This document is a comprehensive set of architectural and engineering drawings for the Building 65 Structural Repairs project at the Eugene J. Towbin Veterans Affairs Medical Center in North Little Rock, Arkansas. The drawings, dated January 31, 2025, cover multiple disciplines including structural, architectural, plumbing, mechanical, and electrical work for a complete structural rehabilitation of Building 65.

The project involves extensive structural repairs including foundation and basement framing repairs, demolition of existing structural elements, installation of new floor support systems, and comprehensive upgrades to mechanical, electrical, and plumbing infrastructure. Key components include removing and replacing concrete slabs, installing new steel framing, repairing columns and walls, implementing new sump pump systems, upgrading electrical panels and conduits, and installing new ventilation systems in the crawl space. The project is designed to address structural deterioration and improve the building's overall infrastructure, with careful consideration for infection control, safety protocols, and minimal disruption to the existing medical facility operations.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

PROJECT SITE MAP

/2

/2

:0

:1

P

M C

U s e rs

\J lo n g h u rs t\ D o c u m e n ts

\A

-0

-Q

-V A

N L it tl e R o c k -B ld g

S tr u c R p r_

R jlo n g h u rs tS

M A

W

.r v t

G-001

COVER

1 2JNL

BUILDING 65 STRUCTURAL

REPAIRS

EUGENE J. TOWBIN VAMC

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114 JANUARY 31, 2025

100% BID DOCUMENTS

598-23-10623-080

BUILDING 65 STRUCTURAL REPAIRS

EUGENE J. TOWBIN VAMC

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

VA PROJECT #: 598-23-106

CLA

DRAWING LIST

GENERAL

G-001 COVER 1 2

G-005 ICRA INFORMATION AND DETAILS 2 2

STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS 1 13

S-002 QA NOTES AND TABLES 2 13

SD-101 FOUNDATION DEMOLITION PLAN 3 13

SD-102 BASEMENT FRAMING DEMOLITION PLAN 4 13

S-101 FOUNDATION REPAIR PLAN 5 13

S-102 BASEMENT FRAMING REPAIR PLAN 6 13

S-103 BASEMENT FRAMING PLAN 7 13

S-500 STRUCTURAL DEMOLITION DETAILS 8 13

S-501 STRUCTURAL DETAILS 9 13

S-502 STRUCTURAL DETAILS 10 13

S-551 SCHEMATIC SHORING DETAILS 11 13

S-552 STRUCTURAL REPAIR DETAILS 12 13

S-553 STRUCTURAL REPAIR DETAILS 13 13

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 4

AD101 GROUND FLOOR DEMOLITION PLAN 2 4

A-101 GROUND FLOOR PLAN 3 4

A-102 CRAWL SPACE FLOOR PLAN 4 4

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 3

PW100 CRAWL SPACE PLUMBING PLAN 2 3

P-601 PLUMBING SCHEDULES 3 3

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 3

MH101 CRAWL SPACE HVAC PLAN 2 3

M-601 MECHANICAL SCHEDULES 3 3

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4

EP101 CRAWL SPACE POWER PLAN 2 4

EP102 BASEMENT ELECTRICAL PLAN 3 4

E-501 ELECTRICAL DETAILS, SINGLE LINE, AND SCHEDULES 4 4

PROJECT

LOCATION

NORTH

Docusign Envelope ID: C07C7FE3-6C72-429D-AFAC-616D85A6678B

1/30/2025

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

5/8" GYPSUM BOARD - BOTH

SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

5"

3 5/8" METAL STUDS @ 16"

O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

B

SEALANT, BOTH SIDES

NON RATED

D

TEMPORARY PREFABRICATED

ICRA WALL SYSTEM. BASIS OF

DESIGN: STARC WALL SYSTEM OR

EDGEGUARD SYSTEM OR EQUAL.

EXISTING CEILING

SYSTEM TO HAVE

INTEGRATED CEILING

SEAL.

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY MATS

(CHANGED END OF

SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT

IN OPERATION DURING

PROJECT - COORDINATE

W/ COR

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL STATION

WITH AUDIO /

VISUAL

EXISTING WALL

BARRIER

NOTE:

A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY

LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS

FOR DISTANCE PRIOR TO STARTING WORK.

EXHAUST LOCATION

- SEE NOTE A

G-005

_____3

G-005

G-003

FLEX DUCT

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

BUILDING 65 STRUCTURAL REPAIRS

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS

PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL

ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON

THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK

AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

2. PROVIDE STICKY MATS AT THE ICRA BARRIER ENTRANCE AND CHANGE DAILY OR MORE

OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN

SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE EXTERIORS DOORS AS PRIMARY CONSTRUCTION ACCESS.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS

PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING

SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER

THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE

CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT

OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF

ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE

USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED

NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN

NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF

THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-

CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.

5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY

ADJACENT EXCAVATION DEBRIS.

6. ALL FURNISHINGS AND EQUIPMENT TO REMAIN IN THE IMPACTED ROOMS SHALL BE COVERED

AND PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: VERIFY WITH THE COR WHETHER CONSTRUCTION AREA USES

FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS

COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO

DIRTY AREAS.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE

WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF

ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE

TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-

CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST

TO PREVENT CONTAMINATION OF THE DUCTS.

3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE

HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.

4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL

VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY

AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL

AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT

WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE

USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,

TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE

MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL

CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE

CLEANING.

ICRA NOTES

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IV or control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

A

.F .F

A P

P R

O X

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

HEPA NEGATIVE

AIR UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I

.F

E X

IS

T

IN

G

W A

L L

FLOOR SLAB ABOVE

CEILING

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

E

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING

CEILING

FLEX DUCT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:0

:1

P

M C

U s e rs

\J lo n g h u rs t\ D o c u m e n ts

\A

-0

-Q

-V A

N L it tl e R o c k -B ld g

S tr u c R p r_

R jlo n g h u rs tS

M A

W

.r v t

G-005

ICRA INFORMATION AND DETAILS

2 2JNL

BUILDING 65 STRUCTURAL

REPAIRS

EUGENE J. TOWBIN VAMC

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114 JANUARY 31, 2025

100% BID DOCUMENTS

598-23-10623-080

CLA

Scale: No Scale

ICRA BARRIER WALL TYPE

Scale: No Scale

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: No Scale

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: No Scale

ICRA ROOM ELEVATION

Scale: No Scale

CROSS SECTION "A"

Scale: No Scale

ICRA MOBILE CONTAINMENT CART

Docusign Envelope ID: C07C7FE3-6C72-429D-AFAC-616D85A6678B

1/30/2025

WORK LIST

DESCRIPTION WORK

ITEM

REFERENCE

DETAIL

ESTIMATED

QUANTITY

SHORE EXISTING CONCRETE COLUMNS AND PILASTERS PRIOR TO REPAIRS AT ALL LEVELS. REPLACE OR REPAIR ELEMENTS DAMAGED OR REMOVED IN ORDER TO INSTALL SHORING SUCH AS EXTERIOR WALLS AND INTERIOR FINISHES. INSTALL NEEDLE SHORING AT PERIMETER WALLS AS REQUIRED TO SUPPORT TRIBUTARY BEAMS.

14 LOCS1A

SHORE EXISTING CONCRETE COLUMNS PRIOR TO REPAIRS AT THE EAST ENTRACE STAIR FRAMING. 2 LOCS1B

REPAIR DELAMINATED OR SPALLED OVERHEAD CONCRETE AND CORRODED REINFORCING STEEL ON UNDERSIDE OF CONCRETE JOISTS. FOR PRICING PURPOSES, ASSUME EACH REPAIR LOCATION IS 3 FEET LONG UNLESS NOTED OTHERWISE ON PLAN. ASSUME AVERAGE DEPTH OF CONCRETE REMOVAL TO BE 3 INCHES AND FULL WIDTH OF THE

EXISTING JOISTS.

250 LF2

REPAIR DELAMINATED OR SPALLED OVERHEAD CONCRETE AND CORRODED REINFORCING STEEL ON UNDERSIDE OF CONCRETE BEAMS. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF REPAIR TO BE 4 INCHES.

70 SF3

REPAIR DELAMINATED OR SPALLED VERTICAL CONCRETE AND CORRODED REINFORCING STEEL ON CONCRETE COLUMNS AND PILASTERS. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF REPAIR TO BE 4 INCHES.

275 SF4

REPAIR DELAMINATED OR SPALLED VERTICAL CONCRETE AND CORRODED REINFORCING STEEL ON CONCRETE

WALLS. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF REPAIR TO BE 4 INCHES.

650 SF5

REPAIR DELAMINATED OR SPALLED OVERHEAD PARTIAL DEPTH CONCRETE AND CORRODED REINFORCING STEEL ON UNDERSIDE OF CONCRETE PAN JOIST SLAB. ASSUME THAT EXISTING WELDED WIRE MESH WILL REQUIRE REPLACEMENT WITH W4 4x4 WELDED WIRE MESH. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF

REPAIR TO BE 2 INCHES.

50 SF6

INSTALL CONCRETE ENCASEMENT AT COLUMNS WITH SEVERELY DETERIORATED REINFORCING STEEL. 8 LOCS7

INSTALL CONCRETE ENCASEMENT AT PILASTERS WITH SEVERELY DETERIORATED REINFORCING STEEL. 13 LOCS8

ENLARGE EXISTING JOISTS DAMAGED BY PREVIOUS CONCRETE CORING OR CHIPPING AT ENDS OF JOISTS. 14 LOCS9

ENLARGE EXISTING JOISTS DAMAGED BY PREVIOUS CONCRETE CORING OR CHIPPING AWAY FROM ENDS OF

JOISTS.

6 LOCS10

INFILL EXISTING SLAB OPENING. 1 LOC11

LOCATE AND SEAL EXISTING ABANDONED PIPE PENETRATIONS WITH CONCRETE REPAIR MATERIAL OR

HYDROPHOBIC GROUT PER DETAILS.

