36C25624R0098 ICRA Preliminary.pdf

PDF 133 KB Posted

Attached to
Z1DA--CON Project #667-24-155 Mammography Site Prep (VA-25-00001572)
Solicitation number
36C25624R0098
Issued by

About this file

This document is an Infection Control Risk Assessment (ICRA) for a construction project at the Overton Brooks VA Medical Center. The project is for Mammography Site Prep, Contract #667-24-155.

The ICRA classifies the construction project activities into four types (A-D) based on the level of dust and debris generated. It then identifies the patient risk groups affected, ranging from low to highest risk. Using an IC Matrix, the ICRA determines the appropriate infection control precaution class (I-V) based on the construction type and patient risk. For this project, the preliminary ICRA was completed on 03/01/2024, with the final ICRA pending. This ICRA provides the required infection control documentation for the construction project.

View the file

Other files

File Type Posted
Dimensions Site Planning Guide MAN-03169 EN Rev_005 12-2017.pdf PDF
A103 3rd Floor Plan.pdf PDF
1_Revised RECORD DRAWINGS-FULL SET.pdf PDF
18 A1.2 SECOND FLOOR PLAN.pdf PDF
36C25624R0098 RFI Register 08212024.docx DOCX document
36C25624R0098 0006.docx DOCX document
DS-09243-Rev005_Brevera_DataSheet_US.pdf PDF
01 00 00 - General Requirements.docx DOCX document
36C25624R0098 0005.docx DOCX document
36C25624R0098 0004.docx DOCX document
36C25624R0098 Mammography Layout-1B .pdf PDF
36C25624R0098 0003.docx DOCX document
667-24-155 Site Visit Sign in Sheet.pdf PDF
36C25624R0098 0002.docx DOCX document
36C25624R0098 0001.docx DOCX document
36C25624R0098 EXHIBIT B.docx DOCX document
36C25624R0098 ICRA Precautions Mammography Site Prep.docx DOCX document
36C25624R0098 Mammography Site Prep - SOW 05292024.docx DOCX document
36C25624R0098 26 05 11 - Requirements for Electrical Installations.docx DOCX document
36C25624R0098 RFP.docx DOCX document
36C25624R0098 EXHIBIT C.docx DOCX document
36C25624R0098 WD LA20240031 Dated 01052024.pdf PDF
36C25624R0098 26 05 33 - Raceway and Boxes for Electrical Systems.docx DOCX document
36C25624R0098 01 00 00 - General Requirements.docx DOCX document
36C25624R0098 23 05 93 - Testing Adjusting and Balancing for HVAC.docx DOCX document
36C25624R0098 EXHIBIT F.docx DOCX document
36C25624R0098 01 33 23 - Shop Drawings-Product Data and Samples .docx DOCX document
36C25624R0098 26 05 19 - Low-Voltage Electrical Power Conductors and Cables.docx DOCX document
36C25624R0098 02 41 00 - Demolition.docx DOCX document
36C25624R0098 01 45 00 - Quality Control.docx DOCX document
36C25624R0098 EXHIBIT A.docx DOCX document
36C25624R0098 01 35 26 - Safety Requirements.docx DOCX document
36C25624R0098 07 84 00 - Firestopping.docx DOCX document
36C25624R0098 EXHIBIT D.docx DOCX document
36C25624R0098 23 05 11 - Common Work Results for HVAC .docx DOCX document
36C25624R0098 EXHIBIT E.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VA Medical Center Infection Prevention & Control

Step One: Circle the Construction Project Activity Type (A-D). Project: Mammography Site Prep 667-24-155

Type A

Inspection and non-invasive activities. Includes but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile/50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type B

Small-scale, short duration activities; minimal dust and debris. Includes but not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection/repair of firewalls and barriers, install conduit/cabling, & access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Type C

Large-scale, long duration activities; moderate amount of dust and debris. Includes but not limited to:

• Removal of preexisting floor covering, walls, casework, or other building components.

• New drywall placement.

• Renovation work in a single room.

• Non-existing cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Type D

Major demolition and construction activities. Includes but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Step Two: Circle the Risk Group(s) affected. Select the higher group, when more than one group will be affected.

Low Risk* Medium Risk High Risk Highest Risk

*Not in patient care areas

• Public hallways & gathering areas

• Office areas

• Breakrooms

• Bathrooms or locker rooms

• Mechanical rooms

• EMS closets

• Waiting areas

• Clinical engineering

• Materials management.

• SPS Decon area

• Kitchen, cafeteria, gift shop, coffee shop, food kiosks.

• Patient care rooms/clinics

• All acute inpatient units

• Emergency department

• Occupation Health

• Pharmacy general areas

• Medication, clean utility & sterile supply rooms

• Imaging/diagnostic suites

• Laboratory.

• All transplant & ICUs

• All oncology units.

• OR suites & restricted areas.

• Procedural suites.

• Pharmacy compounding areas

• SPS: Prep and HLD areas

• Transfusion services.

• Dedicated isolation wards/units.

• Invasive imaging suites:

Step Three: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk.

Construction Project Type

Patient Risk Group Type A Type B Type C Type D

IC

M a tr ix LOW Risk Group1 I II II III

MEDIUM Risk Group1 I II III2 IV2

HIGH Risk Group1 I III IV2 V2

HIGHEST Risk Group1 III IV2 V2 V2

1. Amend as follows for environmental conditions that could affect human health (i.e., sewage, mold, asbestos, gray water, and black water). Class IV Precautions for LOW and MEDIUM Risk Groups and Class V Precautions for HIGH and HIGHEST Risk Groups.

2. Infection Control documents required for Class III Precautions in Type C projects and all Class IV & V Precautions.

Preliminary ICRA: 03/01/2024

DATE

Final ICRA: _

DATE

2024-03-01T15:18:46-0600
CAROL PHILLIPS

File details come from the government source that posted it. Updated .