DOM A _ B WING REFERBISH INTERIOR FINISHES.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25724B0009
About this file
This package includes construction documents and specifications for the revitalization of dormitory halls and walls at the Veterans Affairs Medical Center in Temple, Texas. The project scope involves demolishing existing interior finishes, ceilings, flooring and fixtures in specified areas of Wings A and B, and rebuilding to include new wall finishes, flooring, lighting, and bathroom renovations per the design plans. The construction is intended to upgrade older dormitory spaces and improve accessibility and conditions for veterans. The project number is 674-23-250 and is estimated at $5 million. Bids are due by January 2023 with work to be completed within 18 months of award. The solicitation is designated for SDVOSB/VOSB priority and is being procured using FAR Part 36 construction procedures by the VA's Office of Construction and Facilities Management.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE II
PHASE III
PHASE V
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN SCOPE
PHASE I
PHASE IV
PHASE V
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/17/2023
2:11:49 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A a nd B w in g si te p la n.
rv t
PHASE MAP REFERBISH INTERIOR
FINISHES
TB AO
C-001
1/16" = 1'-0"1 Level 1
1/16" = 1'-0"2 Level 2
674-23-250
TEMPLE, TX
UP
UP
UP
39 SF
BATH
1A100
150 SF
1 BED
1A101
197 SF
2 BED
1A102
45 SF
BATH
1A103
201 SF
2 BED
1A104
202 SF
2 BED
1A105
31 SF
C. LINEN
1A106
33 SF
S. LINEN
1A107
45 SF
BATH
1A108
201 SF
2 BED
1A109
137 SF
QUIET
ROOM
1A110
202 SF
2 BED
1A111
45 SF
BATH
1A112
201 SF
2 BED
1A113
410 SF
BATH
1A119
201 SF
2 BED
1A116
45 SF
BATH
1A117
201 SF
2 BED
1A118
201 SF
2 BED
1A120
45 SF
BATH
1A121
201 SF
2 BED
1A122
410 SF
MULTI-PURPOSE
1A123
201 SF
2 BED
1A124
45 SF
BATH
1A125
201 SF
2 BED
1A126
125 SF
GROUP
ROOM
1A127
39 SF
BATH
1A128
152 SF
1 BED
1A129
199 SF
2 BED
1A130
45 SF
BATH
1A131
201 SF
2 BED
1A132
202 SF
2 BED
1A133
45 SF
BATH
1A134
202 SF
2 BED
1A135
202 SF
2 BED
1A136
45 SF
BATH
1A138
201 SF
2 BED
1A140
202 SF
2 BED
1A141
45 SF
BATH
1A143
202 SF
2 BED
1A144
202 SF
2 BED
1A145
45 SF
BATH
1A146
201 SF
2 BED
1A147
40 SF
IDF
1A148
202 SF
2 BED
1A149
45 SF
BATH
1A151
139 SF
MECH.
1A110A
202 SF
2 BED
1A152
154 SF
1 BED
1A153
44 SF
BATH
1A154
479 SF
PATIENT
STORE
1A155
46 SF
ELE.
1A139
199 SF
STAIRS
S1-1
94 SF
HEALTH
TECH
1A156
168 SF
NURSE
OFFICE
1A157
46 SF
HAC
1A137
895 SF
CORRIDER
C1-6
757 SF
CORRIDOR
C1-21003 SF
CORRIDOR
C1-1
877 SF
CORRIDOR
C1-3
NOT IN
SCOPE
NOT IN
SCOPE
PHASE V
187 SF
MULTI-LIVING
2A200
50 SF
BATH
2A201
247 SF
MULTI-LIVING
2A202
40 SF
BATH
2A203
172 SF
2 BED
2A204
201 SF
2 BED
2A205
30 SF
C. LIN.
2A206
33 SF
S. LIN.
2A207
45 SF
BATH
2A208
201 SF
2 BED
2A209
137 SF
MECH
2A210A
201 SF
2 BED
2A211
45 SF
BATH
2A212
201 SF
2 BED
2A213
69 SF
BATH
2A21448 SF
HAC
2A215
202 SF
2 BED
2A216
45 SF
BATH
2A217
201 SF
2 BED
2A218
119 SF
BATH
2A219
202 SF
2 BED
2A220
45 SF
BATH
2A221
201 SF
2 BED
2A222
418 SF
MULTI-PURP
2A223
199 SF
2 BED
2A224
45 SF
BATH
2A2225
203 SF
2 BED
2A226
121 SF
CORR
C2-3
39 SF
BATH
2A228
153 SF
1 BED
2A229
198 SF
2 BED
2A230
45 SF
BATH
2A231
201 SF
2 BED
2A232
201 SF
2 BED
2A233
45 SF
BATH
2A234
201 SF
2 BED
2A235
201 SF
2 BED
2A236
73 SF
BATH
2A237
45 SF
BATH
2A238
48 SF
ELE.
2A239
201 SF
2 BED
2A240
201 SF
2 BED
2A241
121 SF
BATH
2A242
45 SF
BATH
2A243
201 SF
2 BED
2A244
201 SF
2 BED
2A245
45 SF
BATH
2A246
201 SF
2 BED
2A247
201 SF
2 BED
2A249
158 SF
LOUNGE
2A250
45 SF
BATH
2A251
201 SF
2 BED
2A252
153 SF
1 BED
2A253
44 SF
BATH
2A254
157 SF
1 BED
2A255
66 SF
BATH
2A256
160 SF
1 BED
2A257
43 SF
BATH
2A219A
55 SF
BATH
2A219B
44 SF
BATH
2A212A
54 SF
BATH
2A212B
141 SF
QUIET
ROOM
2A210
199 SF
STAIRS
S2-1
40 SF
COMM
2A248
NOT IN
SCOPE
PHASE V
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:38:18 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING DEMO LEVEL 1 & 2 REVITALIZE DOM
HALLS AND WALLS
TB AO
AD-100
1/8" = 1'-0"1 LEVEL 1 DEMO
1/8" = 1'-0"2 LEVEL 2 DEMO
NOTES
1) DEMO EXISTING INTEROR FLOORING, CEILING
TILES, WALL FINISHES, LIGHT FIXTURES AND
UTILITY EQUIPMENT ( TOILETS, SINKS, SHOWERS,
BATHS,).
674-23-250
150 SF
1 BED
1B100
39 SF
BATH
1B101
198 SF
2 BED
1B102
45 SF
BATH
1B103
201 SF
2 BED
1B104
201 SF
2 BED
1B105
34 SF
H.A.C.
1B106
30 SF
S. LINEN
1B107
45 SF
BATH
1B108
202 SF
2 BED
1B109
134 SF
QUIET
ROOM
1B110
201 SF
2 BED
1B111
45 SF
BATH
1B112
201 SF
2 BED
1B113
67 SF
BATH
1B114
46 SF
H.A.C.
1B115
201 SF
2 BED
1B116
45 SF
BATH
1B117
202 SF
2 BED
1B118
115 SF
BATH
1B119
201 SF
2 BED
1B120
45 SF
BATH
1B121
202 SF
2 BED
1B122
399 SF
MULTI-PURPOSE
1B123
201 SF
2 BED
1B124
45 SF
BATH
1B125
201 SF
2 BED
1B126
154 SF
1 BED
1B129
37 SF
BATH
1B128
115 SF
LOUNGE
1B127
199 SF
2 BED
1B130
45 SF
BATH
1B131
202 SF
2 BED
1B132
201 SF
2 BED
1B133
45 SF
BATH
1B134
202 SF
2 BED
1B135
202 SF
2 BED
1B136
67 SF
BATH
1B137
45 SF
BATH
1B138
45 SF
ELEC.
1B139
202 SF
2 BED
1B140
201 SF
2 BED
1B141
113 SF
BATH
1B142
45 SF
BATH
1B143
202 SF
2 BED
1B144
202 SF
2 BED
1B145
45 SF
BATH
1B146
202 SF
2 BED
1B147
36 SF
IDF
1B148
201 SF
2 BED
1B149
108 SF
LOUNGE
1B150
45 SF
BATH
1B151
203 SF
2 BED
1B152
154 SF
1 BED
1B153
45 SF
BATH
1B154
459 SF
PATIENT
STORAGE
1B155
133 SF
MECH.
1B110A
42 SF
BATH
1B119A
51 SF
BATH
1B119B
41 SF
BATH
1B142A
52 SF
BATH
1B142B
171 SF
COOR.
C1-12
8' - 0 1/4"
NOT IN
SCOPE
PHASE V
188 SF
APARTMENT/
MULTI LIVING
2B200
50 SF
BATH
2B201
247 SF
APARTMENT/
MULTI LIVING
2B202
40 SF
BATH
2B203
173 SF
1 BED
2B204
201 SF
2 BED
2B205
34 SF
C. LIN
2B206
29 SF
S. LIN
2B207
45 SF
BATH
2B208
199 SF
2 BED
2B209
137 SF
QUIET ROOM
2B210
201 SF
2 BED
2B211
45 SF
BATH
2B212
202 SF
2 BED
2B213
69 SF
BATH
2B214
47 SF
H.A.C.
2B215
201 SF
2 BED
2B216
45 SF
BATH
2B217
202 SF
2 BED
2B218
118 SF
BATH
2B219
201 SF
2 BED
2B220
45 SF
BATH
2B221
202 SF
2 BED
2B222
418 SF
MULTI-PURPOSE
ROOM
2B223
201 SF
2 BED
2B224
45 SF
BATH
2B225
201 SF
2 BED
2B226
130 SF
LOUNGE
2B227
40 SF
BATH
2B228
152 SF
1 BED
2B229
198 SF
2 BED
2B230
45 SF
BATH
2B231
202 SF
2 BED
2B232
201 SF
2 BED
2B233
45 SF
BATH
2B234
202 SF
2 BED
2B235
202 SF
2 BED
2B236
72 SF
BATH
2B237
45 SF
BATH
2B238
49 SF
ELE.
2B239
202 SF
2 BED
2B240
201 SF
2 BED
2B241
122 SF
BATH
2B242
45 SF
BATH
2B243
202 SF
2 BED
2B244
202 SF
2 BED
2B245
45 SF
BATH
2B246
202 SF
2 BED
2B247
41 SF
IDF
2B248
201 SF
2 BED
2B249
130 SF
LOUNGE
2B250
45 SF
BATH
2B251
202 SF
2 BED
2B252
155 SF
1 BED
2B253
44 SF
BATH
2B254
160 SF
1 BED
2B255
66 SF
BATH
2B256
157 SF
1 BED
2B257
200 SF
STAIR
55 SF
BATH
2B242B
123 SF
STAIR
S2-8
Not Enclosed
CORRIDOR
C2-14
55 SF
BATH
2B219B
43 SF
BATH
2B242A
NOT IN
SCOPE NOT IN
SCOPE
PHASE V
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:18:59 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING DEMO LEVEL 1 REVITALIZE DOM
HALLS AND WALLS
TB AO
AD-101
1/8" = 1'-0"1 LEVEL 1 DEMO
NOTES
1) DEMO EXISTING INTEROR FLOORING, CEILING TILES, LIGHT
FIXTURES AND UTILITY EQUIPMENT ( TOILETS, SINKS, SHOWERS,
BATHS,) .
674-23-250
1/8" = 1'-0"2 LEVEL 2 DEMO
210 SF
CORRIDOR
C1-15
877 SF
CORRIDOR
C1-3
168 SF
NURSE
OFFICE
1A157
94 SF
HEALTH
TECH
1A156
215 SF
STAIRS
1A164
55 SF
STORAGE
1A160
292 SF
CORRIDOR
C1-16
169 SF
NURSE'S
CONT.
ROOM
1A161 98 SF
OFFICE
1A162
120 SF
SUPPLY
ROOM
1A163
243 SF
CORRIDOR
2C-14
PHASE
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:38:41 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 1 DEMO CALL OUT REVITALIZE DOM
HALLS AND WALLS
TB AO
AD-102
1/4" = 1'-0"1 LEVEL 1 DEMO CALL OUT
674-23-250
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:38:51 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 2 DEMO CALL OUT REVITALIZE DOM
HALLS AND WALLS
TB AO
AD-103
1/4" = 1'-0"1 LEVEL 2 DEMO CALL OUT
674-23-250
39 SF
BATH
1A100
150 SF
1 BED
1A101
197 SF
2 BED
1A102
45 SF
BATH
1A103
201 SF
2 BED
1A104
202 SF
2 BED
1A105
31 SF
C. LINEN
1A106
33 SF
S. LINEN
1A107
45 SF
BATH
1A108
201 SF
2 BED
1A109
137 SF
QUIET
ROOM
1A110
202 SF
2 BED
1A111
45 SF
BATH
1A112
201 SF
2 BED
1A113
410 SF
BATH
1A119
201 SF
2 BED
1A116
45 SF
BATH
1A117
201 SF
2 BED
1A118
201 SF
2 BED
1A120
45 SF
BATH
1A121
201 SF
2 BED
1A122
410 SF
MULTI-PURPOSE
1A123
201 SF
2 BED
1A124
45 SF
BATH
1A125
201 SF
2 BED
1A126
125 SF
GROUP
ROOM
1A127
39 SF
BATH
1A128
152 SF
1 BED
1A129
199 SF
2 BED
1A130
45 SF
BATH
1A131
201 SF
2 BED
1A132
202 SF
2 BED
1A133
45 SF
BATH
1A134
202 SF
2 BED
1A135
202 SF
2 BED
1A136
45 SF
BATH
1A138
201 SF
2 BED
1A140
202 SF
2 BED
1A141
45 SF
BATH
1A143
202 SF
2 BED
1A144
202 SF
2 BED
1A145
45 SF
BATH
1A146
201 SF
2 BED
1A147
40 SF
IDF
1A148
202 SF
2 BED
1A149
45 SF
BATH
1A151
139 SF
MECH.
1A110A
202 SF
2 BED
1A152
154 SF
1 BED
1A153
44 SF
BATH
1A154
479 SF
PATIENT
STORE
1A155
46 SF
ELE.
1A139
199 SF
STAIRS
S1-1
94 SF
HEALTH
TECH
1A156
168 SF
NURSE
OFFICE
1A157AE-1008
46 SF
HAC
1A137
AE-100 2
895 SF
CORRIDER
C1-6
757 SF
CORRIDOR
C1-21003 SF
CORRIDOR
C1-1
877 SF
CORRIDOR
C1-3
AE-10012
AE-100
12' - 9 1/2"
1/
2" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 1/2" 12' - 10" 12' - 9 3/4" 12' - 9 1/4" 9' - 11 3/4"
7'
3/
4"
/4
7'
3/
4"
/4
8'
/2 "5' - 0"
1"
1/ 2"
8'
0"
4' - 11 1/4"
9' - 11 3/4"
1/ 2"
5' - 5 3/4" 9' - 3"10' - 1 1/4"10' - 1 1/2"10' - 1"10' - 1 1/2"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1"10' - 1"
5' - 6 3/4"
7'
3/
4"
6' - 6 1/4"
10' - 1"10' - 1 1/4"10' - 1 1/4"10' - 1"10' - 1 1/2"10' - 1 1/4"10' - 1 1/4"10' - 1"10' - 1 1/2"10' - 1 1/4"10' - 1 1/4"10' - 1"9' - 4"
12' - 10 1/2"
10' - 2"
10' - 0"
4' - 8 1/4"
5' - 6 1/4"
12' - 9 1/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 1/2" 12' - 10" 12' - 9 1/2" 12' - 9 3/4" 12' - 9 3/4"
24' - 7 1/4"
7'
15' - 11 3/4"
/4
7' - 9"
/2
7' - 10 1/4"
6' - 1 1/4"
5'
1/
4" 5'
1/ 4"
6'
1/
2"
8'
/4
8'
3/
4"
15' - 10 1/4"
15' - 10 1/4"
7'
1/
2"
110' - 0 3/4"
5'
1/
2"
/2
/2
7'
5"
7'
5"
5' - 4 1/4"
57' - 5 1/4"105' - 3"
4' - 11 3/4"
6'
1/
4"
4'
3/
4"
NOT IN
SCOPE
55 SF
STORAGE
1A160
215 SF
STAIRS
1A164
120 SF
SUPPLY
ROOM
1A163
210 SF
CORRIDOR
C1-15
292 SF
CORRIDOR
C1-16
169 SF
NURSE'S
CONT.
ROOM
1A161
98 SF
OFFICE
1A162
5' - 4 1/4"
8'
1/
2"
PHASE V
NOT IN
SCOPE
A-113
NOTES
R-1: STAIRS IN SCOPE OF WORK.
R-2: ROOM 1A119 BATHROOM IS NOT IN SCOPE OF
WORK. NOT TO BE REMODELED.
R-3:WING CONNECTION BETWEEN A & B WING IN SCOPE
OF WORK.
R-1
R-2
R-3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:33:03 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING FLOOR PLAN LEVEL1 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-100
1/8" = 1'-0"1 LEVEL 1 NEW CONSTRUCTION
674-23-250
39 SF
BATH
1A100
150 SF
1 BED
1A101
197 SF
2 BED
1A102
45 SF
BATH
1A103
201 SF
2 BED
1A104
202 SF
2 BED
1A105
31 SF
C. LINEN
1A106
33 SF
S. LINEN
1A107
45 SF
BATH
1A108
201 SF
2 BED
1A109
137 SF
QUIET
ROOM
1A110
202 SF
2 BED
1A111
45 SF
BATH
1A112
201 SF
2 BED
1A113
410 SF
BATH
1A119
201 SF
2 BED
1A116
45 SF
BATH
1A117
201 SF
2 BED
1A118
201 SF
2 BED
1A120
45 SF
BATH
1A121
201 SF
2 BED
1A122
410 SF
MULTI-PURPOSE
1A123
201 SF
2 BED
1A124
45 SF
BATH
1A125
201 SF
2 BED
1A126
125 SF
GROUP
ROOM
1A127
39 SF
BATH
1A128
152 SF
1 BED
1A129
199 SF
2 BED
1A130
45 SF
BATH
1A131
201 SF
2 BED
1A132
202 SF
2 BED
1A133
45 SF
BATH
1A134
202 SF
2 BED
1A135
202 SF
2 BED
1A136
45 SF
BATH
1A138
201 SF
2 BED
1A140
202 SF
2 BED
1A141
45 SF
BATH
1A143
202 SF
2 BED
1A144
202 SF
2 BED
1A145
45 SF
BATH
1A146
201 SF
2 BED
1A147
40 SF
IDF
1A148
202 SF
2 BED
1A149
45 SF
BATH
1A151
139 SF
MECH.
1A110A
202 SF
2 BED
1A152 154 SF
1 BED
1A153
44 SF
BATH
1A154
479 SF
PATIENT
STORE
1A155
46 SF
ELE.
1A139
199 SF
STAIRS
S1-1
94 SF
HEALTH
TECH
1A156
168 SF
NURSE
OFFICE
1A157
46 SF
HAC
1A137
PHASE V
LBT WOOD PANELING
FLOOR TILE
NOT IN
SCOPE
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:33:45 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING FLOORING PLAN
LEVEL 1
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-101
1/8" = 1'-0"1 LEVEL 1 FLOORING
674-23-250
TEMPLE, TX
1/4" = 1'-0" Legend 1
NOTES
R-1: ELEC & MECH ROOM SHALL HAVE
TILE AS FLOORING.
R-1
PHASE V
SCOPE
NOT IN
SCOPE
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL
MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:34:08 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING RCP LEVEL 1 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-102
1/8" = 1'-0"1 RCP LEVEL 1
674-23-250
TEMPLE, TX
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
NOTES
R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE
AS IS TO EXISTING. THE FIXTURE & CEILING GRID SHALL
BE REPLACED AS NEW.
R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS
SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT
FIXTURES. SPECS WILL BE PROVED BY VA.
R-3: OVERHANG AREAS SHALL MATCH EXISITNG
CONDITIONS. REFERBISH CEILING TILES AND DAMAGES
TO AREA.
R-4: HARD LID CEILINGS
R-2
R-1
R-3
R-4
187 SF
MULTI-LIVING
2A200
50 SF
BATH
2A201
247 SF
MULTI-LIVING
2A202
40 SF
BATH
2A203
172 SF
2 BED
2A204
201 SF
2 BED
2A205
30 SF
C. LIN.
2A206
33 SF
S. LIN.
2A207
45 SF
BATH
2A208
201 SF
2 BED
2A209
137 SF
MECH
2A210A
201 SF
2 BED
2A211
45 SF
BATH
2A212
201 SF
2 BED
2A213
69 SF
BATH
2A21448 SF
HAC
2A215
202 SF
2 BED
2A216
45 SF
BATH
2A217
201 SF
2 BED
2A218
119 SF
BATH
2A219
202 SF
2 BED
2A220
45 SF
BATH
2A221
201 SF
2 BED
2A222
418 SF
MULTI-PURP
2A223
199 SF
2 BED
2A224
45 SF
BATH
2A2225
203 SF
2 BED
2A226
121 SF
CORR
C2-3
39 SF
BATH
2A228
153 SF
1 BED
2A229
198 SF
2 BED
2A230
45 SF
BATH
2A231
201 SF
2 BED
2A232
201 SF
2 BED
2A233
45 SF
BATH
2A234
201 SF
2 BED
2A235
201 SF
2 BED
2A236
73 SF
BATH
2A237
45 SF
BATH
2A238
48 SF
ELE.
2A239
201 SF
2 BED
2A240
201 SF
2 BED
2A241
121 SF
BATH
2A242
45 SF
BATH
2A243
201 SF
2 BED
2A244
201 SF
2 BED
2A245
45 SF
BATH
2A246
201 SF
2 BED
2A247
201 SF
2 BED
2A249
158 SF
LOUNGE
2A250
45 SF
BATH
2A251
201 SF
2 BED
2A252
153 SF
1 BED
2A253
44 SF
BATH
2A254
157 SF
1 BED
2A255
66 SF
BATH
2A256
160 SF
1 BED
2A257
43 SF
BATH
2A219A
55 SF
BATH
2A219B
44 SF
BATH
2A212A
54 SF
BATH
2A212B
141 SF
QUIET
ROOM
2A210
199 SF
STAIRS
S2-1
AE-101
AE-10125
AE-101 19
AE-101 27
AE-10137
AE-10133
AE-101 39
AE-101
12' - 10 1/2" 12' - 8 1/4" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 1/2" 13' - 0" 10' - 6 3/4" 11' - 11 3/4"
8' - 1 3/4"
13' - 6 1/4"
5'
1/
2"
10' - 0"
1/ 4"21
1/
4"
3/ 4"
8'
1/
2"
6' - 7" 5' - 0 1/2"
8'
1/
4"
10' - 1"
3/ 4"
7'
3/
4"
7'
3/
4"
10' - 1 1/4"10' - 1 3/4"10' - 1 1/4"10' - 1 1/4"10' - 1 1/4"10' - 1 3/4"10' - 1 1/4"10' - 0"10' - 2"
8'
/4
5' - 0"5' - 0"
8'
/4
15' - 11 1/2" 6' - 11 1/2"
9'
/4
/2
7' - 0 1/4"
5' - 5 1/4"
5'
1/
2"7'
3/
4"
7'
/4
24' - 9 1/4"
8'
1/
4"
8'
1/
4" 8'
3/ 4"
10' - 1"10' - 1 1/4"10' - 1 1/4"10' - 1"
5' - 0"
9'
1/
4"5' - 0"10' - 1 1/4"10' - 1 1/2"10' - 1 1/4"10' - 1"10' - 1 1/4"10' - 1 1/2"10' - 1 1/4"10' - 1"10' - 1 1/4"
9' - 4 1/4"
4' - 9"
5' - 6 1/4"
7'
/4
4' - 11"
7'
/4
10' - 1" 12' - 9 3/4" 12' - 9 1/2" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 1/2" 12' - 9 3/4" 12' - 10" 12' - 9 3/4" 12' - 9 1/2" 12' - 9 3/4" 12' - 9 3/4" 6' - 6" 6' - 8 3/4"
7'
3/
4"
110' - 3 1/4"
6' - 0"
9' - 1"
8' - 10"
6' - 0 3/4"
/4
5'
1/
4" 6'
1/ 2"
5'
1/
2"
7' - 8 1/2" 7' - 11 1/4" 16' - 2 1/2"
/4
43' - 10 1/4"
6'
9"
5' - 0 3/4" 105' - 2 1/2"
9'
1/
4"
6' - 3 3/4" 6' - 4 1/4" 9' - 2 1/4"
5' - 7"5' - 0 1/4"14' - 3 1/4"
4'
2" 4'
1/ 2"
6' - 1 3/4"
9' - 7 3/4"
5'
6"
5'
1/
4"
123 SF
STAIRS
S2-7
40 SF
COMM
2A248
343 SF
CORR
C2-2
138 SF
CORR.
C2-5
180 SF
TV
LOUNGE
A2-227
147 SF
CORRIDOR
2C-7
868 SF
CORR
2C-1
883 SF
CORR.
C2-6
NOT IN
SCOPE
PHASE V
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:35:58 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING FLOOR PLAN LEVEL
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-103
1/8" = 1'-0"1 LEVEL 2 NEW CONSTRUCTION
674-23-250
187 SF
MULTI-LIVING
2A200
50 SF
BATH
2A201
247 SF
MULTI-LIVING
2A202
40 SF
BATH
2A203
172 SF
2 BED
2A204
201 SF
2 BED
2A205
30 SF
C. LIN.
2A206
33 SF
S. LIN.
2A207
45 SF
BATH
2A208
201 SF
2 BED
2A209
137 SF
MECH
2A210A
201 SF
2 BED
2A211
45 SF
BATH
2A212
201 SF
2 BED
2A213
69 SF
BATH
2A21448 SF
HAC
2A215
202 SF
2 BED
2A216
45 SF
BATH
2A217
201 SF
2 BED
2A218
119 SF
BATH
2A219
202 SF
2 BED
2A220
45 SF
BATH
2A221
201 SF
2 BED
2A222
418 SF
MULTI-PURP
2A223
199 SF
2 BED
2A224
45 SF
BATH
2A2225
203 SF
2 BED
2A226
121 SF
CORR
C2-3
39 SF
BATH
2A228
153 SF
1 BED
2A229
198 SF
2 BED
2A230
45 SF
BATH
2A231
201 SF
2 BED
2A232
201 SF
2 BED
2A233
45 SF
BATH
2A234
201 SF
2 BED
2A235
201 SF
2 BED
2A236
73 SF
BATH
2A237
45 SF
BATH
2A238
48 SF
ELE.
2A239
201 SF
2 BED
2A240
201 SF
2 BED
2A241
121 SF
BATH
2A242
45 SF
BATH
2A243
201 SF
2 BED
2A244
201 SF
2 BED
2A245
45 SF
BATH
2A246
201 SF
2 BED
2A247
201 SF
2 BED
2A249
158 SF
LOUNGE
2A250
45 SF
BATH
2A251
201 SF
2 BED
2A252
153 SF
1 BED
2A253
44 SF
BATH
2A254
157 SF
1 BED
2A255
66 SF
BATH
2A256
160 SF
1 BED
2A257
43 SF
BATH
2A219A
55 SF
BATH
2A219B
44 SF
BATH
2A212A
54 SF
BATH
2A212B
141 SF
QUIET
ROOM
2A210
199 SF
STAIRS
S2-1
123 SF
STAIRS
S2-7
40 SF
COMM
2A248
LBT WOOD PANELING
FLOOR TILE
NOT IN
SCOPE
PHASE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:36:10 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING FLOORING PLAN
LEVEL 2
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-104
1/8" = 1'-0"1 LEVEL 2 FLOORING
674-23-250
TEMPLE, TX
1/4" = 1'-0" Legend 1
NOTES
R-1: ELEC & MECH ROOMS SHALL HAVE TILE
FLOORING.
PHASE V
SCOPE
NOT IN
SCOPE
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL
MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:36:21 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING RCP LEVEL 2 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-105
1/8" = 1'-0"1 RCP LEVEL 2
674-23-250
TEMPLE, TX
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
NOTES
R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE
AS IS TO EXISTING. THE FIXTURE & CEILING GRID SHALL
BE REPLACED AS NEW.
R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS
SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT
FIXTURES. SPECS WILL BE PROVED BY VA.
R-3: OVERHANG AREAS SHALL MATCH EXISITNG
CONDITIONS. REFERBISH CEILING TILES AND DAMAGES
TO AREA.
R-1
R-2
1B100
39 SF
BATH
1B101
198 SF
2 BED
1B102
45 SF
BATH
1B103
201 SF
2 BED
1B104
201 SF
2 BED
1B105
34 SF
H.A.C.
1B106
30 SF
S. LINEN
1B107
45 SF
BATH
1B108
202 SF
2 BED
1B109
134 SF
QUIET ROOM
1B110
201 SF
2 BED
1B111
45 SF
BATH
1B112
201 SF
2 BED
1B113
67 SF
BATH
1B114
46 SF
H.A.C.
1B115
201 SF
2 BED
1B116
45 SF
BATH
1B117
202 SF
2 BED
1B118
115 SF
BATH
1B119
201 SF
2 BED
1B120
45 SF
BATH
1B121
202 SF
2 BED
1B122
399 SF
MULTI-PURPOSE
1B123
201 SF
2 BED
1B124
45 SF
BATH
1B125
201 SF
2 BED
1B126
154 SF
1 BED
1B129
37 SF
BATH
1B128
115 SF
LOUNGE
1B127
199 SF
2 BED
1B130
45 SF
BATH
1B131
202 SF
2 BED
1B132
201 SF
2 BED
1B133
45 SF
BATH
1B134
202 SF
2 BED
1B135
202 SF
2 BED
1B136
67 SF
BATH
1B137
45 SF
BATH
1B138
45 SF
ELEC.
1B139
202 SF
2 BED
1B140
201 SF
2 BED
1B141
113 SF
BATH
1B142
45 SF
BATH
1B143
202 SF
2 BED
1B144
202 SF
2 BED
1B145
45 SF
BATH
1B146
202 SF
2 BED
1B147
36 SF
IDF
1B148
201 SF
2 BED
1B149
108 SF
LOUNGE
1B150
45 SF
BATH
1B151
203 SF
2 BED
1B152
154 SF
1 BED
1B153
45 SF
BATH
1B154
459 SF
PATIENT
STORAGE
1B155 133 SF
MECH.
1B110A
42 SF
BATH
1B119A
51 SF
BATH
1B119B
41 SF
BATH
1B142A
52 SF
BATH
1B142B
171 SF
COOR.
C1-12
AE-102
AE-102
AE-102
AE-102
AE-102
AE-102
AE-102
AE-102
8' - 0 1/4"
AE-102
8'
1/
4"
26' - 8 3/4"
15' - 11 1/2"
6' - 1 1/4"
4'
/2
5'
1/
4" 5'
/2
4'
3/
4"
57' - 5 1/2"
7'
1/
2"
5' - 4"
10' - 1" 10' - 2" 10' - 1"
6' - 5 1/2" 12' - 10 1/2" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 1/2" 12' - 10" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 1/2" 12' - 10" 12' - 9 1/4" 12' - 9 3/4" 12' - 9 3/4" 10' - 0"
5' - 0"
4' - 7 1/4"
7'
/4
5' - 10"
110' - 8 1/4"
9' - 11 3/4" 12' - 9 1/2" 12' - 9 1/2" 12' - 9 1/2" 12' - 10" 12' - 9 1/2" 12' - 9 3/4" 12' - 9 3/4" 12' - 10" 12' - 9 1/2" 12' - 10" 12' - 9 3/4" 12' - 9 1/4"
10' - 1 1/4" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/4" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/4"
9' - 3 1/4"
10' - 1 1/4"
4' - 7 3/4"
5' - 5 3/4" 9' - 3"
10' - 1"4' - 11 1/4"
8'
0"
8'
/2
5' - 0"
8'
/2
5' - 0"
10' - 1" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/4" 10' - 1 1/4" 10' - 1 1/2" 10' - 1" 10' - 1 1/2" 10' - 1 1/4" 10' - 0 3/4"
7' - 10" 7' - 9 1/4"
6' - 0"
9' - 1"
16' - 6 1/2"24' - 9 1/4"
21' - 3 1/4"
3/ 4"
105' - 2 3/4"
6'
1/
2"
5' - 5" 8' - 10"
3'
/4
4'
1/
2"
6' - 1 3/4"
4'
/4
9' - 7 3/4"6' - 3 1/2"5' - 6 3/4"
8'
3/
4"
5' - 6 3/4" 5' - 0 1/4" 7'
1/ 4"
5' - 8 1/4"
5' - 0" 9'
1/ 4"
14' - 3"
14' - 3 1/4"
200 SF
STAIRS
1B - 3
PHASE V
NOT IN
SCOPE
NOTES
R-1: STAIRS IN SCOPE OF WORK.
R-2: ROOM 1A119 BATHROOM IS NOT IN SCOPE OF WORK. NOT TO BE
REMODELED.
R-3:WING CONNECTION BETWEEN A & B WING IN SCOPE OF WORK.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:15:12 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING FLOOR PLAN LEVEL
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-106
1/8" = 1'-0"1 Level 1
674-23-250
1B100
39 SF
BATH
1B101
198 SF
2 BED
1B102
45 SF
BATH
1B103
201 SF
2 BED
1B104
201 SF
2 BED
1B105
34 SF
H.A.C.
1B106
30 SF
S. LINEN
1B107
45 SF
BATH
1B108
202 SF
2 BED
1B109
134 SF
QUIET
ROOM
1B110
201 SF
2 BED
1B111
45 SF
BATH
1B112
201 SF
2 BED
1B113
67 SF
BATH
1B114
46 SF
H.A.C.
1B115
201 SF
2 BED
1B116
45 SF
BATH
1B117
202 SF
2 BED
1B118
115 SF
BATH
1B119
201 SF
2 BED
1B120
45 SF
BATH
1B121
202 SF
2 BED
1B122
399 SF
MULTI-PURPOSE
1B123
201 SF
2 BED
1B124
45 SF
BATH
1B125
201 SF
2 BED
1B126
154 SF
1 BED
1B129
37 SF
BATH
1B128
115 SF
LOUNGE
1B127
199 SF
2 BED
1B130
45 SF
BATH
1B131
202 SF
2 BED
1B132
201 SF
2 BED
1B133
45 SF
BATH
1B134
202 SF
2 BED
1B135
202 SF
2 BED
1B136
67 SF
BATH
1B137
45 SF
BATH
1B138
45 SF
ELEC.
1B139
202 SF
2 BED
1B140
201 SF
2 BED
1B141
113 SF
BATH
1B142
45 SF
BATH
1B143
202 SF
2 BED
1B144
202 SF
2 BED
1B145
45 SF
BATH
1B146
202 SF
2 BED
1B147
36 SF
IDF
1B148
201 SF
2 BED
1B149
108 SF
LOUNGE
1B150
45 SF
BATH
1B151
203 SF
2 BED
1B152
154 SF
1 BED
1B153
45 SF
BATH
1B154
459 SF
PATIENT
STORAGE
1B155
133 SF
MECH.
1B110A
42 SF
BATH
1B119A
51 SF
BATH
1B119B
41 SF
BATH
1B142A
52 SF
BATH
1B142B
171 SF
COOR.
C1-12
200 SF
STAIRS
1B - 3
AE-102
LBT WOOD PANELING
FLOOR TILE
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:15:33 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING FLOORING LEVEL 1 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-107
1/8" = 1'-0"1 LEVEL 1 FLOORING
674-23-250
TEMPLE, TX
1/4" = 1'-0" Legend 1
NOTES
R-1: ELEC & MECH SHALL HAVE TILE AS
FLOORING.
R-1
PHASE V
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:15:49 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING RCP LEVEL 1 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-108
1/8" = 1'-0"1 LEVEL 1 RCP
674-23-250
TEMPLE, TX
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
NOTES
R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE AS IS TO EXISTING.
THE FIXTURE & CEILING GRID SHALL BE REPLACED AS NEW.
R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS SHALL BE REPLACED
TO NEW WALL MOUNTED LIGHT FIXTURES. SPECS WILL BE PROVED BY VA.
R-3: OVERHANG AREAS SHALL MATCH EXISITNG CONDITIONS. REFERBISH
CEILING TILES AND DAMAGES TO AREA.
R-4: HARD LID CEILINGS
R-1
R-4
R-2
188 SF
APARTMENT/
MULTI LIVING
2B200
50 SF
BATH
2B201
247 SF
APARTMENT/
MULTI LIVING
2B202
40 SF
BATH
2B203
173 SF
1 BED
2B204
201 SF
2 BED
2B205
34 SF
C. LIN
2B206
29 SF
S. LIN
2B207
45 SF
BATH
2B208
199 SF
2 BED
2B209
137 SF
QUIET ROOM
2B210
201 SF
2 BED
2B211
45 SF
BATH
2B212
202 SF
2 BED
2B213
69 SF
BATH
2B214
47 SF
H.A.C.
2B215
201 SF
2 BED
2B216
45 SF
BATH
2B217
202 SF
2 BED
2B218
118 SF
BATH
2B219
201 SF
2 BED
2B220
45 SF
BATH
2B221
202 SF
2 BED
2B222
418 SF
MULTI-PURPOSE
ROOM
2B223
201 SF
2 BED
2B224
45 SF
BATH
2B225
201 SF
2 BED
2B226
130 SF
LOUNGE
2B227
40 SF
BATH
2B228
152 SF
1 BED
2B229
198 SF
2 BED
2B230
45 SF
BATH
2B231
202 SF
2 BED
2B232
201 SF
2 BED
2B233
45 SF
BATH
2B234
202 SF
2 BED
2B235
202 SF
2 BED
2B236
72 SF
BATH
2B237
45 SF
BATH
2B238
49 SF
ELE.
2B239
202 SF
2 BED
2B240
201 SF
2 BED
2B241
122 SF
BATH
2B242
45 SF
BATH
2B243
202 SF
2 BED
2B244
202 SF
2 BED
2B245
45 SF
BATH
2B246
202 SF
2 BED
2B247
41 SF
IDF
2B248
201 SF
2 BED
2B249
130 SF
LOUNGE
2B250
45 SF
BATH
2B251
202 SF
2 BED
2B252
155 SF
1 BED
2B253
44 SF
BATH
2B254
160 SF
1 BED
2B255
66 SF
BATH
2B256
157 SF
1 BED
2B257
200 SF
STAIR
55 SF
BATH
2B242B
123 SF
STAIR
S2-8
Not Enclosed
CORRIDOR
C2-14
55 SF
BATH
2B219B
43 SF
BATH
2B242A
NOT IN
SCOPE NOT IN
SCOPE
PHASE V
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:18:12 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING FLOOR PLAN LEVEL
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-109
1/8" = 1'-0"1 Level 2
674-23-250
188 SF
APARTMENT/
MULTI LIVING
2B200
50 SF
BATH
2B201
247 SF
APARTMENT/
MULTI LIVING
2B202
40 SF
BATH
2B203
173 SF
1 BED
2B204
201 SF
2 BED
2B205
34 SF
C. LIN
2B206
29 SF
S. LIN
2B207
45 SF
BATH
2B208
199 SF
2 BED
2B209
137 SF
QUIET ROOM
2B210
201 SF
2 BED
2B211
45 SF
BATH
2B212
202 SF
2 BED
2B213
69 SF
BATH
2B214
47 SF
H.A.C.
2B215
201 SF
2 BED
2B216
45 SF
BATH
2B217
202 SF
2 BED
2B218
118 SF
BATH
2B219
201 SF
2 BED
2B220
45 SF
BATH
2B221
202 SF
2 BED
2B222
418 SF
MULTI-PURPOSE
ROOM
2B223
201 SF
2 BED
2B224
45 SF
BATH
2B225
201 SF
2 BED
2B226
130 SF
LOUNGE
2B227
40 SF
BATH
2B228
152 SF
1 BED
2B229
198 SF
2 BED
2B230
45 SF
BATH
2B231
202 SF
2 BED
2B232
201 SF
2 BED
2B233
45 SF
BATH
2B234
202 SF
2 BED
2B235
202 SF
2 BED
2B236
72 SF
BATH
2B237
45 SF
BATH
2B238
49 SF
ELE.
2B239
202 SF
2 BED
2B240
201 SF
2 BED
2B241
122 SF
BATH
2B242
45 SF
BATH
2B243
202 SF
2 BED
2B244
202 SF
2 BED
2B245
45 SF
BATH
2B246
202 SF
2 BED
2B247
41 SF
IDF
2B248
201 SF
2 BED
2B249
130 SF
LOUNGE
2B250
45 SF
BATH
2B251
202 SF
2 BED
2B252
155 SF
1 BED
2B253
44 SF
BATH
2B254
160 SF
1 BED
2B255
66 SF
BATH
2B256
157 SF
1 BED
2B257
200 SF
STAIR
55 SF
BATH
2B242B
123 SF
STAIR
S2-8
55 SF
BATH
2B219B
43 SF
BATH
2B242A
NOT IN
SCOPE NOT IN
SCOPE
PHASE V
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:18:21 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING FLOORING PLAN
LEVEL 2
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-110
1/8" = 1'-0"1 LEVEL 2 FLOORING
1/4" = 1'-0" Legend 1
LBT WOOD PANELING
FLOOR TILE
674-23-250
PHASE
SCOPE
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:18:31 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING RCP LEVEL 2 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-111
1/8" = 1'-0"1 LEVEL 2 RCP
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
674-23-250
TEMPLE, TX
NOTES
R-1: HARD LID CEILINGS
C1-15
877 SF
CORRIDOR
C1-3
168 SF
NURSE
OFFICE
1A157
94 SF
HEALTH
TECH
1A156
215 SF
STAIRS
1A164
55 SF
STORAGE
1A160
292 SF
CORRIDOR
C1-16
169 SF
NURSE'S
CONT.
ROOM
1A161 98 SF
OFFICE
1A162
120 SF
SUPPLY
ROOM
1A163
243 SF
CORRIDOR
2C-14
26' - 10 1/2"
16' - 5 1/2" 9' - 7 1/4"
/4
6'
0"
/4
/4
/4
5'
3"
10' - 11 1/4" 8' - 1"
3/ 4"
9' - 2" 16' - 4 3/4"
7'
1/
2"
44' - 8 1/4"
25' - 7 1/4"
/4
NOT IN
SCOPE10' - 10"
17' - 5"
/4
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:36:34 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 1 NEW
CONSTRUCTION CALL OUT
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-112
1/4" = 1'-0"1
LEVEL 1 NEW CONSTRUCTION CALL
OUT
674-23-250
C1-15
877 SF
CORRIDOR
C1-3
168 SF
NURSE
OFFICE
1A157
94 SF
HEALTH
TECH
1A156
215 SF
STAIRS
1A164
55 SF
STORAGE
1A160
292 SF
CORRIDOR
C1-16
169 SF
NURSE'S
CONT.
ROOM
1A161 98 SF
OFFICE
1A162
120 SF
SUPPLY
ROOM
1A163
243 SF
CORRIDOR
2C-14
PHASE
PHASE
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:36:54 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 1 FLOORING CALL
OUT
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-113
1/4" = 1'-0"1 LEVEL 1 FLOORING CALL OUT
1/4" = 1'-0" Legend 1
LBT WOOD PANELING
FLOOR TILE
674-23-250
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL
MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:37:11 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVLE 1 RCP CALL OUT REVITALIZE DOM
HALLS AND WALLS
TB AO
A-114
1/4" = 1'-0"1 RCP LEVEL 1 - Callout 1
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
674-23-250
TEMPLE, TX
R-1
R-2
R-1: WALL MOUNTED LIGHT FIXTURES PLACEMENTS
SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT
FIXTURES. SPECS WILL BE PROVED BY VA.
R-2: OVERHANG AREAS SHALL MATCH EXISITNG
CONDITIONS. REFERBISH CEILING TILES AND DAMAGES
TO AREA.
708 SF
CORR.
C2-7
457 SF
CORR.
C2-15
55 SF
ELEC.
2A260
215 SF
STAIRS
S2-2
88 SF
CORR.
C2-16
128 SF
SUPPLY
2A263
98 SF
OFFICE
2A265
167 SF
SECTION 1
& B
OFFICE
2A264
26' - 10 1/4"
7'
/4
9' - 7 1/4" 16' - 4 3/4"
3/ 4"
10' - 4 3/4"
/4
8' - 1"
3/ 4"
45' - 10 1/2"
5' - 7"
24' - 7"
8'
3"
5'
3"
6'
1/
2" 4'
3/ 4"
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:37:27 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 2 NEW CONSTUCTION
CALL OUT
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-115
1/4" = 1'-0"1
LEVEL 2 NEW CONSTRUCTION CALL
OUT
674-23-250
708 SF
CORR.
C2-7
457 SF
CORR.
C2-15
55 SF
ELEC.
2A260
215 SF
STAIRS
S2-2
88 SF
CORR.
C2-16
128 SF
SUPPLY
2A263
98 SF
OFFICE
2A265
167 SF
SECTION 1
& B
OFFICE
2A264
PHASE
NOT IN
SCOPE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:37:36 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 2 FLOORING CALL
OUT
REVITALIZE DOM
HALLS AND WALLS
TB AO
A-116
1/4" = 1'-0"1 LEVEL 2 FLOORING CALL OUT
1/4" = 1'-0" Legend 1
LBT WOOD PANELING
FLOOR TILE
674-23-250
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL
MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:37:49 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
LEVEL 2 RCP CALL OUT REVITALIZE DOM
HALLS AND WALLS
TB AO
A-117
1/4" = 1'-0"1 RCP LEVEL 2 - Callout 1
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
674-23-250
TEMPLE, TX
NOTES
R-1: WALL MOUNTED LIGHT FIXTURES PLACEMENTS
SHALL BE REPLACED TO NEW WALL MOUNTED LIGHT
FIXTURES. SPECS WILL BE PROVED BY VA.
R-2: OVERHANG AREAS SHALL MATCH EXISITNG
CONDITIONS. REFERBISH CEILING TILES AND DAMAGES
TO AREA.
R-2
4'
0" 4'
0"
8'
0"
0'
6"
8'
0"
8'
0"
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:39:09 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING ELEVATIONS LEVEL
REVITALIZE DOM
HALLS AND WALLS
TB AO
AE-100
1/2" = 1'-0"1 Elevation 4a - 1A154
1/2" = 1'-0"2 Elevation 4b - 1A154 1/2" = 1'-0"3 Elevation 4c - 1A154 1/2" = 1'-0"4 Elevation 4d - 1A154
1/2" = 1'-0"5 Elevation 5a - 1A131 1/2" = 1'-0"6 Elevation 5b - 1A131
1/2" = 1'-0"7 Elevation 5c - 1A131 1/2" = 1'-0"8 Elevation 5d - 1A131
1/2" = 1'-0"9 Elevation 6a- bedroom 1/2" = 1'-0"10 Elevation 6b - bedroom
1/2" = 1'-0"11 Elevation 6c - bedroom 1/2" = 1'-0"12 Elevation 6d - bedroom
1/2" = 1'-0"13 Elevation 14a - Corridor
PAINT COLOR I
12" BY 24" TILE
RUBBBER PROFILE BASE
HAND RAIL
PAINT COLOR II
674-23-250
TEMPLE, TX
NOTES
R-1: HAND RAIL ADDED TO NEW
CONSTRUCTION.
R-2: RUBBER PROFILE BASE.
4'
0"
8'
0"
4'
0"
8'
0"
1'
8" 2'
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
2:39:21 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
A W
IN
G
'.r vt
A WING ELEVATIONS LEVEL
REVITALIZE DOM
HALLS AND WALLS
TB AO
AE-101
1/2" = 1'-0"14 Elevation 7A - 2A237 1/2" = 1'-0"15 Elevation 7B - 2A237
1/2" = 1'-0"16 Elevation 7C - 2A237 1/2" = 1'-0"17 Elevation 7D - 2A237
1/2" = 1'-0"18 Elevation 8A - 2A219B 1/2" = 1'-0"19 Elevation 8B - 2A219B
1/2" = 1'-0"20 Elevation 8C - 2A219B 1/2" = 1'-0"21 Elevation 8D - 2A219B
1/2" = 1'-0"22 Elevation 9A - 2A219 1/2" = 1'-0"23 Elevation 9B - 2A219
1/2" = 1'-0"24 Elevation 9C - 2A219 1/2" = 1'-0"25 Elevation 9D - 2A219
1/2" = 1'-0"26 Elevation 10A - 2A219A 1/2" = 1'-0"27 Elevation 10B - 2A219A
1/2" = 1'-0"28 Elevation 10C - 2A219A 1/2" = 1'-0"29 Elevation 10D -2A219A
1/2" = 1'-0"30 Elevation 11A - BEDROOM
1/2" = 1'-0"31 Elevation 11b -bedroom 1/2" = 1'-0"32 Elevation 11c -bedroom
1/2" = 1'-0"33 Elevation 11d -bedroom 1/2" = 1'-0"34 Elevation 12a - 2A231
1/2" = 1'-0"35 Elevation 12b - 2A231 1/2" = 1'-0"36 Elevation 12c - 2A231
1/2" = 1'-0"37 Elevation 12d - 2A231 1/2" = 1'-0"38 Elevation 13a - 2A254
1/2" = 1'-0"39 Elevation 13b - 2A254 1/2" = 1'-0"40 Elevation 13c - 2A254
1/2" = 1'-0"41 Elevation 13d - 2A254
1/2" = 1'-0"42 Elevation 15a - Corridor
PAINT COLOR I
12" BY 24" TILE
RUBBER PROFILE BASE
HANDRAIL
PAINT COLOR II
674-23-250
TEMPLE, TX
NOTES
R-1: HAND RAIL ADDED TO NEW
CONSTRUCTION.
R-2: RUBBER PROFILE BASE.
5'
0" 9'
0"
9' - 2"
1'
4"
2' - 8"
2'
4"
1'
8"
8' - 4"
1'
0"
2' - 0"
4'
0"
5' - 1 3/4" 3' - 2 1/4"
8' - 0 1/4" 2' - 5 1/2"
14' - 3 1/4"
8' - 1 3/4"
4'
0"
2' - 5 1/2"
8' - 0 1/4"
14' - 3 1/4"
3' - 6 3/4" 4' - 2 1/4"
9'
0"
5' - 0 1/4"
4'
0"
4'
0"
3' - 9 1/2"
8' - 1 3/4"
4' - 4 1/4"
1' - 1 1/4"
5' - 0"
1'
4"
4'
0"
0' - 8 1/2"
3' - 11 1/4"
1'
4"
4'
0" 5'
0"
6' - 3 1/2"
2' - 6"0' - 3 1/2"
4'
0"
4'
0"
8' - 4"
0'
6"
6' - 4 1/4"
10' - 1"
9'
0"
0'
6"
3 10' - 1"
7' - 5 1/4" 10' - 7"
4'
0"
9'
0"
5' - 0" 8' - 11 1/2"
4'
0"
2'
5' - 0"
4'
0"
1'
8"2'
" 4'
0"
4' - 7 3/4"0' - 9 1/2" 1' - 1" 5' - 8 1/4"
4'
0"
3' - 9 1/2"
7' - 4 1/4"
6' - 9 1/4"
9'
0"
4'
0"
1'
0"
2' - 0"
2' - 11 1/4" 4' - 5"
4'
0"
4'
0"
4' - 7 1/4"
7' - 11 3/4"
4'
0"
4' - 7 1/4" 7' - 11 3/4"
4'
0"
1' - 10" 2' - 7 1/2"
0'
6"
13' - 0 1/4" 6' - 5" 12' - 11 1/2"
6' - 4"
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:19:26 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING ELEVATIONS REVITALIZE DOM
HALLS AND WALLS
TB AO
AE-102
1/2" = 1'-0"1 Elevation 1a - 1B114 1/2" = 1'-0"2 Elevation 1b - 1B114
1/2" = 1'-0"3 Elevation 1c - 1B114 1/2" = 1'-0"4 Elevation 1d - 1B114
1/2" = 1'-0"5 Elevation 2a - 1B142 1/2" = 1'-0"6 Elevation 2b - 1B142
1/2" = 1'-0"7 Elevation 2c - 1B142
1/2" = 1'-0"8 Elevation 2d - 1B142 1/2" = 1'-0"9 Elevation 3a - 1B142A
1/2" = 1'-0"10 Elevation 3b - 1B142A 1/2" = 1'-0"11 Elevation 3c - 1B142A
1/2" = 1'-0"12 Elevation 3d - 1B142A 1/2" = 1'-0"13 Elevation 4a - 1B142B
1/2" = 1'-0"14 Elevation 4b - 1B142B 1/2" = 1'-0"15 Elevation 4c - 1B142B
1/2" = 1'-0"16 Elevation 4d - 1B142B
1/2" = 1'-0"17 Elevation 5a - 1B149 1/2" = 1'-0"18 Elevation 5b - 1B149
1/2" = 1'-0"19 Elevation 5c - 1B149 1/2" = 1'-0"20 Elevation 5d - 1B149
1/2" = 1'-0"21 Elevation 6a - 1B146 1/2" = 1'-0"22 Elevation 6b - 1B146
1/2" = 1'-0"23 Elevation 6c - 1B146 1/2" = 1'-0"24 Elevation 6d - 1B146
1/2" = 1'-0"25 Elevation 7a - 1B154 1/2" = 1'-0"26 Elevation 7b - 1B154
1/2" = 1'-0"27 Elevation 7c - 1B154 1/2" = 1'-0"28 Elevation 7d - 1B154
1/2" = 1'-0"29 Elevation 8a - 1B128 1/2" = 1'-0"30 Elevation 8b - 1B128
1/2" = 1'-0"31 Elevation 8c - 1B128 1/2" = 1'-0"32 Elevation 8d - 1B128
1/2" = 1'-0"33 Elevation 9a - Corridor
674-23-250
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:20:03 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
FINISH SCHEUDLE REVITALIZE DOM
HALLS AND WALLS
TB AO
AS-100
INTERIOR FINISH SCHEDULE
Number Name Floor Finish Base Finish Wall Finish Ceiling Finish Area
1B100 1 BED LBT RPB PT-1 2 X 2 GRID 150 SF
1B101 BATH TILE TILE TILE/PT-1 HLC 39 SF
1B102 2 BED LBT RPB PT-1 2 X 2 GRID 198 SF
1B103 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B104 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B105 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B106 H.A.C. TILE TILE TILE/PT-1 2 X 2 GRID 34 SF
1B107 S. LINEN TILE TILE TILE/PT-1 2 X 2 GRID 30 SF
1B108 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B109 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B110 QUIET
ROOM
LBT RPB PT-1 2 X 2 GRID 134 SF
1B110A MECH. TILE RPB PT-1 2 X 2 GRID 133 SF
1B111 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B112 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B113 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B114 BATH TILE TILE TILE/PT-1 HLC 67 SF
1B115 H.A.C. TILE TILE TILE/PT-1 2 X 2 GRID 46 SF
1B116 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B117 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B118 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B119 BATH TILE TILE TILE/PT-1 HLC 115 SF
1B119A BATH TILE TILE TILE/PT-1 HLC 42 SF
1B119B BATH TILE TILE TILE/PT-1 HLC 51 SF
1B120 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B121 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B122 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B123 MULTI-PU
RPOSE
LBT RPB PT-1 2 X 2 GRID 399 SF
1B124 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B125 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B126 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B127 LOUNGE LBT RPB PT-1 2 X 2 GRID 115 SF
1B128 BATH TILE TILE TILE/PT-1 HLC 37 SF
1B129 1 BED LBT RPB PT-1 2 X 2 GRID 154 SF
1B130 2 BED LBT RPB PT-1 2 X 2 GRID 199 SF
1B131 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B132 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B133 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B134 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B135 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B136 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B137 BATH TILE TILE TILE/PT-1 HLC 67 SF
1B138 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B139 ELEC. TILE RPB PT-1 EXPOSED 45 SF
1B140 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B141 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B142 BATH TILE TILE TILE/PT-1 HLC 113 SF
1B142A BATH TILE TILE TILE/PT-1 HLC 41 SF
1B142B BATH TILE TILE TILE/PT-1 HLC 52 SF
1B143 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B144 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B145 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B146 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B147 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
1B148 IDF TILE RPB PT-1 2 X 2 GRID 36 SF
1B149 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
1B150 LOUNGE LBT RPB PT-1 2 X 2 GRID 108 SF
1B151 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B152 2 BED LBT RPB PT-1 2 X 2 GRID 203 SF
1B153 1 BED LBT RPB PT-1 2 X 2 GRID 154 SF
1B154 BATH TILE TILE TILE/PT-1 HLC 45 SF
1B155 PATIENT
STORAGE
LBT RPB PT-1 2 X 2 GRID 459 SF
1B - 3 STAIRS LBT RPB PT-1 2 X 2 GRID 200 SF
2B200 APARTME
NT/ MULTI
LIVING
LBT RPB PT-1 2 X 2 GRID 188 SF
2B201 BATH TILE TILE TILE/PT-1 HLC 50 SF
2B202 APARTME
NT/ MULTI
LIVING
LBT RPB PT-1 2 X 2 GRID 247 SF
2B203 BATH TILE TILE TILE/PT-1 HLC 40 SF
2B204 1 BED LBT RPB PT-1 2 X 2 GRID 173 SF
2B205 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B206 C. LIN TILE TILE TILE/PT-1 2 X 2 GRID 34 SF
2B207 S. LIN TILE TILE TILE/PT-1 2 X 2 GRID 29 SF
2B208 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B209 2 BED LBT RPB PT-1 2 X 2 GRID 199 SF
2B210 QUIET
ROOM
LBT RPB PT-1 2 X 2 GRID 137 SF
INTERIOR FINISH SCHEDULE
Number Name Floor Finish Base Finish Wall Finish Ceiling Finish Area
2B211 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B212 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B213 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B214 BATH TILE TILE TILE/PT-1 HLC 69 SF
2B215 H.A.C. TILE TILE TILE/PT-1 2 X 2 GRID 47 SF
2B216 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B217 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B218 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B219 BATH TILE TILE TILE/PT-1 HLC 118 SF
2B219A BATH TILE TILE TILE/PT-1 HLC 43 SF
2B219B BATH TILE TILE TILE/PT-1 HLC 55 SF
2B220 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B221 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B222 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B223 MULTI-PU
RPOSE
ROOM
LBT RPB PT-1 2 X 2 GRID 418 SF
2B224 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B225 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B226 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B227 LOUNGE TILE TILE PT-1 2 X 2 GRID 130 SF
2B228 BATH TILE TILE TILE/PT-1 HLC 40 SF
2B229 1 BED LBT RPB PT-1 2 X 2 GRID 152 SF
2B230 2 BED LBT RPB PT-1 2 X 2 GRID 198 SF
2B231 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B232 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B233 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B234 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B235 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B236 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B237 BATH TILE TILE TILE/PT-1 HLC 72 SF
2B238 BATH TILE TILE TILE/PT-1 HLC 45 SF
2B239 ELE. TILE TILE PT-1 EXPOSED 49 SF
2B240 2 BED LBT RPB PT-1 2 X 2 GRID 202 SF
2B241 2 BED LBT RPB PT-1 2 X 2 GRID 201 SF
2B242 BATH TILE TILE TILE/PT-1 HLC 122 SF
2B242A BATH TILE TILE TILE/PT-1 HLC 43 SF
2B242B BATH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .