About this file

This document package includes a federal contract solicitation and related project files for interior renovations at the Olin E. Teague Veterans' Medical Center in Temple, Texas. The solicitation seeks bids for a construction project to revitalize dormitory halls and walls under project number 674-23-250, with a bid due date of January 17, 2024. Renovations will include demolition, new wall and floor finishes, lighting, plumbing fixtures, doors and frames, resilient flooring and base, and paint. Required materials and finishes are specified in the schedule for finishes. The project is tax-exempt and the contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17.

View the file

Other files

File Type Posted
36C25724B0009 0009.docx DOCX document
36C25724B0009 0008.docx DOCX document
36C25724B0009 0007.docx DOCX document
36C25724B0009 0006.docx DOCX document
36C25724B0009 0005.docx DOCX document
Plumbing Fixture Schedule.pdf PDF
Lighting Fixtures.pdf PDF
36C25724B0009 0003.docx DOCX document
Specifications_CTX Revitalize Dom Halls and Walls.pdf PDF
Exit lights Dom.pdf PDF
Vanity Lighting.pdf PDF
36C25724B0009 0002.docx DOCX document
A-117.pdf PDF
P12.pdf PDF
P6.pdf PDF
Combined Files-Electrical.pdf PDF
AE-101.pdf PDF
AD-100.pdf PDF
P11.pdf PDF
A-100.pdf PDF
P5.pdf PDF
A-103.pdf PDF
AS-100.pdf PDF
A-109.pdf PDF
P9.pdf PDF
A-115.pdf PDF
A-110.pdf PDF
AS-102.pdf PDF
AE-100.pdf PDF
A-111.pdf PDF
A-104.pdf PDF
P1.pdf PDF
A-112.pdf PDF
DOM A _ B WING REFERBISH INTERIOR FINISHES.pdf PDF
AD-103.pdf PDF
A-105.pdf PDF
AE-102.pdf PDF
Attendance Roster.pdf PDF
A-106.pdf PDF
A-101.pdf PDF
C-001.pdf PDF
A-102.pdf PDF
P2.pdf PDF
P4.pdf PDF
A-113.pdf PDF
A-108.pdf PDF
A-116.pdf PDF
AD-101.pdf PDF
A-107.pdf PDF
A-114.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Olin E. Teague Veterans’ Medical CenterVA Project: 674-23-250
Temple, TXRevitalize Dom Halls and Walls

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 674-23-250 36C257 Department of Veterans Affairs Network Contracting Office (NCO) 17 Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504 36C257 Department of Veterans Affairs Network Contracting Office (NCO) 17 Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 To all Offerors/Bidders

36C25724B0009

X X X January 17, 2023 at 11:00AM CST This amendment has the following purposes:

1. To post additional questions posed after Amendment 0003 with answers.

2. To post the updated Schedule for Finishes.

3. To post the updated Lighting Fixtures Schedule.

4. To post the updated Plumbing Fixtures Schedule.

5. All bids are due via email only to jennifer.

stringer@va.gov No Later Than 1/17/2024 at 11:00 AM CST.

6. No further questions will be accepted upon publication of this amendment.

7. All other terms and conditions of this solicitation remain unchanged.

Jennifer Stringer Contracting Officer 36C25724B0009-CTX Revitalize Dom Halls and Walls Question Set 1 (After Amendment 0003)

1. We understand and please confirm the solicitation duration and price / cost schedule is correct and that amendment #3 specification section 01 00 00 paragraph 1.3 is not applicable. Confirmed. That portion of amendment 3 is not applicable to this project.

1. Does the facility have sufficient vacant space to lump 2nd floor of Wings A & B together and 1st Floor Wings A& B together instead of 5 phases as shown on revised Amendment #2 Revised Drawings? 5 phases are needed.

Can the phasing be revised to 2 phases in lieu of 5? No

1. Amendment #3 specification 01 00 00 paragraph 1.9.G.1 indicates that the contractor is to assist the government in vacating the area of work….This will involve moving of furniture/equipment in other areas of the campus. Contractor to wrap and items tagged y government. Any item damaged in the move shall be replaced with a new item equal to the damaged item. Please identify where on campus the furniture/equipment is being moved to along with a furniture and equipment list a professional moving company can utilize to price the packing and moving. To limit confusion, VA shall relocate the items before work is to commence.

1. We understand and please confirm that the following Amendment #3 specification sections are not applicable to the project: 01 81 11 Sustainable Design Requirements, 06 06 60 Schedules for Plastic Fabrications, 09 22 16 Non-Structural Metal Framing, 09 67 23.30 Resin Mortar Flooring, 09 96 46 Intumescent Painting, 10 28 00 Toilet and Bath Accessories, 10 44 13 Fire Extinguisher Cabinets, 23 05 11 Common Work Results for HVAC, 23 36 00 Air Terminal Units, 26 27 26 Wiring Devics, 26 29 21 Enclosed Switches and Circuit Breakers, 28 13 00 Physical Access Control System. Confirmed

1. Since cementitious underlayment and moisture remediation coatings specified in Amendment #3 Section 09 05 16 Subsurface Preparation for Floor Finishes are unknown until demolition and moisture testing is performed, please confirm that this work will be handled as a differing site condition if encountered. IF, identified, yes.

1. Exit light and wall mounted light fixture data sheets were provided by amendment #3, but not for the typical ceiling mounted light fixtures. Please provide. See attached

1. Please provide the Plumbing fixture schedule per Am#2 Q&A response.

See attached

1. The as-built plumbing drawings provided by amendment show additional bath tubs than shown on the amendment #2 revised plans. Are these additional tubs required to be replaced? As-built drawings are provided as a reference and are not to be used for quantity take off for the current space. All bathtubs within the project scope shall be replaced with showers.

1. Please confirm that water fountains are not required to be replaced as locations are not identified on the plans. Water fountains shall be replaced. Please see the attached plumbing schedule

1. Reference Am#3 Specification Section 01 00 00 paragraph 1.27 Construction Digital Images. Can the superintendent take photos with a camera phone and email them in lieu of a professional photographer on photo paper? Yes

1. Section 09 06 00 Schedule for Finishes contains products including window sills, flashings, doors, 3Form Decorative Resin Panels, coiling counter doors, epoxy mortar flooring, …which are not in scope for this project. We assume items not in scope are not applicable. Correct

1. Section 09 06 00 Schedule for Finishes pages 142 thru 146 are formatted incorrectly and is missing half the information presented (landscape versus portrait formatting issue). Please provide revised Section 09 06 00 so that all items are legible. See attached

1. Section 09 06 00 Schedule for Finishes lists products and manufacturers which are different from previously answered Q&A. We assume either is acceptable unless clarified otherwise. All finishes shall undergo the submittal process before selections are made.

1. New solid surface countertops are required per Amendment #2 Set 4 Q&A #3 response, but no plan details or specification was provided in Amendment #3. Please provide a plan view detail, a cut section plan detail to include whether backsplash is required and how high, the thickness of the solid surface material, whether Countertop supports are required, the front edge detail/profile of the countertop. There does not appear to be any solid surface countertops in this project. All sinks shall be wall hung.

1. New solid surface countertops are required per Amendment #2 Set 4 Q&A #3 response, but basis of design mfr/model/color was not provided in Amendment #3. Please provide a basis of design mfr/model & color of the solid surface countertops. There does not appear to be any solid surface countertops in this project. All sinks shall be wall hung.

1. Room finish schedules on AS100 and AS102 and specification section 09 06 00 Schedule for Finishes paragraph 2.6.B (spec page -142) require 12x12 wall tile while Elevation Plan Sheets AE100 thru AE102 require 12x24 wall tile. We assume either is acceptable unless clarified otherwise by amendment. Wall tile shall be 12 x 24. However, the tile shall go through the submittal process before any selections are made.

1. Revised amendment #2 plan sheets AD-102 and AD-103 are not requiring any demolition in the areas located between wings on both floors. If this is not correct, please provide revised plan sheets. ALL demolition work from the wings shall continue into connecting lobby.

1. Please confirm that standard 5/8” type X gypsum board and greenboard is acceptable per Amendment #2 Set 4 Q&A 8 & 19, and that QuietRock products specified in Amendment #3 Section 09 29 00 paragraph 2.1 are not intended or required. Bidder shall follow information provided in amendment 2.

1. Since relocation of furniture and equipment were not originally part of the scope of work for this project, contractors did not itemize all the furniture and equipment seen at the site visit. Contractors did see hospital recliners, patient wardrobes, side tables, armchairs (hospital grade), beds, glass encased bulletin boards, glass framed artwork, wall mounted televisions, book cases, refrigerators, microwave machines, dvd players, kuerig coffee makers, coffee tables, side tables, couches, love seats. However, this list does not include whatever is located in the Multi-Purpose Rooms, Quiet Rooms and Patient Storage Rooms or the areas added by amendment #2 (halls and offices between the wings on each floor). What and how much furniture is located in each of those rooms? To limit confusion, VA shall relocate the items before work is to commence.

1. Amendment #2 and #3 adds moving furniture and equipment to the scope of work. Please provide a complete list of items including quantities to be moved by the contractor. . To limit confusion, VA shall relocate the items before work is to commence.

20. Optima Health Zone Square Tegular Tile specified in Specification Section 09 06 00 Schedule for Finishes is roughly 4x more expensive than Armstrong #1728 as required by Amendment #2 Q&A#1. We understand that Armstrong #1728 as specifically provided in Amendment #2 Questions and Answers #1 is the correct acoustical ceiling tile. If this is not a correct understanding, please clarify otherwise to all by amendment. Armstrong #1728 is the correct acoustic ceiling tile.

Question Set 2 (After Amendment 0003)

1. With all of the newly issued drawings and specifications, will the Government consider moving out the Bid Due Date to provide an opportunity for the contractors and subcontracts to regroup.

1. With the added scopes and added phasing will the government extend their days to complete – if so, please provide the number of days. No

1. Please provide a side by side of newly issued drawings, as many appear to have old page numbers with new drawings on them. Bidders shall only use the last set of drawings that were issued.

1. Please provide a list of modifications to the drawings, as some pages have been reissued and appear to have some changes, however, they are not clouded or identified. Bidders shall only use the last set of drawings that were issued.

1. Please confirm correct response to (Question Set 6 Item 12 and Question Set 2 Item 4)

4. 12) Drawing A105 shows floor tiles in HAC and Elec Rooms. Other flooring levels do not. Should this be removed from quote, remain for B Wing only, or Add to A Wings?

0. HAC closets, electrical, mechanical and IT closet are to be omitted from this project

4. However, Question Set 2 Item 4 States “Confirm no flooring or painting is intended or required in mechanical, Electrical, IDF, HAC and Comm. Rooms.”

1. HAC closets, electrical, mechanical and IT closet are to be omitted from this project

1. Question Set 7 Item 2 – Please offer a response to allow for the equal bidding of what will be done in these locations – We cannot offer equal bids if contractors are guessing at what will be done in these locations.

5. The construction area of the existing building has a handful of atriums with decorative cove lighting. The drawings show these areas to be lay-in ceilings, is this correct in that the atriums are going to be filled in with drop ceiling grid?

0. Bidders shall omit this work

1. Question Set 7 Item 8 – Please clarify what the yes answer is to, do we need temporary lighting, or can we use the existing tied up out of the way?

6. Can the existing lighting be used as temporary lighting if tied up above the grid, or does temporary lighting need to be included?

0. Existing lights may be utilized as temporary lighting

1. Question Set 12 – Please clarify is the contractor required to provide any permits from state/local agencies.

7. Is the Contractor required to obtain permits or inspections from outside sources for the work being performed or is the Government assuming this responsibility? No permits are required

1. Please clarify response to (Question Set 17 Item 25 and Question Set 6 Item 1 & 1a)

8. Question Set 17 Item 25 “Is this project tax exempt and will the CO/COR provide the necessary tax-exempt certificates.”

0. Yes, the project is tax-exempt. Certificates can be provided.

8. Question Set 6 Item 1 Is this a tax-exempt project?

1. Yes, the project is tax-exempt. Certificates can be provided.

8. Question Set 6 item 1a. If tax-exempt, will the government be providing a tax-exempt certificate to the Prime Contractor for use by subcontractors and vendors?

2. Yes, the project is tax-exempt. Certificates can be provided.

1. The information provided about moving furniture. What is the intent?

9. Will this furniture be reinstalled by the contractor?

0. If so, is any refurbishing required?

9. Does the Government have a planned storage facility?

1. If so what is the location in regard to the work area?

9. Should the contractor assume a temporary storage container (Conex)?

9. Should the contractor anticipate some going into the dumpster?

Furniture shall be removed and relocated by the VA.

SECTION 09 06 00

SCHEDULE FOR FINISHES

VAMC: Olin E. Teague Veterans’ Healthcare Center Location: Temple, Texas Project No. and Name: 674-23-250, Revitalize Dom Halls and Walls Submission: Final Design Submission Date: June 30, 2023

SECTION 09 06 00

SCHEDULE FOR FINISHES

PART I – GENERAL

1.1 DESCRiPTION

A. This section contains a coordinated system in which requirements for materials specified in other sections shown are identified by abbreviated material names and finish codes in the room finish schedule or shown for other locations.

1.2 MANUFACTURERS

A. Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturer’s equivalent to colors, finishes, textures and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer for finish requirements.

1.3 SUBMITALS

A. Submit in accordance with SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES provide quadruplicate samples for color approval of materials and finishes specified in this section.

1.4 applicable publications

A.Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
B.MASTER PAINTING INSTITUTE: (MPI)
2001Architectural Painting Specification Manual

PART 2 - PRODUCTS

2.1 Division 03 – CONCRETE

A. SECTION 03 30 53, CAST-IN-PLACE CONCRETE

Surface
Finish Description
New concrete; slab preparation
Natural gray color, medium broom finish perpendicular to direction of travel
Repair Exterior Patio floors
Repair to match existing finish

2.2 dIVISION 04 – mASONRY (not used)

2.3 Division 05 – METALS

A.SECTION 05 40 00, COLD-FORMED METAL FRAMING
Finish
Color
G90 galvanized
Natural
B.SECTION 05 50 00, METAL FABRICATIONS
Item
Finish
Modular Channel Units
Painted, factory finish
Support for wall and ceiling mounted items (interior)
G90 galvanized
Shelf angles, loose lintels (exterior)
G90 galvanized, painted to match surrounding surfaces
Cast iron downspout shoe
Painted, match existing

2.4 Division 06 – WOOD, PLASTICS, AND COMPOSITES

A. PLASTIC FABRICATIONS

Item
Finish
Manufacturer
Color/Pattern
Decorative Resin Panels, Trim
Sandstone, both sides
3Form
TBD
Window Sills
Factory
WilsonArt
O-6, “Europa” 9210CM, ½” thick

2.5 Division 07 - THERMAL AND MOISTURE PROTECTION

A.SECTION 07 60 00, FLASHING AND SHEET METAL
Item
Finish
Exposed Flashings, steel
Exterior G90 galvanized steel: Three-coat fluoropolymer, color TBD
B.SECTION 07 92 00, JOINT SEALANTS
Location
Color
Manufacturer
Manufacturer Color
New to Existing Walls
Match finished wall color
Basis of Design: Dow Corning
To match adjacent surface
Masonry Control Joints
Match finished wall color
do
do
Plumbing fixtures, caulking
White with mildewcidal additive
do
do
Storefront Framing
Match Aluminum Color
do
do
All other locations
Light gray or aluminum
do
do

2.6 Division 08 - OPENINGS

A.SECTION 08 11 13, HOLLOW METAL DOORS AND FRAMES: Also see Finish Schedule on drawings.
Paint both sides of door and frames same color including ferrous metal louvers
Component
Color of Paint Type and Gloss
Doors and Frames
O-1, Sherwin Williams ”Snowbound,” #SW 7004, Semi-gloss, interior side; TBD exterior side. Do not paint door hardware.
B.SECTION 08 14 00, INTERIOR FLUSH WOOD DOORS: Also see Finish Schedule on drawings.
Component
Finish/Color
Doors
O-1, Sherwin Williams ”Snowbound,” #SW 7004, Semi-gloss
Frames
Hollow Metal Frames, same as Section 08 11 13
C.SECTION 08 31 13, ACCESS DOORS AND FRAMES
Material
Finish/Color
Steel
Factory primed, paint to match adjacent surface
Stainless steel
Exposed, Brushed #4 finish
D.SECTION 08 33 13, COILING COUNTER DOORS: Also see Finish Schedule on drawings.
Component
Finish/Color
Curtain, aluminum
Clear anodized
Curtain, steel (fire rated)
Factory galvanized and primed, paint color TBD
Tracks, Hood, Accessories
Paint per Section 08 11 13
E.SECTION 08 34 74, STC RATED WOOD DOORS: Also see Finish Schedule on drawings.
Component
Finish/Color
Doors and applied moldings
O-1, Sherwin Williams ”Snowbound,” #SW 7004, Semi-gloss
Frames, hollow metal
Hollow Metal Frames, same as Section 08 11 13

F. SECTION 08 71 00, DOOR HARDWARE

RD: Also see Finish Schedule on drawings.

B.SECTION 09 30 13, CERAMIC TILING: Also see Finish Schedule on drawings.
1. SECTION 09 30 13, PORCELAIN TILE
Finish Code
Size
Shape
Finish/Pattern
Manufacturer
Mfg. Color Name/No.
B-2
6” x 12”
Cove Base
Satin
Concept Surfaces
Supreme Series, “Chocolate”
F-3
12” x 12”
Square
Satin
Concept Surfaces
Supreme Series, “Chocolate”
W-6
12” x 12”
Square
Satin
Concept Surfaces
Supreme Series, “Crema”

2. SECTION 09 30 13, WALL AND FLOOR TILE GROUT

Finish Code
Manufacturer
Mfg. Color Name/No.
GR-1
Custom Building Products
#52 Tobacco Brown
GR-2
Custom Building Products
#10 Antique White
C.SECTION 09 51 00, ACOUSTICAL CEILINGS: Also see Finish Schedule and Reflected Ceiling Plan on drawings.
Finish Code
Component
Color, Pattern
Manufacturer
Mfg Name/No.
C-1
Acoustical Ceiling Tile
White
Armstrong
“Optima Health Zone”, Square Tegular, 15/16”,

24” x 24” x 1”

C-1
Exposed Suspension System
White
Armstrong
Prelude XL
D.SECTION 09 65 13, RESILIENT BASE AND ACCESSORIES: Also see Finish Schedule on drawings.
Finish Code
Item
Size
Finish/Pattern
Manufacturer
Mfr. Color Name/No.
B-1
Rubber Profile Base
4-1/2” x 3/8”
Factory
Roppe
Contours Profile,

Novel #45 PV4045, 161 “Snow”

E.SECTION 09 65 19, RESILIENT TILE FLOORING: Also see Finish Schedule on drawings.
Finish Code
Item
Size
Finish/Pattern
Manufacturer
Mfr. Color Name/No.
F-1
Luxury Vinyl Tile
6” x 36” x 3 mm
Factory
Parterre
Vertu LV Plank

11601 “Red House Oak”

F-2
Luxury Vinyl Tile
4” x 36” x 3 mm
Factory
Parterre
Ingrained LV Plank,

11570 “Natural Ash”

F.SECTION 09 67 23.30, EPOXY (EPOXY RESIN COMPOSITE) MORTAR FLOORING (RES-3): Also see Finish Schedule on drawings.
Finish code
Manufacturer
Mfr. Color Name/No.
F-4 Resinous Floor
Stonehard
Stoneblend GSI-G, “Sandstone”
B-3 Resinous Base
Stonehard
Stoneblend GSI-G, “Sandstone”

O-9 Transition from Resinous Floor to Resilient Floor

Basis of Design: Burke
940 Standard Edge T; Color: Cream 205
G.SECTION 09 91 00, PAINT AND COATINGS: Also see Finish Schedule on drawings.
1.MPI Gloss and Sheen StandardsGloss @60Sheen @85
Gloss Level 1a traditional matte finish-flatmax 5 units, and max 10 units
Gloss Level 2a high side sheen flat “velvet-like” finishmax 10 units, and 10-35 units
Gloss Level 3a traditional “egg-shell like” finish10-25 units, and 10-35 units
Gloss Level 4a “satin-like” finish20-35 units, and min. 35 units
Gloss Level 5a traditional semi-gloss35-70 units
Gloss Level 6a traditional gloss70-85 units
Gloss level 7a high glossmore than 85 units
1. Exterior Paint Code
Gloss
Manufacturer
Mfr. Color Name/No.
Exposed Ferrous Metal
TBD
TBD
TBD
Exposed Stainless Steel
Dull #4
N/A
N/A
Exterior Non-ferrous Metal
Clear anodized aluminum
N/A
N/A
2. Interior Paint Code
Gloss
Manufacturer
Mfg. Color Name/No.

W-1 Field paint

Eggshell
Sherwin-Williams
Interior paint, Low VOC, “White Duck”,

SW 7010

W-2 Accent paint

Eggshell
Sherwin-Williams
Interior paint, Low VOC, “Tranquil Aqua”, SW 7611 (blue)

W-3 Accent paint

Eggshell
Sherwin-Williams
Interior paint, Low VOC, “Haven”,

SW 6437 (green)

W-4 Accent paint

Eggshell
Sherwin-Williams
Interior paint, Low VOC, “August Moon”,

SW 7687 (gold)

W-5 Accent paint

Eggshell
Sherwin-Williams
Interior paint, Low VOC, “Sumptuous Peach”,

SW 6345 (orange)

C-2 Field paint

Eggshell
Sherwin-Williams
Interior paint, Low VOC, “Snowbound”,

SW 7004 (white)

H.SECTION 09 96 46, INTUMESCENT PAINT: Also see Finish Schedule on drawings.
Finish code
Manufacturer
Mfr. Color Name/No.
N/A
Albi Mfg. or Int’l Fire Resistant Systems, Inc.
Manufacturer’s standard color; no finish
I.SECTION 09 96 59, RESINOUS specialty Glazed COATING SYSTEMS FOR WALLS and CEILINGS (RES-W1): Also see Finish Schedule on drawings.
Finish code
Manufacturer
Mfr. Color Name/No.
W-7 Resinous Wall
Sherwin-Williams
Saniglaze, “Snowbound” SW 7004, Semi-gloss
C-3 Resinous Ceiling
Sherwin-Williams
Saniglaze, “Snowbound” SW 7004, Semi-gloss

2.8 Division 10 - SPECIALTIES

B.SECTION 10 26 00, WALL AND DOOR PROTECTION: Also see drawings.
Item
Material
Manufacturer
Mfr. Color Name/No.
O-2 Chair Rail
High Impact Vinyl Acrylic
Inpro IPC
EnviroGT G2-2700 Chair Rail;

Color: Designer White

O-3 Wall Protection Sheet, height as shown in Drawings
High Impact Vinyl Acrylic
Inpro IPC
G2 Series Rigid Sheet;

Color: TBD

O-4 Corner Guards, height as shown in Drawings
High Impact Vinyl Acrylic
Inpro IPC
EnviroGT G2-160F Flush Mount;

Color: TBD

C. SECTION 10 28 00, TOILET AND BATH ACCESSORIES: Also see drawings.

Item
Material
Manufacturer
Mfr. Color Name/No.
EQ.2 & 3 Metal Farmed Mirrors
Stainless Steel/Glass
Bobrick
B-290x2436; -x2460
EQ.7 Paper Towel Dispensers
Plastic
Kimberly-Clark Professional
GFCI - VA Furnished
EQ.8 Grab Bars
Stainless Steel
Bobrick
B-5806x30; -x42
EQ.10 Toilet Tissue Dispensers
Plastic
Kimberly-Clark Professional
GFCI - VA Furnished
EQ.11 Toilet Seat Cover Dispensers
Stainless Steel
Bobrick
GFCI - VA Furnished
EQ.12 Sanitary Napkin Disposals
Stainless Steel
Bobrick
GFCI - VA Furnished
EQ.13 Soap Dispensers
Plastic
Kimberly-Clark Professional
GFCI - VA Furnished
EQ.14 Robe Hook
Metal
Bobrick
B-983
EQ.18 Utility Shelves
Stainless Steel
Bobrick
B-224x36
EQ.5 Soft Trap Covers
Vinyl
Mainline
ML11128; Color: white
D.SECTION 10 44 13, FIRE EXTINGUISHER CABINETS: Also see drawings.
Component
Material
Finish

JL Industries - Ambassador 1017G17 (Extinguisher: JL Industries – Cosmic 5E)

Steel
Painted; Color: white

2.10 Division 12- FURNISHINGS

C.SECTION 12 36 00, COUNTERTOPS AND ACCESSORIES: Also see Finish Schedule on drawings.
Finish Code
Manufacturer/Finish/Color
O-6
Solid Surface: WilsonArt; Color: “Europa” 9210CM, ½” thick

2.11 Division 22 - PLUMBING

A.SECTION 22 40 00, PLUMBING FIXTURES AND TRIM: Also see drawings.
Item
Color
Water Closets/Urinals
White
Lavatories, Hand Sinks
do
Service Sinks, Mop Sinks
do
Sink in Staff Lounge with Waste Disposal
Stainless Steel
Hi/Lo Drinking Fountain
do

2.12 DIVISON 26 - ELECTRICAL

A.SECTION 26 51 00, BUILDING LIGHTING INTERIOR: Also see drawings.
Fixture Type
Exterior Finish
Color
LED
Factory paint
White

PART 3 - EXECUTION

3.1 ROOM FINISH SCHEDULE

A.Refer to Room Finish Schedule, Sheet AF-602 for room finishes.
B.Match adjoining or existing similar surfaces colors, textures or patterns where disturbed or damaged by alterations or new work when not scheduled.

- - - E N D - - - See attached document: Lighting Fixtures.

See attached document: Plumbing Fixture Schedule.

SCHEDULE FOR FINISHES

09 06 00 - 16

File details come from the government source that posted it. Updated .