These construction documents are for the replacement of the 1st and 2nd floor boiler at Building 55 in the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project (Number 667-25-200) involves comprehensive mechanical system upgrades, with detailed drawings covering mechanical room plans, floor plans for multiple levels, an attic plan, and a heating hot water schematic. The drawings include specific key notes for each plan, providing technical guidance for contractors on piping modifications, core drilling, wall penetrations, and installation requirements.
The associated federal contract opportunity is a pre-solicitation notice targeted exclusively at Service-Disabled Veteran-Owned Small Businesses (SVOSBs) with a construction cost range between $250,000 and $500,000. The primary NAICS code is 238220 for Plumbing, Heating, and Air Conditioning Contractors. The official solicitation (36C25625R0083) is planned for release on SAM.gov around 04/18/2025, with the contract to be awarded using the FAR 15.101-1 Tradeoff Process. Interested SDVOSB contractors must be certified in the SBA database, registered in SAM, and will be required to submit a bid bond.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 667-25-200 RFI Register 05212025 .docx | DOCX document | |
| 36C25625R0083 0003.docx | DOCX document | |
| 667-25-200 Site Visit Sign in Sheet.pdf | ||
| 36C25625R0083 0002.docx | DOCX document | |
| 36C25625R0083 0001.docx | DOCX document | |
| 36C25625R0083 667-25-200 Specs.pdf | ||
| 36C25625R0083 EXHIBIT D.docx | DOCX document | |
| 36C25625R0083 SOW v2 03272025.doc | DOC document | |
| 36C25625R0083 Replace Bldg 55 Boiler ICRA .pdf | ||
| 36C25625R0083 EXHIBIT A.docx | DOCX document | |
| 36C25625R0083 EXHIBIT F.docx | DOCX document | |
| 36C25625R0083 Pump schedule .pdf | ||
| 36C25625R0083 EXHIBIT C.docx | DOCX document | |
| 36C25625R0083 EXHIBIT E.docx | DOCX document | |
| 36C25625R0083 WD LA20250031 02282025.pdf | ||
| 36C25625R0083 RFP.docx | DOCX document | |
| 36C25625R0083 Class III Precautions - Bldg 55 Boiler Replacement .pdf | ||
| 36C25625R0083.docx | DOCX document | |
| 36C25625R0083 SOW 03272025 .doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025 JM
COVER SHEET AND INDEX CONSTRUCTION
DOCS
FULLY SPRINKLERED E-104
U.S. Department of Veterans Affairs
VETERANS
HEALTH
ADMINISTRATION
Replace Building 55 1st and 2nd Floor Boiler
OVERTON BROOKS VA MEDICAL CENTER
SHREVEPORT, LA
SHEET NO. SHEET NAME
GENERAL
G-001 COVER SHEET & DRAWING INDEX
MECHANICAL
M-100 MECHANICAL ROOM PLAN
M-101 FIRST FLOOR PLAN
M-203 SECOND FLOOR PLAN
M-300 THIRD FLOOR PLAN
M-400 ATTIC PLAN
M-500 HEATING HOT WATER SCHEMATIC
VHASHRMoralJ Line
VHASHRMoralJ Typewritten Text G-001
1 2
1 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025 JM
MECHANICAL ROOM PLAN CONSTRUCTION
DOCS
FULLY SPRINKLERED M-100
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
5-HWB-1
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
UH-5
AutoCAD SHX Text
WH
AutoCAD SHX Text
ET-1
AutoCAD SHX Text
AS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 34"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text
5-EF-2
AutoCAD SHX Text
HWS
AutoCAD SHX Text
5-HWP-1
AutoCAD SHX Text 2"
AutoCAD SHX Text 34"
AutoCAD SHX Text
HWS
AutoCAD SHX Text 2"
AutoCAD SHX Text
HWS
AutoCAD SHX Text R
AutoCAD SHX Text
BCU-2
AutoCAD SHX Text D
AutoCAD SHX Text
HWR
AutoCAD SHX Text 3"
AutoCAD SHX Text MODIFY EXISTING HEATING HOT WATER (HHW) RETURN PIPING TO ACCEPT NEW 3" HHW PIPE AND CONNECTIONS. CONNECTION MUST BE MADE AFTER AFTER AHU HHW RETURN. INSTALL ISOLATION VALVES, PRESSURE TRANSMITTER, FLOW MEASURING DEVICES AND ELEMENTS AS INDICATED ON SHEET M-500. ROUTE 3" HHW SUPPLY AND RETURN PIPING THROUGH FIRE BARRIER WALL. FIRE CAULK PENETRATION, INSULATE PIPING, AND PROVIDE SUPPORTS AS DESCRIBED IN SPECIFICATIONS. REPLACE 1ST AND 2ND FLOOR BOILER (5-HWB-1) AS DESCRIBED IN SOW. ENSURE ALL MODIFICATION NEEDED TO ACCEPT NEW BOILER ARE ACCOUNTED FOR WITHIN THIS CONTRACT. MODIFY ALL PIPING, MECHANICAL COMPONENTS AND ELECTRICAL AS NEEDED TO ACCEPT NEW BOILER.
