SOW Supplement v2.docx

DOCX document 16 KB Posted

Attached to
Z1DA--Project 667-15-104 Renovate and Expand CATH Lab Services
Solicitation number
36C25621R0122
Issued by

About this file

This document provides details for a renovation project at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves renovating Cath Lab 6E with a budget between $2 million and $5 million. Key aspects include replacing door hardware, adding USB ports to headwalls, and clarifying responsibilities for exterior lifts. The solicitation will be open only to Service-Disabled Veteran-Owned Small Businesses as a 100% set-aside. Interested offerors should monitor the beta.SAM website for the request for proposal expected to be issued on August 2nd, 2021, with proposals due around September 1st, 2021. Offerors must be registered in the System for Award Management database and verified in the Vendor Information Pages database to be considered. The contract term is approximately 808 calendar days following the notice to proceed.

View the file

Other files

File Type Posted
1SD002 Supplemental Drawing Revisions.pdf PDF
Pre-Award RFI Register 66715104 26 Aug 21.docx DOCX document
1SD003 Supplemental Drawing Revisions.pdf PDF
1SD004 Cath Lab LAYDOWN.pdf PDF
36C25621R0122 0004.docx DOCX document
36C25621R0122 0003.docx DOCX document
VHA Directive 1193 COVID 2019 Vaccination August 13 2021.pdf PDF
36C25621R0122 0002.docx DOCX document
66715104 PreBid Site Visit Sign In Sheet.pdf PDF
36C25621R0122 0001.docx DOCX document
1MH17 New Exhaust PH2 Rev 1 08022021.pdf PDF
1SD001 Door Hardware 08022021 v2.pdf PDF
1AS100 Wall Types Rev 1 08022021.pdf PDF
1MH16 New Exhaust PH1 Rev 1 08022021.pdf PDF
1MH14 New HVAC Ductwork PH2 Rev 1 08022021.pdf PDF
1MH13 New HVAC Ductwork PH1 Rev 1 08022021.pdf PDF
36C25621R0122 ILSM.pdf PDF
36C25621R0122 ICRA .pdf PDF
36C25621R0122 SOW.doc DOC document
36C25621R0122 EXHIBIT E.docx DOCX document
36C25621R0122 JA.pdf PDF
36C25621R0122 Construction Specifications 05272021.pdf PDF
36C25621R0122 RFP.docx DOCX document
36C25621R0122 CRA.pdf PDF
36C25621R0122 EXHIBIT F.docx DOCX document
36C25621R0122 Construction Drawings .pdf PDF
36C25621R0122 WD06182021 Mod 2.txt TXT text file
36C25621R0122 EXHIBIT A.docx DOCX document
36C25621R0122 EXHIBIT D.docx DOCX document
36C25621R0122 EXHIBIT C.docx DOCX document
36C25621R0122 EXHIBIT B.docx DOCX document
36C25621R0122.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate CATH LAB 6E Project #667-15-104

Amendment To 6E5, Handrails, Door Hardware & Headwalls

Overton Brooks VA Medical Center, Shreveport, LA

CHANGE LAYOUT OF ROOM 6E5 (If Possible):

Current plans indicate a chase wall between room 6E4 and 6E5. During demolition, if it is found and determined that this void or chase area is not needed this room can constructed to match the layout and floorplan of the other pre-op/post-op rooms. Reference Supplemental Drawing Sheets 1-SD-002 and 1-SD-003 which indicate how 6E5 could be finished out. If this chase does not existing or is not needed, then the room shall be constructed in accordance with 1-SD-002 and 1-SD-003 to include all disciplines.

DOOR HARDWARE CHANGE:

Replace all contract required Best hardware Levers and Escutcheons as indicated below:

· Levers: Replace Lever-15’s with Lever-14’s

· Escutcheons: Replace Escutcheon-H’s with Escutcheon-J’s. All Escutcheons shall be J type.

Additionally, all panic hardware shall be externally mounted and not internal or integral.

HEADWALL CHANGE:

All new headwalls to include 2 additional USB charging ports (one USB-A and one USB-C). Additionally, ensure headwalls comply with the Buy American Act.

EXTERIOR LIFT CLARIFICATION:

Contractor shall be responsible for determining the type and size of anchors for the exterior lifts. The VA will provide existing structural as-builts for the east wing of the main hospital. The design of the lift support, anchors/attachments is the contractor’s responsibility. Exterior lift supports and anchor shall be reviewed, approved, and stamped by a structural engineer and submitted to the VA for review.

File details come from the government source that posted it. Updated .