Project 580-22-106 Drawings.pdf
PDF 23 MB Posted
- Attached to
- Y1DA--580-22-106 Site Prep Extremity-MRI Federal contract opportunity
- Solicitation number
- 36C25623R0087
About this file
This document provides details on a federal contract opportunity for site preparation work for an MRI-Extremity replacement project at the Michael E. DeBakey VA Medical Center in Houston, Texas. The pre-solicitation opportunity, with solicitation number 36C25623R0087, is a 100% Service-Disabled Veteran-Owned Small Business set-aside to be issued as a Request for Proposals. Interested offerors must be registered in SAM, VetCert, and have the assigned NAICS code of 236220 in VetCert to be eligible to respond. The contractor shall provide all labor, materials, equipment, administration and supervision to prepare the site for MRI equipment removal and installation according to provided plans and specifications. The period of performance is 300 calendar days from notice to proceed. The solicitation and any amendments will be available on June 13, 2023 on the website listed. A firm-fixed price construction contract valued between $1,000,000 and $2,000,000 will be awarded.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In Sheet.jpg | JPG image | |
| 36C25623R0087 0001.docx | DOCX document | |
| Project 580-22-106 Specifications.pdf | ||
| SF24 Bid Bond.pdf | ||
| 36C25623R0087_1.docx | DOCX document | |
| Project 580-22-106 PDC Drawings dated 4-26-22.pdf | ||
| Project 580-22-106 GE Drawings dated 10-5-22.pdf | ||
| Project 580-22-106 Statement of Work.docx | DOCX document | |
| DOL Wage Determinations TX20230253 dated 5-5-23.pdf | ||
| 36C25623R0087.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:1 :1
P
M
COVER SHEET
NR 01 OF 69TAB
100% CONSTRUCTION DOCUMENTS
SITE PREP MRI SUITE 1C
VA PROJECT NUMBER: 580-22-106
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
100% CONSTRUCTION DOCUMENTS
GI000
MAIN BUILDING
SPUR #: 2217
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
01 GI000 COVER SHEET
02 GI001 GENERAL INFORMATION
03 GI002 ICRA INFORMATION
04 GI010 PHASING PLAN
05 GI011 LIFE SAFETY PLAN
[02] HAZARDOUS MATERIALS
06 HA100 FIRST FLOOR - ENVIRONMENTAL HAZARDS
07 HA101 ROOF - ENVIRONMENTAL HAZARDS
[03] STRUCTURAL
08 SA001 STRUCTURAL GENERAL NOTES
09 SA010 STRUCTURAL SPECIAL INSPECTIONS
10 SB101 PARTIAL FOUNDATION PLAN
11 SB102 FOUNDATION DETAILS
[04] ARCHITECTURAL
12 AD011 DEMOLITION PLAN
13 AD012 DEMOLITION REFLECTED CEILING PLAN
14 AE021 PARTITION TYPES
15 AE101 REFERENCE PLAN
16 AE401 ENLARGED PLANS
17 AE501 INTERIOR ELEVATIONS
18 AE502 INTERIOR ELEVATIONS
19 AE601 PLAN DETAILS, DOOR AND WINDOW SCHEDULE
20 AE701 RF SHIELDING DETAILS
21 AF701 FINISH FLOOR PLANS
22 AF801 MILLWORK
23 AF901 SIGNAGE PLAN
[05] FIRE PROTECTION
24 FA001 FIRE ALARM NOTES MATRIX AND RISER DIAGRAM
25 FA101 FIRE ALARM REFERENCE PLANS
26 FA401 FIRE ALARM ENLARGED PLANS
27 FA500 FIRE ALARM DETAILS
28 FX001 FIRE SPRINKLER NOTES
29 FX101 FIRE SUPPRESSION REFERENCE PLANS
30 FX401 FIRE SUPPRESSION ENLARGED PLANS
31 FX500 FIRE SPRINKLER DETAILS
[06] PLUMBING
32 P-000 PLUMBING LEGEND
33 PD100 PLUMBING DEMOLITION PLANS
34 PL100 PLUMBING PLANS
35 P-601 PLUMBING SCHEDULES AND DETAILS
[07] MECHANICAL
36 M-000 LEGEND AND ABBREVIATIONS
37 MD100 MECHANICAL HVAC DEMOLITION PLAN
38 MD101 MECHANICAL HVAC PIPING DEMOLITION PLAN
39 MP100 MECHANICAL HVAC PIPING PLANS
40 MH100 MECHANICAL HVAC DUCT PLAN
41 M-501 MECHANICAL DETAILS
42 M-502 MECHANICAL DETAILS
43 M-601 MECHANICAL SCHEDULES
44 M-701 MECHANICAL CONTROLS
45 M-702 MECHANICAL CONTROLS
[08] ELECTRICAL
46 E-001 ELECTRICAL SYMBOLS AND LEGEND
47 ED101 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1
48 ED102 ELECTRICAL LIGHTING DEMOLITION PLAN - LEVEL 1
49 ED103 ELECTRICAL DEMOLITION PLANS - INTERSTITIAL AND ROOF
50 ED601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
51 E-101 ELECTRICAL POWER PLAN - LEVEL 1
52 E-102 ELECTRICAL POWER AND LIGHTING PLAN - LEVEL 1
53 E-103 ELECTRICAL POWER PLANS - INTERSTITIAL, ROOF, AND BASEMENT
54 E-401 ELECTRICAL ENLARGED PLANS
55 E-501 ELECTRICAL DETAILS
56 E-502 ELECTRICAL DETAILS
57 E-601 ELECTRICAL ONE-LINE DIAGRAM - NEW WORK
58 E-602 ELECTRICAL SCHEDULES
59 E-603 ELECTRICAL SCHEDULES
[09] TECHNOLOGY
60 T-000 TECHNOLOGY SYMBOLS AND LEGEND
61 TD101 TELECOM DEMOLITION PLAN - LEVEL 1
62 TN101 TELECOMMUNICATIONS FLOOR PLAN - LEVEL 1
63 TN401 TELECOMMUNICATIONS ENLARGED PLANS
64 TN402 TELECOMMUNICATIONS ELEVATION PLANS - LEVEL 1
65 TN500 TELECOMMUNICATIONS DETAILS
66 TN600 TELECOMMUNICATIONS RISERS AND ONE-LINE DIAGRAMS
67 TY101 SECURITY FLOOR PLAN - LEVEL 1
68 TY500 SECURITY DETAILS
69 TY600 SECURITY RISERS AND ONE-LINE DIAGRAMS
TOTAL SHEETS: 69
NN
LOCATION
PLAN
AREA
PLAN
PROJECT LOCATION
DEDUCT ALTERNATES
PROJECT LOCATION
1. MILLWORK TO BE REPLACED WITH CASEWORK,
WITH THE EXCEPTION OF THE CONTROL ROOM
COUNTERTOP FACING THE MRI ROOM. CASEWORK
TO BE VA PROVIDED AND VA INSTALLED.
2. DOOR 1C-394 TO BE REPLACED WITH A SINGLE
SWING DOOR 4' WIDE BY 7' TALL.
3. REPLACE NEW EPOXY FLOORING AND COVE BASE
IN MECH ROOM 1C-392A WITH CONCRETE CURB AND
WATER STOP.
5. KEEP EXISTING FLOORING IN CORRIDOR C1C-316B,
PATCH AND REPLACE AS NEEDED.
6. REMOVE CHANGING ROOM 1C-398, FROM THE
PROJECT SCOPE.
7. REPLACE MRI DOOR WITH FULL LITE SWITCH
GLASS WITH SOLID MRI DOOR.
No. REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
T O
B .O
. R E
F
LE
C T
IV
E
S U
R F
A C
E
3' -4
"M A
X
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
" 4' -0
M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1' -5
'-7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
'-0
WALL
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPERGUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: HOUSTON, TX
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 2A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A
ATTIC AND OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. N/A METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. N/A
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. N/A
OPAQUE DOORS
SWINGING: U-0.370 N/A
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 N/A
OPERABLE: U-0.45 N/A
ENTRANCE DOOR: U-0.63 N/A
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
6" 1'
-6
6" MAX
7" - 9" 11" MIN
17" - 25"
M
IN
6' -0
(ANSI ICC A117.1)
39"- 41"
(A N
S I I
C C
A
7.
1)
M
IN
(A N
S I I
C C
A
7.
1)
1"
3' -6
M
A X
5' -0
M
A X
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:1 :2
P
M
GENERAL INFORMATION
NR 02 OF 69TAB
100% CONSTRUCTION DOCUMENTS
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
GI001
MAIN BUILDING
SPUR #: 2217No. REVISION DESCRIPTION DATE
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F
LE
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE TO
PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
E
DOOR OPENING
VENT TO OUTSIDE ROUTE
TO BE APPROVED BY COR.
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
GI002
GI002
XXXXXX
XXXXXX
XXXXXX
A .F
.F
4' -0
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!
--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--
ICRA, ISLM, WATCH,
MISC. FORMS
PAPER CADDY
INDICATOR
(REFER TO
PLAN AND
ELEVATION)
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
CONSTRUCTION
SUPERVISOR
NAME AND CELL NUMBER
XXXXX
BOILER/CHILLER PLANT AFTER
HOURS CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT
INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
TYPE A OR C ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
TYPE B OR D ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOOR OR
ROOF ASSEMBLY
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED.
COVER WITH ROSIN PAPER/ FIRE
RATED PLYWOOD.
WHEN WORKING ABOVE CEILING WITH
BARRIERS THAT TERMINATE AT CEILING,
PROVIDE PLASTIC ENCLOSURE IN
PLENUM SPACE.
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO LOCKING
BRAKES
MOBILE CART
A D
JU
S
T A
B
LE
H E
IG
H
T
HEPA NEGATIVE AIR
UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
WALL TO EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
A B
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
(2) LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. U404 D
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
REQU.
AS INSPECTIONS AND NON-INVASTIVE ACTIVITES
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
TYPE A
INCLUDES BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER
50 SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING AND ACTIVITIES WHICH
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO
CEILINGS OTHER THAN FOR VISUAL INSPECTION
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTTYPE B
INCLUDES BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACES.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
TYPE C
INCLUDES BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTSTYPE D
INCLUDES BUT NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING
SYSTEM.
• NEW CONSTRUCTION.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
LOW RISK
PATEINT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY/MRI
• RESPIRATORY
THERAPY
• CCU
• EMERGENCY ROOM
• LABOR & DELIVERY
• LABORATORY (SPECIMEN)
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• ANY AREA FOR
IMMUNOCOMPROMISED PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNIT
• NEGATIVE PRESSURE ISOLATION
ROOMS
• ONCOLOGY
• OPERATING ROOMS INCLUDING
• C-SECTION ROOMS
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III/IV
II
III
III/IV
III/IV
III/IV
IV
IV
IV
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE
THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
A. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS I OR CLASS II SHALL REQUIRE APPROVAL BY THE FACILITY SAFETY MANAGER AND CONTRACTING OFFICER REPRESENTATIVE BEFORE BEGINNING ANY CONSTRUCTION WORK. HAZARD RISK CLASSIFICATIONS OF CLASS III OR IV SHALL REQUIRE A
PERMIT BEFORE BEGINNING ANY CONSTRUCTION WORK. INFECTION CONTROL PERMITS WILL BE
ISSUED BY THFACILITY SAFETY MANAGER AND CONTRACTING OFFICER REPRESENTATIVE.
C. INFECTION CONTROL PERMITS SHALL BE POSTED OUTSIDE THE APPROPRIATE CONSTRUCTION
AREA. MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK IS LOCATED IN MULTIPLE AREAS.
D. THE REQUIRED INFECTION CONTROL PRECAUTIONS ARE AS FOLLOWS:
CLASS I:
• NOTIFY THE COR.