AutoCAD SHX Text
KEY NOTES:
MINOR
PROCEDURE
MEDICAL
PREP
STORAGE
JANITOR
CLOSET
RESTROOM
RESTROOM
MECHANICAL
ROOM
ELECTRICAL
ROOM
IT
CLOSET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025 JM
FIRST FLOOR PLAN CONSTRUCTION
DOCS
FULLY SPRINKLERED M-101
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
%%UVAV-113
AutoCAD SHX Text
%%UVAV-114
AutoCAD SHX Text
%%UVAV-116
AutoCAD SHX Text
VAV-116
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 34"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 34"
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text
BCU-1
AutoCAD SHX Text D
AutoCAD SHX Text 3"
AutoCAD SHX Text ROUTE 3" HHW SUPPLY AND RETURN FROM ROOM 143 TO ROOM 122. SEAL PENETRATIONS PER SPECIFICATIONS. AVOID DUCTWORK OR RELOCATE AS NEEDED. CORE DRILL FLOOR OPENING TO ACCEPT NEW 3" HHW SUPPLY AND RETURN RISE. ENSURE PIPE RISER RUNS WITHIN CLOSE PROXIMTEY TO PLAN WEST WALL AND ADJACENT TO STRUCTURAL BEAM. PIPE RISER MUST LIMITED THE AMOUNT OF FITTINGS TO REDUCE PRESSURE LOSS. RELOCATE ALL ELEMENTS TO ACCEPT NEW PIPING.
EXAM
ROOM
RE
ST
RO
OM
RESTROOM
CORRIDOR
HBPC
OFFICE
T
T
T
T
H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025 JM
SECOND FLOOR PLAN CONSTRUCTION
DOCS
FULLY SPRINKLERED M-200
ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg ftp://image.autodesk.com/drawing/SINGLE_OVAL_SINK.dwg AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
%%UVAV-214
AutoCAD SHX Text
VAV-216
AutoCAD SHX Text
%%UVAV-220
AutoCAD SHX Text
VAV-220
AutoCAD SHX Text
VAV-218
AutoCAD SHX Text
%%UVAV-217
AutoCAD SHX Text
VAV-217
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1 "14"
AutoCAD SHX Text
AutoCAD SHX Text CORE DRILL FLOOR OPENING TO ACCEPT NEW 3" HHW SUPPLY AND RETURN RISE. ENSURE PIPE RISER RUNS WITHIN CLOSE PROXIMTEY TO PLAN WEST WALL AND ADJACENT TO STRUCTURAL BEAM. PIPE RISER MUST LIMITED THE AMOUNT OF FITTINGS TO REDUCE PRESSURE LOSS. RELOCATE ALL ELEMENTS TO ACCEPT NEW PIPING. CONSTRUCT A CHASE WALL TO ENCLOSE PIPE RISE. MATCH ALL EXISTING FINISHES TO INCLUDE PAINT, TEXTURE, AND COVE BASE. MODIFY FLOORING AND CEILING TILE AND TRACK AS NEEDED.
AutoCAD SHX Text
KEY NOTES:
VHASHRMoralJ Typewritten Text M-203
VHASHRMoralJ Line
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025 JM
THIRD FLOOR PLAN CONSTRUCTION
DOCS
FULLY SPRINKLERED M-300
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VAV-321
AutoCAD SHX Text T
AutoCAD SHX Text
VAV-311
AutoCAD SHX Text T
AutoCAD SHX Text
VAV-310
AutoCAD SHX Text
VAV-310
AutoCAD SHX Text
VAV-312
AutoCAD SHX Text
55-BCU-4
AutoCAD SHX Text
RL/RS
AutoCAD SHX Text
VAV- 311
AutoCAD SHX Text
VAV-321
AutoCAD SHX Text
12" HWR
AutoCAD SHX Text
12" HWS
AutoCAD SHX Text
12" HWR
AutoCAD SHX Text
12" HWS
AutoCAD SHX Text
12" HWS
AutoCAD SHX Text
1" HWR
AutoCAD SHX Text
1" HWS
AutoCAD SHX Text 34" D
AutoCAD SHX Text CORE DRILL FLOOR OPENING TO ACCEPT NEW 3" HHW SUPPLY AND RETURN RISE. ENSURE PIPE RISER RUNS WITHIN CLOSE PROXIMTEY TO PLAN WEST WALL AND ADJACENT TO STRUCTURAL BEAM. PIPE RISER MUST LIMITED THE AMOUNT OF FITTINGS TO REDUCE PRESSURE LOSS. RELOCATE ALL ELEMENTS TO ACCEPT NEW PIPING. CONSTRUCT A CHASE WALL TO ENCLOSE PIPE RISE. MATCH ALL EXISTING FINISHES TO INCLUDE PAINT, TEXTURE, AND COVE BASE. MODIFY FLOORING AND CEILING TILE AND TRACK AS NEEDED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025 JM
ATTIC PLAN CONSTRUCTION
DOCS
FULLY SPRINKLERED M-400
AutoCAD SHX Text
EQUIPMENT LEVEL
