Amendment 0002 Mobile Endoscope Reprocessing Unit.pdf
PDF 606 KB Posted
- Attached to
- AMENDMENT 0002 36C25626R0008 Renovate Sterile Processing Services (SPS)- Solicitation Federal contract opportunity
- Solicitation number
- 36C25626R0008
About this file
This document is a Facility Requirements specification for STERIS's Mobile Endoscope Reprocessing Unit deployment.
The facility must provide a 75' L x 30' W x 15' H landing and service clearance area for the Mobile Endoscope Reprocessing Unit and a 51' L x 20' W x 15' H area for the Support Unit, located within 120' for air line connection. The facility is responsible for permitting, compliance with local regulations, protecting all external lines, and constructing a connecting corridor or structure for instrument transport—which can only be built after the mobile unit arrives on site to avoid substantial costs and delays. The facility must supply up to five 5' x 10' x 1" or six 4' x 8' x 1" steel road plates based on site conditions and provide anchor hardware to secure the units using supplied straps at tie down rings rated for 9,200 lb capacity.
Electrical service requires 480 VAC, 3-phase, 60 Hz power with disconnects within 30' of the unit front. The Mobile Endoscope Reprocessing Unit draws 350 AMP MOP (262 AMP FLA) through two 40' shoreline cables with Meltric DR250 connectors; the Support Unit draws 100 AMP MOP (52 AMP FLA) through one 40' shoreline cable with Meltric DR100 connectors. Facility-provided utilities include cold water (1½" FNPT connection, 50-80 psi, 40-70°F, 700 GPH average), wastewater (4" connection, 700 GPH average, less than 140°F discharge), HVAC condensate drain, and wet-system fire sprinkler supply (2" Victaulic coupling, 143 GPM at 46 psi minimum residual pressure). Water quality specifications are detailed for temperature, pressure, hardness, dissolved solids, alkalinity, pH, conductivity, and trace metals. In climates with consistent heat index exceeding 100°F, an ancillary cooling package requiring an additional 30 AMP breaker is mandatory. Fire alarm systems must be conventional analog with 2 zones, supervisory tamper switches, and water flow switches, exporting conditions to three dry contacts. Telephone and data connections require the facility to supply a managed switch if needed; STERIS provides the patch panel but not IT peripherals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 Site Planning and Utility Connection Guide.pdf | ||
| Amendment 0002 SPEC section 27 51 16.pdf | ||
| Ammendment 0002 SPS Site Visit Attendance Sheet.pdf | ||
| Amendment 0002 36C25626R0008 0002 .pdf | ||
| Amendment 0002 36C25626R0008 REVISED PRICE SHEET.pdf | ||
| AMENDMENT 0001 36C25626R0008.pdf | ||
| SF24 Bid Bond.pdf | ||
| 564-19-403 Statement of Work RO_DI System.pdf | ||
| 564-19-403 Reverse Osmosis SD226719.pdf | ||
| 564-19-403 Project Specifications Volume 2.pdf | ||
| 564-19-403 Project Specifications Volume 1.pdf | ||
| 564-19-403 Project Drawings Volume 1.pdf | ||
| DOL Wage Determinations AR20260035 dated 01-02-2026.pdf | ||
| 564-19-403 Statement of Work Renovate SPS.pdf | ||
| 564-19-403 Specifications RO_DI.pdf | ||
| 564-19-403 Project Specifications Volume 3.pdf | ||
| 564-19-403 Project Drawings Volume 2.pdf | ||
| 36C25626R0008_Solicitation.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General
• Permitting and compliance with applicable local and facility-specific regulations is the responsibility of the facility.
• All external lines (incl. water, drain, and air) must be facility protected.
Service Clearance
• The Mobile Endoscope Reprocessing Unit requires 75’ L x 30’ W x 15’ H area for landing and service clearance.
• The Support Unit requires 51’ L x 20’ W x 15’ H area for landing and service clearance and must be located within 120’ of the mobile unit for air line connection.
Access
• Facility to provide a connecting corridor or structure for transport of instruments into and out of the Mobile Endo-scope Reprocessing Unit. IMPORTANT: This structure can only be built once the mobile unit arrives on site. Substantial costs and project delays will result if the structure is built prior to mobile unit arrival and placement.
• Entry and Exit doors are located on the driver side of the mobile unit and the Emergency Exit door is located at the rear of the passenger side expandable section.
Road Plates:
• Based on individual site conditions, facility to supply up to
(5) 5’ x 10’ x 1” or (6) 4’ x 8’ x 1” steel road plates.
Unit Anchoring / Tie Downs
• The Mobile Endoscope Reprocessing Unit has 2 tie down rings at each corner and 4 additional per side (16 total).
• Anchor points are rated at 9,200 lb capacity (6,500 lb horizontal/vertical capacity) and should be placed with the anchor strap forming a 45° angle to the ground.
• At minimum, corners must be secured - final tie down configuration is field specific. STERIS will provide straps needed to secure the mobile unit at each corner. Anchor hardware is to be provided by the facility.
• The Support Unit has 3 tie rings on each side to be used as needed.
Mobile Endoscope Reprocessing Unit: Facility Requirements
Power Requirements
GENERAL
• Electrical Service: 480 VAC, 3-phase, 60 Hz
• Configuration: 4 wire (L1, L2, L3, G) Neutral NOT required.
• Disconnects must be within 30’ of the front of unit.
• Earth grounds to be installed by facility per NEC Article 250 -
20’ ground cables with clamps provided. A single point ground stud is located adjacent to power connections on the front of each unit. (2) Ground rods to be supplied by facility.
MOBILE ENDOSCOPE REPROCESSING UNIT
• Total Load: 350 AMP MOP (262 AMP FLA) with parallel feed through (2) provided 40’ shoreline cables having Meltric DR250 connectors. Facility to provide (2) mating connectors or purchase from STERIS.
SUPPORT UNIT
• Total Load: 100 AMP MOP (52 AMP FLA) through (1) provided
40’ shoreline cable with Meltric DR100 connectors. Facility to provide mating connector or purchase from STERIS.
Cold Water Supply Requirements
• 1-½” FNPT connection inside driver side belly box.
• Dynamic pressure 50-80 psi at mobile unit input.
• Facility to provide pressure reducer / backflow prevention if required.
• Temperature: 40° F Min, 70° F Max
• 700 GPH average (30 GPM peak)
• Water Quality: See Chart below for specific requirements.
IMPORTANT: Failure to meet STERIS water quality requirements may result in delayed Customer use or additional charges for equipment maintenance.
Wastewater
• 4” wastewater connection inside driver side belly box.
• 700 GPH average (60 GPM peak flow).
• Wastewater discharge temperature will be less than 140° F.
HVAC Condensate Drain
• Nominal ¾” pipe(s) at front and rear of Mobile Endoscope
Reprocessing Unit and front of Support Unit.
Fire Sprinkler – Wet System ONLY
• Sprinkler supply: 2” Victaulic coupling (rear of mobile unit).
• Supply required: 143 GPM at mobile unit.
• Residual Pressure: 46 psi minimum at mobile unit.
Fire Alarm Connection
• Conventional analog fire alarm system with local audible-visual, horn-strobe alarm devices for occupant warning.
• Unit alarm system configured with 2 zones with detection and pull stations.
o 1 zone with supervisory tamper switch on sprinkler water control valve.
o 1 zone for water flow switch on sprinkler system.
• System exports trouble, supervisory and alarm conditions to three dry contacts at the rear of the mobile unit.
Telephone and Data Connections
• STERIS will provide patch panel for IT connections.
• Customer to supply managed switch if required.
• Customer may extend their IT network to the mobile unit.
• STERIS does not provide IT peripherals such as computers, phone, or printers.
Ancillary Cooling Package
• In climates where the heat index consistently exceeds
100° F, the cooling package is a requirement.
• Power Requirements for cooling package (normal power) o 480 VAC, 3-phase, 60 Hz, (1) 30 AMP breaker
• STERIS will supply HVAC precooling unit including all ancillary components.
CONFIDENTIAL – Do not duplicate or disclose without the expressed written consent of STERIS Corporation. 20250210 - Rev E