50 LOCS12

INSTALL SUPPLEMENTAL STEEL POST AT DETERIORATED STAIR COLUMNS. 2 LOCS8.5 /4 S-553

/3 S-551

/1 S-551

/2 S-552

/3 S-552

/5 S-552

/6 S-552

/1 S-552

/1 S-553

/2 S-553

/4 S-552

/9 S-552

PROVIDE AN ALLOWANCE FOR REINFORCING STEEL THAT WILL BE INSTALLED WHERE EXISTING REINFORCING

STEEL HAS LOST MORE THAN 10% OF ITS CROSS SECTIONAL AREA.

5,000 LBS15

PROVIDE AN ALLOWANCE TO REPAIR PARTIAL DEPTH, DETERIORATED OVERHEAD CONCRETE SLAB SOFFIT

UNCOVERED DURING THE REPAIR.

1,000 SF16

PROVIDE AN ALLOWANCE TO REMOVE AND REPLACE EXISTING INSULATION ADJACENT TO REPAIR AS NEEDED TO

PERFORM WORK.

LUMP SUM17

AT CONTRACTOR'S OPTION, PROVIDE AN ALLOWANCE TO INSTALL BAR COUPLERS IN LIEU OF REMOVAL OF SOUND CONCRETE TO INSTALL REINFORCING BARS SPLICED PER REBAR SPLICE LENGTH TABLE. BUILD OUT CONCRETE

REPAIR TO PROVIDE MINIMUM CONCRETE COVER PER CONCRETE COVER TABLE.

1,000 LOCS18

WORK LIST NOTES:

1. THE VALUES IN THE "ESTIMATED QUANTITY" COLUMN OF THE WORK LISTS MAY BE GREATER THAN OR LESS THAN THE AMOUNTS SHOWN ON PLAN. USE

THE QUANTITIES LISTED IN THE WORK LIST FOR BID PURPOSES AND PROVIDE UNIT COSTS. CONTRACTOR SHALL FIELD VERIFY QUANTITIES AND LOCATIONS PRIOR TO WORK. NOT ALL LOCATIONS OF WORK ITEMS MAY BE SHOWN ON PLANS. ADDITIONAL LOCATIONS MAY BE DISCOVERED DURING

REPAIRS.

2. BID PRICING SHALL REFLECT THE PRODUCTS SPECIFIED IN THIS DOCUMENT. SUBSTITUTIONS AND ASSOCIATED PRICING MAY BE SUBMITTED IN ADDITION TO THE UNIT COST PRICES FOR THE SPECIFIED MATERIALS. THE ENGINEER SHALL REVIEW AND DETERMINE IF THE ALTERNATE PRODUCT IS CONSIDERED

"EQUAL" AND IF IT WILL BE ALLOWED AS A SUBSTITUTION.

3. CONTRACTOR SHALL KEEP A CURRENT SCHEDULE OF VALUES FOR ALL WORK ITEMS BEING PERFORMED WITH QUANTITIES COMPLETED TO DATE. ANY ANTICIPATED OVERAGES OR SHORTAGES TO THE BID QUANTITIES LISTED ABOVE SHOULD BE PRESENTED AS WELL.

4. REPAIRS AREAS GREATER THAN 2 SQUARE FEET IN SIZE SHALL USE FORM AND POUR OR FORM AND PUMP PACKAGED REPAIR MATERIALS.

INSTALL GALVANIC ANODES AT PERIMETER OF CONCRETE REPAIR AREAS. FOR PRICING PURPOSES, ASSUME VECTOR CORROSION SERVICES GALVASHIELD XP4 AS BASIS OF DESIGN PRODUCT SPACED @18" OC.

1,600 LOCS13

INSTALL ANTI-CARBONATION COATING AT BOTTOM AND SIDES OF ALL EXISTING BEAMS OF THE CRAWL SPACE. FOR

PRICING PURPOSES, ASSUME SIKAGARD 670W BY SIKA AS BASIS OF DESIGN PRODUCT.

5,300 SF14

/8 S-552

/7 S-552

/3 S-553

/1 S-552

/3 S-553

/10 S-552

/6 S-553

/6 S-553

SHORE FLOOR STRUCTURE UNDER EXISTING ELECTRICAL ROOM. 1 LOC1C /6 S-551

PROVIDE AN ALLOWANCE TO INSTALL EPOXY DOWELS WHERE SUPPLEMENTAL STEEL CANNOT BE DEVELOPED.

ASSUME DOWELS ARE #5 BARS, 25" LONG WITH 8" EMBEDMENT INTO EXISTING CONCRETE USING HILTI HIT RE 500V3.

500 LOCS19 -

ALLOWANCES

# NUMBER

& AND

@ AT

A/E ARCHITECT / ENGINEER

AB ANCHOR BOLT

ACI AMERICAN CONCRETE INSTITUTE

ADDL ADDITIONAL

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AGG AGGREGATE

AH, AHU AIR HANDLING UNIT

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

APA AMERICAN PLYWOOD ASSOCIATION

APPROX APPROXIMATELY

ARCH ARCHITECTURAL

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

AT/FP ANTI-TERRORISM/ FORCE

PROTECTION

AWS AMERICAN WELDING SOCIETY

BET BETWEEN

BLDG BUILDING

BLW BELOW

BM BEAM

BN BOUNDARY NAIL

BOF BOTTOM OF FOOTING

BOS BOTTOM OF STEEL

BOT BOTTOM

BRG BEARING

BTWN BETWEEN

C CHANNEL

CD CONSTRUCTION DOCUMENTS

CE CARBON EQUIVALENT

CENT CENTERED

CFMF COLD-FORMED METAL FRAMING

CFS COLD-FORMED STEEL

CIP CAST IN PLACE

CJ CONTROL JOINT/CEILING JOIST

CJP COMPLETE JOINT PENETRATION

CL CENTERLINE

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

CONC CONCRETE

COND CONDITION

CONN CONNECT, CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COR CORNER, CONTRACTING OFFICER'S

REPRESENTATIVE

CTR CENTER

CU FT CUBIC FEET

CY CUBIC YARD

D DEEP, DEPTH

DAS DEFORMED ANCHOR STUD

DBL DOUBLE

DEG DEGREE

DEMO DEMOLISH, DEMOLITION

DEP DEPRESSED

DIA, Ø DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIR DIRECTION

DL DEAD LOAD

DO DITTO

DT DRAG TRUSS

DTL DETAIL

DWG(S) DRAWINGS

DWL DOWEL

EA EACH

EF EACH FACE

ELEC ELECTRICAL

ELEV ELEVATION

EN EDGE NAIL

EOR ENGINEER OF RECORD

EQ, = EQUAL, EQUALS

EQN EQUATION

EQUIP EQUIPMENT

ES EACH SIDE

EW EACH WAY

EXIST, (E) EXISTING

EXP EXPANSION

EXT EXTERNAL, EXTERIOR

FF FAR FACE, FINISH FACE

FFE FINISH FLOOR ELEVATION

FG FINISH GRADE

FJ FLOOR JOIST

FN FIELD NAIL

FND FOUNDATION

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOS FACE OF STUD

FRMG FRAMING

FS FAR SIDE

FT, ' FOOT

FTG FOOTING

Fy YIELD STRESS

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GLB GLUED LAMINATED BEAM

GT GIRDER TRUSS

GUSS GUSSET

GYP BD GYPSUM BOARD

HAS HEADED ANCHOR STUD

HD HOLD DOWN

HDR HEADER

HGR HANGER

HK HOOK

HORIZ HORIZONTAL

HP HIGH POINT

HSS HOLLOW STRUCTURAL SECTION

HT HEIGHT

HVAC HEATNG/ VENTILATING/ AIR

CONDITIONING

I MOMENT OF INERTIA

IBC INTERNATIONAL BUILDING CODE

ICF INSULATED CONCRETE FORM

ID INSIDE DIAMETER

CONCRETE PLACEMENT CONDITION: CONCRETE COVER

CAST AGAINST AND PERMANENTLY EXPOSED

TO EARTH

3"

CONCRETE EXPOSED TO EARTH OR WEATHER,

#6 THROUGH #18 BAR

2"

CONCRETE EXPOSED TO EARTH OR WEATHER,

#5 BAR AND SMALLER

1 1/2"

CONCRETE NOT EXPOSED: SLABS, WALLS, AND

JOISTS, #11 BAR AND SMALLER

1"

CONCRETE MIX TABLE

USE

f'c

(KSI)

CONCRETE

WEIGHT

MAX.

W/C

RATIO

MAX.

AGG.

(IN)

AIR

CONTENT

EXPOSURE

CLASS

OTHER

NOTES

SLABS ON DECK OR INTERIOR

TOPPING SLABS

3.5 NWT 0.5 3/4 - F0, S0, W0, C0 -

SHOTCRETE 5 NWT 0.4 1/2 NOTE 6 F3, S0, W1, C2 -

FLOW FILL 0.1 - - - - - FF

CONCRETE REPAIR - - - - - - SEE

SPEC

030130

STEEL SHAPES ASTM REQUIREMENTS

WIDE FLANGE SHAPES A992

CHANNELS, ANGLES, PLATES, AND BARS A36, UON

HSS ASTM A500 GRADE C

HAS A108

DAS A1064

BOLTS F3125-TYPE A325

ANCHOR RODS F1554 GR 55

MIX TABLE NOTES:

1. CEMENT TYPE TO BE ASTM TYPE C150 I/II OR ASTM C595 TYPE IL UNLESS OTHERWISE

NOTED.

2. CONTRACTOR TO PROVIDE SLUMP AS NEEDED FOR WORKABILITY AND CONSISTENCY

TO BE PLACED INTO FORMS AND AROUND REINFORCEMENT WITHOUT SEGREGATION

OR EXCESS BLEEDING. USE ADMIXTURES AS REQUIRED TO OBTAIN DESIRED RESULTS.

3. NORMAL WEIGHT (NWT) CONCRETE SHALL HAVE A DRY DENSITY OF 145 ± 5 PCF

4. AIR CONTENT SHALL BE ± 1 1/2% FROM REQUIRED VALUES. DO NOT PROVIDE AIR

ENTRAINING ADMIXTURES TO ANY INTERIOR SLABS UNLESS CONTRACTOR CAN

DEMONSTRATE TO ARCHITECT THAT SLABS WITH ENTRAINED AIR WILL HAVE

ACCEPTABLE FINISH.

5. EXPOSURE CLASS DEFINITION PER ACI301/318. CONTRACTOR TO PROVIDE MIXES THAT

MEET THESE REQUIREMENTS. FOR CORROSION PROTECTION OF REINFORCING (C0,

C1, C2) PROVIDE MAXIMUM CHLORIDE ION CONTENT IN CONCRETE (%/WT) OF C0 = 1.0,

C1 = 0.3, C2 = 0.15).

6. SHOTCRETE: MIX SHALL HAVE AIR ENTRAINING ADMIXTURE MEETING THE AIR

CONCRETE PERCENTAGES LISTED BELOW

A. WET MIX SHOTCRETE: F3 = 6%

B. DRY MIX SHOTCRETE: F3 = 4 1/2%

7. OTHER NOTES ADDITIONAL INFO:

FF = FLOW FILL SHALL BE PROPORTIONED TO PROVIDE INDICATED STRENGTH,

AND SHALL BE SELF-COMPACTING. MAXIMUM STRENGTH SHALL BE 150 PSI.

COMPLY WITH NRMCA "GUIDE SPECIFICIATION FOR CONTROLLED LOW

STRENGTH MATERIALS (CLSM)" AND ACI 229R.

POST-INSTALLED ANCHORS

TYPE USE ANCHOR

ADHESIVE ANCHOR:

CONCRETE: HILTI HIT-HY 200

MECHANICAL ANCHORS:

SCREW ANCHOR: HILTI KWIK HUS-EZ

EXPANSION ANCHOR: HILTI KWIK BOLT TZ2

STRUCTURAL ABBREVIATIONS

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Construction Management Civil Engineering Structural

8822 South Ridgeline Boulevard, Suite 310

Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com

Calibre Engineering, Inc.

Calib er

/2

/2

:0

:2

P

M A u to d e s k D o c s /L

R B

R

E P

A

IR

S /L

R B ld g

R e p a ir s

S T

R R

.r v t

S-001

GENERAL STRUCTURAL NOTES,

DESIGN LOADS & ABBREVIATIONS

1 13JTB

BUILDING 65 STRUCTURAL

REPAIRS

EUGENE J. TOWBIN VAMC

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114 JANUARY 31, 2025

100% BID DOCUMENTS

598-23-10623-080

ES

CODE AND DESIGN CRITERIA

1. BUILDING CODES:

a. LATEST EDITION OF U.S. DEPARTMENT OF VETERANS AFFAIRS DESIGN

GUIDES, STANDARDS AND MANUALS

b. INTERNATIONAL BUILDING CODE (IBC) - 2021

c. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), STEEL

CONSTRUCTION MANUAL - 15th EDITION

d. AISC, SEISMIC DESIGN MANUAL - 3rd EDITION

e. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7, MINIMUM DESIGN

LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER

STRUCTURES - 2022

f. AMERICAN CONCRETE INSTITUTE (ACI) 318, BUILDING CODE

REQUIREMENTS FOR STRUCTURAL CONCRETE - 2019

2. DESIGN CRITERIA

a. RISK CATEGORY: II

3. DESIGN LOADS

a. FLOOR

1. SUPERIMPOSED DEAD LOAD: 10 PSF

2. TYP LIVE LOAD: 100 PSF

4. SEISMIC DESIGN DATA

a. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE

b. SEISMIC IMPORTANCE FACTOR (Ie): 1

c. Ss: 0.540g

d. S1: 0.170g

e. SITE CLASS: B

f. Sds: 0.280g

g. Sd1: 0.110g

h. SEISMIC DESIGN CATEGORY: B

IN, " INCH

INCL INCLUDE

INFO INFORMATION

INS INSULATED, INSULATION

INT INTERIOR

JST JOIST

JT JOINT

K, KIPS THOUSAND POUNDS

KLF KIPS PER LINEAR FOOT

KSF KIPS PER SQUARE FOOT

L LENGTH, ANGLE

LB POUND

LF LINEAR FOOT

LG LONG, LIGHT GUAGE

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLR ROOF LIVE LOAD

LLV LONG LEG VERTICAL

LOC LOCATE, LOCATION

LONG LONGITUDINAL

LTE TENSION EMBEDMENT

LTS LAP TENSION SPLICE

LW LIGHT WEIGHT

MAS MASONRY

MAX MAXIMUM

MB MACHINE BOLT

MBR MEMBER

MECH MECHANICAL

MED MEDIUM

MEZZ MEZZANINE

MF MOMENT FRAME

MFG MANUFACTURING

MID MIDDLE

MIN MINIMUM

MISC MISCELLANEOUS

MLS MASONRY LAP SPLICE

MO MASONRY OPENING

MOD MODIFY, MODIFIED

MPH MILES PER HOUR

MRF MANUFACTURER

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NS NEAR SIDE

NTS NOT TO SCALE

NW NORMAL WEIGHT

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND, OVERHEAD

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

OWSJ OPEN WEB STEEL JOIST

P/C PIN CONNECTED

PAF POWDER ACTUATED FASTENER

PAR PARALLEL

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PERIM PERIMETER

PL PLATE

PLUMB PLUMBING

PLYWD PLYWOOD

PNL PANEL

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED, POINT,

PRETENSIONED

REINF REINFORCING, REINFORCED

REQ REQUIRED

RET RETURN, RETAINING

REV REVISION, REVISED

RF ROOF

RFT RAFTERS

RS ROUGH SAWN

RT ROOF TRUSS

S SECTION MODULUS

SC SLIP CRITICAL

SCHED SCHEDULE

SDC SEISMIC DESIGN CATEGORY

SDI STEEL DECK INSTITUTE

SECT SECTION

SEIS SEISMIC

SEOR STRUCTURAL ENGINEER OF RECORD

SEP SEPARATION

SF SQUARE FEET

SHT SHEET

SIM SIMILAR

SJI STEEL JOIST INSTITUTE

SL SNOW LOAD

SMS SHEET METAL SCREW

SPEC(S) SPECIFICATION(S)

SPRT SUPPORT

SQ SQUARE

SS STAINLESS STEEL

ST SNUG TIGHT

STD STANDARD

STIF/STIFF STIFFENER

STL STEEL

STRUCT STRUCTURAL, STRUCTURE

SUSP SUSPENDED

SYM SYMMETRICAL

T&B TOP AND BOTTOM

TGB TOP OF GRADE BEAM

THK THICK, THICKNESS

TL TOTAL LOAD

TN TOE NAIL

TOB TOP OF BEAM

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOS TOP OF STEEL

TOW TOP OF WALL

TYP TYPICAL

UFC UNITED FACILITES CRITERIA

UON UNLESS OTHERWISE NOTED

V SHEAR

VB VAPOR BARRIER

VERT VERTICAL

VIF VIF

W WIDTH, WEST, WIDE FLANGE

W/ WITH

W/C WATER CONTENT

W/O WITHOUT

WL WIND LOAD

WPT WORKING POINT

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

x, * BY, TIMES

GENERAL NOTES

1. THE PROJECT SPECIFICATIONS ARE A PART OF THE CONTRACT DOCUMENTS.

2. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS,

ARCHITECTURAL DRAWINGS, AND EXISTING CONDITIONS/DIMENSIONS. THE

CONTRACTOR SHALL NOTIFY THE COR OF ANY DISCREPANCIES BEFORE

PROCEEDING WITH ANY WORK.

3. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE COMPLETED STRUCTURE.

THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR

SHALL PROVIDE ALL MEASURES AND MEANS NECESSARY TO PROTECT PERSONS

AND STRUCTURES DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE,

BUT NOT BE LIMITED TO, BRACING, SHORING, ETC. OBSERVATION BY THE

ARCHITECT, ENGINEER OR COR DOES NOT INCLUDE REVIEW OF THESE

MEASURES.

4. NOTES AND DETAILS ON THE STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER

GENERAL NOTES. TYPICAL DETAILS SHALL BE USED WHENEVER APPLICABLE.

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. ALL WORK NOT DETAILED OR NOTED SHALL BE CONSTRUCTED IN ACCORDANCE

WITH OTHER SIMILAR WORK SHOWN ON THE DRAWINGS AND TYPICAL DETAILS.

6. DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.

7. NO PIPES OR DUCTS SHALL BE PLACED IN OR PENETRATE STRUCTURAL MEMBERS

UNLESS SPECIFICALLY DESIGNED AND DETAILED.

8. STRUCTURAL DRAWINGS TO BE USED IN CONJUNCTION WITH ARCHITECTURAL,

MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS HEREIN.

9. REFER TO ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:

a. SIZE AND LOCATION OF DOOR AND WINDOW OPENINGS, EXCEPT AS

NOTED.

b. SIZE AND LOCATION OF INTERIOR AND EXTERIOR NONBEARING

PARTITIONS.

c. SIZE AND LOCATION OF CURBS, FLOOR DRAINS, SLOPES, DEPRESSED

AREAS, CHANGES IN LEVEL, RAMPS, CHAMFERS, GROOVES, INSERTS, ETC.

d. SIZE AND LOCATION OF FLOOR OPENINGS, IF NOT DIMENSIONED ON THESE

DRAWINGS.

e. FLOOR.

f. DIMENSIONS NOT SHOWN ON STRUCT DWGS.

10. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR THE

FOLLOWING:

a. PIPE RUNS, SLEEVES, HANGERS, EQUIPMENT, SLAB OPENINGS, NOT

SHOWN OR NOTED ON STRUCTURAL DRAWINGS

b. ELECTRICAL CONDUIT, BOXES, OUTLETS.

c. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, AND PLUMBING

FIXTURES.

d. SIZE AND LOCATION OF MACHINE AND EQUIPMENT BASES. CONTRACTOR'S

ENGINEER SHALL DESIGN SEISMIC ANCHORAGE FOR MECHANICAL AND

ELECTRICAL EQUIPMENT PER SPEC.

11. ASTM REFERENCES ARE FOR LATEST REVISIONS AND ISSUE, UON.

12. CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EXCAVATION

FOR UNSUITABLE CONDITIONS, UNCONSOLIDATED AND UNDOCUMENTED FILLS,

BURIED STRUCTURES, UTILITIES, ETC., AND SHALL IMMEDIATELY NOTIFY THE COR

OF ANY SITE CONDITIONS NOT REFLECTED ON THE DRAWINGS OR DIFFERENT

FROM MAXIMUM OR MINIMUM DIMENSIONS INDICATED, INCLUDING CONFLICT IN

GRADES, ADVERSE SOIL CONDITIONS, GROUND WATER PRESENT, DEEPENED

FOOTINGS, UNCOVERED AND UNEXPECTED UTILITY LINES, ETC.

13. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON STRUCTURAL

FRAME SUCH THAT THE LOADING DOES NOT EXCEED THE DESIGN LIVE LOADS.

PROVIDE SHORING AND BRACING WHERE DESIGN STRENGTH HAS NOT BEEN

ATTAINED OR STRUCTURE IS NOT COMPLETE.

14. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF UTILITY SERVICES IN

AREAS TO BE EXCAVATED BEFORE BEGINNING EXCAVATION. EXERCISE CAUTION

IN EXCAVATING AND TRENCHING.

15. THE STRUCTURAL ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND

SHALL NOT BE RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS,

TECHNIQUES, SEQUENCES OR PROCEDURES, FOR SAFETY PRECAUTIONS AND

PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACT AND OMISSIONS OF

THE CONTRACTOR, SUB-CONTRACTORS OR ANY OTHER PERSONS PERFORMING

ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE

WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

16. VERIFY ALL OPENING DIMENSIONS THROUGH FLOOR, ROOF, AND WALLS WITH

MECHANICAL AND ELECTRICAL CONTRACTORS.

17. STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINE

INTERSECTIONS, UNLESS DIMENSIONED OTHERWISE.

18. NOTIFY ARCHITECT OF ANY CONDITIONS NOT CONSTRUCTED PER THE CONTRACT

DOCUMENTS PRIOR TO PROCEEDING WITH CORRECTIVE WORK. SUBMIT

PROPOSED REPAIR TO THE ARCHITECT FOR ACCEPTANCE.

19. NOTHING SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS

ELIMINATING THE NEED FOR THE CONTRACTOR TO COMPLY WITH ALL OSHA

REQUIREMENTS. WHERE THE STRUCTURAL DRAWINGS APPEAR TO CONFLICT

WITH OSHA REQUIREMENTS, THE STRUCTURAL DRAWINGS REPRESENT FINAL

CONDITIONS ONLY.

20. THE CONTRACT DOCUMENTS HAVE BEEN PREPARED USING AVAILABLE DRAWINGS

AND SITE OBSERVATION AS PERMITTED BY ACCESS RESTRICTIONS DURING

DESIGN. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING

CONDITIONS WHICH ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT

DOCUMENTATION. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL

CONDITIONS NOT PER THE CONTRACT DOCUMENTS.

21. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL CONDITIONS PRIOR

TO SUBMITTING SHOP DRAWINGS.

a. CONTRACTOR SHALL MAKE ALLOWANCE FOR THE RESOLUTION OF SUCH

DISCOVERIES IN THE CONSTRUCTION SCHEDULE.

22. SUBMIT A DIMENSIONED DRAWING OF ALL NEW OPENINGS THROUGH EXISTING

STRUCTURE AND SECURE APPROVAL PRIOR TO CUTTING. NEW OPENINGS MAY BE

EITHER SHOWN ON THE CONTRACT DOCUMENTS OR PROPOSED BY THE

CONTRACTOR. DRAWING SHALL SHOW:

a. VERTICAL & HORIZONTAL LOCATION AND SIZE OF NEW OPENING(S)

b. ALL EXISTING OPENINGS IN THE VICINITY OF THE NEW OPENING(S)

c. ALL EXISTING STRUCTURE (BEAMS, COLUMNS, SLABS, WALLS, ETC) IN THE

VICINITY OF THE NEW OPENING(S)

d. ALL REINFORCING BAR SIZES AND POSITIONS (LAYOUT LOCATION AND

DEPTH) CONFLICTING WITH OR IN THE VICINITY OF THE NEW OPENING(S).

23. SEE ARCHITECTURAL PLANS FOR INTERIOR PARTITIONS. PARTITION FRAMING

SHALL BE CONNECTED TO THE PRIMARY STRUCTURE IN SUCH A WAY SO AS TO

ALLOW FOR VERTICAL LIVE LOAD DEFLECTIONS OF 1/2” AT FLOOR FRAMING DO

NOT MAKE RIGID VERTICAL AND HORIZONTAL CONNECTIONS TO THE PRIMARY

STRUCTURE IN THE PLANE OF THE PARTITION.

