202 SF

2 BED

1B140

201 SF

2 BED

1B141

113 SF

BATH

1B142

45 SF

BATH

1B143

202 SF

2 BED

1B144

202 SF

2 BED

1B145

45 SF

BATH

1B146

202 SF

2 BED

1B147

36 SF

IDF

1B148

201 SF

2 BED

1B149

108 SF

LOUNGE

1B150

45 SF

BATH

1B151

203 SF

2 BED

1B152

154 SF

1 BED

1B153

45 SF

BATH

1B154

459 SF

PATIENT

STORAGE

1B155

133 SF

MECH.

1B110A

42 SF

BATH

1B119A

51 SF

BATH

1B119B

41 SF

BATH

1B142A

52 SF

BATH

1B142B

171 SF

COOR.

C1-12

200 SF

STAIRS

1B - 3

AE-102

LBT WOOD PANELING

FLOOR TILE

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:15:33 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING FLOORING LEVEL 1 REVITALIZE DOM

HALLS AND WALLS

TB AO

A-107

1/8" = 1'-0"1 LEVEL 1 FLOORING

674-23-250

TEMPLE, TX

1/4" = 1'-0" Legend 1

NOTES

R-1: ELEC & MECH SHALL HAVE TILE AS

FLOORING.

R-1

PHASE V

2 X 4 LIGHT FIXTURE

1 X 4 LIGHT FIXTURE

1 X 3 LIGHT FIXTURE WALL MOUNT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:15:49 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING RCP LEVEL 1 REVITALIZE DOM

HALLS AND WALLS

TB AO

A-108

1/8" = 1'-0"1 LEVEL 1 RCP

674-23-250

TEMPLE, TX

1/4" = 1'-0"

LIGHT FIXTURE LEGEND

NOTES

R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE AS IS TO EXISTING.

THE FIXTURE & CEILING GRID SHALL BE REPLACED AS NEW.

R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS SHALL BE REPLACED

TO NEW WALL MOUNTED LIGHT FIXTURES. SPECS WILL BE PROVED BY VA.

R-3: OVERHANG AREAS SHALL MATCH EXISITNG CONDITIONS. REFERBISH

CEILING TILES AND DAMAGES TO AREA.

R-4: HARD LID CEILINGS

R-1

R-4

R-2

188 SF

APARTMENT/

MULTI LIVING

2B200

50 SF

BATH

2B201

247 SF

APARTMENT/

MULTI LIVING

2B202

40 SF

BATH

2B203

173 SF

1 BED

2B204

201 SF

2 BED

2B205

34 SF

C. LIN

2B206

29 SF

S. LIN

2B207

45 SF

BATH

2B208

199 SF

2 BED

2B209

137 SF

QUIET ROOM

2B210

201 SF

2 BED

2B211

45 SF

BATH

2B212

202 SF

2 BED

2B213

69 SF

BATH

2B214

47 SF

H.A.C.

2B215

201 SF

2 BED

2B216

45 SF

BATH

2B217

202 SF

2 BED

2B218

118 SF

BATH

2B219

201 SF

2 BED

2B220

45 SF

BATH

2B221

202 SF

2 BED

2B222

418 SF

MULTI-PURPOSE

ROOM

2B223

201 SF

2 BED

2B224

45 SF

BATH

2B225

201 SF

2 BED

2B226

130 SF

LOUNGE

2B227

40 SF

BATH

2B228

152 SF

1 BED

2B229

198 SF

2 BED

2B230

45 SF

BATH

2B231

202 SF

2 BED

2B232

201 SF

2 BED

2B233

45 SF

BATH

2B234

202 SF

2 BED

2B235

202 SF

2 BED

2B236

72 SF

BATH

2B237

45 SF

BATH

2B238

49 SF

ELE.

2B239

202 SF

2 BED

2B240

201 SF

2 BED

2B241

122 SF

BATH

2B242

45 SF

BATH

2B243

202 SF

2 BED

2B244

202 SF

2 BED

2B245

45 SF

BATH

2B246

202 SF

2 BED

2B247

41 SF

IDF

2B248

201 SF

2 BED

2B249

130 SF

LOUNGE

2B250

45 SF

BATH

2B251

202 SF

2 BED

2B252

155 SF

1 BED

2B253

44 SF

BATH

2B254

160 SF

1 BED

2B255

66 SF

BATH

2B256

157 SF

1 BED

2B257

200 SF

STAIR

55 SF

BATH

2B242B

123 SF

STAIR

S2-8

Not Enclosed

CORRIDOR

C2-14

55 SF

BATH

2B219B

43 SF

BATH

2B242A

NOT IN

SCOPE NOT IN

SCOPE

PHASE V

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:18:12 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING FLOOR PLAN LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-109

1/8" = 1'-0"1 Level 2

674-23-250

188 SF

APARTMENT/

MULTI LIVING

2B200

50 SF

BATH

2B201

247 SF

APARTMENT/

MULTI LIVING

2B202

40 SF

BATH

2B203

173 SF

1 BED

2B204

201 SF

2 BED

2B205

34 SF

C. LIN

2B206

29 SF

S. LIN

2B207

45 SF

BATH

2B208

199 SF

2 BED

2B209

137 SF

QUIET ROOM

2B210

201 SF

2 BED

2B211

45 SF

BATH

2B212

202 SF

2 BED

2B213

69 SF

BATH

2B214

47 SF

H.A.C.

2B215

201 SF

2 BED

2B216

45 SF

BATH

2B217

202 SF

2 BED

2B218

118 SF

BATH

2B219

201 SF

2 BED

2B220

45 SF

BATH

2B221

202 SF

2 BED

2B222

418 SF

MULTI-PURPOSE

ROOM

2B223

201 SF

2 BED

2B224

45 SF

BATH

2B225

201 SF

2 BED

2B226

130 SF

LOUNGE

2B227

40 SF

BATH

2B228

152 SF

1 BED

2B229

198 SF

2 BED

2B230

45 SF

BATH

2B231

202 SF

2 BED

2B232

201 SF

2 BED

2B233

45 SF

BATH

2B234

202 SF

2 BED

2B235

202 SF

2 BED

2B236

72 SF

BATH

2B237

45 SF

BATH

2B238

49 SF

ELE.

2B239

202 SF

2 BED

2B240

201 SF

2 BED

2B241

122 SF

BATH

2B242

45 SF

BATH

2B243

202 SF

2 BED

2B244

202 SF

2 BED

2B245

45 SF

BATH

2B246

202 SF

2 BED

2B247

41 SF

IDF

2B248

201 SF

2 BED

2B249

130 SF

LOUNGE

2B250

45 SF

BATH

2B251

202 SF

2 BED

2B252

155 SF

1 BED

2B253

44 SF

BATH

2B254

160 SF

1 BED

2B255

66 SF

BATH

2B256

157 SF

1 BED

2B257

200 SF

STAIR

55 SF

BATH

2B242B

123 SF

STAIR

S2-8

55 SF

BATH

2B219B

43 SF

BATH

2B242A

NOT IN

SCOPE NOT IN

SCOPE

PHASE V

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:18:21 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING FLOORING PLAN

LEVEL 2

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-110

1/8" = 1'-0"1 LEVEL 2 FLOORING

1/4" = 1'-0" Legend 1

LBT WOOD PANELING

FLOOR TILE

674-23-250

PHASE

SCOPE

2 X 4 LIGHT FIXTURE

1 X 4 LIGHT FIXTURE

1 X 3 LIGHT FIXTURE WALL MOUNT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:18:31 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING RCP LEVEL 2 REVITALIZE DOM

HALLS AND WALLS

TB AO

A-111

1/8" = 1'-0"1 LEVEL 2 RCP

1/4" = 1'-0"

LIGHT FIXTURE LEGEND

674-23-250

TEMPLE, TX

NOTES

R-1: HARD LID CEILINGS

C1-15

877 SF

CORRIDOR

C1-3

168 SF

NURSE

OFFICE

1A157

94 SF

HEALTH

TECH

1A156

215 SF

STAIRS

1A164

55 SF

STORAGE

1A160

292 SF

CORRIDOR

C1-16

169 SF

NURSE'S

CONT.

ROOM

1A161 98 SF

OFFICE

1A162

120 SF

SUPPLY

ROOM

1A163

243 SF

CORRIDOR

2C-14

26' - 10 1/2"

16' - 5 1/2" 9' - 7 1/4"

/4

6'

0"

/4

/4

/4

5'

3"

10' - 11 1/4" 8' - 1"

3/ 4"

9' - 2" 16' - 4 3/4"

7'

1/

2"

44' - 8 1/4"

25' - 7 1/4"

/4

NOT IN

SCOPE10' - 10"

17' - 5"

/4

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:36:34 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 1 NEW

CONSTRUCTION CALL OUT

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-112

1/4" = 1'-0"1

LEVEL 1 NEW CONSTRUCTION CALL

OUT

674-23-250

C1-15

877 SF

CORRIDOR

C1-3

168 SF

NURSE

OFFICE

1A157

94 SF

HEALTH

TECH

1A156

215 SF

STAIRS

1A164

55 SF

STORAGE

1A160

292 SF

CORRIDOR

C1-16

169 SF

NURSE'S

CONT.

ROOM

1A161 98 SF

OFFICE

1A162

120 SF

SUPPLY

ROOM

1A163

243 SF

CORRIDOR

2C-14

PHASE

PHASE

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:36:54 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 1 FLOORING CALL

OUT

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-113

1/4" = 1'-0"1 LEVEL 1 FLOORING CALL OUT

1/4" = 1'-0" Legend 1

LBT WOOD PANELING

FLOOR TILE

674-23-250

2 X 4 LIGHT FIXTURE

1 X 4 LIGHT FIXTURE

1 X 3 LIGHT FIXTURE WALL

MOUNT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:37:11 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVLE 1 RCP CALL OUT REVITALIZE DOM

HALLS AND WALLS

TB AO

A-114

1/4" = 1'-0"1 RCP LEVEL 1 - Callout 1

1/4" = 1'-0"

LIGHT FIXTURE LEGEND

674-23-250

TEMPLE, TX

R-1

R-2

R-1: WALL MOUNTED LIGHT FIXTURES PLACEMENTS

SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT

FIXTURES. SPECS WILL BE PROVED BY VA.

R-2: OVERHANG AREAS SHALL MATCH EXISITNG

CONDITIONS. REFERBISH CEILING TILES AND DAMAGES

TO AREA.

708 SF

CORR.

C2-7

457 SF

CORR.

C2-15

55 SF

ELEC.

2A260

215 SF

STAIRS

S2-2

88 SF

CORR.

C2-16

128 SF

SUPPLY

2A263

98 SF

OFFICE

2A265

167 SF

SECTION 1

& B

OFFICE

2A264

26' - 10 1/4"

7'

/4

9' - 7 1/4" 16' - 4 3/4"

3/ 4"

10' - 4 3/4"

/4

8' - 1"

3/ 4"

45' - 10 1/2"

5' - 7"

24' - 7"

8'

3"

5'

3"

6'

1/

2" 4'

3/ 4"

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:37:27 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 2 NEW CONSTUCTION

CALL OUT

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-115

1/4" = 1'-0"1

LEVEL 2 NEW CONSTRUCTION CALL

OUT

674-23-250

708 SF

CORR.

C2-7

457 SF

CORR.

C2-15

55 SF

ELEC.

2A260

215 SF

STAIRS

S2-2

88 SF

CORR.

C2-16

128 SF

SUPPLY

2A263

98 SF

OFFICE

2A265

167 SF

SECTION 1

& B

OFFICE

2A264

PHASE

NOT IN

SCOPE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:37:36 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 2 FLOORING CALL

OUT

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-116

1/4" = 1'-0"1 LEVEL 2 FLOORING CALL OUT

1/4" = 1'-0" Legend 1

LBT WOOD PANELING

FLOOR TILE

674-23-250

2 X 4 LIGHT FIXTURE

1 X 4 LIGHT FIXTURE

1 X 3 LIGHT FIXTURE WALL

MOUNT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:37:49 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

LEVEL 2 RCP CALL OUT REVITALIZE DOM

HALLS AND WALLS

TB AO

A-117

1/4" = 1'-0"1 RCP LEVEL 2 - Callout 1

1/4" = 1'-0"

LIGHT FIXTURE LEGEND

674-23-250

TEMPLE, TX

NOTES

R-1: WALL MOUNTED LIGHT FIXTURES PLACEMENTS

SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT

FIXTURES. SPECS WILL BE PROVED BY VA.

R-2: OVERHANG AREAS SHALL MATCH EXISITNG

CONDITIONS. REFERBISH CEILING TILES AND DAMAGES

TO AREA.

