This document appears to be a set of revised record drawings for a federal contract opportunity related to the Mammography Site Prep project (VA-25-00001572) with Solicitation Number 36C25624R0098. The contract is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
The key details of the contract opportunity include:
- Solicitation Number: 36C25624R0098
- Project Name: Mammography Site Prep (VA-25-00001572)
- Issuing Agency: Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16
- The document provided appears to be a set of revised record drawings, but does not contain details on the specific products, services, or performance requirements of the contract.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 667-085
WOMEN'S PRIMARY CARE CLINIC
THIRD FLOOR ADDITION
DEPARTMENT OF VETERANS AFFAIRS
OVERTON BROOKS VAMC
SHREVEPORT, LAGENERAL NOTES APPLICABLE TO ALL DRAWINGS
FOR THIS PROJECT
DRAWING TITLEDWG
NO.
INDEX OF DRAWINGS
DRAWING TITLEDWG
NO.
LOCATION
DRAWING TITLEDWG
NO.
BUILDING
SCHEDULING NOTE TO CONTRACTOR:
RECORD DRAWINGS
G001
COVER SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
RECORD DRAWINGS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WOMEN'S PRIMARY CARE
CLINIC THIRD FLOOR ADDITION
SHREVEPORT, LA
667-085
Project Director
03/10/2017 JJH MCC/DBRevisions: Date:
4525 Main Street Virginia Beach, VA 23462
757.455.5800 Fax: 757.455.5638
www.clarknexsen.com Clark Nexsen License # C-1028
APPLIEDENGINEERING
SOLUTIONS
AutoCAD SHX Text
1. WORK FOR EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT WORK FOR EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT FOR EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT FOR EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT EACH AREA IS TO BE COORDINATED WITH THE COR OR PROJECT AREA IS TO BE COORDINATED WITH THE COR OR PROJECT AREA IS TO BE COORDINATED WITH THE COR OR PROJECT IS TO BE COORDINATED WITH THE COR OR PROJECT IS TO BE COORDINATED WITH THE COR OR PROJECT TO BE COORDINATED WITH THE COR OR PROJECT TO BE COORDINATED WITH THE COR OR PROJECT BE COORDINATED WITH THE COR OR PROJECT BE COORDINATED WITH THE COR OR PROJECT COORDINATED WITH THE COR OR PROJECT COORDINATED WITH THE COR OR PROJECT WITH THE COR OR PROJECT WITH THE COR OR PROJECT THE COR OR PROJECT THE COR OR PROJECT COR OR PROJECT COR OR PROJECT OR PROJECT OR PROJECT PROJECT PROJECT ENGINEER. 2. CONTRACTOR IS TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR CONTRACTOR IS TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR IS TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR IS TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR TO SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR SUBMIT A WRITTEN SCHEDULE OF WORK TO THE COR FOR A WRITTEN SCHEDULE OF WORK TO THE COR FOR A WRITTEN SCHEDULE OF WORK TO THE COR FOR WRITTEN SCHEDULE OF WORK TO THE COR FOR WRITTEN SCHEDULE OF WORK TO THE COR FOR SCHEDULE OF WORK TO THE COR FOR SCHEDULE OF WORK TO THE COR FOR OF WORK TO THE COR FOR OF WORK TO THE COR FOR WORK TO THE COR FOR WORK TO THE COR FOR TO THE COR FOR TO THE COR FOR THE COR FOR THE COR FOR COR FOR COR FOR FOR FOR APPROVAL WHICH DETAILS CONSTRUCTION START AND CONSTRUCTION COMPLETION WHICH DETAILS CONSTRUCTION START AND CONSTRUCTION COMPLETION WHICH DETAILS CONSTRUCTION START AND CONSTRUCTION COMPLETION DETAILS CONSTRUCTION START AND CONSTRUCTION COMPLETION DETAILS CONSTRUCTION START AND CONSTRUCTION COMPLETION CONSTRUCTION START AND CONSTRUCTION COMPLETION CONSTRUCTION START AND CONSTRUCTION COMPLETION START AND CONSTRUCTION COMPLETION START AND CONSTRUCTION COMPLETION AND CONSTRUCTION COMPLETION AND CONSTRUCTION COMPLETION CONSTRUCTION COMPLETION CONSTRUCTION COMPLETION COMPLETION COMPLETION FOR EACH AREA. SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE EACH AREA. SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE EACH AREA. SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE AREA. SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE AREA. SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE SCHEDULE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE OF WORK SHALL BE SUBMITTED AND APPROVED BY THE WORK SHALL BE SUBMITTED AND APPROVED BY THE WORK SHALL BE SUBMITTED AND APPROVED BY THE SHALL BE SUBMITTED AND APPROVED BY THE SHALL BE SUBMITTED AND APPROVED BY THE BE SUBMITTED AND APPROVED BY THE BE SUBMITTED AND APPROVED BY THE SUBMITTED AND APPROVED BY THE SUBMITTED AND APPROVED BY THE AND APPROVED BY THE AND APPROVED BY THE APPROVED BY THE APPROVED BY THE BY THE BY THE THE THE COR PRIOR TO STARTING ANY WORK ACTIVITIES. 3. BUILDING WILL REMAIN OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR BUILDING WILL REMAIN OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR WILL REMAIN OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR WILL REMAIN OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR REMAIN OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR REMAIN OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR OCCUPIED DURING COURSE OF CONSTRUCTION. CONTRACTOR DURING COURSE OF CONSTRUCTION. CONTRACTOR DURING COURSE OF CONSTRUCTION. CONTRACTOR COURSE OF CONSTRUCTION. CONTRACTOR COURSE OF CONSTRUCTION. CONTRACTOR OF CONSTRUCTION. CONTRACTOR OF CONSTRUCTION. CONTRACTOR CONSTRUCTION. CONTRACTOR CONSTRUCTION. CONTRACTOR CONTRACTOR CONTRACTOR TO MAINTAIN WEATHER TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION MAINTAIN WEATHER TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION MAINTAIN WEATHER TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION WEATHER TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION WEATHER TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION TIGHTNESS TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION TO AVOID OCCUPANT DISRUPTION. CONSTRUCTION AVOID OCCUPANT DISRUPTION. CONSTRUCTION AVOID OCCUPANT DISRUPTION. CONSTRUCTION OCCUPANT DISRUPTION. CONSTRUCTION OCCUPANT DISRUPTION. CONSTRUCTION DISRUPTION. CONSTRUCTION DISRUPTION. CONSTRUCTION CONSTRUCTION CONSTRUCTION ACTIVITIES SHOULD BE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE SHOULD BE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE SHOULD BE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE BE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE BE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE SCHEDULED TO AVOID LEAVING ANY PORTION OF THE TO AVOID LEAVING ANY PORTION OF THE TO AVOID LEAVING ANY PORTION OF THE AVOID LEAVING ANY PORTION OF THE AVOID LEAVING ANY PORTION OF THE LEAVING ANY PORTION OF THE LEAVING ANY PORTION OF THE ANY PORTION OF THE ANY PORTION OF THE PORTION OF THE PORTION OF THE OF THE OF THE THE THE BUILDINGS ENVELOPE EXPOSED WHILE WORK IS NOT IN PROGRESS.
