This document is a comprehensive set of architectural and engineering drawings for the Building 65 Structural Repairs project at the Eugene J. Towbin Veterans Affairs Medical Center in North Little Rock, Arkansas. The drawings, dated January 31, 2025, cover multiple disciplines including structural, architectural, plumbing, mechanical, and electrical work for a complete structural rehabilitation of Building 65.
The project involves extensive structural repairs including foundation and basement framing repairs, demolition of existing structural elements, installation of new floor support systems, and comprehensive upgrades to mechanical, electrical, and plumbing infrastructure. Key components include removing and replacing concrete slabs, installing new steel framing, repairing columns and walls, implementing new sump pump systems, upgrading electrical panels and conduits, and installing new ventilation systems in the crawl space. The project is designed to address structural deterioration and improve the building's overall infrastructure, with careful consideration for infection control, safety protocols, and minimal disruption to the existing medical facility operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25625R0087 0004.pdf | ||
| 36C25625R0087 0003.pdf | ||
| Attch A_RFIs for Building 65 Structural Repairs 36C25625R0087 - VA Response.pdf | ||
| Attch C_Site Visit Sign In Form - 598-23-106 Building 65 Repairs dtd 5-13-2025.pdf | ||
| Attch B_Solicitation Work List Unit Pricing Table.pdf | ||
| 36C25625R0087 0002.docx | DOCX document | |
| 36C25625R0087 0001 Amendment.pdf | ||
| 36C25625R0087 Site Visit Agenda.docx | DOCX document | |
| Attachment F_EXHIBIT B PERFORMANCE RELEVANCY SURVEY.docx | DOCX document | |
| Attachment E_EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf | ||
| Bldg 65 Structural Repairs Specifications BD 20250131.pdf | ||
| Attachment D -Wage Determination.pdf | ||
| 36C25625R0087 Solicitation_ Completed.pdf | ||
| 598-23-106 B65 SOW v20250121.doc | DOC document | |
| 36C25625R0087_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
PROJECT SITE MAP
/2
/2
:0
:1
P
M C
U s e rs
\J lo n g h u rs t\ D o c u m e n ts
\A
-0
-Q
-V A
N L it tl e R o c k -B ld g
S tr u c R p r_
R jlo n g h u rs tS
M A
W
.r v t
G-001
COVER
1 2JNL
BUILDING 65 STRUCTURAL
REPAIRS
EUGENE J. TOWBIN VAMC
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114 JANUARY 31, 2025
100% BID DOCUMENTS
598-23-10623-080
BUILDING 65 STRUCTURAL REPAIRS
EUGENE J. TOWBIN VAMC
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
VA PROJECT #: 598-23-106
CLA
DRAWING LIST
GENERAL
G-001 COVER 1 2
G-005 ICRA INFORMATION AND DETAILS 2 2
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS 1 13
S-002 QA NOTES AND TABLES 2 13
SD-101 FOUNDATION DEMOLITION PLAN 3 13
SD-102 BASEMENT FRAMING DEMOLITION PLAN 4 13
S-101 FOUNDATION REPAIR PLAN 5 13
S-102 BASEMENT FRAMING REPAIR PLAN 6 13
S-103 BASEMENT FRAMING PLAN 7 13
S-500 STRUCTURAL DEMOLITION DETAILS 8 13
S-501 STRUCTURAL DETAILS 9 13
S-502 STRUCTURAL DETAILS 10 13
S-551 SCHEMATIC SHORING DETAILS 11 13
S-552 STRUCTURAL REPAIR DETAILS 12 13
S-553 STRUCTURAL REPAIR DETAILS 13 13
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 4
AD101 GROUND FLOOR DEMOLITION PLAN 2 4
A-101 GROUND FLOOR PLAN 3 4
A-102 CRAWL SPACE FLOOR PLAN 4 4
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 3
PW100 CRAWL SPACE PLUMBING PLAN 2 3
P-601 PLUMBING SCHEDULES 3 3
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 3
MH101 CRAWL SPACE HVAC PLAN 2 3
M-601 MECHANICAL SCHEDULES 3 3
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4
EP101 CRAWL SPACE POWER PLAN 2 4
EP102 BASEMENT ELECTRICAL PLAN 3 4
E-501 ELECTRICAL DETAILS, SINGLE LINE, AND SCHEDULES 4 4
PROJECT
LOCATION
NORTH
Docusign Envelope ID: C07C7FE3-6C72-429D-AFAC-616D85A6678B
1/30/2025
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
5/8" GYPSUM BOARD - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
5"
3 5/8" METAL STUDS @ 16"
O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
B
SEALANT, BOTH SIDES
NON RATED
D
TEMPORARY PREFABRICATED
ICRA WALL SYSTEM. BASIS OF
DESIGN: STARC WALL SYSTEM OR
EDGEGUARD SYSTEM OR EQUAL.
EXISTING CEILING
SYSTEM TO HAVE
INTEGRATED CEILING
SEAL.
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY
LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
G-005
_____3
G-005
G-003
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
BUILDING 65 STRUCTURAL REPAIRS
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL
ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK
AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. PROVIDE STICKY MATS AT THE ICRA BARRIER ENTRANCE AND CHANGE DAILY OR MORE
OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN
SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE EXTERIORS DOORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN
NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF
THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-
CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
6. ALL FURNISHINGS AND EQUIPMENT TO REMAIN IN THE IMPACTED ROOMS SHALL BE COVERED
AND PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: VERIFY WITH THE COR WHETHER CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO
DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST
TO PREVENT CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE
HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL
AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT
WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE
USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,
TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
E
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:1
P
M C
U s e rs
\J lo n g h u rs t\ D o c u m e n ts
\A
-0
-Q
-V A
N L it tl e R o c k -B ld g
S tr u c R p r_
R jlo n g h u rs tS
M A
W
.r v t
G-005
ICRA INFORMATION AND DETAILS
2 2JNL
BUILDING 65 STRUCTURAL
REPAIRS
EUGENE J. TOWBIN VAMC
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114 JANUARY 31, 2025
100% BID DOCUMENTS
598-23-10623-080
CLA
Scale: No Scale
ICRA BARRIER WALL TYPE
Scale: No Scale
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: No Scale
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: No Scale
ICRA ROOM ELEVATION
Scale: No Scale
CROSS SECTION "A"
Scale: No Scale
ICRA MOBILE CONTAINMENT CART
Docusign Envelope ID: C07C7FE3-6C72-429D-AFAC-616D85A6678B
1/30/2025
WORK LIST
DESCRIPTION WORK
ITEM
REFERENCE
DETAIL
ESTIMATED
QUANTITY
SHORE EXISTING CONCRETE COLUMNS AND PILASTERS PRIOR TO REPAIRS AT ALL LEVELS. REPLACE OR REPAIR ELEMENTS DAMAGED OR REMOVED IN ORDER TO INSTALL SHORING SUCH AS EXTERIOR WALLS AND INTERIOR FINISHES. INSTALL NEEDLE SHORING AT PERIMETER WALLS AS REQUIRED TO SUPPORT TRIBUTARY BEAMS.
14 LOCS1A
SHORE EXISTING CONCRETE COLUMNS PRIOR TO REPAIRS AT THE EAST ENTRACE STAIR FRAMING. 2 LOCS1B
REPAIR DELAMINATED OR SPALLED OVERHEAD CONCRETE AND CORRODED REINFORCING STEEL ON UNDERSIDE OF CONCRETE JOISTS. FOR PRICING PURPOSES, ASSUME EACH REPAIR LOCATION IS 3 FEET LONG UNLESS NOTED OTHERWISE ON PLAN. ASSUME AVERAGE DEPTH OF CONCRETE REMOVAL TO BE 3 INCHES AND FULL WIDTH OF THE
EXISTING JOISTS.
250 LF2
REPAIR DELAMINATED OR SPALLED OVERHEAD CONCRETE AND CORRODED REINFORCING STEEL ON UNDERSIDE OF CONCRETE BEAMS. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF REPAIR TO BE 4 INCHES.
70 SF3
REPAIR DELAMINATED OR SPALLED VERTICAL CONCRETE AND CORRODED REINFORCING STEEL ON CONCRETE COLUMNS AND PILASTERS. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF REPAIR TO BE 4 INCHES.
275 SF4
REPAIR DELAMINATED OR SPALLED VERTICAL CONCRETE AND CORRODED REINFORCING STEEL ON CONCRETE
WALLS. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF REPAIR TO BE 4 INCHES.
650 SF5
REPAIR DELAMINATED OR SPALLED OVERHEAD PARTIAL DEPTH CONCRETE AND CORRODED REINFORCING STEEL ON UNDERSIDE OF CONCRETE PAN JOIST SLAB. ASSUME THAT EXISTING WELDED WIRE MESH WILL REQUIRE REPLACEMENT WITH W4 4x4 WELDED WIRE MESH. FOR PRICING PURPOSES, ASSUME AN AVERAGE DEPTH OF
REPAIR TO BE 2 INCHES.
50 SF6
INSTALL CONCRETE ENCASEMENT AT COLUMNS WITH SEVERELY DETERIORATED REINFORCING STEEL. 8 LOCS7
INSTALL CONCRETE ENCASEMENT AT PILASTERS WITH SEVERELY DETERIORATED REINFORCING STEEL. 13 LOCS8
ENLARGE EXISTING JOISTS DAMAGED BY PREVIOUS CONCRETE CORING OR CHIPPING AT ENDS OF JOISTS. 14 LOCS9
ENLARGE EXISTING JOISTS DAMAGED BY PREVIOUS CONCRETE CORING OR CHIPPING AWAY FROM ENDS OF
JOISTS.
6 LOCS10
INFILL EXISTING SLAB OPENING. 1 LOC11
LOCATE AND SEAL EXISTING ABANDONED PIPE PENETRATIONS WITH CONCRETE REPAIR MATERIAL OR
HYDROPHOBIC GROUT PER DETAILS.
50 LOCS12
INSTALL SUPPLEMENTAL STEEL POST AT DETERIORATED STAIR COLUMNS. 2 LOCS8.5 /4 S-553
/3 S-551
/1 S-551
/2 S-552
/3 S-552
/5 S-552
/6 S-552
/1 S-552
/1 S-553
/2 S-553
/4 S-552
/9 S-552
PROVIDE AN ALLOWANCE FOR REINFORCING STEEL THAT WILL BE INSTALLED WHERE EXISTING REINFORCING
STEEL HAS LOST MORE THAN 10% OF ITS CROSS SECTIONAL AREA.
5,000 LBS15
PROVIDE AN ALLOWANCE TO REPAIR PARTIAL DEPTH, DETERIORATED OVERHEAD CONCRETE SLAB SOFFIT
UNCOVERED DURING THE REPAIR.
1,000 SF16
PROVIDE AN ALLOWANCE TO REMOVE AND REPLACE EXISTING INSULATION ADJACENT TO REPAIR AS NEEDED TO
PERFORM WORK.
LUMP SUM17
AT CONTRACTOR'S OPTION, PROVIDE AN ALLOWANCE TO INSTALL BAR COUPLERS IN LIEU OF REMOVAL OF SOUND CONCRETE TO INSTALL REINFORCING BARS SPLICED PER REBAR SPLICE LENGTH TABLE. BUILD OUT CONCRETE
REPAIR TO PROVIDE MINIMUM CONCRETE COVER PER CONCRETE COVER TABLE.
1,000 LOCS18
WORK LIST NOTES:
1. THE VALUES IN THE "ESTIMATED QUANTITY" COLUMN OF THE WORK LISTS MAY BE GREATER THAN OR LESS THAN THE AMOUNTS SHOWN ON PLAN. USE
THE QUANTITIES LISTED IN THE WORK LIST FOR BID PURPOSES AND PROVIDE UNIT COSTS. CONTRACTOR SHALL FIELD VERIFY QUANTITIES AND LOCATIONS PRIOR TO WORK. NOT ALL LOCATIONS OF WORK ITEMS MAY BE SHOWN ON PLANS. ADDITIONAL LOCATIONS MAY BE DISCOVERED DURING
REPAIRS.
2. BID PRICING SHALL REFLECT THE PRODUCTS SPECIFIED IN THIS DOCUMENT. SUBSTITUTIONS AND ASSOCIATED PRICING MAY BE SUBMITTED IN ADDITION TO THE UNIT COST PRICES FOR THE SPECIFIED MATERIALS. THE ENGINEER SHALL REVIEW AND DETERMINE IF THE ALTERNATE PRODUCT IS CONSIDERED
"EQUAL" AND IF IT WILL BE ALLOWED AS A SUBSTITUTION.
3. CONTRACTOR SHALL KEEP A CURRENT SCHEDULE OF VALUES FOR ALL WORK ITEMS BEING PERFORMED WITH QUANTITIES COMPLETED TO DATE. ANY ANTICIPATED OVERAGES OR SHORTAGES TO THE BID QUANTITIES LISTED ABOVE SHOULD BE PRESENTED AS WELL.
4. REPAIRS AREAS GREATER THAN 2 SQUARE FEET IN SIZE SHALL USE FORM AND POUR OR FORM AND PUMP PACKAGED REPAIR MATERIALS.
INSTALL GALVANIC ANODES AT PERIMETER OF CONCRETE REPAIR AREAS. FOR PRICING PURPOSES, ASSUME VECTOR CORROSION SERVICES GALVASHIELD XP4 AS BASIS OF DESIGN PRODUCT SPACED @18" OC.
1,600 LOCS13
INSTALL ANTI-CARBONATION COATING AT BOTTOM AND SIDES OF ALL EXISTING BEAMS OF THE CRAWL SPACE. FOR
PRICING PURPOSES, ASSUME SIKAGARD 670W BY SIKA AS BASIS OF DESIGN PRODUCT.
5,300 SF14
/8 S-552
/7 S-552
/3 S-553
/1 S-552
/3 S-553
/10 S-552
/6 S-553
/6 S-553
SHORE FLOOR STRUCTURE UNDER EXISTING ELECTRICAL ROOM. 1 LOC1C /6 S-551
PROVIDE AN ALLOWANCE TO INSTALL EPOXY DOWELS WHERE SUPPLEMENTAL STEEL CANNOT BE DEVELOPED.
ASSUME DOWELS ARE #5 BARS, 25" LONG WITH 8" EMBEDMENT INTO EXISTING CONCRETE USING HILTI HIT RE 500V3.
500 LOCS19 -
ALLOWANCES
# NUMBER
& AND
@ AT
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AH, AHU AIR HANDLING UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATELY
ARCH ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AT/FP ANTI-TERRORISM/ FORCE
PROTECTION
AWS AMERICAN WELDING SOCIETY
BET BETWEEN
BLDG BUILDING
BLW BELOW
BM BEAM
BN BOUNDARY NAIL
BOF BOTTOM OF FOOTING
BOS BOTTOM OF STEEL
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
C CHANNEL
CD CONSTRUCTION DOCUMENTS
CE CARBON EQUIVALENT
CENT CENTERED
CFMF COLD-FORMED METAL FRAMING
CFS COLD-FORMED STEEL
CIP CAST IN PLACE
CJ CONTROL JOINT/CEILING JOIST
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CORNER, CONTRACTING OFFICER'S
REPRESENTATIVE
CTR CENTER
CU FT CUBIC FEET
CY CUBIC YARD
D DEEP, DEPTH
DAS DEFORMED ANCHOR STUD
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DEP DEPRESSED
DIA, Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTION
DL DEAD LOAD
DO DITTO
DT DRAG TRUSS
DTL DETAIL
DWG(S) DRAWINGS
DWL DOWEL
EA EACH
EF EACH FACE
ELEC ELECTRICAL
ELEV ELEVATION
EN EDGE NAIL
EOR ENGINEER OF RECORD
EQ, = EQUAL, EQUALS
EQN EQUATION
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EXIST, (E) EXISTING
EXP EXPANSION
EXT EXTERNAL, EXTERIOR
FF FAR FACE, FINISH FACE
FFE FINISH FLOOR ELEVATION
FG FINISH GRADE
FJ FLOOR JOIST
FN FIELD NAIL
FND FOUNDATION
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FRMG FRAMING
FS FAR SIDE
FT, ' FOOT
FTG FOOTING
Fy YIELD STRESS
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GLB GLUED LAMINATED BEAM
GT GIRDER TRUSS
GUSS GUSSET
GYP BD GYPSUM BOARD
HAS HEADED ANCHOR STUD
HD HOLD DOWN
HDR HEADER
HGR HANGER
HK HOOK
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
HT HEIGHT
HVAC HEATNG/ VENTILATING/ AIR
CONDITIONING
I MOMENT OF INERTIA
IBC INTERNATIONAL BUILDING CODE
ICF INSULATED CONCRETE FORM
ID INSIDE DIAMETER
CONCRETE PLACEMENT CONDITION: CONCRETE COVER
CAST AGAINST AND PERMANENTLY EXPOSED
TO EARTH
3"
CONCRETE EXPOSED TO EARTH OR WEATHER,
#6 THROUGH #18 BAR
2"
CONCRETE EXPOSED TO EARTH OR WEATHER,
#5 BAR AND SMALLER
1 1/2"
CONCRETE NOT EXPOSED: SLABS, WALLS, AND
JOISTS, #11 BAR AND SMALLER
1"
CONCRETE MIX TABLE
USE
f'c
(KSI)
CONCRETE
WEIGHT
MAX.
W/C
RATIO
MAX.
AGG.
(IN)
AIR
CONTENT
EXPOSURE
CLASS
OTHER
NOTES
SLABS ON DECK OR INTERIOR
TOPPING SLABS
3.5 NWT 0.5 3/4 - F0, S0, W0, C0 -
SHOTCRETE 5 NWT 0.4 1/2 NOTE 6 F3, S0, W1, C2 -
FLOW FILL 0.1 - - - - - FF
CONCRETE REPAIR - - - - - - SEE
SPEC
030130
STEEL SHAPES ASTM REQUIREMENTS
WIDE FLANGE SHAPES A992
CHANNELS, ANGLES, PLATES, AND BARS A36, UON
HSS ASTM A500 GRADE C
HAS A108
DAS A1064
BOLTS F3125-TYPE A325
ANCHOR RODS F1554 GR 55
MIX TABLE NOTES:
1. CEMENT TYPE TO BE ASTM TYPE C150 I/II OR ASTM C595 TYPE IL UNLESS OTHERWISE
NOTED.
2. CONTRACTOR TO PROVIDE SLUMP AS NEEDED FOR WORKABILITY AND CONSISTENCY
TO BE PLACED INTO FORMS AND AROUND REINFORCEMENT WITHOUT SEGREGATION
OR EXCESS BLEEDING. USE ADMIXTURES AS REQUIRED TO OBTAIN DESIRED RESULTS.
3. NORMAL WEIGHT (NWT) CONCRETE SHALL HAVE A DRY DENSITY OF 145 ± 5 PCF
4. AIR CONTENT SHALL BE ± 1 1/2% FROM REQUIRED VALUES. DO NOT PROVIDE AIR
ENTRAINING ADMIXTURES TO ANY INTERIOR SLABS UNLESS CONTRACTOR CAN
DEMONSTRATE TO ARCHITECT THAT SLABS WITH ENTRAINED AIR WILL HAVE
ACCEPTABLE FINISH.