R-2

4'

0" 4'

0"

8'

0"

0'

6"

8'

0"

8'

0"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:39:09 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING ELEVATIONS LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

AE-100

1/2" = 1'-0"1 Elevation 4a - 1A154

1/2" = 1'-0"2 Elevation 4b - 1A154 1/2" = 1'-0"3 Elevation 4c - 1A154 1/2" = 1'-0"4 Elevation 4d - 1A154

1/2" = 1'-0"5 Elevation 5a - 1A131 1/2" = 1'-0"6 Elevation 5b - 1A131

1/2" = 1'-0"7 Elevation 5c - 1A131 1/2" = 1'-0"8 Elevation 5d - 1A131

1/2" = 1'-0"9 Elevation 6a- bedroom 1/2" = 1'-0"10 Elevation 6b - bedroom

1/2" = 1'-0"11 Elevation 6c - bedroom 1/2" = 1'-0"12 Elevation 6d - bedroom

1/2" = 1'-0"13 Elevation 14a - Corridor

PAINT COLOR I

12" BY 24" TILE

RUBBBER PROFILE BASE

HAND RAIL

PAINT COLOR II

674-23-250

TEMPLE, TX

NOTES

R-1: HAND RAIL ADDED TO NEW

CONSTRUCTION.

R-2: RUBBER PROFILE BASE.

4'

0"

8'

0"

4'

0"

8'

0"

1'

8" 2'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:39:21 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING ELEVATIONS LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

AE-101

1/2" = 1'-0"14 Elevation 7A - 2A237 1/2" = 1'-0"15 Elevation 7B - 2A237

1/2" = 1'-0"16 Elevation 7C - 2A237 1/2" = 1'-0"17 Elevation 7D - 2A237

1/2" = 1'-0"18 Elevation 8A - 2A219B 1/2" = 1'-0"19 Elevation 8B - 2A219B

1/2" = 1'-0"20 Elevation 8C - 2A219B 1/2" = 1'-0"21 Elevation 8D - 2A219B

1/2" = 1'-0"22 Elevation 9A - 2A219 1/2" = 1'-0"23 Elevation 9B - 2A219

1/2" = 1'-0"24 Elevation 9C - 2A219 1/2" = 1'-0"25 Elevation 9D - 2A219

1/2" = 1'-0"26 Elevation 10A - 2A219A 1/2" = 1'-0"27 Elevation 10B - 2A219A

1/2" = 1'-0"28 Elevation 10C - 2A219A 1/2" = 1'-0"29 Elevation 10D -2A219A

1/2" = 1'-0"30 Elevation 11A - BEDROOM

1/2" = 1'-0"31 Elevation 11b -bedroom 1/2" = 1'-0"32 Elevation 11c -bedroom

1/2" = 1'-0"33 Elevation 11d -bedroom 1/2" = 1'-0"34 Elevation 12a - 2A231

1/2" = 1'-0"35 Elevation 12b - 2A231 1/2" = 1'-0"36 Elevation 12c - 2A231

1/2" = 1'-0"37 Elevation 12d - 2A231 1/2" = 1'-0"38 Elevation 13a - 2A254

1/2" = 1'-0"39 Elevation 13b - 2A254 1/2" = 1'-0"40 Elevation 13c - 2A254

1/2" = 1'-0"41 Elevation 13d - 2A254

1/2" = 1'-0"42 Elevation 15a - Corridor

PAINT COLOR I

12" BY 24" TILE

RUBBER PROFILE BASE

HANDRAIL

PAINT COLOR II

674-23-250

TEMPLE, TX

NOTES

R-1: HAND RAIL ADDED TO NEW

CONSTRUCTION.

R-2: RUBBER PROFILE BASE.

5'

0" 9'

0"

9' - 2"

1'

4"

2' - 8"

2'

4"

1'

8"

8' - 4"

1'

0"

2' - 0"

4'

0"

5' - 1 3/4" 3' - 2 1/4"

8' - 0 1/4" 2' - 5 1/2"

14' - 3 1/4"

8' - 1 3/4"

4'

0"

2' - 5 1/2"

8' - 0 1/4"

14' - 3 1/4"

3' - 6 3/4" 4' - 2 1/4"

9'

0"

5' - 0 1/4"

4'

0"

4'

0"

3' - 9 1/2"

8' - 1 3/4"

4' - 4 1/4"

1' - 1 1/4"

5' - 0"

1'

4"

4'

0"

0' - 8 1/2"

3' - 11 1/4"

1'

4"

4'

0" 5'

0"

6' - 3 1/2"

2' - 6"0' - 3 1/2"

4'

0"

4'

0"

8' - 4"

0'

6"

6' - 4 1/4"

10' - 1"

9'

0"

0'

6"

3 10' - 1"

7' - 5 1/4" 10' - 7"

4'

0"

9'

0"

5' - 0" 8' - 11 1/2"

4'

0"

2'

5' - 0"

4'

0"

1'

8"2'

" 4'

0"

4' - 7 3/4"0' - 9 1/2" 1' - 1" 5' - 8 1/4"

4'

0"

3' - 9 1/2"

7' - 4 1/4"

6' - 9 1/4"

9'

0"

4'

0"

1'

0"

2' - 0"

2' - 11 1/4" 4' - 5"

4'

0"

4'

0"

4' - 7 1/4"

7' - 11 3/4"

4'

0"

4' - 7 1/4" 7' - 11 3/4"

4'

0"

1' - 10" 2' - 7 1/2"

0'

6"

13' - 0 1/4" 6' - 5" 12' - 11 1/2"

6' - 4"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:19:26 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

B WING ELEVATIONS REVITALIZE DOM

HALLS AND WALLS

TB AO

AE-102

1/2" = 1'-0"1 Elevation 1a - 1B114 1/2" = 1'-0"2 Elevation 1b - 1B114

1/2" = 1'-0"3 Elevation 1c - 1B114 1/2" = 1'-0"4 Elevation 1d - 1B114

1/2" = 1'-0"5 Elevation 2a - 1B142 1/2" = 1'-0"6 Elevation 2b - 1B142

1/2" = 1'-0"7 Elevation 2c - 1B142

1/2" = 1'-0"8 Elevation 2d - 1B142 1/2" = 1'-0"9 Elevation 3a - 1B142A

1/2" = 1'-0"10 Elevation 3b - 1B142A 1/2" = 1'-0"11 Elevation 3c - 1B142A

1/2" = 1'-0"12 Elevation 3d - 1B142A 1/2" = 1'-0"13 Elevation 4a - 1B142B

1/2" = 1'-0"14 Elevation 4b - 1B142B 1/2" = 1'-0"15 Elevation 4c - 1B142B

1/2" = 1'-0"16 Elevation 4d - 1B142B

1/2" = 1'-0"17 Elevation 5a - 1B149 1/2" = 1'-0"18 Elevation 5b - 1B149

1/2" = 1'-0"19 Elevation 5c - 1B149 1/2" = 1'-0"20 Elevation 5d - 1B149

1/2" = 1'-0"21 Elevation 6a - 1B146 1/2" = 1'-0"22 Elevation 6b - 1B146

1/2" = 1'-0"23 Elevation 6c - 1B146 1/2" = 1'-0"24 Elevation 6d - 1B146

1/2" = 1'-0"25 Elevation 7a - 1B154 1/2" = 1'-0"26 Elevation 7b - 1B154

1/2" = 1'-0"27 Elevation 7c - 1B154 1/2" = 1'-0"28 Elevation 7d - 1B154

1/2" = 1'-0"29 Elevation 8a - 1B128 1/2" = 1'-0"30 Elevation 8b - 1B128

1/2" = 1'-0"31 Elevation 8c - 1B128 1/2" = 1'-0"32 Elevation 8d - 1B128

1/2" = 1'-0"33 Elevation 9a - Corridor

674-23-250

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

1:20:03 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

B W

IN

G

.rv t

FINISH SCHEUDLE REVITALIZE DOM

HALLS AND WALLS

TB AO

AS-100

INTERIOR FINISH SCHEDULE

Number Name Floor Finish Base Finish Wall Finish Ceiling Finish Area

1B100 1 BED LBT RPB PT-1 2 X 2 GRID 150 SF

1B101 BATH TILE TILE TILE/PT-1 HLC 39 SF

1B102 2 BED LBT RPB PT-1 2 X 2 GRID 198 SF

1B103 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B104 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B105 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B106 H.A.C. TILE TILE TILE/PT-1 2 X 2 GRID 34 SF

1B107 S. LINEN TILE TILE TILE/PT-1 2 X 2 GRID 30 SF

1B108 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B109 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B110 QUIET

ROOM

LBT RPB PT-1 2 X 2 GRID 134 SF

1B110A MECH. TILE RPB PT-1 2 X 2 GRID 133 SF

1B111 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B112 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B113 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B114 BATH TILE TILE TILE/PT-1 HLC 67 SF

1B115 H.A.C. TILE TILE TILE/PT-1 2 X 2 GRID 46 SF

1B116 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B117 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B118 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B119 BATH TILE TILE TILE/PT-1 HLC 115 SF

1B119A BATH TILE TILE TILE/PT-1 HLC 42 SF

1B119B BATH TILE TILE TILE/PT-1 HLC 51 SF

1B120 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B121 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B122 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B123 MULTI-PU

RPOSE

LBT RPB PT-1 2 X 2 GRID 399 SF

1B124 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B125 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B126 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B127 LOUNGE LBT RPB PT-1 2 X 2 GRID 115 SF

1B128 BATH TILE TILE TILE/PT-1 HLC 37 SF

1B129 1 BED LBT RPB PT-1 2 X 2 GRID 154 SF

1B130 2 BED LBT RPB PT-1 2 X 2 GRID 199 SF

1B131 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B132 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B133 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B134 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B135 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B136 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B137 BATH TILE TILE TILE/PT-1 HLC 67 SF

1B138 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B139 ELEC. TILE RPB PT-1 EXPOSED 45 SF

1B140 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B141 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B142 BATH TILE TILE TILE/PT-1 HLC 113 SF

1B142A BATH TILE TILE TILE/PT-1 HLC 41 SF

1B142B BATH TILE TILE TILE/PT-1 HLC 52 SF

1B143 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B144 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B145 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B146 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B147 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

1B148 IDF TILE RPB PT-1 2 X 2 GRID 36 SF

1B149 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

1B150 LOUNGE LBT RPB PT-1 2 X 2 GRID 108 SF

1B151 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B152 2 BED LBT RPB PT-1 2 X 2 GRID 203 SF

1B153 1 BED LBT RPB PT-1 2 X 2 GRID 154 SF

1B154 BATH TILE TILE TILE/PT-1 HLC 45 SF

1B155 PATIENT

STORAGE

LBT RPB PT-1 2 X 2 GRID 459 SF

1B - 3 STAIRS LBT RPB PT-1 2 X 2 GRID 200 SF

2B200 APARTME

NT/ MULTI

LIVING

LBT RPB PT-1 2 X 2 GRID 188 SF

2B201 BATH TILE TILE TILE/PT-1 HLC 50 SF

2B202 APARTME

NT/ MULTI

LIVING

LBT RPB PT-1 2 X 2 GRID 247 SF

2B203 BATH TILE TILE TILE/PT-1 HLC 40 SF

2B204 1 BED LBT RPB PT-1 2 X 2 GRID 173 SF

2B205 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B206 C. LIN TILE TILE TILE/PT-1 2 X 2 GRID 34 SF

2B207 S. LIN TILE TILE TILE/PT-1 2 X 2 GRID 29 SF

2B208 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B209 2 BED LBT RPB PT-1 2 X 2 GRID 199 SF

2B210 QUIET

ROOM

LBT RPB PT-1 2 X 2 GRID 137 SF

INTERIOR FINISH SCHEDULE

Number Name Floor Finish Base Finish Wall Finish Ceiling Finish Area

2B211 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B212 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B213 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B214 BATH TILE TILE TILE/PT-1 HLC 69 SF

2B215 H.A.C. TILE TILE TILE/PT-1 2 X 2 GRID 47 SF

2B216 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B217 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B218 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B219 BATH TILE TILE TILE/PT-1 HLC 118 SF

2B219A BATH TILE TILE TILE/PT-1 HLC 43 SF

2B219B BATH TILE TILE TILE/PT-1 HLC 55 SF

2B220 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B221 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B222 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B223 MULTI-PU

RPOSE

ROOM

LBT RPB PT-1 2 X 2 GRID 418 SF

2B224 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B225 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B226 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B227 LOUNGE TILE TILE PT-1 2 X 2 GRID 130 SF

2B228 BATH TILE TILE TILE/PT-1 HLC 40 SF

2B229 1 BED LBT RPB PT-1 2 X 2 GRID 152 SF

2B230 2 BED LBT RPB PT-1 2 X 2 GRID 198 SF

2B231 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B232 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B233 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B234 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B235 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B236 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B237 BATH TILE TILE TILE/PT-1 HLC 72 SF

2B238 BATH TILE TILE TILE/PT-1 HLC 45 SF

2B239 ELE. TILE TILE PT-1 EXPOSED 49 SF

2B240 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF

2B241 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF

2B242 BATH TILE TILE TILE/PT-1 HLC 122 SF

2B242A BATH TILE TILE TILE/PT-1 HLC 43 SF

2B242B BATH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .