36C25622R0094 061663 Cementitious Sheathing .docx

DOCX document 27 KB Posted

Attached to
Z2DA--Project #502-19-107 - Replace AHU-104 - Construction - 36C25622R0094
Solicitation number
502-19-107
Issued by

About this file

This specification document outlines cementitious sheathing requirements for a construction project to replace air handling unit 104 and ductwork at building 7 of the Department of Veterans Affairs Health Care System in Alexandria, Louisiana. The project number is 502-19-107. Cement board sheathing is required for exterior framed wall construction and must meet ANSI A118.9 and ASTM C1325 standards with a thickness of 5/8 inch and a minimum width of 48 inches. Related accessories like screws, joint reinforcement, and bonding material must be corrosion-resistant and installed according to manufacturer instructions. The sheathing must have a minimum 14 percent total recycled content and is covered by a 10-year manufacturer warranty.

View the file

Other files

File Type Posted
36C25622R0094 ECS Geotechnical Report.pdf PDF
36C25622R0094 0004.docx DOCX document
36C25622R0094 RFI Register 08292022.docx DOCX document
36C25622R0094 0003.docx DOCX document
36C25622R0094 0002.docx DOCX document
Site Visit Sign in Sheet 50219107.pdf PDF
36C25622R0094 0001.docx DOCX document
36C25622R0094 282300 Video Surveillance .docx DOCX document
36C25622R0094 233700 AIR OUTLETS AND INLETS.docx DOCX document
36C25622R0094 054000 Cold Formed Metal Framing .docx DOCX document
36C25622R0094 013216.15 Project Schedules (Small Projects-Design-Bid-Build).docx DOCX document
36C25622R0094 018113 Sustainable Construction Requirements.docx DOCX document
36C25622R0094 230923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC .doc DOC document
36C25622R0094 COVID-19 Safety Protocols for Federal Contractors Rev 2.docx DOCX document
36C25622R0094 260923 Lighting Controls.docx DOCX document
36C25622R0094 Brand Name JA 502-19-107 Redacted.pdf PDF
36C25622R0094 260511 Requirements for ELEC installation.docx DOCX document
36C25622R0094 IFC Drawings Part 3 .pdf PDF
36C25622R0094 260800 Commissioning of Electrical Systems.docx DOCX document
36C25622R0094 283100 Fire Detection and Alarm .doc DOC document
36C25622R0094 280800 Commissioning of Electronic Safety and Security Systems .docx DOCX document
36C25622R0094 232500 HVAC WATER TREATMENT .docx DOCX document
36C25622R0094 096513 Resilient Base and Accessories.docx DOCX document
36C25622R0094 092216 Non-Structural Metal Framing .docx DOCX document
36C25622R0094 IFC Drawings Part 4 .pdf PDF
36C25622R0094 EXHIBIT B.docx DOCX document
36C25622R0094 013323 Shop Drawings Product Data and Samples.docx DOCX document
36C25622R0094 260533 Raceways and Boxes for Electrical Systems .docx DOCX document
36C25622R0094 232123 HYDRONIC PUMPS.docx DOCX document
36C25622R0094 010000 General Requirements .docx DOCX document
36C25622R0094 233400 HVAC FANS.docx DOCX document
36C25622R0094 024100 Demolition .docx DOCX document
36C25622R0094 262911 Motor Controllers .docx DOCX document
36C25622R0094 090600 Schedule for Finishes .docx DOCX document
36C25622R0094 230512 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT.docx DOCX document
36C25622R0094 230593 TESTING ADJUSTING AND BALANCING FOR HVAC.docx DOCX document
36C25622R0094 014500 Quality Control.docx DOCX document
36C25622R0094 092900 Gypsum Board .docx DOCX document
36C25622R0094 232113 HYDRONIC PIPING .docx DOCX document
36C25622R0094 Project Risk Assessment .pdf PDF
36C25622R0094 079200 Joint Sealants .docx DOCX document
36C25622R0094 015719 Temporary Environmental Controls .doc DOC document
36C25622R0094 Revised SOW 05202022 .docx DOCX document
36C25622R0094 237300 INDOOR CENTRAL STATION AIR HANDLING UNITS.docx DOCX document
36C25622R0094 IFC Drawings Part 1 .pdf PDF
36C25622R0094 265100 Interior Lighting .docx DOCX document
36C25622R0094 078400 Firestopping.docx DOCX document
36C25622R0094 RFP.docx DOCX document
36C25622R0094 262921 Enclosed Switches and Circuit Breakers.docx DOCX document
36C25622R0094 IFC Drawings Part 2.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE AHU #104 AND DUCTWORK BLDG. 7

