Building 4 Transformer ICRA Final.docx
DOCX document 35 KB Posted
- Attached to
- Project No. 667-18-110, Replace Transformer and Correct Electrical Deficiencies, Bldg 4 Federal contract opportunity
- Solicitation number
- 36C25622R0028
About this file
This document contains an Infection Control Risk Assessment (ICRA) and details of a related federal contract opportunity to replace a transformer and correct electrical deficiencies at a VA medical center building. The ICRA outlines a classification system for construction project types from A to D based on scope and activity, identifies affected patient risk groups from low to highest, and determines a class of precautions using an ICRA matrix based on project type and risk group. The federal contract opportunity is a 100% SDVOSB set-aside to be issued through RFP procedures with a tentative RFP date of January 18, 2022 and proposal due date of February 18, 2022. The location of work is the Overton Brooks VA Medical Center in Shreveport, Louisiana. The construction cost range is $500,000 to $1,000,000 and the NAICS code is 236220 with a small business size standard of $39.5M. Offerors must be registered and verified as an SDVOSB in the VetBiz registry and SAM database to be considered for award.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Prevention & Control Construction Risk Assessment (ICRA)
Project: Building 4 Transformer 667-18-110 Preliminary Assessment* by: Date:____________ FINAL ICRA Determined and Processed by: Vickie L Moore Final Date: June 29, 2021___ STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)
| TYPE A |
| Inspection and Non-Invasive Activities. Includes, but is not limited to: |
· removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet
· painting (but not sanding)
· wallcovering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
| TYPE B |
| Small scale, short duration activities which create minimal dust Includes, but is not limited to: |
· installation of telephone and computer cabling
· access to chase spaces
· cutting of walls or ceiling where dust migration can be controlled.
· Project Specific: Contracted asbestos abatement
| TYPE C |
| Work generates a moderate/high level of dust or requires demolition/removal of any fixed building components or assemblies Includes, but is not limited to: |
· removal of floorcoverings, ceiling tiles and casework; new wall construction
· minor duct work or electrical work above ceilings
· major cabling activities
· any activity which cannot be completed within a single work shift.
· NOTE: New structure to be built adjacent to Building 4
| TYPE D |
| Major demolition and construction projects Includes, but is not limited to: |
· activities which require consecutive work shifts
· requires heavy demolition, removal of a complete cabling system, or excavation
· new construction.
STEP TWO: CIRCLE the affected Patient Risk Groups. If more than one risk group will be affected, select the higher risk group.
| Low Risk |
| Medium Risk |
| High Risk |
| Highest Risk |
· Office areas
· Kitchen storage area
· Public access, hallways, elevator Lobby
· Non-clinical vacated engineering space
· Cardiology
· Echocardiography
· Endoscopy
· Nuclear Medicine
· Physical Therapy
· Radiology/MRI
· Respiratory Therapy
· Kitchen – food preparation area
· Step Down Unit
· Emergency Room
· Laboratories (specimen)
· Medical Units
· Outpatient Surgery
· Pharmacy
· Post Anesthesia Care Unit
· Surgical Units
· Minor Procedure Rooms
· Sterile Supply storage/distribution
· Immunocompromised patient care areas
· Cardiac Cath Lab
· Sterile Processing Service
· Preparation Area
· Decontamination Area
· Intensive Care Unit
· Negative pressure isolation rooms
· Oncology
· Operating rooms
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk Construction Project Type
| Patient Risk Group |
| TYPE A |
| TYPE B |
| TYPE C |
| TYPE D |
| IC Matrix |
| LOW Risk Group |
| I |
| II |
| II |
| III/IV |
| MEDIUM Risk Group |
| I |
| II |
| III |
| IV |
| HIGH Risk Group |
| I |
| II |
| III/IV |
| IV |
| HIGHEST Risk Group |
| II |
| III/IV |
| III/IV |
| IV |
Preliminary ICRA Approved Final ICRA Approved
*A preliminary ICRA is required for contracting purposes only; do not post during construction. The FINAL ICRA must be posted at the construction site.
image1.emf image2.emf