This document is a Performance Relevancy Survey for a federal contract opportunity, Solicitation Number 36C25624R0098 for Site Prep for Mammography.

The survey requires offerors to provide information on up to 5 relevant past performance projects completed within the past 5 years, including contract details, description of work performed, and an assessment of the relevancy of the work to the current solicitation. Offerors must also provide additional information not specific to the referenced projects, such as any history of liquidated damages, problems encountered and corrective actions taken, and unique skills or accomplishments relevant to the current project. The survey is part of the proposal submission requirements for the federal contract opportunity, which is for project number 667-24-155 to be awarded by the Department of Veterans Affairs, Veterans Integrated Service Network 16.

View the file

Other files

File Type Posted
Dimensions Site Planning Guide MAN-03169 EN Rev_005 12-2017.pdf PDF
A103 3rd Floor Plan.pdf PDF
1_Revised RECORD DRAWINGS-FULL SET.pdf PDF
18 A1.2 SECOND FLOOR PLAN.pdf PDF
36C25624R0098 RFI Register 08212024.docx DOCX document
36C25624R0098 0006.docx DOCX document
DS-09243-Rev005_Brevera_DataSheet_US.pdf PDF
01 00 00 - General Requirements.docx DOCX document
36C25624R0098 0005.docx DOCX document
36C25624R0098 0004.docx DOCX document
36C25624R0098 Mammography Layout-1B .pdf PDF
36C25624R0098 0003.docx DOCX document
667-24-155 Site Visit Sign in Sheet.pdf PDF
36C25624R0098 0002.docx DOCX document
36C25624R0098 0001.docx DOCX document
36C25624R0098 EXHIBIT B.docx DOCX document
36C25624R0098 ICRA Precautions Mammography Site Prep.docx DOCX document
36C25624R0098 Mammography Site Prep - SOW 05292024.docx DOCX document
36C25624R0098 26 05 11 - Requirements for Electrical Installations.docx DOCX document
36C25624R0098 RFP.docx DOCX document
36C25624R0098 EXHIBIT C.docx DOCX document
36C25624R0098 WD LA20240031 Dated 01052024.pdf PDF
36C25624R0098 26 05 33 - Raceway and Boxes for Electrical Systems.docx DOCX document
36C25624R0098 01 00 00 - General Requirements.docx DOCX document
36C25624R0098 23 05 93 - Testing Adjusting and Balancing for HVAC.docx DOCX document
36C25624R0098 EXHIBIT F.docx DOCX document
36C25624R0098 01 33 23 - Shop Drawings-Product Data and Samples .docx DOCX document
36C25624R0098 26 05 19 - Low-Voltage Electrical Power Conductors and Cables.docx DOCX document
36C25624R0098 02 41 00 - Demolition.docx DOCX document
36C25624R0098 ICRA Preliminary.pdf PDF
36C25624R0098 01 45 00 - Quality Control.docx DOCX document
36C25624R0098 01 35 26 - Safety Requirements.docx DOCX document
36C25624R0098 07 84 00 - Firestopping.docx DOCX document
36C25624R0098 EXHIBIT D.docx DOCX document
36C25624R0098 23 05 11 - Common Work Results for HVAC .docx DOCX document
36C25624R0098 EXHIBIT E.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 667-24-155 Site Prep for Mammography 36C25624R0098

EXHIBIT A

PERFORMANCE RELEVANCY SURVEY

Offeror Name/Company

PART 1. CONTRACT REFERENCES: Provide the following information requested in this format for each of the projects/contracts you intend to have considered for evaluation. Projects shall have been completed no more than 5 years prior to the solicitation issue date. Provide all information requested regarding YOUR PERFORMANCE on the contracts you elect to reference.

Project Submittal #___________________ (NOTE: Offerors allowed NO MORE than 5 projects- offerors to make appropriate copies) Project/Contract Title: ________________________________ Contract Number/Task Order Number:_______________________ Location of Project:__________________________________ Description of Effort as Prime ( ) or Subcontractor ( ) Original Contract Value: $________________________ Current/completed Contract Value: $_________________________ Was project completed on time: Yes ( ) No ( ) Start date: ___________________ End date:_________________ Reason for delay if applicable:__________________________________________________ Any liquidated damages: Yes ( ) No ( ) CPARS available: Yes ( ) No ( ) (NOTE: Offeror can provide CPARS with proposal; however, the questionnaire has more detailed questions.)

Provide detailed description of the work performed under the contract and describe why you believe the work is VERY REVELANT, RELEVANT, or SEMI-RELEVANT. (Circle one)

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Relevance detailed description of project to include work by subcontractors:

Point of Contact of Reference on project (who you are sending questionnaire/survey to):

Name: ________________________ Title: ________________________ Agency: ________________________ Email: ________________________ Phone: ________________________ POTENTIAL OFFERORS: IT IS YOUR RESPONSIBILITY TO FOLLOW-UP WITH YOUR REFERENCES IN SUBMITTING QUESTIONNAIRES PRIOR TO THE CLOSE OF THE SOLICITATION.

PART 2. NOT RELATED TO PART 1: Additional offeror information required, but not project specific. THIS INFORMATION NEED ONLY BE PROVIDED ONCE IN YOUR SUBMISSION PACKAGE.

Offeror representative providing the below information:_______________________

1. Provide information regarding the assessment of liquidated damages on any contracts within the last five years. (Frequency, circumstances, severity of problem, etc.)

2. Offerors are strongly encouraged to include with their proposals information on problems encountered on any relevant projects and the specific corrective actions taken to remedy the problems. Furthermore, please provide explanation of any marginal ratings in CPARS if applicable:

3. Other Past Performance Considerations. Information provided shall be limited to the period starting five years prior to the solicitation release date and may include the following:

a. Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations

b. Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

4. Address any technical areas about this project you consider uniquely relevant to this solicitation.

· Descriptions must address the following:

· Describe the specific elements of the work performed by your firm.

· Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on this project.

File details come from the government source that posted it. Updated .