DEPARTMENT OF VETERANS AFFAIRS HEALTH CARE SYSTEM-ALEXANDRIA, LA

PROJECT NO.: 502-19-107

SECTION 06 16 63

CEMENTITIOUS SHEATHING

GENERAL

SUMMARY

Section Includes:

Cement board sheathing at exterior framed wall construction.

APPLICABLE PUBLICATIONS

Comply with references to extent specified in this Section.

American National Standards Institute (ANSI):

A118.910 - Cementitious Backer Units.

ASTM International (ASTM):

C95418 - Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in. (0.84 mm) to 0.112 in. (2.84 mm) in Thickness C100218 - Steel SelfPiercing Tapping Screws for Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs.

C132514 - NonAsbestos FiberMat Reinforced Cementitious Backer Units.

SUBMITTALS

Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

Manufacturer's Literature and Data:

Description of each product.

Installation instructions.

Warranty.

Samples:

Cement Board: 200 mm by 200 mm (8 inches by 8 inches), minimum size.

Fasteners: One of each type used.

Provide Sustainable Construction Requirements-Provide in accordance with other Division 1 sections.

DELIVERY AND STORAGE

Deliver products in manufacturer's original sealed packaging.

Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

Before installation, return or dispose of products within distorted, damaged, or opened packaging.

STORAGE AND HANDLING

Store products indoors in dry, weathertight facility.

Protect products from damage during handling and construction operations.

WARRANTY

Construction Warranty: FAR clause 52.24621, "Warranty of Construction."

Manufacturer's Warranty: Warrant sheathing against material and manufacturing defects.

Warranty Period: 10 years.

PRODUCTS

PRODUCTS - GENERAL

Provide each product from one manufacturer.

Sustainable Construction Requirements:

Sheathing Recycled Content: 14 percent total recycled content, minimum.

SHEATHING

Cement Boards: Meeting ANSI A118.9 and ASTM C1325.

Thickness: 16 mm (5/8 inch) .

Width: 1219 mm (48 inches), minimum.

ACCESSORIES

Steel Drill Screws: Corrosionresistant, selfdrilling.

ASTM C1002, Type S for fastening to framing less than 0.8 mm (33 mils) thick.

ASTM C954 for fastening to framing 0.8 mm (33 mils) thick and greater.

Joint Reinforcement: Alkali resistant tape as recommended by sheathing manufacturer.

Bonding Material: As recommended by sheathing manufacturer.

EXECUTION

PREPARATION

Examine and verify substrate suitability for product installation.

Protect existing construction and completed work from damage.

Verify framing is plumb and in plane.

Correct substrate deficiencies.

SHEATHING INSTALLATION

Install products according to manufacturer's instructions.

Secure units to framing members with screws spaced maximum 200 mm (8 inches) o.c. and not closer than 13 mm (1/2 inch) from edge of unit.

Install screw heads without penetrating cement board surface.

Install sheathing with 6 mm (1/4 inch) gap where sheathing abuts masonry or similar materials to prevent wicking of moisture.

Install sheathing with 10 mm (3/8 inch) gap where nonloadbearing construction abuts structural elements or building expansion joints.

Horizontal Installation: Abut ends of boards over centers of studs. Stagger end joints minimum one stud spacing for adjacent boards. Fasten boards at perimeter and within field of board to each stud.

Vertical Installation: Install board vertical edges centered over studs. Abut ends and edges of each board with those of adjacent boards. Fasten boards at perimeter and with fin field of board to each stud.

Apply bonding material to imbed tape and completely fill board joints, and gaps between each panel.

PROTECTION

Remove loose or spalling joint finish. Patch areas missing joint finish.

Replace broken or damaged boards.

Protect boards from moisture using temporary coverings until finishes are applied.

- E N D - 06 16 63 - 4