• EXECUTE WORK USING METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING TILES DISPLACED FOR VISUAL INSPECTION.
• UPON COMPLETION: CLEAN WORK AREA, AND NOTIFY COR.
CLASS II:
• NOTIFY THE COR.
• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE
SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS.
• WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
• SEAL UNUSED DOORS WITH PAINTERS TAPE.
• BLOCK OFF AND SEAL AIR VENTS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
• UPON COMPLETION: WIPE WORK SURFACES WITH CLEANER/ DISINFECTANT. CONTAIN
CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
CLASS III:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK
SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL
WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A
DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINEDWITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR.
• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL
WORK HOURS.
• VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
CLASS IV:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK
SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL
WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A
DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE
CONTRACTOR.
• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
• CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
• ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE.
• REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL
WORK HOURS.
• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
• VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
• AREA TO BE CLEANED/DISINFECTED PER VA ENVIRONMENTAL SERVICES GUIDELINES AS
COORDINATED BY THE COR.
• UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
GENERAL ICRA NOTES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:1 :2
P
M
ICRA INFORMATION
NR 03 OF 69TAB
100% CONSTRUCTION DOCUMENTS
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
GI002
MAIN BUILDING
SPUR #: 2217
1/2" = 1'-0"
GENERAL ICRA CONSTRUCTION PLAN LAYOUT1
3/8" = 1'-0"
ICRA ELEVATION4
3/8" = 1'-0"
SECTION AT ICRA CONSTRUCTION PLAN3 3/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART2
3/4" = 1'-0"
ICRA BARRIER WALL TYPES5
PROJECT
AREA
H
G.3
H.5
27 26 25.5 25.2 25 24.5
G.2
G
F.7
F.5
F
J
36'-6" 18'-3" 8'-3" 10'-0" 18'-3" 18'-3"
DRESS
1C-398
CONTROL
1C-396
MRI
1C-396A
EQUIPMENT
1C-394 BREAK RM
1C-377
9'
-6
'-3
8'
-0
'-3
5'
-6
7' -3
'-9
'-3
'-3
CORRIDOR
C1C-316
CORRIDOR
C1C-316B
CORRIDOR
C1C-320PHASE 2
PHASE 3
PHASE 1
PHASE 4
MECH ROOM
1C-392A
DRESS
1C-392B
DRESS
1C-392C
MRI EQUIPMENT
1C-392D
MRI
1C-392E
MRI
1C-386B
CONT
1C-386
DRESS
1C-392I
TOLIET
1C-392H
SOILED
1C-392L
CLEAN
1C-392J
READING
1C-391
ELEC
1C-393
HAC
1C-395
WASTE
1C-371
EQUIPMENT
1C-379B
MRI
1C-379E
READING
1C-389
READING
1C-387
TECH
1C-385
READING
1C-390
OFFICE
1C-375
OFFICE
1C-373
WAITING
C1C-318
CONTROL
1C-379A
DRESS
1C-379E
DRESS
1C-379D
CONTROL AREA
1C-392F
POWER SUP & COMP
1C-386A
MRI
1C-386C
PREP
1C-392G
SUB WAIT
1C-379
PHASE 1
109'-6"
PHASE 3
PHASE 3
STORAGE
1C-376A
READING
1C-376B
CORRIDOR
C1C-317
TOILET
1C-382
PHASE 3
PHASE 2
PHASE 1
BREAK ROOM RENOVATION AND RELOCATION OF DOUBLE DOOR
IN CORRIDOR.
PHASING LEGEND
PHASE 2
MRI ROOM CONSTRUCTION. EQUIPMENT ROOM
CONSTRUCTION. RELOCATION OF CORRIDOR DOORS.
NEW EPOXY FLOORING AND INTERGAL BASE IN MECH ROOM
1C-392A.
TEMPORARY RF PANELS TO BE INSTALLED, BETWEEN THE MRI
ROOM AND THE CONTROL ROOM, TO HAVE THE MRI ROOM
TESTED FOR A RF LEAKS.
PHASE 3
REMOVAL OF STOREFRONT, CORRIDOR DOOR AND PARTIAL
WALL, AND 10' WIDE OPENING NEAR MRI. LAYDOWN OF
FLOOR PROTECTION FOR MRI RIGGING.
INSTALL OF THE MRI.
PHASE 4
REINSTALL STOREFRONT. CONSTRUCTION OF
WALL BETWEEN CONTROL ROOM AND MRI. CONSTRUCTION
OF THE CONTROL ROOM MILLWORK. CONSTRUCTION OF THE
CHANGING ROOM.
MRI RIGGING INSTALL PATH
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:1 :2
P
M
PHASING PLAN
NR 04 OF 69TAB
100% CONSTRUCTION DOCUMENTS
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
GI010
MAIN BUILDING
SPUR #: 2217
1" = 200'-0"
KEY PLAN
N
N
1/8" = 1'-0"
LEVEL 1 - PHASING PLAN1
FIRE - 1 HOUR
FIRE - 2 HOUR
FIRE - 3 HOUR
PARTITION LEGEND
SMOKE
EXISTING WALL TO REMAIN
NEW NON-RATED WALLS
NFPA 220-2021 CHAPTER 4- TABLE 4.1.1
CONSTRUCTION TYPE: TYPE II (000)
FIRE RESISTANCE RATINGS
COLUMNS: 0 HR
BEAM, GIRDERS, TRUSSES: 0 HR
FLOOR/CEILING ASSEMBLIES: 0 HR
ROOF/CEILING ASSEMBLIES: 0 HR
EXTERIOR NON-BEARING WALLS: 0 HR
INTERIOR NON-BEARING WALLS: 0 HR
FIRE-RESISTIVE REQUIREMENTS:
NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK, EXTERIOR
NON-BEARING WALLS, INTERIOR NON-BEARING WALLS (U.N.O. AT EXTERIOR)
NFPA 101-2021 CHAPTER 19 TRAVEL DISTANCE
SHALL NOT EXCEED 75 FT OR 100 FT IF PROTECTED THROUGHOUT BY AN APPROVED
AUTOMATIC SPRINKLER SYSTEM.
NFPA 101-2021 CHAPTERS 19 COMMON PATH OF TRAVEL
SHALL NOT EXCEED 50 FT.
PROTECTED AREAS: STORAGE ROOMS/CLEAN/SOILED:
PER VA FIRE PROTECTION DESIGN MANUAL 3.1.A, STORAGE ROOMS ARE HAZARDOUS AREAS.
PER NFPA 101: 39.3.2.1, HAZARDOUS AREAS SHALL BE PROTECTED AS STATED IN SECTION 8.7.
PER NFPA 101: 8.7, ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL
TO THE GENERAL OCCUPANCY SHALL BE PROVIDED BY ONE OF THE FOLLOWING:
• 1 HR FIRE BARRIER OR PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEM
1 HR FIRE BARRIER WITH SPRINKLER PROTECTION, PROVIDED.
SMOKE COMPARTMENTALIZATION: NOT REQUIRED FOR BUSINESS OCCUPANCIES, NOT PROVIDED.
FIRE ALARM SYSTEM: REQUIRED / PROVIDED AUTOMATIC SYSTEM.
STANDPIPES: NOT REQUIRED / NOT PROVIDED.
LIFE SAFETY CODE ANALYSIS
LIFE SAFETY LEGEND
FEC FIRE EXTINGUISHER CABINET
EXIT LIGHT / SIGN
NOT IN SCOPE
BUILDING EXIT
EGRESS PATH
124 SF
BREAK RM
1C-377
CORRIDOR
C1C-320
CORRIDOR
C1C-316B
165 SF
EQUIPMENT
1C-394
316 SF
MRI
1C-396A
163 SF
CONTROL
1C-396
60 SF
DRESS
1C-398
CORRIDOR
C1C-316
FEC
FEC
T R
A V
E L
D
IS
T A
N C
E
'-1
0"
MECH ROOM
1C-392A
DRESS
1C-392B
DRESS
1C-392C
MRI EQUIPMENT
1C-392D
MRI
1C-392E
MRI
1C-386B
CONT
1C-386
DRESS
1C-392I
TOLIET
1C-392H
SOILED
1C-392L
CLEAN
1C-392J
READING
1C-391
ELEC
1C-393
HAC
1C-395
WASTE
1C-371
EQUIPMENT
1C-379B
MRI
1C-379E
READING
1C-389
READING
1C-387
TECH
1C-385
READING
1C-390
OFFICE
1C-375
OFFICE
1C-373
WAITING
C1C-318
CONTROL
1C-379A
DRESS
1C-379E
DRESS
1C-379D
CONTROL AREA
1C-392F
POWER SUP & COMP
1C-386A
MRI
1C-386C
PREP
1C-392G
SUB WAIT
1C-379
PROJECT
AREA
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:1 :2
P
M
LIFE SAFETY PLAN
NR 05 OF 69TAB
100% CONSTRUCTION DOCUMENTS
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
GI011
MAIN BUILDING
SPUR #: 2217
N
1/8" = 1'-0"
LEVEL 1 - LIFE SAFETY PLAN1
KEY PLAN
N t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
A
M
FIRST FLOOR -
ENVIRONMENTAL HAZARDS
CD
JR
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
HA100
MAIN BUILDING
SPUR #: 2217
No. REVISION DESCRIPTION DATE
DRESS
1C-398
CONTROL
1C-396
MRI
1C-396A
EQUIPMENT
1C-394
BREAK RM
1C-377
CORRIDOR
C1C-316
CORRIDOR
C1C-316B
CORRIDOR
C1C-320
N
NOT TO SCALE
LEVEL 1 - OVERALL FLOOR PLAN
L1
L2
L2
HAZARDOUS MATERIALS KEYNOTES
PHASE 4: REMOVE LEAD-CONTAINING SINK IN WHOLE USING MANUAL METHODS AND
NON-DESTRUCTIVE TECHNIQUES WITHIN A REGULATED AREA, 1 LEAD CONTAINING SINK AND 1
REGULATED AREA.
PHASES 1, 3, AND 4: CERAMIC WALL TILES AND EXTERIOR GRANITE FACADE CONTAIN TRACE LEVELS
OF LEAD BELOW THE EPA THRESHOLD OF 1.0 mg/cm2 AS MEASURED BY XRF AND WHERE DEFINED
AS A LEAD BASED MATERIAL. GENERAL CONTRACTOR TO FOLLOW PRACTICES THAT REDUCE
FRACTURE AND IMPACT. EMPLOY TECHNIQUES AND METHODS TO COMPLY WITH OSHA LEAD
STANDARD 29CFR1926.62. AVOID SIGNIFICANT DAMAGE TO TILES DURING WALL MATERIAL
DEMOLITION.
AREA NOT WITHIN SCOPE OF WORK
L1
100% CONSTRUCTION DOCUMENTS
L2 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. BR2171 EXP. 09/30/2023
MEP ENGR REG. NO. F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE SUITE H2
EDMOND, OK 73003
(405) 856-2965
FULLY SPRINKLERED
INDUSTRIAL HYGIENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
A
M
ROOF - ENVIRONMENTAL
HAZARDS
CD
JR
SITE PREP MRI SUITE 1C
02/23/2023
580-22-106
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
HA101
MAIN BUILDING
SPUR #: 2217
No. REVISION DESCRIPTION DATE
100% CONSTRUCTION DOCUMENTS
27 26 25.5 25.2 25 24.5 24
H
H.5
HAZARDOUS MATERIALS KEYNOTES
REMOVE SPOT LOCATIONS OF ASBESTOS (PACM) ROOF AND UNDERLYING FELT, MASTICS AND TARS
USING MANUAL MEANS AND CHEMICAL METHODS IN A REGULATED AREA. COORDINATE SPOT
AREAS OF REMOVAL AND EXACT SIZES OF ROOF PENETRATIONS WITH THE GENERAL CONTRACTOR, 5 ROOF AREAS AND 50 SF TOTAL AND 1 MOBILIZATION. USE CLEAR BRIDGING ENCAPSULANT ON
EXPOSED SURFACES. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS.
