This is a Question and Answer Sheet documenting clarifications from Session Two of a federal contracting process for fire alarm and suppression maintenance services.

The document addresses ten key areas of contractor responsibility and pricing structure. Labor for scheduled maintenance and unscheduled services remains under CLIN 0001, while CLIN 0002 covers all unscheduled services and after-hours callbacks. CLIN 0003 covers parts and materials only, with associated labor charged separately to CLIN 0001 or CLIN 0002. The maintenance contractor performs preventive maintenance, repairs deficiencies, and tests repairs, but a separate VA inspection contractor remains responsible for final annual certification. The prime contractor must independently demonstrate at least five years of fire alarm and fire suppression maintenance and repair experience within the last eight years; subcontractor or key personnel experience does not satisfy this requirement. On-site staffing consists of 32 hours per week with one NICET Level II or III fire alarm technician plus one Program Manager, with the Program Manager required to be on-site during scheduled hours or available 24/7 with a 2-hour on-site response for callbacks. The contract includes preventive maintenance, repairs, post-repair testing, and monthly fire alarm monitoring, with replacement parts for pre-existing deficiencies funded from a $50,000 parts rider. NICET Level II certification is acceptable for all fire alarm work, and both the prime contractor and any subcontractor must provide manufacturer authorization letters from Notifier to demonstrate capability to perform maintenance on the Notifier system.

View the file

Other files

File Type Posted
Relevant Experience Form.pdf PDF
36C25627Q0041 0003.pdf PDF
36C25627Q0041 0003_1.docx DOCX document
36C25627Q0041 0002.pdf PDF
36C25627Q0041 0002_1.docx DOCX document
Site Vist Information.docx DOCX document
Question and Answer Sheet - October 30th.docx DOCX document
36C25627Q0041 0001_1.docx DOCX document
36C25627Q0041 0001.pdf PDF
Preliminary Question and Answer Sheet.docx DOCX document
Relevant Experience Form.pdf PDF
Wage Determination.pdf PDF
Performance Work Statement Final.pdf PDF
36C25627Q0041 Final.docx DOCX document
36C25627Q0041_1.docx DOCX document
852.219-75 VA NOTICE OF LIMIT ON SUBCONTRACTING.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer Sheet (Session Two)

1. If an unscheduled trouble occurs while our scheduled technician is already onsite, please confirm whether the labor remains under CLIN 0001 or transfers to CLIN 0002. Also confirm whether CLIN 0002 applies to all unscheduled services or only after-hours callbacks. The labor remains under CLIN 0001 and CLIN 0002 applies to all unscheduled service and after-hours callbacks.

2. Please clarify the division of responsibility between this maintenance contract and the VA’s separate inspection contract. PBFS understands that we will perform preventive maintenance, repair deficiencies, and test our repairs and replacements, but we will not perform or certify the complete annual inspection. Please confirm that the separate inspection contractor remains responsible for the final annual certification and green tag. Yes, the Inspection contract is responsible for inspection and testing but if a deficiency is found and it is red tagged the maintenance contract will test what they have repaired or replaced and green tag.

3. Please confirm that CLIN 0003 covers parts and materials only. Labor for troubleshooting, removal, installation, programming, testing, and system restoration should be charged to CLIN 0001, CLIN 0002, or separately authorized and should not be included in the material cost. CLIN 0003 is parts and materials only. Labor for troubleshooting, removal, installation, programming, testing, and system restoration should be charged to CLIN 0001, CLIN 0002, or separately authorized and should not be included in the material cost

4. Relevant Experience (Volume 2): The solicitation requires at least five years of fire alarm and fire suppression maintenance and repair experience within the last eight years "as a prime contractor." May an offeror meet this requirement with documented experience from its proposed subcontractor who will perform the technical work, and/or from its key personnel? If so, should those entries be submitted on the Relevant Experience Form? No, the prime contractor must have at least five years of fire alarm and fire suppression maintenance and repair experience within the last eight years.

5. On-Site Hours: CLIN 0001 states 40 hours per week of on-site scheduled service. The October 30 Q&A states 32 hours per week with one NICET Level II or III fire alarm technician plus one Program Manager. Please confirm which requirement offerors should price. This one: 32 hours per week with one NICET Level II or III fire alarm technician plus one Program Manager

6. Program Manager: Must the Program Manager be physically on site during the scheduled weekly hours, or be available 24/7 with a 2-hour on-site response for callbacks and escorting? May the Program Manager be located in the New Orleans area rather than on site full-time? The Program Manager must be onsite for scheduled weekly hours, or be available 24/7 with a 2-hour on-site response for callbacks and escorting

7. Testing Scope: The October 30 Q&A states that VA has a separate testing contractor, but also that this contract includes all ~6,749 fire alarm and suppression devices. Please confirm whether offerors should price the annual NFPA 72 / NFPA 25 inspection and testing of all devices, or only preventive maintenance, repairs, and post-repair testing. This contract is for preventive maintenance, repairs, and post-repair testing.

8. Monitoring: The PWS states the contractor shall provide monthly fire alarm monitoring, while the Q&A states monitoring is provided off-site by Johnson Controls. Should offerors include monitoring in CLIN 0001, or will VA keep its current Johnson Controls monitoring? Yes, the contract calls for the contractor to provide monthly monitoring. Please include in CLIN 0001

9. Pre-Existing Deficiencies: The Q&A states that correction of pre-existing deficiencies is included. Will replacement parts for pre-existing deficiencies be funded from the $50,000 parts rider (CLIN 0003), with labor included in CLIN 0001? YES

10. Technician Qualifications: PWS Sections 1.7, 3.7.1, and 8.1 require NICET Level III and a control-unit manufacturer authorization letter, while the October 30 Q&A permits NICET Level II or III. Please confirm that NICET Level II is acceptable for all fire alarm work, and thaft the manufacturer (Notifier) authorization letter may be provided by the subcontractor performing the work. NICET Level II is acceptable for all fire alarm work, and the manufacturer (Notifier) authorization letter needs to come from the Prime and the sub-contractor. The government needs to know that both Prime and Sub can perform maintenance on the NOTIFIER SYSTEM.