SUBMITTAL NOTES

1. SEE THE PROJECT SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. SUBMITTALS SHALL NOT CONTAIN SUBSTITUTION REQUESTS WITHOUT PRIOR

AUTHORIZATION. SUBSTITUTION REQUESTS ARE FOR CONTRACTOR'S

CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CHANGES

NECESSARY IF THEY CHOOSE TO SUBSTITUTE AND SHALL COORDINATE ALL

DETAILS. COST OF ADDITIONAL FIELD AND OFFICE WORK NECESSITATED BY

REQUESTS BY THE CONTRACTOR FOR A SUBSTITUTION REQUEST OR DUE TO

ERRORS OR OMISSIONS IN CONSTRUCTION SHALL BE BORNE BY THE

CONTRACTOR.

3. DELEGATED DESIGN SUBMITTALS:

a. THE CONTRACTOR SHALL EMPLOY OR RETAIN A PROFESSIONAL ENGINEER

LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED TO DESIGN AND

DETAIL DELEGATED DESIGN ITEMS TO MEET THE PERFORMANCE AND

DESIGN CRITERIA ESTABLISHED AS PART OF THE BASE BUILDING

STRUCTURE. DELEGATED DESIGN ITEMS INCLUDE:

1. SHORING DESIGN

2. GALVANIC ANODES.

b. CONNECTION OF DEFERRED SUBMITTAL ITEMS TO PRIMARY STRUCTURE

BY DEFERRED SUBMITTAL SUPPLIER. DEFERRED SUBMITTAL SUPPLIER TO

PROVIDE CONNECTIONS AND FRAMING ARRANGEMENT TO AVOID LOADING

WHICH EXCEEDS THE CAPACITY OF THE ELEMENT BEING ATTACHED TO.

c. ALL DEFERRED SUBMITTALS TO BE ATTACHED TO PRIMARY STRUCTURE

WITH A PINNED CONNECTION. MOMENT CONNECTIONS TO PRIMARY

STRUCTURE NOT PERMITTED UNLESS NOTED ON DRAWINGS OR

APPROVED BY ENGINEER IN WRITING PRIOR TO SUBMITTAL OF DRAWINGS

OR CALCULATIONS.

d. LOADING AND LOCATION FOR ATTACHMENT OF DEFERRED SUBMITTAL

ITEMS ARE NOTED ON DRAWINGS AND ARE NOT TO BE RE-LOCATED OR

INCREASED WITHOUT WRITTEN APPROVAL.

e. WALLS, GRADE BEAMS AND THE UNDERSIDE OF CONCRETE ON METAL

DECK SHALL BE CONSIDERED CRACKED FOR THE PURPOSE OF DESIGNING

ANCHORS FOR ATTACHMENT OF DEFERRED SUBMITTAL ITEMS.

f. POWDER ACTUATED FASTENERS (PAF) INTO CONCRETE OR CMU SHALL

NOT BE USED TO RESIST TENSION LOADS. PAF SHALL NOT BE USED TO

RESIST GRAVITY LOADS WHICH INCLUDE BRICK VENEER.

REINFORCING STEEL NOTES

1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN ACCORDANCE WITH

ACI 318 AND THE CRSI "MANUAL OF STANDARD PRACTICE" AS MODIFIED BY THE

PROJECT DRAWINGS AND SPECIFICATIONS.

2. DEFORMED REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF

ASTM A615 GRADE 60.

3. WELDING OF REINFORCING SHALL BE WITH LOW HYDROGEN ELECTRODES IN

CONFORMANCE WITH AWS D1.4. WELDING OF REINFORCING STEEL IS LIMITED TO

A706 REBAR.

4. NO REINFORCING BAR FIELD BENDS SHALL BE MADE UNLESS A706 REBAR.

5. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064 GR. 65.

6. MINIMUM LAP OF WELDED WIRE FABRIC SHALL BE 6” OR TWO MESH PANELS,

WHICHEVER IS GREATER.

7. SPLICES SHALL BE MADE WHERE INDICATED ON THE STRUCTURAL DRAWINGS. IF

NOT INDICATED, SPLICE BEAM BOTTOM BARS OVER SUPPORTS AND TOP BARS AT

MIDSPAN. MAKE BAR CONTINUOUS AROUND CORNERS UON. ALL SPLICES TO BE

CONTACT TENSION SPLICE (CLASS B) UON.

8. DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME

GRADE, SIZE, SPACING, AND NUMBER AS THE SPECIFIED VERTICAL REINFORCING,

UON.

9. WHERE A 90°, 135°, OR 180° HOOK IS GRAPHICALLY INDICATED, PROVIDE

CORRESPONDING ACI STANDARD HOOKS UON.

10. MECHANICAL SPLICE COUPLERS: INSTALL IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS

CONCRETE NOTES

1. ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL

CONFORM TO ACI 318 AND ACI 301, LATEST EDITIONS, WITH MODIFICATIONS AS

NOTED ON THE DESIGN DRAWINGS OR SPECIFICATIONS.

2. CONCRETE MIXES SHALL BE SUBMITTED FOR REVIEW, DESIGNED BY A QUALIFIED

TESTING LABORATORY AND SHALL BEAR THE SEAL OF AN ENGINEER LICENSED IN

THE UNITED STATES.