Attachment 9 Oct - Dec 2025 - Construction.pdf
PDF 330 KB Posted
- Attached to
- S205--Waste and Refuse Collection services
- Solicitation number
- 36C25626Q0325
About this file
This is an appendix containing a Construction & Demolition (C&D) waste management data table for a federal facility contract. The document presents quarterly and monthly waste generation metrics across three building locations: BLDG 9, BLDG 8, and BLDG 52/9, each generating 30 cubic yards per removal cycle on an on-call basis.
The table tracks actual waste volumes measured in pounds (lbs) and tons, with monthly Municipal Solid Waste (MSW) averaging 288,368 lbs (144.18 tons) and quarterly MSW totaling 1,059,287.40 lbs. Monthly Construction & Demolition (C&D) waste averages 17,380 lbs (8.69 tons), with quarterly C&D totaling 96,990.00 lbs (48.5 tons). The data indicates waste removal is provided on an as-needed basis with actual volumes documented per removal event. A notation specifies that 2 CY GFE portables remain on-site for servicing until informed otherwise by the contracting officer. The metrics establish baseline waste generation rates for cost estimation and service level planning purposes under the contract.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 9
File details come from the government source that posted it. Updated .