5. EXPOSURE CLASS DEFINITION PER ACI301/318. CONTRACTOR TO PROVIDE MIXES THAT
MEET THESE REQUIREMENTS. FOR CORROSION PROTECTION OF REINFORCING (C0,
C1, C2) PROVIDE MAXIMUM CHLORIDE ION CONTENT IN CONCRETE (%/WT) OF C0 = 1.0,
C1 = 0.3, C2 = 0.15).
6. SHOTCRETE: MIX SHALL HAVE AIR ENTRAINING ADMIXTURE MEETING THE AIR
CONCRETE PERCENTAGES LISTED BELOW
A. WET MIX SHOTCRETE: F3 = 6%
B. DRY MIX SHOTCRETE: F3 = 4 1/2%
7. OTHER NOTES ADDITIONAL INFO:
FF = FLOW FILL SHALL BE PROPORTIONED TO PROVIDE INDICATED STRENGTH,
AND SHALL BE SELF-COMPACTING. MAXIMUM STRENGTH SHALL BE 150 PSI.
COMPLY WITH NRMCA "GUIDE SPECIFICIATION FOR CONTROLLED LOW
STRENGTH MATERIALS (CLSM)" AND ACI 229R.
POST-INSTALLED ANCHORS
TYPE USE ANCHOR
ADHESIVE ANCHOR:
CONCRETE: HILTI HIT-HY 200
MECHANICAL ANCHORS:
SCREW ANCHOR: HILTI KWIK HUS-EZ
EXPANSION ANCHOR: HILTI KWIK BOLT TZ2
STRUCTURAL ABBREVIATIONS
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Construction Management Civil Engineering Structural
8822 South Ridgeline Boulevard, Suite 310
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Calibre Engineering, Inc.
Calib er
/2
/2
:0
:2
P
M A u to d e s k D o c s /L
R B
R
E P
A
IR
S /L
R B ld g
R e p a ir s
S T
R R
.r v t
S-001
GENERAL STRUCTURAL NOTES,
DESIGN LOADS & ABBREVIATIONS
1 13JTB
BUILDING 65 STRUCTURAL
REPAIRS
EUGENE J. TOWBIN VAMC
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114 JANUARY 31, 2025
100% BID DOCUMENTS
598-23-10623-080
ES
CODE AND DESIGN CRITERIA
1. BUILDING CODES:
a. LATEST EDITION OF U.S. DEPARTMENT OF VETERANS AFFAIRS DESIGN
GUIDES, STANDARDS AND MANUALS
b. INTERNATIONAL BUILDING CODE (IBC) - 2021
c. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), STEEL
CONSTRUCTION MANUAL - 15th EDITION
d. AISC, SEISMIC DESIGN MANUAL - 3rd EDITION
e. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7, MINIMUM DESIGN
LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES - 2022
f. AMERICAN CONCRETE INSTITUTE (ACI) 318, BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE - 2019
2. DESIGN CRITERIA
a. RISK CATEGORY: II
3. DESIGN LOADS
a. FLOOR
1. SUPERIMPOSED DEAD LOAD: 10 PSF
2. TYP LIVE LOAD: 100 PSF
4. SEISMIC DESIGN DATA
a. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE
b. SEISMIC IMPORTANCE FACTOR (Ie): 1
c. Ss: 0.540g
d. S1: 0.170g
e. SITE CLASS: B
f. Sds: 0.280g
g. Sd1: 0.110g
h. SEISMIC DESIGN CATEGORY: B
IN, " INCH
INCL INCLUDE
INFO INFORMATION
INS INSULATED, INSULATION
INT INTERIOR
JST JOIST
JT JOINT
K, KIPS THOUSAND POUNDS
KLF KIPS PER LINEAR FOOT
KSF KIPS PER SQUARE FOOT
L LENGTH, ANGLE
LB POUND
LF LINEAR FOOT
LG LONG, LIGHT GUAGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLR ROOF LIVE LOAD
LLV LONG LEG VERTICAL
LOC LOCATE, LOCATION
LONG LONGITUDINAL
LTE TENSION EMBEDMENT
LTS LAP TENSION SPLICE
LW LIGHT WEIGHT
MAS MASONRY
MAX MAXIMUM
MB MACHINE BOLT
MBR MEMBER
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MF MOMENT FRAME
MFG MANUFACTURING
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MLS MASONRY LAP SPLICE
MO MASONRY OPENING
MOD MODIFY, MODIFIED
MPH MILES PER HOUR
MRF MANUFACTURER
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
NW NORMAL WEIGHT
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND, OVERHEAD
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OWSJ OPEN WEB STEEL JOIST
P/C PIN CONNECTED
PAF POWDER ACTUATED FASTENER
PAR PARALLEL
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERIM PERIMETER
PL PLATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED, POINT,
PRETENSIONED
REINF REINFORCING, REINFORCED
REQ REQUIRED
RET RETURN, RETAINING
REV REVISION, REVISED
RF ROOF
RFT RAFTERS
RS ROUGH SAWN
RT ROOF TRUSS
S SECTION MODULUS
SC SLIP CRITICAL
SCHED SCHEDULE
SDC SEISMIC DESIGN CATEGORY
SDI STEEL DECK INSTITUTE
SECT SECTION
SEIS SEISMIC
SEOR STRUCTURAL ENGINEER OF RECORD
SEP SEPARATION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SL SNOW LOAD
SMS SHEET METAL SCREW
SPEC(S) SPECIFICATION(S)
SPRT SUPPORT
SQ SQUARE
SS STAINLESS STEEL
ST SNUG TIGHT
STD STANDARD
STIF/STIFF STIFFENER
STL STEEL
STRUCT STRUCTURAL, STRUCTURE
SUSP SUSPENDED
SYM SYMMETRICAL
T&B TOP AND BOTTOM
TGB TOP OF GRADE BEAM
THK THICK, THICKNESS
TL TOTAL LOAD
TN TOE NAIL
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UFC UNITED FACILITES CRITERIA
UON UNLESS OTHERWISE NOTED
V SHEAR
VB VAPOR BARRIER
VERT VERTICAL
VIF VIF
W WIDTH, WEST, WIDE FLANGE
W/ WITH
W/C WATER CONTENT
W/O WITHOUT
WL WIND LOAD
WPT WORKING POINT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
x, * BY, TIMES
GENERAL NOTES
1. THE PROJECT SPECIFICATIONS ARE A PART OF THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS,
ARCHITECTURAL DRAWINGS, AND EXISTING CONDITIONS/DIMENSIONS. THE
CONTRACTOR SHALL NOTIFY THE COR OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH ANY WORK.
3. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE COMPLETED STRUCTURE.
THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR
SHALL PROVIDE ALL MEASURES AND MEANS NECESSARY TO PROTECT PERSONS
AND STRUCTURES DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE,
BUT NOT BE LIMITED TO, BRACING, SHORING, ETC. OBSERVATION BY THE
ARCHITECT, ENGINEER OR COR DOES NOT INCLUDE REVIEW OF THESE
MEASURES.
4. NOTES AND DETAILS ON THE STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER
GENERAL NOTES. TYPICAL DETAILS SHALL BE USED WHENEVER APPLICABLE.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. ALL WORK NOT DETAILED OR NOTED SHALL BE CONSTRUCTED IN ACCORDANCE
WITH OTHER SIMILAR WORK SHOWN ON THE DRAWINGS AND TYPICAL DETAILS.
6. DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.
7. NO PIPES OR DUCTS SHALL BE PLACED IN OR PENETRATE STRUCTURAL MEMBERS
UNLESS SPECIFICALLY DESIGNED AND DETAILED.
8. STRUCTURAL DRAWINGS TO BE USED IN CONJUNCTION WITH ARCHITECTURAL,
MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS HEREIN.
9. REFER TO ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
a. SIZE AND LOCATION OF DOOR AND WINDOW OPENINGS, EXCEPT AS
NOTED.
b. SIZE AND LOCATION OF INTERIOR AND EXTERIOR NONBEARING
PARTITIONS.
c. SIZE AND LOCATION OF CURBS, FLOOR DRAINS, SLOPES, DEPRESSED
AREAS, CHANGES IN LEVEL, RAMPS, CHAMFERS, GROOVES, INSERTS, ETC.
d. SIZE AND LOCATION OF FLOOR OPENINGS, IF NOT DIMENSIONED ON THESE
DRAWINGS.
e. FLOOR.
f. DIMENSIONS NOT SHOWN ON STRUCT DWGS.
10. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR THE
FOLLOWING:
a. PIPE RUNS, SLEEVES, HANGERS, EQUIPMENT, SLAB OPENINGS, NOT
SHOWN OR NOTED ON STRUCTURAL DRAWINGS
b. ELECTRICAL CONDUIT, BOXES, OUTLETS.
c. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, AND PLUMBING
FIXTURES.
d. SIZE AND LOCATION OF MACHINE AND EQUIPMENT BASES. CONTRACTOR'S
ENGINEER SHALL DESIGN SEISMIC ANCHORAGE FOR MECHANICAL AND
ELECTRICAL EQUIPMENT PER SPEC.
11. ASTM REFERENCES ARE FOR LATEST REVISIONS AND ISSUE, UON.
12. CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EXCAVATION
FOR UNSUITABLE CONDITIONS, UNCONSOLIDATED AND UNDOCUMENTED FILLS,
BURIED STRUCTURES, UTILITIES, ETC., AND SHALL IMMEDIATELY NOTIFY THE COR
OF ANY SITE CONDITIONS NOT REFLECTED ON THE DRAWINGS OR DIFFERENT
FROM MAXIMUM OR MINIMUM DIMENSIONS INDICATED, INCLUDING CONFLICT IN
GRADES, ADVERSE SOIL CONDITIONS, GROUND WATER PRESENT, DEEPENED
FOOTINGS, UNCOVERED AND UNEXPECTED UTILITY LINES, ETC.
13. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON STRUCTURAL
FRAME SUCH THAT THE LOADING DOES NOT EXCEED THE DESIGN LIVE LOADS.
PROVIDE SHORING AND BRACING WHERE DESIGN STRENGTH HAS NOT BEEN
ATTAINED OR STRUCTURE IS NOT COMPLETE.
14. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF UTILITY SERVICES IN
AREAS TO BE EXCAVATED BEFORE BEGINNING EXCAVATION. EXERCISE CAUTION
IN EXCAVATING AND TRENCHING.
15. THE STRUCTURAL ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND
SHALL NOT BE RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS,
TECHNIQUES, SEQUENCES OR PROCEDURES, FOR SAFETY PRECAUTIONS AND
PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACT AND OMISSIONS OF
THE CONTRACTOR, SUB-CONTRACTORS OR ANY OTHER PERSONS PERFORMING
ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE
WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
16. VERIFY ALL OPENING DIMENSIONS THROUGH FLOOR, ROOF, AND WALLS WITH
MECHANICAL AND ELECTRICAL CONTRACTORS.
17. STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINE
INTERSECTIONS, UNLESS DIMENSIONED OTHERWISE.
18. NOTIFY ARCHITECT OF ANY CONDITIONS NOT CONSTRUCTED PER THE CONTRACT
DOCUMENTS PRIOR TO PROCEEDING WITH CORRECTIVE WORK. SUBMIT
PROPOSED REPAIR TO THE ARCHITECT FOR ACCEPTANCE.
19. NOTHING SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS
ELIMINATING THE NEED FOR THE CONTRACTOR TO COMPLY WITH ALL OSHA
REQUIREMENTS. WHERE THE STRUCTURAL DRAWINGS APPEAR TO CONFLICT
WITH OSHA REQUIREMENTS, THE STRUCTURAL DRAWINGS REPRESENT FINAL
CONDITIONS ONLY.
20. THE CONTRACT DOCUMENTS HAVE BEEN PREPARED USING AVAILABLE DRAWINGS
AND SITE OBSERVATION AS PERMITTED BY ACCESS RESTRICTIONS DURING
DESIGN. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING
CONDITIONS WHICH ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT
DOCUMENTATION. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL
CONDITIONS NOT PER THE CONTRACT DOCUMENTS.
21. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL CONDITIONS PRIOR
TO SUBMITTING SHOP DRAWINGS.
a. CONTRACTOR SHALL MAKE ALLOWANCE FOR THE RESOLUTION OF SUCH
DISCOVERIES IN THE CONSTRUCTION SCHEDULE.
22. SUBMIT A DIMENSIONED DRAWING OF ALL NEW OPENINGS THROUGH EXISTING
STRUCTURE AND SECURE APPROVAL PRIOR TO CUTTING. NEW OPENINGS MAY BE
EITHER SHOWN ON THE CONTRACT DOCUMENTS OR PROPOSED BY THE
CONTRACTOR. DRAWING SHALL SHOW:
a. VERTICAL & HORIZONTAL LOCATION AND SIZE OF NEW OPENING(S)
b. ALL EXISTING OPENINGS IN THE VICINITY OF THE NEW OPENING(S)
c. ALL EXISTING STRUCTURE (BEAMS, COLUMNS, SLABS, WALLS, ETC) IN THE
VICINITY OF THE NEW OPENING(S)
d. ALL REINFORCING BAR SIZES AND POSITIONS (LAYOUT LOCATION AND
DEPTH) CONFLICTING WITH OR IN THE VICINITY OF THE NEW OPENING(S).
23. SEE ARCHITECTURAL PLANS FOR INTERIOR PARTITIONS. PARTITION FRAMING
SHALL BE CONNECTED TO THE PRIMARY STRUCTURE IN SUCH A WAY SO AS TO
ALLOW FOR VERTICAL LIVE LOAD DEFLECTIONS OF 1/2” AT FLOOR FRAMING DO
NOT MAKE RIGID VERTICAL AND HORIZONTAL CONNECTIONS TO THE PRIMARY
STRUCTURE IN THE PLANE OF THE PARTITION.
