Attachment 7 Jul - Sep 2025 - Construction.pdf
PDF 161 KB Posted
- Attached to
- S205--Waste and Refuse Collection services
- Solicitation number
- 36C25626Q0325
About this file
This is a pricing table for Construction & Demolition (C&D) services covering three buildings. The table presents labor-hour estimates and costs across multiple line items for BLDG 9, BLDG 88, and BLDG 52/8, each with a 30 cubic yard (CY) removal/disposal requirement designated as "ON CALL" services. The actual labor hours and associated costs are provided for each building, with totals calculated for comparative analysis. The combined total C&D labor burden sums to 31.820 hours at a base cost of 28.140, with an overhead allocation of 21.340. The pricing structure appears designed to accommodate flexible scheduling with on-call service provisions for debris removal across the three separate building locations.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7
File details come from the government source that posted it. Updated .