AutoCAD SHX Text
AutoCAD SHX Text
VFD #3
AutoCAD SHX Text
55-HWP-ATTIC-2
AutoCAD SHX Text 30x20 DOWN
AutoCAD SHX Text G
AutoCAD SHX Text
55-HWB-ATTIC-2
AutoCAD SHX Text
AS
AutoCAD SHX Text
DDC PANEL
AutoCAD SHX Text
HWS
AutoCAD SHX Text
VFD #1
AutoCAD SHX Text
VFD #2
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
HUMIDIFIER
AutoCAD SHX Text
COOLING
AutoCAD SHX Text 32x20 DOWN
AutoCAD SHX Text
55-FCU-01
AutoCAD SHX Text
12" HWS
AutoCAD SHX Text
12" HWR
AutoCAD SHX Text
2 " HWR12" HWR
AutoCAD SHX Text
2 " HWS12" HWS
AutoCAD SHX Text 2"
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
VFD #4
AutoCAD SHX Text 34x20
AutoCAD SHX Text 34x20
AutoCAD SHX Text
55-ET-ATTIC-1
AutoCAD SHX Text 16"%%c
AutoCAD SHX Text
55-EF-ATTIC-3
AutoCAD SHX Text 32x16
AutoCAD SHX Text 32x16
AutoCAD SHX Text 32x16
AutoCAD SHX Text 3"
AutoCAD SHX Text CORE DRILL FLOOR OPENING TO ACCEPT NEW 3" HHW SUPPLY AND RETURN RISE. ENSURE PIPE RISER RUNS WITHIN CLOSE PROXIMTEY TO PLAN WEST WALL AND ADJACENT TO STRUCTURAL BEAM. PIPE RISER MUST LIMITED THE AMOUNT OF FITTINGS TO REDUCE PRESSURE LOSS. RELOCATE ALL ELEMENTS TO ACCEPT NEW PIPING. PENETRATE MECHANICAL ROOM WALL TO ROUTE NEW PIPING. ROUTE VERTICAL AND HORIZANTAL RUN NEXT TO STRUCTURAL BEAM. DO NOT IMPACT MAINTENANCE ACCESS TO BOILER AND OTHER MECHANICAL DEVICES. CONNECT NEW 3" HHW RETURN TO EXISTING 3" HHW SUPPLY. PROVIDE ISOLATION VALVES, TEMPERATURE SENSORS, AND PRESSURE TRANSMITTER AT NEW CONNECTION. CONNECT NEW 3" HHW SUPPLY TO EXISTING 3" HHW RETURN. PROVIDE ISOLATION VALVES, TEMPERATURE SENSORS, AND PRESSURE TRANSMITTER AT NEW CONNECTION.
3 12
3 12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OVERTON BROOKS VAMC
SHREVEPORT, LOUISIANA
Project Director
Revisions: Date:
Project Director Contact Information
667-25-200
BLDG 1 - MAIN HOSPITAL
Replace Building 55 1st and 2nd Floor Boiler
JM01/09/2025
HEATING HOT WATER
SCHEMATIC
CONSTRUCTION
DOCS
FULLY SPRINKLERED M-500
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BOILER HOT WATER SCHEMATIC
AutoCAD SHX Text
NONE
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
5-HWB-1
AutoCAD SHX Text
5-HWP-1
AutoCAD SHX Text
TO 1ST FLOOR SYSTEM
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
55-HWB-ATTIC-2
AutoCAD SHX Text
5-HWP-2
AutoCAD SHX Text
FROM 1ST FLOOR SYSTEM
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
TO 3RD FLOOR SYSTEM
AutoCAD SHX Text
FROM 3RD FLOOR SYSTEM
AutoCAD SHX Text
TO 2ND FLOOR SYSTEM
AutoCAD SHX Text
FROM 2ND FLOOR SYSTEM
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BOILER HOT WATER SCHEMATIC
AutoCAD SHX Text
NONE
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text PROVIDE PIPE MOUNTED PRESSURE GAUGE AND PRESSURE SENSOR FOR BAS AND PETE'S PLUG, PROVIDE PIPE MOUNTED THERMOMETER AND TEMPERATURE SENSOR FOR THE BUILDING AUTOMATION SYSTEM (BAS) PROVIDE FLOW SENSOR IN THERMO-WELD. BALL VALVE AND UNION CHECK VALVE
AutoCAD SHX Text
KEY NOTES:
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text
HWS
VHASHRMoralJ Typewritten Text
MODULATING CONTROLS VALVES
VHASHRMoralJ Typewritten Text
VHASHRMoralJ Oval
VHASHRMoralJ Typewritten Text
VHASHRMoralJ Oval
| Sheets and Views |
| Building 55 Boiler-G-001 |
| Building 55 Boiler-M-100 |
| Building 55 Boiler-M-101 |
| Building 55 Boiler-M-200 |
| Building 55 Boiler-M-300 |
| Building 55 Boiler-M-400 |
| Building 55 Boiler-M-500 |
File details come from the government source that posted it. Updated .