Attachment 2 Jan - Mar 2025 Construction.pdf
PDF 188 KB Posted
- Attached to
- S205--Waste and Refuse Collection services
- Solicitation number
- 36C25626Q0325
About this file
This is an appendix containing a Construction & Demolition (C&D) pricing table for four building lots. The table displays cost estimates across multiple buildings with the following structure: BLDG 9, BLDG 88, BLDG 5/2B, and BLDG T162, each designated for 30 calendar year removal on an on-call basis with actual cost terms. The table provides detailed line-item quantities and pricing columns, with total C&D waste quantities of 23,000 lbs distributed across the four buildings. The rightmost columns show total estimated costs of 21,180 (middle column) and 28,140 (final column), representing different cost scenarios or phases. Individual building costs range from approximately 1,280 to 13,700 depending on the column reference, indicating variable pricing structures or contingency estimates for demolition activities.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
File details come from the government source that posted it. Updated .