Updated Sewer Site Plan.pdf
PDF 53 KB Posted
- Attached to
- J045--Sewer and Grease Trap Cleaning Service
- Solicitation number
- 36C25626Q0216
About this file
This is a floor plan or architectural diagram depicting the layout of a facility with multiple rooms and spaces. The image shows a building footprint with gray outlined walls and interior partitions, with several labeled areas including loading docks, a loading room, a back flow preventer, and a parking area (PARKING). A red line traces through the facility, appearing to indicate a specific route, workflow pathway, or circulation path with numbered points marked along it (such as (A), (B), (C), (D), (E), (F), (G), (H), and numbered sequences like (13), (2), (3), (14, 15)). The red line pathway begins at the upper left, moves through various sections of the building, and extends toward the lower right portion of the diagram. Additional technical notations and measurements are visible throughout the floor plan. Without accompanying documentation such as a legend, specifications, or narrative description, the specific purpose of the red pathway (whether it represents emergency egress, material flow, security routes, or another operational sequence) cannot be definitively determined from the image alone.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626Q0216 0004.docx | DOCX document | |
| 36C25626Q0216 0002.docx | DOCX document | |
| 36C25626Q0216 0001_1.docx | DOCX document | |
| 36C25626Q0216v3.pdf | ||
| 36C25626Q0216_1.docx | DOCX document | |
| WD 2015-5153 Rev 29.pdf | ||
| Sewer and Grease Trap Site Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .