About this file

This document package includes architectural drawings and specifications for the Revitalize Dom Halls and Walls project at the Temple VA Medical Center in Temple, Texas. The drawings depict existing conditions and proposed renovations for various patient rooms, corridors, and common areas on Level 2 of Building A Wing, including new construction of handrails and installation of rubber base trim. The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs for construction services to complete the project, identified as VISN 17 Project #674-23-250, with responses due under Solicitation #36C25724B0009. Renovations include painting, new flooring, and minor construction work. The scope, drawings, and contract details provide relevant information for prospective offerors to understand requirements and prepare proposals for the Revitalize Dom Halls and Walls project.

View the file

Other files

File Type Posted
36C25724B0009 0009.docx DOCX document
36C25724B0009 0008.docx DOCX document
36C25724B0009 0007.docx DOCX document
36C25724B0009 0006.docx DOCX document
36C25724B0009 0005.docx DOCX document
Plumbing Fixture Schedule.pdf PDF
Lighting Fixtures.pdf PDF
36C25724B0009 0004.docx DOCX document
36C25724B0009 0003.docx DOCX document
Specifications_CTX Revitalize Dom Halls and Walls.pdf PDF
Exit lights Dom.pdf PDF
Vanity Lighting.pdf PDF
36C25724B0009 0002.docx DOCX document
A-117.pdf PDF
P12.pdf PDF
P6.pdf PDF
Combined Files-Electrical.pdf PDF
AD-100.pdf PDF
P11.pdf PDF
A-100.pdf PDF
P5.pdf PDF
A-103.pdf PDF
AS-100.pdf PDF
A-109.pdf PDF
P9.pdf PDF
A-115.pdf PDF
A-110.pdf PDF
AS-102.pdf PDF
AE-100.pdf PDF
A-111.pdf PDF
A-104.pdf PDF
P1.pdf PDF
A-112.pdf PDF
DOM A _ B WING REFERBISH INTERIOR FINISHES.pdf PDF
AD-103.pdf PDF
A-105.pdf PDF
AE-102.pdf PDF
Attendance Roster.pdf PDF
A-106.pdf PDF
A-101.pdf PDF
C-001.pdf PDF
A-102.pdf PDF
P2.pdf PDF
P4.pdf PDF
A-113.pdf PDF
A-108.pdf PDF
A-116.pdf PDF
AD-101.pdf PDF
A-107.pdf PDF
A-114.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4'

0"

8'

0"

4'

0"

8'

0"

1'

8" 2'

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:39:21 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING ELEVATIONS LEVEL

REVITALIZE DOM

HALLS AND WALLS

TB AO

AE-101

1/2" = 1'-0"14 Elevation 7A - 2A237 1/2" = 1'-0"15 Elevation 7B - 2A237

1/2" = 1'-0"16 Elevation 7C - 2A237 1/2" = 1'-0"17 Elevation 7D - 2A237

1/2" = 1'-0"18 Elevation 8A - 2A219B 1/2" = 1'-0"19 Elevation 8B - 2A219B

1/2" = 1'-0"20 Elevation 8C - 2A219B 1/2" = 1'-0"21 Elevation 8D - 2A219B

1/2" = 1'-0"22 Elevation 9A - 2A219 1/2" = 1'-0"23 Elevation 9B - 2A219

1/2" = 1'-0"24 Elevation 9C - 2A219 1/2" = 1'-0"25 Elevation 9D - 2A219

1/2" = 1'-0"26 Elevation 10A - 2A219A 1/2" = 1'-0"27 Elevation 10B - 2A219A

1/2" = 1'-0"28 Elevation 10C - 2A219A 1/2" = 1'-0"29 Elevation 10D -2A219A

1/2" = 1'-0"30 Elevation 11A - BEDROOM

1/2" = 1'-0"31 Elevation 11b -bedroom 1/2" = 1'-0"32 Elevation 11c -bedroom

1/2" = 1'-0"33 Elevation 11d -bedroom 1/2" = 1'-0"34 Elevation 12a - 2A231

1/2" = 1'-0"35 Elevation 12b - 2A231 1/2" = 1'-0"36 Elevation 12c - 2A231

1/2" = 1'-0"37 Elevation 12d - 2A231 1/2" = 1'-0"38 Elevation 13a - 2A254

1/2" = 1'-0"39 Elevation 13b - 2A254 1/2" = 1'-0"40 Elevation 13c - 2A254

1/2" = 1'-0"41 Elevation 13d - 2A254

1/2" = 1'-0"42 Elevation 15a - Corridor

PAINT COLOR I

12" BY 24" TILE

RUBBER PROFILE BASE

HANDRAIL

PAINT COLOR II

674-23-250

TEMPLE, TX

NOTES

R-1: HAND RAIL ADDED TO NEW

CONSTRUCTION.

R-2: RUBBER PROFILE BASE.

R-1

R-2