AutoCAD SHX Text
1. THE CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF THE CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF SHALL CONSIST OF THE COMPLETE SET OF SHALL CONSIST OF THE COMPLETE SET OF CONSIST OF THE COMPLETE SET OF CONSIST OF THE COMPLETE SET OF OF THE COMPLETE SET OF OF THE COMPLETE SET OF THE COMPLETE SET OF THE COMPLETE SET OF COMPLETE SET OF COMPLETE SET OF SET OF SET OF OF OF CONSTRUCTION DRAWINGS AND THE SPECIFICATIONS. IT IS THE OWNER'S INTENT DRAWINGS AND THE SPECIFICATIONS. IT IS THE OWNER'S INTENT DRAWINGS AND THE SPECIFICATIONS. IT IS THE OWNER'S INTENT AND THE SPECIFICATIONS. IT IS THE OWNER'S INTENT AND THE SPECIFICATIONS. IT IS THE OWNER'S INTENT THE SPECIFICATIONS. IT IS THE OWNER'S INTENT THE SPECIFICATIONS. IT IS THE OWNER'S INTENT SPECIFICATIONS. IT IS THE OWNER'S INTENT SPECIFICATIONS. IT IS THE OWNER'S INTENT IT IS THE OWNER'S INTENT IT IS THE OWNER'S INTENT IS THE OWNER'S INTENT IS THE OWNER'S INTENT THE OWNER'S INTENT THE OWNER'S INTENT OWNER'S INTENT OWNER'S INTENT INTENT INTENT THAT BOTH CONSTRUCTION DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH BOTH CONSTRUCTION DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH BOTH CONSTRUCTION DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH CONSTRUCTION DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH CONSTRUCTION DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH DRAWINGS AND SPECIFICATIONS COMPLIMENT EACH AND SPECIFICATIONS COMPLIMENT EACH AND SPECIFICATIONS COMPLIMENT EACH SPECIFICATIONS COMPLIMENT EACH SPECIFICATIONS COMPLIMENT EACH COMPLIMENT EACH COMPLIMENT EACH EACH EACH OTHER. THEY REQUIRE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE THEY REQUIRE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE THEY REQUIRE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE REQUIRE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE REQUIRE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE A COMPLETE AND OPERATIONAL PRODUCT BASED ON THE COMPLETE AND OPERATIONAL PRODUCT BASED ON THE COMPLETE AND OPERATIONAL PRODUCT BASED ON THE AND OPERATIONAL PRODUCT BASED ON THE AND OPERATIONAL PRODUCT BASED ON THE OPERATIONAL PRODUCT BASED ON THE OPERATIONAL PRODUCT BASED ON THE PRODUCT BASED ON THE PRODUCT BASED ON THE BASED ON THE BASED ON THE ON THE ON THE THE THE DESIGN PARAMETERS. 2. SMOKING IN AREAS OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT SMOKING IN AREAS OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT IN AREAS OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT IN AREAS OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT AREAS OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT AREAS OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT OTHER THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT THAN OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT OFFICIALLY MARKED AS "SMOKING AREAS" WILL NOT MARKED AS "SMOKING AREAS" WILL NOT MARKED AS "SMOKING AREAS" WILL NOT AS "SMOKING AREAS" WILL NOT AS "SMOKING AREAS" WILL NOT "SMOKING AREAS" WILL NOT "SMOKING AREAS" WILL NOT AREAS" WILL NOT AREAS" WILL NOT WILL NOT WILL NOT NOT NOT BE PERMITTED ON VA PREMISES. 3. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED USED IN THIS PROJECT SHALL BE PROPERLY SECURED USED IN THIS PROJECT SHALL BE PROPERLY SECURED IN THIS PROJECT SHALL BE PROPERLY SECURED IN THIS PROJECT SHALL BE PROPERLY SECURED THIS PROJECT SHALL BE PROPERLY SECURED THIS PROJECT SHALL BE PROPERLY SECURED PROJECT SHALL BE PROPERLY SECURED PROJECT SHALL BE PROPERLY SECURED SHALL BE PROPERLY SECURED SHALL BE PROPERLY SECURED BE PROPERLY SECURED BE PROPERLY SECURED PROPERLY SECURED PROPERLY SECURED SECURED SECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE TO REDUCE POSSIBILITY OF ANY OF THESE TO REDUCE POSSIBILITY OF ANY OF THESE REDUCE POSSIBILITY OF ANY OF THESE REDUCE POSSIBILITY OF ANY OF THESE POSSIBILITY OF ANY OF THESE POSSIBILITY OF ANY OF THESE OF ANY OF THESE OF ANY OF THESE ANY OF THESE ANY OF THESE OF THESE OF THESE THESE THESE TOOLS BEING A HAZARD TO PATIENTS, STAFF OR VISITORS. 4. "ALL" VA PROPERTY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY "ALL" VA PROPERTY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY VA PROPERTY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY VA PROPERTY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY PROPERTY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY PROPERTY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY THAT IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY IS NOT UNDER THIS PROJECT WHICH IS DAMAGED BY NOT UNDER THIS PROJECT WHICH IS DAMAGED BY NOT UNDER THIS PROJECT WHICH IS DAMAGED BY UNDER THIS PROJECT WHICH IS DAMAGED BY UNDER THIS PROJECT WHICH IS DAMAGED BY THIS PROJECT WHICH IS DAMAGED BY THIS PROJECT WHICH IS DAMAGED BY PROJECT WHICH IS DAMAGED BY PROJECT WHICH IS DAMAGED BY WHICH IS DAMAGED BY WHICH IS DAMAGED BY IS DAMAGED BY IS DAMAGED BY DAMAGED BY DAMAGED BY BY BY CONSTRUCTION OF THIS PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR OF THIS PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR OF THIS PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR THIS PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR THIS PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR PROJECT SHALL BE REPLACED OR REPAIRED TO MATCH OR SHALL BE REPLACED OR REPAIRED TO MATCH OR SHALL BE REPLACED OR REPAIRED TO MATCH OR BE REPLACED OR REPAIRED TO MATCH OR BE REPLACED OR REPAIRED TO MATCH OR REPLACED OR REPAIRED TO MATCH OR REPLACED OR REPAIRED TO MATCH OR OR REPAIRED TO MATCH OR OR REPAIRED TO MATCH OR REPAIRED TO MATCH OR REPAIRED TO MATCH OR TO MATCH OR TO MATCH OR MATCH OR MATCH OR OR OR EXCEED THE QUALITY THAT EXISTED BEFORE DAMAGE. 5. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH FOR ACQUIRING I.D. BADGES FOR EACH FOR ACQUIRING I.D. BADGES FOR EACH ACQUIRING I.D. BADGES FOR EACH ACQUIRING I.D. BADGES FOR EACH I.D. BADGES FOR EACH I.D. BADGES FOR EACH BADGES FOR EACH BADGES FOR EACH FOR EACH FOR EACH EACH EACH MEMBER OF HIS WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO OF HIS WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO OF HIS WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO HIS WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO HIS WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO WORK FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO FORCE BEFORE ANY MEMBER WILL BE ALLOWED TO BEFORE ANY MEMBER WILL BE ALLOWED TO BEFORE ANY MEMBER WILL BE ALLOWED TO ANY MEMBER WILL BE ALLOWED TO ANY MEMBER WILL BE ALLOWED TO MEMBER WILL BE ALLOWED TO MEMBER WILL BE ALLOWED TO WILL BE ALLOWED TO WILL BE ALLOWED TO BE ALLOWED TO BE ALLOWED TO ALLOWED TO ALLOWED TO TO TO PERFORM WORK ON VA PREMISES. 6. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN OR EQUIPMENT WILL BE LOANED OR GIVEN OR EQUIPMENT WILL BE LOANED OR GIVEN EQUIPMENT WILL BE LOANED OR GIVEN EQUIPMENT WILL BE LOANED OR GIVEN WILL BE LOANED OR GIVEN WILL BE LOANED OR GIVEN BE LOANED OR GIVEN BE LOANED OR GIVEN LOANED OR GIVEN LOANED OR GIVEN OR GIVEN OR GIVEN GIVEN GIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME. 7. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. 8. SEE SPECIFICATION SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND SEE SPECIFICATION SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND SPECIFICATION SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND SPECIFICATION SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND 01 00 00 FOR INTERIM LIFE SAFETY MEASURES AND 00 00 FOR INTERIM LIFE SAFETY MEASURES AND 00 00 FOR INTERIM LIFE SAFETY MEASURES AND 00 FOR INTERIM LIFE SAFETY MEASURES AND 00 FOR INTERIM LIFE SAFETY MEASURES AND FOR INTERIM LIFE SAFETY MEASURES AND FOR INTERIM LIFE SAFETY MEASURES AND INTERIM LIFE SAFETY MEASURES AND INTERIM LIFE SAFETY MEASURES AND LIFE SAFETY MEASURES AND LIFE SAFETY MEASURES AND SAFETY MEASURES AND SAFETY MEASURES AND MEASURES AND MEASURES AND AND AND SECTION 01 35 26 INFECTION CONTROL MEASURES.
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text A121
AutoCAD SHX Text A104
AutoCAD SHX Text
THIRD FLOOR REFLECTED CEILING PLAN
AutoCAD SHX Text A201
AutoCAD SHX Text
EXTERIOR ELEVATIONS
AutoCAD SHX Text A402
AutoCAD SHX Text
ENLARGED FLOOR PLANS
AutoCAD SHX Text A301
AutoCAD SHX Text
BUILDING SECTIONS
AutoCAD SHX Text A351
AutoCAD SHX Text
WALL SECTIONS
AutoCAD SHX Text A352
AutoCAD SHX Text
WALL SECTIONS
AutoCAD SHX Text A354
AutoCAD SHX Text
STAIRWAY 1 - WALL SECTIONS
AutoCAD SHX Text A355
AutoCAD SHX Text
STAIRWAY 2 - WALL SECTIONS
AutoCAD SHX Text A451
AutoCAD SHX Text
INTERIOR ELEVATIONS
AutoCAD SHX Text A501
AutoCAD SHX Text
WALL TYPES
AutoCAD SHX Text
AutoCAD SHX Text
AREA MAP
AutoCAD SHX Text
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
STRUCTURAL
AutoCAD SHX Text G001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text G002
AutoCAD SHX Text
LEGENDS, ABBREVIATIONS, AND NOTES
AutoCAD SHX Text M101
AutoCAD SHX Text M001
AutoCAD SHX Text M102
AutoCAD SHX Text
MD103
AutoCAD SHX Text M104
AutoCAD SHX Text M501
AutoCAD SHX Text M502
AutoCAD SHX Text M601
AutoCAD SHX Text A102
AutoCAD SHX Text
SECOND FLOOR PLAN
AutoCAD SHX Text
LS100
AutoCAD SHX Text
THIRD FLOOR LIFE SAFETY PLAN
AutoCAD SHX Text
AD102
AutoCAD SHX Text
SECOND FLOOR DEMOLITION PLAN
AutoCAD SHX Text
AD102A
AutoCAD SHX Text
SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN
AutoCAD SHX Text
AD121
AutoCAD SHX Text
ROOF DEMOLITION PLAN
AutoCAD SHX Text
AD201
AutoCAD SHX Text
EXTERIOR ELEVATIONS - DEMOLITION
AutoCAD SHX Text A101
AutoCAD SHX Text
FIRST FLOOR PLAN
AutoCAD SHX Text A401
AutoCAD SHX Text
ENLARGED FLOOR PLANS
AutoCAD SHX Text
LEGEND AND GENERAL NOTES - MECHANICAL
AutoCAD SHX Text
THIRD FLOOR SUPPLY DUCTWORK NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
THIRD FLOOR PIPING NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
THIRD FLOOR RETURN AND EXHAUST DUCTWORK NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
MEZZANINE FLOOR SUPPLY DUCTWORK NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
DETAILS - MECHANICAL
AutoCAD SHX Text
DETAILS - MECHANICAL
AutoCAD SHX Text
SCHEDULES - MECHANICAL
AutoCAD SHX Text M801
AutoCAD SHX Text
CONTROL SCHEMATIC, CONTROL SCHEDULES AND LEGEND - MECHANICAL
AutoCAD SHX Text A103A
AutoCAD SHX Text
EQUIPMENT LEVEL FLOOR PLAN
AutoCAD SHX Text A104A
AutoCAD SHX Text
EQUIPMENT LEVEL REFLECTED CEILING PLAN
AutoCAD SHX Text A302
AutoCAD SHX Text
BUILDING SECTIONS
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text E001
AutoCAD SHX Text
LEGEND AND RISER DIAGRAMS
AutoCAD SHX Text
EY501
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text E002
AutoCAD SHX Text
PANELBOARD SCHEDULES AND PARTIAL FIRST FLOOR PLAN
AutoCAD SHX Text
EL101
AutoCAD SHX Text
THIRD FLOOR LIGHTING PLAN
AutoCAD SHX Text
EP101
AutoCAD SHX Text
THIRD FLOOR POWER PLAN
AutoCAD SHX Text
EP102
AutoCAD SHX Text
MEZZANINE AND STAIRS PLANS
AutoCAD SHX Text
EY101
AutoCAD SHX Text
THIRD FLOOR PLAN
AutoCAD SHX Text
EY102
AutoCAD SHX Text
NEW WORK MEZZANINE PLAN, PARTIAL FIRST AND SECOND FLOOR PLANS
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
AutoCAD SHX Text P001
AutoCAD SHX Text
FIRST FLOOR PIPING DEMOLITION PLAN
AutoCAD SHX Text
PD101
AutoCAD SHX Text
FIRST FLOOR WASTE, DRAIN AND VENT PIPING PLAN
AutoCAD SHX Text
PL101
AutoCAD SHX Text
SECOND FLOOR WASTE, DRAIN AND VENT PIPING PLAN
AutoCAD SHX Text
PL102
AutoCAD SHX Text
THIRD FLOOR WASTE, DRAIN AND VENT PIPING PLAN
AutoCAD SHX Text
PL103
AutoCAD SHX Text
MEZZANINE FLOOR WASTE, DRAIN AND VENT PIPING PLAN
AutoCAD SHX Text
PL104
AutoCAD SHX Text
FIRST & SECOND FLOOR DOMESTIC WATER DISTRIBUTION PLAN
AutoCAD SHX Text
PP101
AutoCAD SHX Text
THIRD FLOOR DOMESTIC WATER DISTRIBUTION PLAN
AutoCAD SHX Text
PP102
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text S001
AutoCAD SHX Text
STRUCTURAL NOTES
AutoCAD SHX Text S002
AutoCAD SHX Text
STRUCTURAL NOTES
AutoCAD SHX Text S202
AutoCAD SHX Text
BRACING ELEVATIONS
AutoCAD SHX Text S101
AutoCAD SHX Text
ROOF FRAMING PLAN
AutoCAD SHX Text S102
AutoCAD SHX Text
HIGH ROOF FRAMING PLAN
AutoCAD SHX Text S201
AutoCAD SHX Text
BRACING ELEVATIONS
AutoCAD SHX Text S501
AutoCAD SHX Text
STEEL DETAILS
AutoCAD SHX Text S502
AutoCAD SHX Text
STEEL DETAILS
AutoCAD SHX Text S503
AutoCAD SHX Text
STEEL DETAILS
AutoCAD SHX Text
SD101
AutoCAD SHX Text
ROOF DEMOLITION PLAN
AutoCAD SHX Text
FP001
AutoCAD SHX Text
LEGENDS, DETAILS AND GENERAL NOTES
AutoCAD SHX Text
FP101
AutoCAD SHX Text
THIRD FLOOR PLAN
AutoCAD SHX Text
FP102
AutoCAD SHX Text
PARTIAL FIRST FLOOR AND MEZZANINE PLAN
AutoCAD SHX Text A502
AutoCAD SHX Text
SECTION DETAILS
AutoCAD SHX Text A503
AutoCAD SHX Text
PLAN DETAILS
AutoCAD SHX Text A353
AutoCAD SHX Text
PARTIAL WALL SECTIONS
AutoCAD SHX Text A452
AutoCAD SHX Text
CABINET AND CEILING BULKHEAD DETAILS
AutoCAD SHX Text
AS100
AutoCAD SHX Text
ARCHITECTURAL SITE PLAN
AutoCAD SHX Text
AD301
AutoCAD SHX Text
BUILDING SECTIONS - DEMOLITION
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
MD101
AutoCAD SHX Text
FIRST FLOOR RETURN AND EXHAUST DUCTWORK DEMOLITION FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
MD102
AutoCAD SHX Text
FIRST FLOOR PIPING DEMOLITION FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
FIRST FLOOR RETURN AND EXHAUST DUCTWORK NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
FIRST FLOOR PIPING NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
SECOND FLOOR EXHAUST DUCT AND PIPING DEMOLITION FLOOR PLAN - MECHANICAL
AutoCAD SHX Text M105
AutoCAD SHX Text M106
AutoCAD SHX Text M107
AutoCAD SHX Text M401
AutoCAD SHX Text
LARGE SCALE MECHANICAL SPACE NEW WORK PLAN - MECHANICAL
AutoCAD SHX Text M802
AutoCAD SHX Text
SEQUENCE OF CONTROLS - MECHANICAL
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AD101
AutoCAD SHX Text
FIRST FLOOR DEMOLITION PLAN
AutoCAD SHX Text
AD101A
AutoCAD SHX Text
FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
AutoCAD SHX Text A504
AutoCAD SHX Text
STAIR DETAILS
AutoCAD SHX Text A601
AutoCAD SHX Text
FINISH SCHEDULES
AutoCAD SHX Text A611
AutoCAD SHX Text
DOOR SCHEDULE, DOORS, FRAMES AND DETAILS
AutoCAD SHX Text A612
AutoCAD SHX Text
WINDOW TYPES
AutoCAD SHX Text A613
AutoCAD SHX Text
THIRD FLOOR SIGNAGE PLAN
AutoCAD SHX Text
QH103
AutoCAD SHX Text
THIRD FLOOR EQUIPMENT PLAN
AutoCAD SHX Text A103
AutoCAD SHX Text
THIRD FLOOR PLAN
AutoCAD SHX Text S504
AutoCAD SHX Text
STEEL DETAILS
AutoCAD SHX Text
ROOF DEMOLITION FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
MD104
AutoCAD SHX Text M103
AutoCAD SHX Text
SECOND FLOOR EXHAUST DUCT AND PIPING NEW WORK FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
ISOMETRIC RISER DIAGRAMS
AutoCAD SHX Text
PP301
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
PP401
AutoCAD SHX Text
RECORD DRAWINGS
AutoCAD SHX Text 1 -
AutoCAD SHX Text 4/22/2021
AutoCAD SHX Text 440 Martin Luther King, Jr. Blvd., Suite 401 Macon, Georgia 31201 Phone: (478) 314-1270 - Fax: (478) 314-1271 www.aes-pe.com
MOUNTING HEIGHTS
ARCHITECTURAL LEGEND
DOOR / WALL LEGEND
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL RENOVATION GENERAL
NOTES:
ARCHITECTURAL GENERAL
NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
RECORD DRAWINGS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WOMEN'S PRIMARY CARE
CLINIC THIRD FLOOR ADDITION
SHREVEPORT, LA
667-085
Project Director
03/10/2017 JJH MCC/DBRevisions: Date:
G002
LEGENDS ABBREVIATIONS AND NOTES
AutoCAD SHX Text
DISPENSERS
AutoCAD SHX Text
H/C TELEPHONE
AutoCAD SHX Text
ELEC. OUTLET
AutoCAD SHX Text
GLOVE
AutoCAD SHX Text
(SIDE REACH)
AutoCAD SHX Text
(@ COUNTER)
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
PROJECTION SCREEN /
AutoCAD SHX Text
MARKER BOARD
AutoCAD SHX Text
TYP. OUTLET &
AutoCAD SHX Text
TELE @ COUNTER
AutoCAD SHX Text
TELE
AutoCAD SHX Text
GAS
AutoCAD SHX Text
RECEPTACLE
AutoCAD SHX Text
SHARPS
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
CALL
AutoCAD SHX Text
PUBLIC
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
FULL LENGTH
AutoCAD SHX Text
MIRROR
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
COAT CLOSET/
AutoCAD SHX Text
RACK
AutoCAD SHX Text
HOOK
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
ROD
AutoCAD SHX Text
CABINET
AutoCAD SHX Text
FIRE EXTING.
AutoCAD SHX Text
FOUNTAIN
AutoCAD SHX Text
H/C DRINKING
AutoCAD SHX Text
SWITCHES
AutoCAD SHX Text
CONTROLS/
AutoCAD SHX Text
COMM/TELE
AutoCAD SHX Text
MODULE
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
FIRE ALARM
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW DRYWALL STUD TOP OF SLAB TOP OF MASONRY ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. COORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTION DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT, AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT, CONDUIT, AND PIPE ROUTING ABOVE CEILINGS. COORDINATE AND PROVIDE SOLID WOOD BLOCKING FOR WALL HOOKS, BRACKETS, GRAB BARS, WOOD MOLDINGS, DISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONS WITH COTR FOR GOVERNMENT FURNISHED EQUIPMENT. PROVIDE IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, AND FIRE-RATED WALLBOARD WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB (ONE HOUR MINIMUM AT MASONRY AND SLABS). SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COTR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. REFER TO SHEET A601 FOR FINISH TYPE AND LOCATION. REFER TO SHEET A611 FOR DOOR SCHEDULE. REFER TO SHEET A501 FOR PARTITION TYPES. ANY RENOVATION OR NEW WORK ON FIRST FLOOR (OCCUPIED) WILL NEED TO BE ACCOMPLISHED AFTER HOURS OR ON WEEKENDS. COORDINATE WITH COR.
AutoCAD SHX Text NORMAL WORKING HOURS: SHALL BE 7:30 A.M. - 4:00 P.M., MONDAY THROUGH FRIDAY EXCEPT FEDERAL HOLIDAYS. RECEIVE APPROVAL AND COORDINATE WORK DURING NON-NORMAL HOURS WITH THE COR AT LEAST 72 HOURS IN ADVANCE. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS COORDINATE SIZE AND LOCATION OF SUCH WORK WITH INSTALLERS OF SUCH CONDUIT, PIPE, DUCT, AND EQUIPMENT. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. FIELD VERIFY EXISTING DIMENSIONS PRIOR TO ORDERING OR CUTTING MATERIALS. OPENINGS CREATED IN SLABS, SMOKE PARTITIONS, OR FIRE RATED PARTITIONS BY THIS WORK SHALL BE REPAIRED USING TECHNIQUES AND MATERIALS TO MAINTAIN THE RATING OF THE WALL, INCLUDING BUT NOT LIMITED TO, SMOKE DAMPERS, FIRE DAMPERS, FIRESTOPPING, AND FIRE SAFING. PENETRATIONS OF MASONRY WALLS AND CONCRETE FLOORS SHALL BE FIRE STOPPED TO MINIMUM ONE HOUR RATING. PROTECT WITH UL. RATED ASSEMBLIES WHERE APPLICABLE.
AutoCAD SHX Text A.
AutoCAD SHX Text B.
AutoCAD SHX Text C.
AutoCAD SHX Text D.
AutoCAD SHX Text E.
AutoCAD SHX Text F.
AutoCAD SHX Text G.
AutoCAD SHX Text H.
AutoCAD SHX Text A.
AutoCAD SHX Text B.
AutoCAD SHX Text C.
AutoCAD SHX Text D.
AutoCAD SHX Text E.
AutoCAD SHX Text F.
AutoCAD SHX Text G.
AutoCAD SHX Text H.
AutoCAD SHX Text
CABINET MOUNTED FIRE EXTINGUISHER -
AutoCAD SHX Text
WALL TYPE
AutoCAD SHX Text
LIGHT FIXTURE (SEE ELEC. DRAWINGS FOR EXACT TYPES)
AutoCAD SHX Text
LIGHT FIXTURE (SEE ELEC. DRAWINGS FOR EXACT TYPES)
AutoCAD SHX Text
FIRE ALARM VISIBLE APPLIANCE
AutoCAD SHX Text 24" x 24" CEILING GRID WITH LAY-IN ACOUSTICAL CEILING TILES
AutoCAD SHX Text
FIRE ALARM COMBINATION AUDIBLE/VISIBLE APPLIANCE
AutoCAD SHX Text
RECESSED- LIGHT FIXTURE (SEE ELEC. DRAWINGS FOR EXACT TYPES)
AutoCAD SHX Text
HVAC DIFFUSER, SEE MECHANICAL DRAWINGS
AutoCAD SHX Text
GYPSUM BOARD CEILING. SEE FINISH SCHEDULE FOR INFORMATION
AutoCAD SHX Text
SHEET WHERE DETAIL IS DRAWN
AutoCAD SHX Text
HVAC RETURN AIR GRILLE, SEE MECHANICAL DRAWINGS
AutoCAD SHX Text
SHEET WHERE DETAIL IS DRAWN
AutoCAD SHX Text
COLUMN CENTERLINE DESIGNATION
AutoCAD SHX Text A
AutoCAD SHX Text
WALL ELEVATION REFERENCE
AutoCAD SHX Text
ELEVATION MARKER
AutoCAD SHX Text + 0'-6"
AutoCAD SHX Text
SECTION MARKER
AutoCAD SHX Text
VERTICAL ELEVATION
AutoCAD SHX Text
DETAIL REFERENCE
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
DETAIL REFERENCE
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
HEAT DETECTOR
AutoCAD SHX Text
SPEAKER
AutoCAD SHX Text
FIRE ALARM PULL STATION
AutoCAD SHX Text
EXIT SIGN (WALL, CEILING)
AutoCAD SHX Text
AutoCAD SHX Text
NEW WORK NOTE
AutoCAD SHX Text
DEMOLITION NOTE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
AutoCAD SHX Text F.E.C.
AutoCAD SHX Text
DOOR NUMBER
AutoCAD SHX Text
ROOM NAME AND NUMBER
AutoCAD SHX Text ACROVYN ACOUSTICAL CEILING TILE ABOVE FINISH FLOOR ALUMINUM BATT INSULATION BULKHEAD BEAM/BEAMS BOTTOM OF BEARING CEMENTITIOUS BACKER BOARD CENTERLINE CEILING CONCRETE MASONRY UNIT CASED OPENING CONCRETE CONSTRUCTOR CONTRACTING OFFICER'S REPRESENTATIVE CERAMIC TILE CARPET DIAMETER DOWNSPOUT DRAWING/DRAWINGS ELECTRIC DRINKING FOUNTAIN ELECTRICAL EQUAL EXPOSED STRUCTURE ET CETERA EXISTING EXPOSED TO STRUCTURE FACTORY FINISH FLOOR DRAIN FIRE HOSE CABINET FINISHED FLOOR FINISH FLOOR FACE OF FURRING FIELD VERIFY (PRIOR TO ORDERING OR CUTTING) FABRIC WALLCOVERING GAGE GLASS GALV. METAL STUDS GYPSUM WALL BOARD GYPSUM BOARD HOLLOW METAL HEATING VENTILATION AND AIR-CONDITIONING INSULATION MATERIAL MAXIMUM MECHANICAL MANUFACTURE MINIMUM MASONRY OPENING METAL MOUNTED METAL NOT IN CONTRACT NON LOAD BEARING WALL ASSEMBLY NOT TO SCALE ON CENTER OPPOSITE HAND PLASTER PLASTIC LAMINATE PAIR PAINTED PAINT RUBBER BASE REFRIGERATOR ROUGH OPENING RECESSED PAPER HOLDER SEALED CONCRETE SOAP DISPENSER SOLID CORE WOOD SIMILAR SANITARY NAPKIN DISPENSER STAINLESS STEEL STEEL SUBSTRATE SHEET VINYL TELEPHONE TOP OF TOP OF STEEL TYPICAL UNLESS NOTED OTHERWISE VINYL COMPOSITION TILE VINYL WALL COVERING WALL COVERING WATER RESISTANT WOOD
AutoCAD SHX Text AC ACT AFF ALUM BATT BKHD BM/BMS BO BRG. CBB CLG. CMU C.O. CONC CONSTR. COR, COTR CT CPT DIA/ DS DWG./DWGS EDF ELEC EQ ES ETC EXIST. EXP FAC F.D. F.H.C. FF FIN FLR F.O. FURR. FV FWC GA GL GMS GWB GYP BD/GB HM HVAC INSUL. MATL MAX MECH MFGR. MIN M.O. MET MTD MTL NIC NLB NTS O.C. O.H. PLS PLAS. LAM./PL PR PT PNT RB REF R.O. RPH SC S.D. SCWD SIM SND SS STL SUBS. SV TELE T.O. T.O.S. TYP. UNO VCT VWC WC WR WD
AutoCAD SHX Text
NEW DOORS, FRAMES, AND HARDWARE
AutoCAD SHX Text
NEW WALLS
AutoCAD SHX Text
WALLS TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING WALLS TO REMAIN
AutoCAD SHX Text
DOORS , DOOR FRAMES, AND HARDWARE TO BE DEMOLISHED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. METAL STUDS USED FOR CONSTRUCTION SHALL BE MINIMUM 20 GA. 4" GALVANIZED. DEMOLITION DEBRIS REMOVAL MUST BE COMPLETED BY ROLLING CART TRANSPORT. DEBRIS SHOULD BE COVERED AND DAMPENED IF REQUIRED. CLEAN PATH OF TRAVEL EACH DAY. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.
AutoCAD SHX Text J.
AutoCAD SHX Text K.
AutoCAD SHX Text
AutoCAD SHX Text L.
AutoCAD SHX Text A101
AutoCAD SHX Text
AutoCAD SHX Text A101
AutoCAD SHX Text
AutoCAD SHX Text A101
AutoCAD SHX Text
AutoCAD SHX Text G002
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
FLOOR PENETRATION DETAIL
AutoCAD SHX Text G002
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
WALL PENETRATION DETAIL
AutoCAD SHX Text G002
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
1HR RATED CEILING ASSEMBLY
AutoCAD SHX Text I.
AutoCAD SHX Text
RECORD DRAWINGS
AutoCAD SHX Text 1 -
4/22/2021
XXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X
XXXX
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
GENERAL NOTES
SITE PLAN KEYNOTES
WOMEN'S PRIMARY CARE
CLINIC 3RD FLOOR ADDITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
RECORD DRAWINGS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WOMEN'S PRIMARY CARE
CLINIC THIRD FLOOR ADDITION
SHREVEPORT, LA
667-085
Project Director
03/10/2017 JJH MCC/DBRevisions: Date:
AS100
ARCHITECTURAL SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text
AS100
AutoCAD SHX Text
AutoCAD SHX Text 3/32" = 1'-0"
AutoCAD SHX Text
ARCHITECTURAL SITE PLAN
AutoCAD SHX Text
5-HWB-1
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWR
AutoCAD SHX Text
UH-5
AutoCAD SHX Text
WH
AutoCAD SHX Text
ET-1
AutoCAD SHX Text
AS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text
5-EF-2
AutoCAD SHX Text
5-HWP-1
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
5-CH-1
AutoCAD SHX Text
4" CWR
AutoCAD SHX Text
4" CWS
AutoCAD SHX Text R
AutoCAD SHX Text
BCU-2
AutoCAD SHX Text
CU-2
AutoCAD SHX Text D
AutoCAD SHX Text
5-CWP-1
AutoCAD SHX Text
5-AHU-1
AutoCAD SHX Text
BDW - COOLING
AutoCAD SHX Text
BDW - HEATING
AutoCAD SHX Text
OA
AutoCAD SHX Text
4" CWR
AutoCAD SHX Text
ET-2
AutoCAD SHX Text
AS
AutoCAD SHX Text
4" CWS
AutoCAD SHX Text
34" HWS
AutoCAD SHX Text
34" HWR
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
1 " HWR14" HWR
AutoCAD SHX Text
1 " HWS14" HWS
AutoCAD SHX Text
34" HWR
AutoCAD SHX Text
34" HWS
AutoCAD SHX Text
5-AHU-2
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CWR
AutoCAD SHX Text
RO
AutoCAD SHX Text
1" CWR
AutoCAD SHX Text
1" CWS
AutoCAD SHX Text
12" RO
AutoCAD SHX Text
12" RO
AutoCAD SHX Text
55-CH-PAT-2
AutoCAD SHX Text
55-CWP-PAT-2
AutoCAD SHX Text
AS
AutoCAD SHX Text
4" CWR (AG)
AutoCAD SHX Text
4" CWR (UG)
AutoCAD SHX Text
4" CWS (UG)
AutoCAD SHX Text
4" CWS (AG)
AutoCAD SHX Text
4" CWS
AutoCAD SHX Text
4" CWR
AutoCAD SHX Text
BUFFER TANK-2
AutoCAD SHX Text
4" CWR (UG)
AutoCAD SHX Text
ET-3
AutoCAD SHX Text
BUFFER TANK-1
AutoCAD SHX Text
EGRESS
AutoCAD SHX Text
EGRESS
AutoCAD SHX Text
AS100
AutoCAD SHX Text
AutoCAD SHX Text
AS100
AutoCAD SHX Text
AutoCAD SHX Text
AS100
AutoCAD SHX Text
AutoCAD SHX Text
EGRESS
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text A. CONSTRUCTION FENCE AND STAGING AREA TO BE CONFIRMED WITH COR. CONSTRUCTION FENCE AND STAGING AREA TO BE CONFIRMED WITH COR. B. ALL FIRST FLOOR EGRESS-ROUTES TO REMAIN OPERATIONAL DURING ALL FIRST FLOOR EGRESS-ROUTES TO REMAIN OPERATIONAL DURING CONSTRUCTION. ELEVATED WORK OUTSIDE THE CONSTRUCTION FENCE MUST BE COORDINATED WITH THE COR.
AutoCAD SHX Text CONTRACTOR TO MAINTAIN CLEAR BUILDING EGRESS THROUGHOUT DURATION OF CONSTRUCTION. CONTRACTOR STAGING AREA. EXACT LOCATION TO BE COORDINATED WITH COR. CONSTRUCTION FENCE. LIMIT CONSTRUCTION TO FENCE AREAS AND THOSE IMMEDIATELY ADJACENT TO BUILLDING. NEW CONCRETE PAD FOR NEW MECH. EQUIP. REMOVE ALL NECESSARY VEGETATION. NEW CONCRETE PAD FOR NEW CONDENSING UNIT. CONTRACTOR TO MAINTAIN ONE WAY VEHICULAR TRAFFIC. UTILITY EQUIPMENT TO REMAIN OPERATIONAL. CONTRACTOR TO PROTECT DURING CONSTRUCTION. EXACT LOCATION TO BE DETERMINE IN THE FIELD. COORDINATE WITH COR.
AutoCAD SHX Text C
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text Department of
AutoCAD SHX Text ALL LETTERING TO BE PAINTED BLACK WITH EXCEPTION OF PROJECT TITLE WHICH IS TO BE BLUE
AutoCAD SHX Text
PAINT BORDER MEMBER BLACK ENAMEL
AutoCAD SHX Text 2"x4" FRAME AND BRACES IN SAME PLANE
AutoCAD SHX Text
METAL FACE WHITE ENAMEL
AutoCAD SHX Text 2"x4" FRAME AND BRACE IN BACK
AutoCAD SHX Text
BORDER MEMBER PAINTED BLACK
AutoCAD SHX Text
BACKGROUND TO BE PAINTED WHITE
AutoCAD SHX Text
METAL FACE
AutoCAD SHX Text STRETCH METAL FACE TIGHT, TURN OVER FRAME AND SECURE WITH FLAT HEAD DEFORMED NAILS.
AutoCAD SHX Text
LETTERING TO BE HELVETICA STYLE 1 1/2" HIGH TO BE CENTERED HORIZONTAL
AutoCAD SHX Text ANY SEAM IN METAL TO BE FLAT SEAM - SEAMS TO BE HORIZONTAL AND OCCUR BETWEEN LINES OF LETTERING.
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text 4"x4" POSTS PAINTED WHITE
AutoCAD SHX Text
SECTION ON CENTERLINE
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
ARCHITECT TO PROVIDE DIGITAL LOGO AND ADDRESS
AutoCAD SHX Text THIS SPACE FOR PROJECT TITLE LETTERING TO BE HELVETICA STYPE 5" HIGH CENTERED BETWEEN LETTERING ABOVE AND BELOW ONE OR TWO LINES AS REQUIRED. WORDING TO BE COORDINATED WITH COR.
AutoCAD SHX Text
DESIGNED AND SUPERVISED BY: DEPARTMENT OF VETERANS AFFAIRS WASHINGTON D.C.
AutoCAD SHX Text
GENERAL CONTRACTOR
AutoCAD SHX Text
CENTER TO BE WHITE
AutoCAD SHX Text
SURROUNDING BORDER TO BLUE
AutoCAD SHX Text L
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
AS100
AutoCAD SHX Text
AutoCAD SHX Text 1' = 1'-0"
AutoCAD SHX Text
CONSTRUCTION SIGN
AutoCAD SHX Text
CONTRACTOR TO PROVIDE DIGITAL LOGO AND ADDRESS
AutoCAD SHX Text
FIN. GRADE
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text
(2)-#4 BARS
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text
EDGE OF EQUIPMENT OR SUPPORT LEG
AutoCAD SHX Text #4@18"O.C.
AutoCAD SHX Text
3/8" RADIUS (TYP.)
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text
FIN. GRADE
AutoCAD SHX Text
AS100
AutoCAD SHX Text
AutoCAD SHX Text 3/4" = 1'-0"
AutoCAD SHX Text
EQUIPMENT PAD DETAIL
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
RECORD DRAWINGS
AutoCAD SHX Text 1 -
AutoCAD SHX Text 4/22/2021
AutoCAD SHX Text 0'
AutoCAD SHX Text
SCALE: 3/32"=1'-0"
AutoCAD SHX Text 32'
AutoCAD SHX Text 24'
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text 0'
AutoCAD SHX Text
SCALE: 1"=1'-0"
AutoCAD SHX Text 6"
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 3'
AutoCAD SHX Text
SCALE: 3/4"=1'-0"
AutoCAD SHX Text 0'
AutoCAD SHX Text 4'
AutoCAD SHX Text 3'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
6"
FEC
FEC
88'-6"
'-0
117'-0"
'-2
S S
S S
S
SSS
S S
S S
S
S S S
S S S
S
S S S
S S
S S
S
S
F
F
'-4
LIFE SAFETY LEGEND
XXX'-X"
FEC
CODE ANALYSIS - THIRD FLOOR
F
S S S S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
RECORD DRAWINGS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WOMEN'S PRIMARY CARE
CLINIC THIRD FLOOR ADDITION
SHREVEPORT, LA
667-085
Project Director
03/10/2017 JJH MCC/DBRevisions: Date:
LS100
THIRD FLOOR LIFE SAFETY PLAN
AutoCAD SHX Text S301
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #1
AutoCAD SHX Text S301
AutoCAD SHX Text S301
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #2
AutoCAD SHX Text S302
AutoCAD SHX Text
LS100
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
THIRD FLOOR LIFE SAFETY PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
TOTAL TRAVEL DISTANCE TO EXIT
AutoCAD SHX Text
EXIT LIGHT
AutoCAD SHX Text
1 HOUR RATED WALL
AutoCAD SHX Text OCCUPANCY CLASSIFICATIONS: BUSINESS GROUP B BY IBC 2012 BUSINESS GROUP B BY IBC 2012 NEW CONSTRUCTION SHALL CONFORM CONFORM TO LIFE SAFETY CODE CHAPTER 38. NFPA 101 LIFE SAFETY CODE 2012 NFPA 13 SPRINKLER CODE 2012 OCCUPANCY LOAD (TABLE 7.3.1.2) THIRD FLOOR (BUSINESS) 100 gross sf/occupant (BUSINESS) 100 gross sf/occupant 100 gross sf/occupant 6,826 sf/100 = 73 OCCUPANTS EQUIPMENT LEVEL FLOOR 524 sf 524 sf CONSTRUCTION TYPE (IBC TABLE 601): TYPE IIB (1,1,1 TABLE A8.2.1.2) TYPE IIB (1,1,1 TABLE A8.2.1.2) SPRINKLERED ALLOWABLE HEIGHT (TABLE 503 IBC 2012): 3 STORIES 3 STORIES ALLOWABLE AREA (TABLE 503 IBC 2012): 23,000 SF/FLOOR 23,000 SF/FLOOR REQUIRED RATINGS (TABLE A.8.2.1.2): NEW WORK NEW WORK NEW WORK STAIR ENCLOUSURE (IBC 1009.3.1.2) 1 HOUR (IBC 1009.3.1.2) 1 HOUR SHATFS (IBC 713.4) 1 HOUR (IBC 713.4) 1 HOUR 1 HOUR CORRIDOR WALLS (IBC 1018.1) 0 HOUR - SPRINKLERED (IBC 1018.1) 0 HOUR - SPRINKLERED SMOKE BARRIER (LSC) NOT REQUIRED NOT REQUIRED MEANS OF EGRESS; EGRESS WIDTH (7.3.3.1) STAIRS 0.3 INCH/OCCUPANT SERVED EXISTING THIRD FLOOR LEVEL 0.3"x73 = 22" 0.3"x73 = 22" 0.3"x73 = 22" REQUIRED 144" AVAILABLE EXIT TRAVEL DISTANCE (38.2.6.3) 300 FT 300 FT CORRIDOR WIDTH (38.2.3.2) 44" REQUIRED 44" REQUIRED (5'-0" PROVIDED) DOOR WIDTH (7.2.1.2.3.2) 32 IN 32 IN DEAD END CORRIDOR (38.2.5.2) 50 FT 50 FT COMMON PATH OF TRAVEL (38.2.5.3.1) 100 FT 100 FT NUMBER EXIT PER FLOOR (38.2.4.1) 2 (38.2.4.1) 2 2
AutoCAD SHX Text
FIRE ALARM PULL STATION
AutoCAD SHX Text
SMOKE RATED WALL
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text 0'
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 12'
AutoCAD SHX Text
RECORD DRAWINGS
AutoCAD SHX Text 1 -
S S
S S
S
SSS
S S
S S
S
S S S
S S S
S
S S S
S S
S S
S
S
BID
DEDUCT
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
RECORD DRAWINGS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WOMEN'S PRIMARY CARE
CLINIC THIRD FLOOR ADDITION
SHREVEPORT, LA
667-085
Project Director
03/10/2017 JJH MCC/DBRevisions: Date:
QH103
THIRD FLOOR EQUIPMEMT PLAN
RE
FE
RE
NC
E
ON
LY
TH
IS
S
HE
ET
F
OR
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #1
AutoCAD SHX Text S301
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #2
AutoCAD SHX Text S302
AutoCAD SHX Text
QH103
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
THIRD FLOOR PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text K-1728
AutoCAD SHX Text
(HATCHED AREA)
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text 0'
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 12'
AutoCAD SHX Text
RECORD DRAWINGS
AutoCAD SHX Text 1 -
DEMOLITION PLAN KEY NOTES
GENERAL DEMOLITION PLAN NOTES
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
RECORD DRAWINGS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WOMEN'S PRIMARY CARE
CLINIC THIRD FLOOR ADDITION
SHREVEPORT, LA
667-085
Project Director
03/10/2017 JJH MCC/DBRevisions: Date:
AD101
FIRST FLOOR DEMOLITION PLAN
AutoCAD SHX Text
AD101
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
FIRST FLOOR DEMOLITION PLAN
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4960-ET
AutoCAD SHX Text
BARDON
AutoCAD SHX Text
C_URINALS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
LOW
AutoCAD SHX Text
VISION
AutoCAD SHX Text
AutoCAD SHX Text
LASER
AutoCAD SHX Text
AutoCAD SHX Text
TECH
AutoCAD SHX Text
AutoCAD SHX Text
TECH
AutoCAD SHX Text
AutoCAD SHX Text
TECH
AutoCAD SHX Text
AutoCAD SHX Text
SOILED
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
AutoCAD SHX Text
TECH
AutoCAD SHX Text
AutoCAD SHX Text
MINOR
AutoCAD SHX Text
PROCEDURE
AutoCAD SHX Text
AutoCAD SHX Text
MEDICAL
AutoCAD SHX Text
PREP
AutoCAD SHX Text
AutoCAD SHX Text
LASER
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
JANITOR
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
COORIDOR
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
MENS
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
LOCKERS/
AutoCAD SHX Text
FILES
AutoCAD SHX Text
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text
AutoCAD SHX Text
VISUAL
AutoCAD SHX Text
FIELDS
AutoCAD SHX Text
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
AutoCAD SHX Text
ULTRA SOUND
AutoCAD SHX Text
AutoCAD SHX Text
VISUAL FIELDS
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
STAIR #2
AutoCAD SHX Text S102
AutoCAD SHX Text
STAIR #1
AutoCAD SHX Text S101
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text #1
AutoCAD SHX Text E101
AutoCAD SHX Text
IT
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
AD301
AutoCAD SHX Text
AutoCAD SHX Text
AD301
AutoCAD SHX Text
AutoCAD SHX Text
EGRESS
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .