A-108.pdf
PDF 186 KB Posted
- Solicitation number
- 36C25724B0009
About this file
This document contains a renovation project drawing and related federal contract opportunity. The drawing shows light fixture placements and notes for renovating patient rooms, wall areas, and ceiling tiles at the Veterans Affairs Medical Center in Temple, Texas. The related federal opportunity is a solicitation from the Department of Veterans Affairs to revitalize dormitory halls and walls for the Temple VAMC project numbered 674-23-250. Responses to the solicitation are due on an unspecified date to renovate lighting, walls, and ceilings as depicted in the project drawing in order to modernize dormitory areas at the specified medical center location.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT IN
SCOPE
PHASE V
2 X 4 LIGHT FIXTURE
1 X 4 LIGHT FIXTURE
1 X 3 LIGHT FIXTURE WALL MOUNT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t
B
A
C
D
E
F thr ee in ch es on e f oo t
6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
11/20/2023
1:15:49 PMS:
\E ng in ee rin g\
D es ig n\
H ea lth ca re E ng in ee r -
A O
\T
EM
PL
E\
D O
M A
B w in g re no va tio n\
B W
IN
G
.rv t
B WING RCP LEVEL 1 REVITALIZE DOM
HALLS AND WALLS
TB AO
A-108
1/8" = 1'-0"1 LEVEL 1 RCP
674-23-250
TEMPLE, TX
1/4" = 1'-0"
LIGHT FIXTURE LEGEND
NOTES
R-1: PATIENT ROOMS SHALL HAVE 1 2 X 4 LIGHT FIXTURE AS IS TO EXISTING.
THE FIXTURE & CEILING GRID SHALL BE REPLACED AS NEW.
R-2: WALL MOUNTED LIGHT FIXTURES PLACEMENTS SHALL BE REPLACED
TO NEW WALL MOUNTED LIGHT FIXTURES. SPECS WILL BE PROVED BY VA.
R-3: OVERHANG AREAS SHALL MATCH EXISITNG CONDITIONS. REFERBISH
CEILING TILES AND DAMAGES TO AREA.
R-4: HARD LID CEILINGS
R-1
R-4
R-2
R-3
R-3
File details come from the government source that posted it. Updated .