This drawing package pertains to the construction project to revitalize dormitory halls and walls at the Veterans Affairs Medical Center in Temple, Texas. The project will renovate wings A and B, including upgrading elevations for bedrooms, corridors and other areas to elevation 1A154, 1A131 and other specified locations. Renovations will include installing new rubber base trim, adding handrails to meet construction code, and painting interior walls and common areas with two different color schemes. The solicitation number is 36C25724B0009 and seeks bids to complete the project under contract number 674-23-250, which has a projected completion date of November 2023. The construction value and agency sponsor are not specified.

View the file

Other files

File Type Posted
36C25724B0009 0009.docx DOCX document
36C25724B0009 0008.docx DOCX document
36C25724B0009 0007.docx DOCX document
36C25724B0009 0006.docx DOCX document
36C25724B0009 0005.docx DOCX document
Plumbing Fixture Schedule.pdf PDF
Lighting Fixtures.pdf PDF
36C25724B0009 0004.docx DOCX document
36C25724B0009 0003.docx DOCX document
Specifications_CTX Revitalize Dom Halls and Walls.pdf PDF
Exit lights Dom.pdf PDF
Vanity Lighting.pdf PDF
36C25724B0009 0002.docx DOCX document
A-117.pdf PDF
P12.pdf PDF
P6.pdf PDF
Combined Files-Electrical.pdf PDF
AE-101.pdf PDF
AD-100.pdf PDF
P11.pdf PDF
A-100.pdf PDF
P5.pdf PDF
A-103.pdf PDF
AS-100.pdf PDF
A-109.pdf PDF
P9.pdf PDF
A-115.pdf PDF
A-110.pdf PDF
AS-102.pdf PDF
A-111.pdf PDF
A-104.pdf PDF
P1.pdf PDF
A-112.pdf PDF
DOM A _ B WING REFERBISH INTERIOR FINISHES.pdf PDF
AD-103.pdf PDF
A-105.pdf PDF
AE-102.pdf PDF
Attendance Roster.pdf PDF
A-106.pdf PDF
A-101.pdf PDF
C-001.pdf PDF
A-102.pdf PDF
P2.pdf PDF
P4.pdf PDF
A-113.pdf PDF
A-108.pdf PDF
A-116.pdf PDF
AD-101.pdf PDF
A-107.pdf PDF
A-114.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4'

0" 4'

0"

8'

0"

0'

6"

8'

0"

8'

0"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:39:09 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING ELEVATIONS LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

AE-100

1/2" = 1'-0"1 Elevation 4a - 1A154

1/2" = 1'-0"2 Elevation 4b - 1A154 1/2" = 1'-0"3 Elevation 4c - 1A154 1/2" = 1'-0"4 Elevation 4d - 1A154

1/2" = 1'-0"5 Elevation 5a - 1A131 1/2" = 1'-0"6 Elevation 5b - 1A131

1/2" = 1'-0"7 Elevation 5c - 1A131 1/2" = 1'-0"8 Elevation 5d - 1A131

1/2" = 1'-0"9 Elevation 6a- bedroom 1/2" = 1'-0"10 Elevation 6b - bedroom

1/2" = 1'-0"11 Elevation 6c - bedroom 1/2" = 1'-0"12 Elevation 6d - bedroom

1/2" = 1'-0"13 Elevation 14a - Corridor

PAINT COLOR I

12" BY 24" TILE

RUBBBER PROFILE BASE

HAND RAIL

PAINT COLOR II

674-23-250

TEMPLE, TX

NOTES

R-1: HAND RAIL ADDED TO NEW

CONSTRUCTION.

R-2: RUBBER PROFILE BASE.

R-2

R-1

File details come from the government source that posted it. Updated .