36C25622R0094 260541 UNDERGROUND ELEC CONSTRUCTION .docx

DOCX document 33 KB Posted

Attached to
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 Federal contract opportunity
Solicitation number
502-19-107
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This solicitation package includes specifications for replacing an air handling unit and associated ductwork at a Department of Veterans Affairs medical facility. Key requirements include removing an existing air handling unit and installing a new unit along with new ductwork in Building 7. The solicitation number is 502-19-107 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. Offerors should follow specifications in Section 26 05 41 for underground electrical construction, including installing new ducts, raceways, pull boxes, and connections to form a complete underground electrical system serving the new air handling unit.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094, newest first.
File Type Posted
36C25622R0094 0003.docx DOCX document
36C25622R0094 0002.docx DOCX document
Site Visit Sign in Sheet 50219107.pdf PDF
36C25622R0094 Brand Name JA 502-19-107 Redacted.pdf PDF
36C25622R0094 COVID-19 Safety Protocols for Federal Contractors Rev 2.docx DOCX document
36C25622R0094 280800 Commissioning of Electronic Safety and Security Systems .docx DOCX document
36C25622R0094 000110 VHA Master Specifications Rev 2.docx DOCX document
36C25622R0094 262726 Wiring Devices .docx DOCX document
36C25622R0094 283100 Fire Detection and Alarm .doc DOC document
36C25622R0094 260923 Lighting Controls.docx DOCX document
36C25622R0094 232500 HVAC WATER TREATMENT .docx DOCX document
36C25622R0094 260511 Requirements for ELEC installation.docx DOCX document
36C25622R0094 234000 HVAC AIR CLEANING DEVICES .docx DOCX document
36C25622R0094 238100 DECENTRALIZED UNITARY HVAC EQUIPMENT.docx DOCX document
36C25622R0094 260800 Commissioning of Electrical Systems.docx DOCX document
36C25622R0094 232113 HYDRONIC PIPING .docx DOCX document
36C25622R0094 230923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC .doc DOC document
36C25622R0094 014500 Quality Control.docx DOCX document
36C25622R0094 013526 Safety Requirements .docx DOCX document
36C25622R0094 099100 Painting .docx DOCX document
36C25622R0094 095100 Acoustical Ceilings .docx DOCX document
36C25622R0094 087100 Door Hardware .docx DOCX document
36C25622R0094 092216 Non-Structural Metal Framing .docx DOCX document
36C25622R0094 096513 Resilient Base and Accessories.docx DOCX document
36C25622R0094 079200 Joint Sealants .docx DOCX document
36C25622R0094 092900 Gypsum Board .docx DOCX document
36C25622R0094 076000 Flashing and Sheet Metal .docx DOCX document
36C25622R0094 015719 Temporary Environmental Controls .doc DOC document
36C25622R0094 IFC Drawings Part 3 .pdf PDF
36C25622R0094 271000 Control Communication and Signal Wiring.docx DOCX document
36C25622R0094 EXHIBIT F.docx DOCX document
36C25622R0094 000115 List of Drawing Sheets .docx DOCX document
36C25622R0094 WD LA20220051 Mod 3 06242022.docx DOCX document
36C25622R0094 EXHIBIT D.docx DOCX document
36C25622R0094 EXHIBIT C.docx DOCX document
36C25622R0094 280500 Common Work Results for Electronic Safety and Security .docx DOCX document
36C25622R0094 230711 HVAC AND BOILER PLANT INSULATION .docx DOCX document
36C25622R0094 081113 Hollow Metal Doors and Frames.docx DOCX document
36C25622R0094 092400 Portland Cement Plastering .docx DOCX document
36C25622R0094 061663 Cementitious Sheathing .docx DOCX document
36C25622R0094 054000 Cold Formed Metal Framing .docx DOCX document
36C25622R0094 089000 Louvers and Vents .docx DOCX document
36C25622R0094 017419 Construction Waste Management .doc DOC document
36C25622R0094 013216.15 Project Schedules (Small Projects-Design-Bid-Build).docx DOCX document
36C25622R0094 018113 Sustainable Construction Requirements.docx DOCX document
36C25622R0094 IFC Drawings Part 4 .pdf PDF
36C25622R0094 Revised SOW 05202022 .docx DOCX document
36C25622R0094 RFP.docx DOCX document
36C25622R0094 IFC Drawings Part 1 .pdf PDF
36C25622R0094 IFC Drawings Part 2.pdf PDF
Show all 50

Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE AHU #104 AND DUCTWORK BLDG. 7

DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA

PROJECT NO.: 502-19-107

SECTION 26 05 41

UNDERGROUND ELECTRICAL CONSTRUCTION

PART 1 GENERAL

1.1 DESCRIPTION

A.This section specifies the furnishing, installation, and connection of underground ducts and raceways, and pullboxes to form a complete underground electrical raceway system.
B.The terms “duct” and “conduit” are used interchangeably in this section.

1.2 RELATED WORK

A.Section 07 92 00, JOINT SEALANTS: Sealing of conduit penetrations.
B.Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.
C.Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.
D.Section 31 20 11, EARTH MOVING (SHORT FORM): Trenching, backfill, and compaction.

1.3 qualITY ASSURANCE

A.Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
B.Coordinate layout and installation of ducts, and pullboxes with final arrangement of other utilities, site grading, and surface features.

1.4 SUBMITTALS

A.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:
1.Shop Drawings:
a.Submit sufficient information to demonstrate compliance with drawings and specifications.
b.Submit information on, pullboxes, ducts, and hardware.
c.Proposed deviations from the drawings shall be clearly marked on the submittals. If it is necessary to locate pullboxes, or duct banks at locations other than shown on the drawings, show the proposed locations accurately on scaled site drawings, and submit to the COR for approval prior to construction.
2.Certifications: Two weeks prior to the final inspection, submit the following.
a.Certification by the manufacturer that the materials conform to the requirements of the drawings and specifications.
b.Certification by the Contractor that the materials have been properly installed, connected, and tested.

1.5 APPLICABLE PUBLICATIONS

A.Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B.American Concrete Institute (ACI):
Building Code Requirements for Structural Concrete
318-14/318M-14Building Code Requirements for Structural Concrete & Commentary
SP-66-04ACI Detailing Manual
C.American National Standards Institute (ANSI):
77-14Underground Enclosure Integrity
D.American Society for Testing and Materials (ASTM):
C478 REV A-15Standard Specification for Precast Reinforced Concrete Manhole Sections
C858-10Underground Precast Concrete Utility Structures
C990-09Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants.
E.National Electrical Manufacturers Association (NEMA):
TC 2-13Electrical Polyvinyl Chloride (PVC) Conduit
TC 3-15Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC Conduit And Tubing
TC 6 & 8-13Polyvinyl Chloride (PVC) Plastic Utilities Duct For Underground Installations
TC 9-04Fittings For Polyvinyl Chloride (PVC) Plastic Utilities Duct For Underground Installation
F.National Fire Protection Association (NFPA):
70-17National Electrical Code (NEC)
70E-15National Electrical Safety Code
G.Underwriters Laboratories, Inc. (UL):
6-07Electrical Rigid Metal Conduit-Steel
467-13Grounding and Bonding Equipment
651-11Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings
651A-11Schedule 40 and 80 High Density Polyethylene (HDPE) Conduit

PART 2 PRODUCTS

2.1 pullboxes

A.General: Size as indicated on the drawings. Provide pullboxes with weatherproof, non-skid covers with recessed hook eyes, secured with corrosion- and tamper-resistant hardware. Cover material shall be identical to pullbox material. Covers shall have molded lettering, ELECTRIC or SIGNAL as applicable. Pullboxes shall comply with the requirements of ANSI 77 Tier 5loading. Provide pulling irons, 22 mm (0.875 inch) diameter galvanized steel bar with exposed triangular-shaped opening.
B.Polymer Concrete Pullboxes: Shall be molded of sand, aggregate, and polymer resin, and reinforced with steel, fiberglass, or both. Pullbox shall have open bottom.
C.Fiberglass Pullboxes: Shall be sheet-molded, fiberglass-reinforced, polyester resin enclosure joined to polymer concrete top ring or frame.
D.Concrete Pullboxes: Shall be monolithically poured reinforced concrete.

2.2 Ducts

A.Number and sizes shall be as shown on the drawings.
B.Ducts (concrete-encased):
1.Plastic Duct:
a.UL 651 and 651A Schedule 40 PVC conduit.
b.Duct shall be suitable for use with 90˚ C (194˚ F) rated conductors.
2.Conduit Spacers: Prefabricated plastic.
C.Ducts (direct-burial):
1.Plastic duct:
a.UL 651, 651A, and 651B, Schedule 80 PVC or HDPE conduit.
b.Duct shall be suitable for use with 75˚ C (167˚ F) rated conductors.
2.Rigid metal conduit: UL 6 and NEMA RN1 galvanized rigid metal, half-lap wrapped with 10 mil PVC tape.

2.3 Grounding

A. Ground Rods and Ground Wire: Per Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.

2.4 WARNING Tape

A. 4-mil polyethylene 75 mm (3 inches) wide detectable tape, red with black letters, imprinted with “CAUTION - BURIED ELECTRIC CABLE BELOW” or similar.

2.5 PULL Rope for spare ducts

A. Plastic with 890 N (200 lb) minimum tensile strength.

PART 3 EXECUTION

3.1 pullbox INSTALLATION

A.Assembly and installation shall be per the requirements of the manufacturer.
1.Install pullboxes level and plumb.
2.Units shall be installed on a 300 mm (12 inches) thick level bed of 90% compacted granular fill, wellgraded from the 25 mm (1 inch) sieve to the No. 4 sieve. Granular fill shall be compacted with a minimum of four passes with a plate compactor.
B.Access: Ensure the top of frames and covers are flush with finished grade.

3.2 TRENCHING

A.Refer to Section 31 20 11 EARTH MOVING (SHORT FORM) for trenching, backfilling, and compaction.
A.Before performing trenching work at existing facilities, a Ground Penetrating Radar Survey shall be carefully performed by a certified technician to reveal all existing underground ducts, conduits, cables, and other utility systems.
B.Work with extreme care near existing ducts, conduits, and other utilities to avoid damaging them.
C.Cut the trenches neatly and uniformly.
D.For Concrete-Encased Ducts:
1.After excavation of the trench, stakes shall be driven in the bottom of the trench at 1.2 M (4 feet) intervals to establish the grade and route of the duct bank.
2.Pitch the trenches uniformly toward manholes or both ways from high points between manholes for the required duct line drainage. Avoid pitching the ducts toward buildings wherever possible.
3.The walls of the trench may be used to form the side walls of the duct bank, provided that the soil is selfsupporting and that the concrete envelope can be poured without soil inclusions. Forms are required where the soil is not selfsupporting.
4.After the concrete-encased duct has sufficiently cured, the trench shall be backfilled to grade with earth, and appropriate warning tape installed.
E.Individual conduits to be installed under existing paved areas and roads that cannot be disturbed shall be jacked into place using rigid metal conduit, or bored using plastic utilities duct or PVC conduit, as approved by the /COR.

3.3 DUCT INSTALLATION

A.General Requirements:
1.Ducts shall be in accordance with the NEC, as shown on the drawings, and as specified.
2.Join and terminate ducts with fittings recommended by the manufacturer.
3.Slope ducts to drain towards manholes and pullboxes, and away from building and equipment entrances. Pitch not less than 100 mm (4 inches) in 30 M (100 feet).
4.Underground conduit stubups and sweeps to equipment inside of buildings shall be galvanized rigid metal conduit half-lap wrapped with PVC tape, and shall extend a minimum of 1.5 M (5 feet) outside the building foundation. Tops of conduits below building slab shall be minimum 610 mm (24 inches) below bottom of slab.
5.Stubups and sweeps to equipment mounted on outdoor concrete slabs shall be galvanized rigid metal conduit half-lap wrapped with PVC tape, and shall extend a minimum of 1.5 M (5 feet) away from the edge of slab.
6.Install insulated grounding bushings on the conduit terminations.
7.Radius for sweeps shall be sufficient to accomplish pulls without damage. Minimum radius shall be six times conduit diameter.
8.All multiple conduit runs shall have conduit spacers. Spacers shall securely support and maintain uniform spacing of the duct assembly a minimum of 75 mm (3 inches) above the bottom of the trench during the concrete pour. Spacer spacing shall not exceed 1.5 M (5 feet). Secure spacers to ducts and earth to prevent floating during concrete pour. Provide nonferrous tie wires to prevent displacement of the ducts during concrete pour. Tie wires shall not act as substitute for spacers.
9.Duct lines shall be installed no less than 300 mm (12 inches) from other utility systems, such as water, sewer, chilled water.
10.Clearances between individual ducts:
a.For similar services, not less than 75 mm (3 inches).
b.For power and signal services, not less than 150 mm (6 inches).
11.Duct lines shall terminate at window openings in manhole walls as shown on the drawings. All ducts shall be fitted with end bells.
12.Couple the ducts with proper couplings. Stagger couplings in rows and layers to ensure maximum strength and rigidity of the duct bank.
13.Keep ducts clean of earth, sand, or gravel, and seal with tapered plugs upon completion of each portion of the work.
14.Spare Ducts: Where spare ducts are shown, they shall have a nylon pull rope installed. They shall be capped at each end and labeled as to location of the other end.
15.Duct Identification: Place continuous strip of warning tape approximately 300 mm (12 inches) above ducts before backfilling trenches. Warning tape shall be preprinted with proper identification.
16.Duct Sealing: Seal ducts, including spare ducts, at building entrances and at outdoor terminations for equipment, with a suitable non-hardening compound to prevent the entrance of foreign objects and material, moisture, and gases.
17.Use plastic ties to secure cables to insulators on cable arms. Use minimum two ties per cable per insulator.
B.Concrete-Encased Ducts:
1.Install concrete-encased ducts for medium-voltage systems, low-voltage systems, and signal systems, unless otherwise shown on the drawings.
2.Duct banks shall be single or multiple duct assemblies encased in concrete. Ducts shall be uniform in size and material throughout the installation.
3.Tops of concrete-encased ducts shall be:
a.Not less than 600 mm (24 inches) and not less than shown on the drawings, below finished grade.
b.Not less than 750 mm (30 inches) and not less than shown on the drawings, below roads and other paved surfaces.
c.Additional burial depth shall be required in order to accomplish NEC-required minimum bend radius of ducts.
d.Conduits crossing under grade slab construction joints shall be installed a minimum of 1.2 M (4 feet) below slab.
4.Extend the concrete envelope encasing the ducts not less than 75 mm (3 inches) beyond the outside walls of the outer ducts.
5.Within 3 M (10 feet} of building penetrations, install reinforcing steel bars at the top and bottom of each concrete envelope to provide protection against vertical shearing.
6.Install reinforcing steel bars at the top and bottom of each concrete envelope of all ducts underneath roadways and parking areas.
7.Where new ducts and concrete envelopes are to be joined to existing manholes, pullboxes, ducts, and concrete envelopes, make the joints with the proper fittings and fabricate the concrete envelopes to ensure smooth durable transitions.
8.Duct joints in concrete may be placed side by side horizontally, but shall be staggered at least 150 mm (6 inches) vertically.
9.Pour each run of concrete envelope between manholes or other terminations in one continuous pour. If more than one pour is necessary, terminate each pour in a vertical plane and install 19 mm (0.75 inch) reinforcing rod dowels extending 450 mm (18 inches) into concrete on both sides of joint near corners of envelope.
10.Pour concrete so that open spaces are uniformly filled. Do not agitate with power equipment unless approved by COR.
C.Direct-Burial Ducts:
1.Install direct-burial ducts only where shown on the drawings. Provide direct-burial ducts only for low-voltage power and lighting branch circuits.
2.Tops of ducts shall be:
a.Not less than 600 mm (24 inches) and not less than shown on the drawings, below finished grade.
b.Not less than 750 mm (30 inches) and not less than shown on the drawings, below roads and other paved surfaces.
c.Additional burial depth shall be required in order to accomplish NEC-required minimum bend radius of ducts.
3.Do not kink the ducts. Compaction shall not deform the ducts.
F.Connections to Existing Ducts: Where connections to existing ducts are indicated, excavate around the ducts as necessary. Cut off the ducts and remove loose concrete from inside before installing new ducts. Provide a reinforced-concrete collar, poured monolithically with the new ducts, to take the shear at the joint of the duct banks.
G.Partially-Completed Ducts: During construction, wherever a construction joint is necessary in a duct bank, prevent debris such as mud and dirt from entering ducts by providing suitable plugs. Fit concrete envelope of a partially completed ducts with reinforcing steel extending a minimum of 600 mm (2 feet) back into the envelope and a minimum of 600 mm (2 feet) beyond the end of the envelope. Provide one No. 4 bar in each corner, 75 mm (3 inches) from the edge of the envelope. Secure corner bars with two No. 3 ties, spaced approximately 300 mm (12 inches) apart. Restrain reinforcing assembly from moving during pouring of concrete.

3.4 acceptance checks and tests

A.Duct Testing and Cleaning:
1.Upon completion of the duct installation, a standard flexible mandrel shall be pulled through each duct to loosen particles of earth, sand, or foreign material left in the duct, and to test for out-of-round conditions.
2.The mandrel shall be not less than 300 mm (12 inches) long, and shall have a diameter not less than 13 mm (0.5 inch) less than the inside diameter of the duct. A brush with stiff bristles shall then be pulled through each duct to remove the loosened particles. The diameter of the brush shall be the same as, or slightly larger than, the diameter of the duct.
3.If testing reveals obstructions or out-of-round conditions, the Contractor shall replace affected section(s) of duct and retest to the satisfaction of the COR.
4.Mandrel pulls shall be witnessed by the COR.

---END---

26 05 41 - 11