This floor plan drawing is for level 2 of a construction project to revitalize dormitory halls and walls at the Veterans Affairs Medical Center in Temple, Texas. The project involves renovating areas on level 2 including multi-living spaces, bedrooms, bathrooms, mechanical rooms, lounges, corridors, and stairs. The floor plan provides square footage measurements and layout details for these renovated areas. The related federal contract opportunity is a solicitation for the construction project, issued by the Department of Veterans Affairs Veterans Health Administration VISN 17. The project number is 674-23-250 with an estimated completion date of November 2023.

View the file

Other files

File Type Posted
36C25724B0009 0009.docx DOCX document
36C25724B0009 0008.docx DOCX document
36C25724B0009 0007.docx DOCX document
36C25724B0009 0006.docx DOCX document
36C25724B0009 0005.docx DOCX document
Plumbing Fixture Schedule.pdf PDF
Lighting Fixtures.pdf PDF
36C25724B0009 0004.docx DOCX document
36C25724B0009 0003.docx DOCX document
Specifications_CTX Revitalize Dom Halls and Walls.pdf PDF
Exit lights Dom.pdf PDF
Vanity Lighting.pdf PDF
36C25724B0009 0002.docx DOCX document
A-117.pdf PDF
P12.pdf PDF
P6.pdf PDF
Combined Files-Electrical.pdf PDF
AE-101.pdf PDF
AD-100.pdf PDF
P11.pdf PDF
A-100.pdf PDF
P5.pdf PDF
A-103.pdf PDF
AS-100.pdf PDF
A-109.pdf PDF
P9.pdf PDF
A-115.pdf PDF
A-110.pdf PDF
AS-102.pdf PDF
AE-100.pdf PDF
A-111.pdf PDF
P1.pdf PDF
A-112.pdf PDF
DOM A _ B WING REFERBISH INTERIOR FINISHES.pdf PDF
AD-103.pdf PDF
A-105.pdf PDF
AE-102.pdf PDF
Attendance Roster.pdf PDF
A-106.pdf PDF
A-101.pdf PDF
C-001.pdf PDF
A-102.pdf PDF
P2.pdf PDF
P4.pdf PDF
A-113.pdf PDF
A-108.pdf PDF
A-116.pdf PDF
AD-101.pdf PDF
A-107.pdf PDF
A-114.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

187 SF

MULTI-LIVING

2A200

50 SF

BATH

2A201

247 SF

MULTI-LIVING

2A202

40 SF

BATH

2A203

172 SF

2 BED

2A204

201 SF

2 BED

2A205

30 SF

C. LIN.

2A206

33 SF

S. LIN.

2A207

45 SF

BATH

2A208

201 SF

2 BED

2A209

137 SF

MECH

2A210A

201 SF

2 BED

2A211

45 SF

BATH

2A212

201 SF

2 BED

2A213

69 SF

BATH

2A21448 SF

HAC

2A215

202 SF

2 BED

2A216

45 SF

BATH

2A217

201 SF

2 BED

2A218

119 SF

BATH

2A219

202 SF

2 BED

2A220

45 SF

BATH

2A221

201 SF

2 BED

2A222

418 SF

MULTI-PURP

2A223

199 SF

2 BED

2A224

45 SF

BATH

2A2225

203 SF

2 BED

2A226

121 SF

CORR

C2-3

39 SF

BATH

2A228

153 SF

1 BED

2A229

198 SF

2 BED

2A230

45 SF

BATH

2A231

201 SF

2 BED

2A232

201 SF

2 BED

2A233

45 SF

BATH

2A234

201 SF

2 BED

2A235

201 SF

2 BED

2A236

73 SF

BATH

2A237

45 SF

BATH

2A238

48 SF

ELE.

2A239

201 SF

2 BED

2A240

201 SF

2 BED

2A241

121 SF

BATH

2A242

45 SF

BATH

2A243

201 SF

2 BED

2A244

201 SF

2 BED

2A245

45 SF

BATH

2A246

201 SF

2 BED

2A247

201 SF

2 BED

2A249

158 SF

LOUNGE

2A250

45 SF

BATH

2A251

201 SF

2 BED

2A252

153 SF

1 BED

2A253

44 SF

BATH

2A254

157 SF

1 BED

2A255

66 SF

BATH

2A256

160 SF

1 BED

2A257

43 SF

BATH

2A219A

55 SF

BATH

2A219B

44 SF

BATH

2A212A

54 SF

BATH

2A212B

141 SF

QUIET

ROOM

2A210

199 SF

STAIRS

S2-1

123 SF

STAIRS

S2-7

40 SF

COMM

2A248

LBT WOOD PANELING

FLOOR TILE

NOT IN

SCOPE

PHASE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management on e e igh th inc h = on e f oo t

B

A

C

D

E

F thr ee in ch es on e f oo t

6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6" 6" thr ee qu art ers in ch on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r i nc h = on e f oo t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

11/20/2023

2:36:10 PMS:

\E ng in ee rin g\

D es ig n\

H ea lth ca re E ng in ee r -

A O

\T

EM

PL

E\

D O

M A

B w in g re no va tio n\

A W

IN

G

'.r vt

A WING FLOORING PLAN

LEVEL 2

REVITALIZE DOM

HALLS AND WALLS

TB AO

A-104

1/8" = 1'-0"1 LEVEL 2 FLOORING

674-23-250

TEMPLE, TX

1/4" = 1'-0" Legend 1

NOTES

R-1: ELEC & MECH ROOMS SHALL HAVE TILE

FLOORING.

R-1

R-1

File details come from the government source that posted it. Updated .