SUBMITTAL NOTES
1. SEE THE PROJECT SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. SUBMITTALS SHALL NOT CONTAIN SUBSTITUTION REQUESTS WITHOUT PRIOR
AUTHORIZATION. SUBSTITUTION REQUESTS ARE FOR CONTRACTOR'S
CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CHANGES
NECESSARY IF THEY CHOOSE TO SUBSTITUTE AND SHALL COORDINATE ALL
DETAILS. COST OF ADDITIONAL FIELD AND OFFICE WORK NECESSITATED BY
REQUESTS BY THE CONTRACTOR FOR A SUBSTITUTION REQUEST OR DUE TO
ERRORS OR OMISSIONS IN CONSTRUCTION SHALL BE BORNE BY THE
CONTRACTOR.
3. DELEGATED DESIGN SUBMITTALS:
a. THE CONTRACTOR SHALL EMPLOY OR RETAIN A PROFESSIONAL ENGINEER
LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED TO DESIGN AND
DETAIL DELEGATED DESIGN ITEMS TO MEET THE PERFORMANCE AND
DESIGN CRITERIA ESTABLISHED AS PART OF THE BASE BUILDING
STRUCTURE. DELEGATED DESIGN ITEMS INCLUDE:
1. SHORING DESIGN
2. GALVANIC ANODES.
b. CONNECTION OF DEFERRED SUBMITTAL ITEMS TO PRIMARY STRUCTURE
BY DEFERRED SUBMITTAL SUPPLIER. DEFERRED SUBMITTAL SUPPLIER TO
PROVIDE CONNECTIONS AND FRAMING ARRANGEMENT TO AVOID LOADING
WHICH EXCEEDS THE CAPACITY OF THE ELEMENT BEING ATTACHED TO.
c. ALL DEFERRED SUBMITTALS TO BE ATTACHED TO PRIMARY STRUCTURE
WITH A PINNED CONNECTION. MOMENT CONNECTIONS TO PRIMARY
STRUCTURE NOT PERMITTED UNLESS NOTED ON DRAWINGS OR
APPROVED BY ENGINEER IN WRITING PRIOR TO SUBMITTAL OF DRAWINGS
OR CALCULATIONS.
d. LOADING AND LOCATION FOR ATTACHMENT OF DEFERRED SUBMITTAL
ITEMS ARE NOTED ON DRAWINGS AND ARE NOT TO BE RE-LOCATED OR
INCREASED WITHOUT WRITTEN APPROVAL.
e. WALLS, GRADE BEAMS AND THE UNDERSIDE OF CONCRETE ON METAL
DECK SHALL BE CONSIDERED CRACKED FOR THE PURPOSE OF DESIGNING
ANCHORS FOR ATTACHMENT OF DEFERRED SUBMITTAL ITEMS.
f. POWDER ACTUATED FASTENERS (PAF) INTO CONCRETE OR CMU SHALL
NOT BE USED TO RESIST TENSION LOADS. PAF SHALL NOT BE USED TO
RESIST GRAVITY LOADS WHICH INCLUDE BRICK VENEER.
REINFORCING STEEL NOTES
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN ACCORDANCE WITH
ACI 318 AND THE CRSI "MANUAL OF STANDARD PRACTICE" AS MODIFIED BY THE
PROJECT DRAWINGS AND SPECIFICATIONS.
2. DEFORMED REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF
ASTM A615 GRADE 60.
3. WELDING OF REINFORCING SHALL BE WITH LOW HYDROGEN ELECTRODES IN
CONFORMANCE WITH AWS D1.4. WELDING OF REINFORCING STEEL IS LIMITED TO
A706 REBAR.
4. NO REINFORCING BAR FIELD BENDS SHALL BE MADE UNLESS A706 REBAR.
5. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064 GR. 65.
6. MINIMUM LAP OF WELDED WIRE FABRIC SHALL BE 6” OR TWO MESH PANELS,
WHICHEVER IS GREATER.
7. SPLICES SHALL BE MADE WHERE INDICATED ON THE STRUCTURAL DRAWINGS. IF
NOT INDICATED, SPLICE BEAM BOTTOM BARS OVER SUPPORTS AND TOP BARS AT
MIDSPAN. MAKE BAR CONTINUOUS AROUND CORNERS UON. ALL SPLICES TO BE
CONTACT TENSION SPLICE (CLASS B) UON.
8. DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME
GRADE, SIZE, SPACING, AND NUMBER AS THE SPECIFIED VERTICAL REINFORCING,
UON.
9. WHERE A 90°, 135°, OR 180° HOOK IS GRAPHICALLY INDICATED, PROVIDE
CORRESPONDING ACI STANDARD HOOKS UON.
10. MECHANICAL SPLICE COUPLERS: INSTALL IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS
CONCRETE NOTES
1. ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL
CONFORM TO ACI 318 AND ACI 301, LATEST EDITIONS, WITH MODIFICATIONS AS
NOTED ON THE DESIGN DRAWINGS OR SPECIFICATIONS.
2. CONCRETE MIXES SHALL BE SUBMITTED FOR REVIEW, DESIGNED BY A QUALIFIED
TESTING LABORATORY AND SHALL BEAR THE SEAL OF AN ENGINEER LICENSED IN
THE UNITED STATES.