ASBESTOS CONTAINING ROOF SYSTEM (PACM), PROTECT AS NECESSARY.
A1
N
NOT TO SCALE
ROOF
A2
A1
A1
A1
A1
A2
GENERAL NOTES
THE STRUCTURAL DRAWINGS DEPICT THE STRUCTURE IN ITS FINAL CONSTRUCTED CONFIGURATION.
NEITHER CONSTRUCTION MEANS AND METHODS NOR CONSTRUCTION SAFETY ARE PART OF THE
STRUCTURAL ENGINEER’S EXPERTISE OR SCOPE OF WORK. THE GENERAL CONTRACTOR AND THEIR
SUBCONTRACTORS ARE FULLY RESPONSIBLE FOR THE MEANS AND METHODS USED TO CONSTRUCT
THE STRUCTURE AND FOR FULL COMPLIANCE WITH ALL JOB SAFETY RELATED REGULATIONS AND CONDITIONS AT THE SITE. LIMITED SITE VISITS, IF ANY, BY THE STRUCTURAL ENGINEER ARE SOLELY
TO OBSERVE COMPLETED PARTS OF THE STRUCTURE. THE STRUCTURAL ENGINEER IS NEITHER
QUALIFIED TO OBSERVE NOR COMMENT ON CONSTRUCTION MEANS AND METHODS AND JOB SITE
SAFETY.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO
FABRICATION/CONSTRUCTION. NOTIFY STRUCTURAL ENGINEER AND ARCHITECT OF ANY
DISCREPANCIES PRIOR TO FABRICATION/CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL
WORK FITTING AS INTENDED BY THE DRAWINGS AND SPECIFICATIONS.
PRINCIPAL OPENINGS ARE SHOWN ON THE DRAWINGS. SEE ARCHITECTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS FOR OPENINGS, SLEEVES, CURBS, INSERTS, DEPRESSIONS, ETC NOT SHOWN.
ALL DETAILS ARE TYPICAL UNLESS NOTED OTHERWISE. DETAILS SHALL APPLY TO SIMILAR AND LIKE
CONDITIONS.
SHOP DRAWINGS SHALL BE NEW DRAWINGS PRODUCED BY THE CONTRACTOR, ILLEGIBLE
REPRODUCTIONS OF THE DESIGN DRAWINGS WILL BE REJECTED. ELECTRONIC FILES MAY BE
PURCHASED FROM THE ENGINEER OF RECORD FOR THE PURPOSE OF PREPARING SHOP DRAWINGS.
THE CONTRACTOR WILL BE REQUIRED TO SIGN AN INDEMNITY STATEMENT PRIOR TO TRANSMISSION
OF THE ELECTRONIC FILES TO THE CONTRACTOR. THE USE OF REPRODUCTIONS OF THESE
CONTRACT DRAWINGS BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR
MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES THEIR ACCEPTANCE OF ALL INFORMATION SHOWN HEREIN AS CORRECT, AND OBLIGATES THEMSELF TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY ERRORS OR OMISSIONS THAT MAY OCCUR HEREIN.
MINIMUM SHOP DRAWING SUBMITTAL REQUIREMENTS INCLUDE:
CONCRETE MIX DESIGNS FOR EACH CLASS OF CONCRETE WITH TEST DATA
CONCRETE ACCESSORIES (VAPOR BARRIER, REINFORCING SUPPORT CHAIRS, ETC.)
CONCRETE REINFORCING SHOP DRAWINGS
STRUCTURAL STEEL SHOP DRAWINGS (SEALED BY A LICENSED PROFESSIONAL
ENGINEER)
THIS PROJECT CONSISTS OF A MODIFICATION TO AN EXISTING BUILDING. INFORMATION ON EXISTING
CONDITIONS HAS BEEN TAKEN FROM THE ORIGINAL DESIGN DRAWINGS AND SHOWN ON THESE
DRAWINGS. THESE DRAWINGS WERE ASSUMED TO BE “AS-BUILT” DRAWINGS SINCE EXISTING
CONDITIONS WERE NOT ACCESSIBLE OR SINCE FIELD OBSERVATION OF EXISTING CONDITION IS
BEYOND THE ENGINEER’S SCOPE OF WORK DURING THE DESIGN PHASE OF THIS PROJECT. THE
ACCURACY OF THIS INFORMATION HAS NOT BEEN VERIFIED. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO VERIFY ALL EXISTING DIMENSIONS SHOWN ON THESE DRAWINGS AND TO VERIFY
THE LOCATION OF ALL FRAMING MEMBERS AND OTHER OBSTRUCTIONS WHICH WILL AFFECT THE
WORK. AS PART OF THIS WORK THE CONTRACTOR SHALL PREPARE AN ACCURATE FIELD SURVEY OF
THE LOCATION OF ALL STRUCTURAL MEMBERS IN THE WORK AREA PRIOR TO BEGINNING SHOP
DRAWINGS AND CONSTRUCTION. THIS SURVEY SHALL BE SUBMITTED TO THE ARCHITECT WITH
VARIANCES NOTED. CLAIMS FOR ADDITIONAL TIME OR EXTRA COST DUE TO OBSTRUCTIONS AND VARIANCES IN THE LOCATION OF THE STRUCTURAL MEMBERS WILL NOT BE HONORED AFTER WORK
HAS BEGUN ON THE PROJECT.
BUILDING CODE: INTERNATIONAL BUILDING CODE, 2021 EDITION
DEAD LOAD:
ANY CHANGES IN CONSTRUCTION MATERIALS FROM THOSE SHOWN ON
THE ARCHITECTURAL OR STRUCTURAL DRAWINGS SHALL BE REPORTED BY
THE CONTRACTOR TO THE STRUCTURAL ENGINEER FOR VERIFICATION OF
LOAD CARRYING CAPACITY OF THE STRUCTURE.
LIVE LOAD:
ROOF: 20 PSF
CLINICAL SPACE: 80 PSF
PARTITION: 20 PSF
CORRIDORS: 100 PSF (1ST FLOOR)/ 80 PSF (ABOVE 1ST FLOOR)
LOBBIES: 100 PSF
OFFICE: 50 PSF
LIGHT STORAGE: 125 PSF
MECHANICAL: 150 PSF
HANDRAILS: 50 PLF / 200 POUNDS IN ANY DIRECTION
LIVE LOAD REDUCTIONS HAVE BEEN APPLIED IN ACCORDANCE WITH THE
BUILDING CODE, UNLESS NOTED OTHERWISE.
ARCHITECTURAL BARRIER ACT:
GRAB BAR: 250 LBS ANY DIRECTION
TUB/SHOWER SEAT: 250 LBS ANY DIRECTION
FASTENERS: 250 LBS ANY DIRECTION
WIND LOAD:
INTERNATIONAL BUILDING CODE, 2021 EDITION, WINDBORNE DEBRIS REGION
VELOCITY (ULT) : 152 MPH THREE SECOND GUST
EXPOSURE: C
RISK CATEGORY: IV
INTERNAL PRESSURE COEFFICIENT, Gcpi: +/- 0.18
SEISMIC LOAD:
RISK CATEGORY: IV
SEISMIC IMPORTANCE FACTOR (I): 1.5
MAPPED SPECTRAL RESP ACCEL (Ss/S1): 0.067g/0.039g
SITE CLASS: D
SPECTRAL RESPONSE COEFF (Sds/Sd1): 0.071g/0.062g
SEISMIC DESIGN CATEGORY: A
EFFECTIVE WIND AREA ft² a a a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .