This is a consolidated questions and answers document addressing clarifications to Solicitation No. 36C25526R0066 for referral laboratory testing services. The VA's Veterans Health Administration, Veterans Integrated Service Network 15 (Legacy VISN 15) seeks a contractor to provide comprehensive referral laboratory testing services supporting eight VA Medical Centers: St. Louis John Cochran, Columbia, Kansas City, Marion, Evansville, Poplar Bluff, Wichita, and facilities in Eastern Kansas (Topeka/Leavenworth). The base contract period begins January 1, 2027 (with the effective date potentially moving back), followed by four option years. The estimated annual testing volume is approximately 160,366 tests network-wide, with individual facility volumes detailed in an embedded spreadsheet. The government removed STAT (Stat/urgent) testing from the Performance Work Statement, retaining only critical/abnormal testing with specific result thresholds and notification requirements.
Key service requirements include routine specimen pickups at specified times (ranging from 3:00 PM to 11:00 PM CST depending on facility and day), on-site laboratory processors at four locations (St. Louis John Cochran, Columbia, Kansas City, and Marion), and unscheduled/critical specimen pickups during normal business hours only (8 total incidents recorded over the previous 12 months). The contractor must perform a minimum of 51 percent of listed tests in-house, with no more than 49 percent referred to subcontractor laboratories. Pricing requirements include completing D.1 Test Schedule workbooks with maximum turnaround times and methodologies for each test, with an additional line item for third-party referral testing marked up over the subcontractor's quoted cost. The HL7 interface must be phased in with at least 95 percent of tests configured and compliant within six months post-award. The government requires three completed past performance questionnaires (Form D.8) from references, confirmed Oracle Health baseline approval status at proposal submission, and current Business Partner Gateway Interconnection Security Agreement and Memorandum of Understanding documentation. Specimen loss remediation includes fee waivers for lost specimens, documented direct-cost reimbursement for Class A losses, and potential payment reductions for Class A losses causing material adverse patient outcomes, with no stated aggregate cap. The acquisition is unrestricted based on market research showing no capable small businesses meeting the requirement. Revised proposal due date is December 18, 2026, at 5:00 PM CST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25526R0066__Amendment0001.docx | DOCX document | |
| D.2 Test Schedule Instructions_Amemdment0001.docx | DOCX document | |
| D.1 Test Schedule_Amendment0001.xlsx | XLSX spreadsheet | |
| 36C25526R0066 0001.docx | DOCX document | |
| D.3 Quality Assurance Surveillance Plan QASP.pdf | ||
| D.9 Subcontracting Plan Template.docx | DOCX document | |
| 36C25526R0066_1.docx | DOCX document | |
| D.4 Contractor Rules of Behavior.pdf | ||
| D.10 Applicable Wage Determinations.pdf | ||
| D.7 Key Personnel Roster.pdf | ||
| D.2 Test Schedule Instructions.docx | DOCX document | |
| D.5 Organizational Conflict of Interest.pdf | ||
| D.6 Immigration and Nationality Act.pdf | ||
| D.8 Past Performance Questionnaire.pdf | ||
| D.1 Test Schedule.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C25526R0066
1. Will the Government accept test-specific clarification requests after the November 6, 2026, question deadline as offerors complete their review and matching of the test schedule?
The Government will not accept test specific questions after the deadline.
2. Can the Government provide historical STAT testing utilization by participating facility, including test type and annual volume?
The Government utilizes local partnering local hospitals and other VA facilities for all STAT testing and will not rely on the Reference Lab Contract for such services. The Government is utilizing the following as a definition of STAT: critical/immediate patient survival, without delay. Govt has Rremoved STAT from PWS, see changes to the following portions of the solicitation in 36C25526R0066_Amendment0001 paragraphs/sections 4.3.2., 4.5.1., 4.5.1.1, 4.5.1.3., ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES. Approximate Critical/abnormal testing utilization follows:
| Test |
| Critical low (<) |
| Critical high (>) |
| Units |
Hematology
| White blood cell count |
| < 0.5 |
| > 100 |
| k/mm³ |
| WBC, CSF |
| — |
| > 10 |
| /µL |
| Hemoglobin |
| < 7.0 |
| — |
| g/dL |
| Total hemoglobin (blood gas) |
| < 7.0 |
| — |
| g/dL |
| Platelet count |
| < 20,000 |
| > 1,000,000 |
| /mm³ |
| Blast count |
| — |
| > 0 |
| % |
Coagulation
| APTT |
| — |
| ≥ 90 |
| sec |
| INR |
| — |
| ≥ 4.5 |
| — |
| Fibrinogen |
| ≤ 100 |
| — |
| mg/dL |
| Anti-Xa |
| — |
| ≥ 1.0 |
| IU/mL |
Chemistry (serum/plasma)
| Sodium |
| < 120 |
| > 160 |
| mEq/L |
| Potassium |
| < 3.0 |
| > 6.0 |
| mEq/L |
| Calcium |
| < 7.0 |
| > 13.0 |
| mg/dL |
| Ionized calcium (CA++) |
| < 0.9 |
| > 1.5 |
| mmol/L |
| Glucose |
| < 54 |
| > 500 |
| mg/dL |
| CO2 / bicarbonate |
| < 10 |
| > 40 |
| mEq/L |
| Magnesium |
| < 1.0 |
| > 5.0 |
| mg/dL |
| Phosphorus |
| < 1.0 |
| — |
| mg/dL |
| Lactic acid |
| — |
| ≥ 4.0 |
| mmol/L |
| CK-MB mass |
| — |
| > 6.6 |
| ng/mL |
Cardiac troponin
| hs-Troponin I (assay in A, B): female |
| — |
| > 14 |
| ng/L |
| hs-Troponin I (assay in A, B): male |
| — |
| > 35 |
| ng/L |
| High-sensitivity troponin (assay in C, D) |
| — |
| ≥ 64 |
| ng/L |
Therapeutic drug levels and toxicology
| Digoxin |
| — |
| > 2.5 |
| ng/mL |
| Phenytoin (Dilantin) |
| — |
| > 30 |
| µg/mL |
| Valproic acid |
| — |
| > 125 |
| µg/mL |
| Carbamazepine (Tegretol) |
| — |
| > 15 |
| µg/mL |
| Lithium |
| — |
| > 1.5 |
| mEq/L |
| Theophylline |
| — |
| > 25 |
| µg/mL |
| Gentamicin (peak) |
| — |
| > 12 |
| µg/mL |
| Phenobarbital |
| — |
| > 40 |
| µg/mL |
| Acetaminophen |
| — |
| > 200 |
| µg/mL |
| Salicylate |
| — |
| > 50 |
| mg/dL |
| Ethanol |
| — |
| > 300 |
| mg/dL |
Blood gas (arterial unless noted)
| pH |
| < 7.25 |
| > 7.60 |
| — |
| pCO2 |
| < 25 |
| > 60 |
| mmHg |
| pO2 |
| < 50 |
| — |
| mmHg |
| Oxyhemoglobin (sO2 by oximetry) |
| < 50 |
| — |
| % |
| sO2 (arterial) |
| < 80 |
| — |
| % |
| Carboxyhemoglobin |
| — |
| > 10 |
| % |
| Methemoglobin |
| — |
| > 5 |
| % |
| Total CO2 (blood gas) |
| < 10 |
| > 42 |
| mmol/L |
Urinalysis
| Glucose AND ketones |
| — |
| Glucose ≥ 500 mg/dL AND ketone ≥ 80 mg/dL |
| mg/dL |
Microbiology and serology (positive results; all are called)
| Blood culture |
| — |
| Positive |
| — |
| Gram stain: organisms seen in CSF or sterile body fluids |
| — |
| Positive |
| — |
| CSF culture |
| — |
| Positive |
| — |
| Meningitis panel |
| — |
| Positive |
| — |
| AFB smear |
| — |
| Presence of acid-fast bacilli |
| — |
| Cryptococcal antigen (CSF) |
| — |
| Any positive |
| — |
| Legionella antigen |
| — |
| Positive |
| — |
| Eye culture |
| — |
| Growing P. aeruginosa or Bacillus spp. |
| — |
| Intraoperative fluids or tissues |
| — |
| Positive |
| — |
| Surgical wound culture |
| — |
| Growing S. pyogenes |
| — |
| S. agalactiae from pregnant woman |
| — |
| Positive (surveillance culture for Group B only) |
| — |
| Y. pestis, F. tularensis, B. anthracis |
| — |
| Isolated in culture |
| — |
Blood bank
| Transfusion reaction evaluation |
| — |
| Positive / hemolysis |
| — |
| Antibody screen and/or direct Coombs |
| — |
| New positive within 3 weeks of RBC transfusion |
| — |
3. Can the Government provide historical unscheduled and STAT specimen pickup volumes by facility, including after-hours, weekend, and holiday requests?
See above answer.
4. Can the Government provide the desired staffing hours and schedules for on-site processors at each designated facility, including expectations for alternate personnel and coverage during scheduled and unscheduled absences?
Response: See updated PWS 2.2.1. These are current times that processors work, but can be negotiated by station upon award. Alternate personnel and coverage during absences is addressed in PWS 2.2.
5. Will the Government confirm that the Contractor retains responsibility and authority for recruitment, hiring, selection, supervision, and employment decisions involving its on-site processor personnel under PWS Sections 2.2.3, 2.2.5, 2.2.8 and VAAR 852.237-75, while the Government retains its contractual authority to verify qualifications, credentialing, security requirements, and personnel compliance?
Response: Yes. This is a non-personal services contract. Under PWS 2.2.3, 2.2.5, and 2.2.8 and VAAR 852.237-75, the Contractor is responsible for its own recruitment, hiring, selection, supervision, and employment decisions for its on-site processors. The Government's authority is limited to verifying qualifications, credentialing, training, background investigations, and security compliance (PWS 2.2.8, 8.18, 8.19), refusing personnel whose conduct jeopardizes patient care (PWS 2.2.5), and approving key personnel substitutions (PWS 2.2.2 and 2.2.3). Contractor personnel may not report to duty until the Contracting Officer provides written notice that all requirements are met (PWS 2.2.8).
6. For unscheduled and STAT specimen pickups, will the Government clarify whether the required one-hour courier response time refers to physical arrival at the requesting facility or acknowledgment and dispatch of the courier?
Response: See changes to paragraph 4.3.2 in solicitation 36C25526R0066_Amendment0001.
7. Will the Government clarify whether exceptions to the one-hour courier response requirement are permitted for circumstances outside the Contractor's reasonable control, including severe weather, road closures, natural disasters, or other transportation disruptions?
Response: See changes to paragraph 4.3.2 in solicitation 36C25526R0066_Amendment0001.
8. Will the Government permit Contractor-designated technical resources to collaborate directly with VA laboratory and IT personnel on test mapping, interface validation, implementation, troubleshooting, and go-live support, subject to applicable VA security and access requirements?
Response: Yes, subject to VA security and access requirements. PWS 8.4.5 and 8.4.10 require the Contractor to provide interface mapping information and IT support for testing and troubleshooting, and PWS 8.4.11 requires VA verification before acceptance. Contractor technical resources may coordinate directly with VA laboratory and IT personnel on these activities through the assigned COR and the facility Information Security Officer. Access must be limited to the minimum necessary (PWS 8.11.2.1), and all personnel must complete required security and privacy training and sign the Rules of Behavior before access is granted (PWS 8.17.1).
9. Will the Government clarify whether the requirement to provide confirmatory testing at no additional charge under PWS Section 4.5.1.2 applies only to confirmatory procedures included within the originally ordered test methodology, or whether it also applies to separately ordered confirmatory tests that are not included in the original test?
Response: This applies only to confirmatory procedures included within the originally ordered test methodology, see updated PWS paragraph 4.5.1.2 in solicitation 36C25526R0066_Amendment0001.
10. Factor 2 indicates that past performance evaluations may utilize the Contractor Performance Assessment Reporting System (CPARS), while also requiring a minimum of three Past Performance Questionnaires. Will the Government accept completed CPARS evaluations in lieu of the Past Performance Questionnaires for contracts with documented CPARS performance ratings, and confirm that Attachment D.8 is the correct questionnaire referenced in Factor 2?
Response: The non-price response must include completed Past Performance Questionnaires (Section D, D.8), and offerors must survey a minimum of three references (Factor 2 and the Addendum to 52.212-1). CPARS and PPIRS may be used by the Government as additional sources, but the solicitation does not state that CPARS evaluations replace the questionnaires. Offerors may include CPARS evaluations as supporting information, but must still submit three completed D.8 questionnaires. Attachment D.8 is the correct questionnaire. The reference to "Section D, D.6" in Factor 2 is a cross-reference error, since D.6 is the Immigration and Nationality Act certification. See corrected solicitation 36C25526R0066_Amendment0001.
11. Will the Government clarify whether offerors may satisfy the requirement for three years of quality-of-service and performance records under Factor 1, Sub-factor B, through documented quality management programs, established performance indicators, and representative performance summaries, rather than providing detailed historical incident-level data for lost specimens, damaged specimens, delayed results, and testing not performed?
Response: No. Sub-factor B requires "current data demonstrating the number of lost specimens, the number of broken specimens, and the number of delayed test results ... in relation to the total number of specimens carried and total number of tests performed in the last three years." Offerors must provide those counts and totals for the three-year period. Narrative descriptions of the quality management program, performance indicators, and representative performance summaries may supplement the required data but do not replace it. Sub-factor B does not require incident-level detail, although the Government may request supporting documentation to verify information (Addendum to 52.212-1, paragraph (g)).
12. Will the Government clarify whether turnaround time performance may be demonstrated through published test-specific turnaround times, established quality monitoring processes, and representative performance reporting, or whether actual historical turnaround time compliance percentages are required for each test or participating facility?
Response: Sub-factor A requires the proposed maximum turnaround time for each test in the D.1 workbook, and PWS 4.5.3.1.1 requires TAT parameters to match the Contractor's published specimen collection guide. Sub-factor B requires counts of delayed results in relation to total tests performed over three years, which is the historical TAT performance data the Government will evaluate. The solicitation does not require per-test or per-facility historical TAT compliance percentages beyond that. Offerors may supplement the required data with published test-specific TATs, quality monitoring processes, and representative performance reporting.
13. Will the Government clarify the required timeframe for initial notification of specimens that cannot be tested (TNP) and whether the incident reporting and root-cause analysis requirements under PWS Section 4.6.6.4 apply to all TNP occurrences or only those meeting specified incident-reporting criteria?
Response: PWS 4.6.6.1 requires immediate notification upon discovery that a specimen is irretrievably lost, destroyed, or rendered untestable. Under that section, a specimen is "irretrievably lost or destroyed" if it cannot be located, recovered, re-tested from original material, or salvaged to produce a valid result. Under the PWS 4.6.6.2 table, initial notification is due within one hour of discovery for clinically irreplaceable specimens (written incident report within four hours) and within four hours for all other specimens (written incident report within 24 hours). The final root cause analysis under PWS 4.6.6.4 is due within 10 calendar days after the written incident report. Therefore, a test-not-performed occurrence is subject to these timeframes only when the specimen cannot be re-tested or salvaged. Unsatisfactory specimens that remain untestable are reported under PWS 4.5.3.7.
14. Will the Government clarify whether offerors must submit copies of an existing nationally approved VA Business Partner Gateway Interconnection Security Agreement (ISA) and Memorandum of Understanding (MOU) under PWS Section 8.4.3 with their proposals, or whether confirmation of an existing approved agreement is sufficient?
Response: PWS 8.4.3 requires the Contractor to possess and maintain a current VA nationally approved Business Partner Gateway ISA and MOU throughout the contract. The non-price submission list in the Addendum to 52.212-1 does not include copies of the ISA or MOU. Offerors must be on the approved Federal EHR VA Baseline list by the time of offer submission or they will be determined to be technically unacceptable (PWS 8.4.1). Confirmation of an existing approved ISA and MOU in the proposal is sufficient, with copies furnished before the interface is connected.
15. Will the Government clarify whether tests not specifically identified in Attachment D.1 may be added to the resulting contract through modification and whether separately priced handling or administrative fees are permissible for miscellaneous or third-party referral testing?
Response: Yes. Tests not listed in D.1 may be added only by written modification executed by the Contracting Officer (PWS 8.5.1 and 6.1.1). Unlisted tests are priced on the D.1 "Additional Tests Not Listed" line. The solicitation does not authorize separately priced handling or administrative fees on referred tests, because PWS 4.1.3 prohibits any additional transfer or confirmation charge. Therefore, testing price for miscellaneous third-party referral testing should include any administrative and shipping fees. See change to B.2 SCHEDULE OF SERVICES. Added an additional line under the table listing the Total Estimated Amount per year and overall. This adder will remain the same through the life of the contract. Vendors shall provide a % or $ amount over test and shipping cost quoted by the 3rd party vendor.
16. Will the Government clarify whether required performance and quality reports may be submitted using existing Contractor reporting systems and available data elements, provided all required information is included, or whether specific customized report formats and tracking systems are required?
Response: Yes, Contractor’s existing reporting systems can be used provided the existing system captures every data element the PWS requires. The solicitation specifies the required content for the monthly utilization report (PWS 4.6.4), the quarterly cost savings report (PWS 4.6.5), test result reports (PWS 4.5.3.6), and incident reports (PWS 4.6.6.3). It requires electronic submission on the stated due dates but does not prescribe a customized report format or a separate tracking system.
17. Can the Government provide historical referral laboratory specimen volumes and test order volumes by participating facility, including average daily workload, to assist offerors in developing appropriate staffing, transportation, and operational support plans?
Response: See imbedded excel document for volume, each facility has a tab. The updated PWS states the need for staffing and operational support per station. See response to Question #20 for transportation requirements. Imbedded document follows:
COURIER, TRANSPORTATION AND STAT
| No. |
| Reference |
| Question |
| 18 |
| PWS 4.3.2; B.2; D.1 |
| Since PWS 4.3.2 states that unscheduled specimen transport is priced separately, but neither B.2 nor D.1 contains a line item for it, how should offerors price unscheduled/STAT pick-ups, and will that price be included in the evaluated total? |
Response: 4.3.2 wording changed. See answers to numbers 2,3,6, and 7.
| 19 |
| PWS 4.3.2 |
| How many unscheduled/STAT pick-ups did each facility require per month over the most recent 12 months, and how many of those occurred on weekdays versus nights, weekends and Federal holidays? |
Response: PWS 4.3.2 as amended removed the reference to STAT pick-ups. Unscheduled critical/abnormal pick-ups per station over last 12 months follow:
Poplar Bluff: 0 Marion: 0 Evansville: 0 St. Louis: 0 Wichita: 0 Columbia: 2 (during normal hours) Eastern Kansas (Topeka/Leavenworth): 5 (during normal hours) Kansas City: 1 (during normal hours)
| 20 |
| PWS 4.3.1.1 |
| How many routine pick-ups per day does each facility currently receive, and at approximately what times? |
Response: Current routine pick-up times follow:
Columbia: 10:00 pm CST (Monday - Friday) St. Louis: 4:00 pm CST (Monday – Friday) Topeka: 5:00 pm CST (Monday – Friday) Leavenworth: 6:00 pm CST (Monday – Friday) Marion: 6:00 pm CST (Monday – Friday); 2:30 pm CST Saturday and Sunday Evansville: 4:00 pm CST (Monday – Friday) Poplar Bluff: 3:00 pm CST (Monday – Friday) Wichita:5:00 pm CST (Monday – Saturday) Kansas City: 11:00 am and 11:00 pm CST (Monday – Friday)
| 21 |
| PWS 4.3.3; 4.4 |
| Will the Government accept a scheduled pick-up by a commercial overnight carrier (for example, FedEx Priority Overnight), with specimens packaged by facility staff or contractor personnel, as the routine “mechanism for specimen pickup” required by PWS 4.4? |
Response: The Government does not prescribe the carrier. PWS 4.4 requires the Contractor to provide a mechanism for specimen pickup, and PWS 4.3.1.1 requires routine pickups at mutually agreed times. A scheduled commercial overnight carrier pickup may be proposed as the routine mechanism if it meets the agreed pickup times, the packaging and transport integrity requirements of PWS 4.3.3, the training requirements of PWS 4.3.4 (couriers must be trained to handle biological specimens), and the QASP measures in 7.3.2 and 7.3.5.
| 22 |
| PWS 1.4; 4.3.2 |
| If the pickup is STAT is there a designated time that the study needs to be processed as well? |
Response: STAT requirement removed from solicitation. See solicitation 36C25526R0066_Amendment0001.
| 23 |
| PWS 4.6.8.1; 4.6.10 |
| Would a specimen loss or delay caused by a commercial carrier or airline, or by road closures during declared severe weather, be classified as a Class A or a Class B event for purposes of the compensation provisions in PWS 4.6.10? |
Response: Not automatically. A carrier or airline loss caused by courier mishandling or another preventable process failure would be Class A (PWS 4.6.8.1(a)). A road closure or other disruption during declared severe weather may qualify as Class B (PWS 4.6.8.1(b)), but only if the Contractor documents that its standard operating procedures and safeguards were fully in place and properly followed. The burden is on the Contractor, and absent that documentation the event is Class A by default (PWS 4.6.8.2). Class B status relieves the compensation obligations only if the Contracting Officer agrees in writing (PWS 4.6.8.4), and the Government may reclassify on review (PWS 4.6.8.3).
ON-SITE PROCESSORS AND SITE PERSONNEL
| No. |
| Reference |
| Question |
| 24 |
| PWS 2.1; 2.2.1 |
| What hours and days of coverage are required for each On-site Processor position at St. Louis John Cochran, Columbia, Marion and Kansas City, and is weekend coverage expected? Are the Kansas City positions (2 primary, 1 alternate) a firm requirement? |
Response: See updated PWS 2.2.1. These are current times that processors work, but can be negotiated by station upon award. The number of processors required by station is a firm requirement.
| 25 |
| PWS 2.3 |
| Are packaging specimens for shipment (including dry ice, UN1845), printing shipping labels and manifests, and handing packages to a commercial carrier permitted On-site Processor duties? |
Response: Partially, with conditions. VA staff is backup if there are no contractor provided on-site processors. PWS 2.3.2 permits on-site processors to prepare specimens for shipment to referral testing, and PWS 2.3.6 permits other activities directly related to referral testing that the client would not normally perform. PWS 4.2.3 requires the Contractor to supply dry ice and containers. The Contractor must comply with 49 CFR, DOT, and IATA requirements for shipping biological and hazardous substances, including UN1845 dry ice (PWS 4.3.4.1). Any personnel who package, label, manifest, or hand off shipments must have the hazardous materials training required by PWS 4.3.4.2.
| 26 |
| PWS 2.1; 2.8 |
| If the contractor places part-time shipping/logistics personnel at facilities that do not require an On-site Processor, will the Government provide workspace? |
Response: Yes, under PWS 2.1, any additional facility staffed by the Contractor must be coordinated with the COR and CO. Equipment furnished under PWS 2.7 remains the Contractor's property. Any workspace request for an On-site Processor would be addressed through the COR and CO.
VOLUME AND TEST SCHEDULE
| No. |
| Reference |
| Question |
| 27 |
| D.1 |
| Are the D.1 estimated quantities (160,366 per period) network-wide annual estimates? Can the Government provide estimated volumes by facility? |
Yes, they are annual estimates in D.1. See #17 for historical VISN wide orders broken down by station in the tabs (Jan 1, 2026 to November 14, 2026).
| 28 |
| D.1 |
| What is the basis for the estimated 5,000 COVID-19 Molecular/NAAT tests per year, and is that volume expected to continue through the option periods? |
Response: This is a remnant from previous years. D.1 Test Schedules has been updated to reflect 100 per year. See updated D.1 Test Schedule. – 00005, 1005, 2005, 3005, 4005, BO change to 100.
| 29 |
| D.1 |
| How should offerors price, and how will the Government evaluate, Line 0006 (“Additional Tests Not Listed,” quantity 1) and the send-out handling fee line (CPT 99001, quantity 2,820)? |
Response: This is a placeholder. Do not add a price on that line item for each year. Any contractor that submits a price for that line item will be changed to zero to ensure fairness in price evaluation.
TURNAROUND TIME
| No. |
| Reference |
| Question |
| 30 |
| PWS 4.5; Factor 1 |
| The prior solicitation (36C25521R0004) provided VA TAT thresholds for the most commonly used tests; will proposed maximum TATs under this solicitation be evaluated against Government TAT thresholds, and if so, can the Government provide them? |
Response: The solicitation does not state Government TAT thresholds, and the prior solicitation (36C25521R0004) is not incorporated into this one. Under Factor 1, Sub-factor A, offerors propose a maximum TAT for each test in D.1, and PWS 4.5 and 7.3.4 set the performance standards.
| 31 |
| PWS 1.9.18 |
| When a commercial carrier performs the pick-up, does the turnaround time clock begin at the carrier’s pick-up scan? |
Response: Yes, the clock begins at specimen pickup. PWS 1.9.18 defines TAT as the time between pick-up of the specimen and receipt of results by a Government facility, and PWS 4.5.2 calculates routine TAT from specimen pickup time. When a commercial carrier performs the pickup, the carrier's documented pickup scan (or the pickup time on the manifest or chain-of-custody record) is the pickup time for this purpose.
TRANSITION AND IT
| No. |
| Reference |
| Question |
| 32 |
| General |
| What is the anticipated award date, and will a phase-in or transition period be provided before the January 1, 2027 base period start, given that current incumbent task orders appear to run through May 31, 2027? |
Response: The award date is not stated in the solicitation. The base period begins January 1, 2027 (B.2). This date is a goal due to the implementation of the new Electronic Healthcare Record System (EHRM). The effective date may move back. The contract will be for a base year starting on the effective date and four option years. The solicitation does not provide a phase-in or transition period. The effective date will be no more than 10 days after the date of award. After award, the Contractor must contact the COR within five calendar days to coordinate supplies and equipment, and must deliver supplies within two work days after receiving a task order (PWS 4.4). The task order will contain the same effective date as the award. The solicitation does not address the expiration of incumbent task orders.
| 33 |
| PWS 8.4 |
| Must the HL7 interface be operational at the start of performance, or is interim result reporting (printing, fax or secure web portal) acceptable while the interface, Business Partner Gateway ISA and MOU are completed? Can the Government provide each facility’s planned Oracle Health go-live schedule? |
Response: Interim reporting is addressed in PWS 4.5.3.1.2 and 5.2.2, which require an alternate route of transmission (telephone, courier, or fax) if the primary system fails, and PWS 8.4.5.2, which requires referral results to be printed via a secured link to the ordering hospital. The LEDI interface must be phased in: at least 95% of tests must be configured and compliant within six months after award, in three validation phases (PWS 8.4.8). Facilities convert individually (PWS 8.4.1). Go live schedule for Oracle Cerner with a lockdown no change period 12 months prior to Go-Live follows:
Eastern Missouri and Southern Illinois Go-Live Nov 6, 2027 Western Missouri and Kansas Go-Live Jan 29, 2028
TEAMING, SUBCONTRACTING AND SOCIOECONOMIC EVALUATION
| No. |
| Reference |
| Question |
| 34 |
| Factor 1, Sub-factor A |
| May the required minimum of one year of experience transporting biomedical materials be demonstrated through a teaming partner or subcontractor that will perform the transportation, or must it be held by the prime offeror? |
Response: The solicitation does not require the prime offeror to personally hold the one-year biomedical materials transport experience. A teaming partner or subcontractor that will perform the transportation may be identified, and its experience may be credited if the proposal clearly identifies the partner, its role, and the work it will perform, and includes the licensure and written guarantee documentation required under Sub-factor A.
| 35 |
| PWS 1.4 |
| Is there a quantitative limit on referrals to secondary (subcontract) laboratories? |
Response: No more than 49%, see updated solicitation: PWS 1.4. While the Government recognizes that certain specialized or low-volume tests may appropriately be referred to qualified subcontractor laboratories, excessive reliance on subcontracting introduces additional layers of coordination and oversight that can increase administrative burden, create potential delays in testing and reporting, and reduce the Government's ability to assess the actual capabilities of the performing laboratory. Requiring the Prime Contractor to perform the majority of testing ensures that the awardee possesses substantial in-house laboratory capability, maintains direct control over quality management systems, and can effectively manage workload fluctuations and urgent testing requirements.
| 36 |
| Factors 1 and 2; 13 CFR 128.402(f) |
| Will the Government consider the past performance, experience and qualifications of each joint venture partner, including toward the minimum of three past performance references under Factor 2 and the experience requirement under Factor 1, Sub-factor A? |
Response: The solicitation does not expressly address joint venture experience. The Government intends to evaluate the past performance and experience of a joint venture and its members to the extent the proposal shows each partner's role in performing the work.
ADDITIONAL SOLICITATION CLARIFICATIONS
| No. |
| Reference |
| Question |
| 37 |
| SF 1449 unrestricted designation; Section E; VAAR Subpart 819.70 |
| What market research supports the unrestricted acquisition strategy, and how were capable certified SDVOSBs, including qualifying joint ventures, considered? If applicable set-aside criteria can be met, will VA consider an SDVOSB set-aside for the requirement ? |
Response: The following market research supported full and open competition: All Oracle Health baseline approved referral laboratories are large businesses, no type of small business provided the required response to the sources sought, no market research suggests two or more of any type of small business referral laboratories capable of handling the required quantity of testing for this contract. An SDVOSB set-aside will not be considered for this requirement based on market research results, as supported by the Small Business Administration. Large businesses submitting a proposal to this solicitation must provide a sub-contracting plan as defined in instructions to offerors utilizing the template provided in section D, D.9 Subcontracting Plan Template or provide an already government approved commercial subcontracting plan.
| 38 |
| D.1 Test Schedule; D.2 alternate test instructions; PWS 1.3 |
| For proprietary, branded, or abbreviated descriptions in D.1, including ANACHOICE and BRCAVANTAGE entries, please provide the nonproprietary analytes, panel content, required methodology, specimen requirements, and reflex criteria needed to establish clinical equivalence. What documentation and approval standard will apply to alternate assays proposed under D.2, and will clinically equivalent assays be evaluated without preference for the incumbent's brand or catalog terminology? |
Response: Yes, equivalent tests will be evaluated and approved by facility laboratory directors without a preference to the incumbent’s brand. To find branded test criteria for the above two listed tests, go to the following link: https://www.questdiagnostics.com/healthcare-professionals/test-directory
| 39 |
| D.1 Items tab; D.2; Factor 1 Subfactor A |
| Please validate the test description and CPT associations, including 0003HS, described as ANTI-THYROGLOBULIN ANTIBO with CPT 87900 and 87901, and 0003WV, described as BRCAVANTAGE single site BRCA with CPT 82785 and 86003. Will a corrected schedule be issued, and which field controls when a description and CPT association differ? In which workbook column should offerors enter the methodology required by Subfactor A, since D.2 does not assign that field? |
Response: If company utilizes different CPT Code than what is listed in the D.1 Test Schedule, columns E and BZ, please fill-in/change the CPT Codes that are applicable to your test. Test methodology utilize column CL “SALIENT CHARACTERISTICS”, see D.2 TEST SCHEDULE INSTRUCTIONS_AMENDMENT0001. Check directory for CPT Code correctness and change accordingly in both columns E and BZ.
| 40 |
| D.2 Test Schedule Instructions; Factor 1 Subfactor A |
| D.2 permits a separate workbook listing tests an offeror cannot provide and for which no equivalent is available, while Subfactor A calls for all referral laboratory testing services. Will any unavailable test make an offer technically unacceptable? If omissions are permitted, please identify the minimum coverage requirement, any mandatory tests, and how omissions will affect technical evaluation and the evaluated price. |
Response: Factor 1, Sub-factor A calls for all referral laboratory testing services, and D.2 permits a separate listing of tests the offeror cannot provide. The solicitation text does not set a minimum coverage percentage or a mandatory test list. The Addendum to 52.212-1 requires a written statement addressing each omission. Omissions will be evaluated under Factor 1 and may affect the technical rating and risk assessment. Acceptable level of contractor performed tests are 51% of the listed required testing. A contractor that can provide more of the listed tests will be evaluated higher than one that has omissions as it will affect result retrieval times. Equivalent tests are not considered omissions.
| 41 |
| PWS 4.3.3, 4.6.7 through 4.6.10 and 2.13 |
| Please identify any per-event or aggregate limit on specimen-loss remediation costs, direct-cost reimbursement, and payment reductions. How will VA distinguish contractor-caused loss from loss attributable to VA preparation or packaging before contractor custody, and how will costs be documented and reviewed before an invoice offset? Please clarify how overlapping remediation, fee-waiver, reimbursement, and payment-reduction provisions will be applied without duplicate recovery for the same cost. |
Response: Both the hospital and the contractor will conduct internal investigations to determine the point of loss. The solicitation sets no per-event or aggregate cap on remediation costs or direct-cost reimbursement. The Contractor bears remediation costs (PWS 4.6.7.4), waives fees on lost specimens (PWS 4.6.10.2(b)), reimburses documented direct costs for Class A losses (PWS 4.6.10.3), and may be subject to payment reductions for Class A losses of clinically irreplaceable specimens that cause material adverse outcomes (PWS 4.6.10.4). Loss attributable to VA preparation or packaging before Contractor custody is the ordering activity's responsibility (PWS 4.3.3). Classification is made by the Contractor in the incident report and is subject to Contracting Officer review (PWS 4.6.8.1 through 4.6.8.3). Reimbursement claims are submitted by the COR within 60 days, and approved amounts are applied through next-month invoice discount within 30 days (PWS 4.6.10.3(d)). The solicitation does not contain express anti-duplication language. Accession numbers are assigned yearly with a Julian date preventing duplication.
ASSAY SPECIFIC TECHNICAL CLARIFICATIONS
| No. |
| Reference |
| Question |
| 42 |
| D.1: 0002TV, 0002TW and 0002TX; D.2 |
| For 0002TV, may free and bioavailable testosterone be calculated from measured total testosterone, SHBG and albumin, or is equilibrium dialysis required for free testosterone? Is total testosterone by immunoassay acceptable for 0002TV and 0002TW, while 0002TX requires LC/MS/MS? Please specify the required calculation and reference intervals. |
Response: Free and bioavailable testosterone will be calculated from measured total testosterone, SHBG and albumin. The current used is the Vermeulen Equation. Changes to equation and/or testing by immunoassay subject to prior approval by station laboratory directors.
| 43 |
| D.1: 0002QD, 0004YU and 0005CE; PWS 4.3.3 |
| For the client-incubated, four-tube and single-tube QuantiFERON entries, which facilities perform incubation before shipment, and which require contractor incubation? May offerors use manufacturer-permitted alternative collection workflows? Please identify who supplies incubators and records collection, tube-transfer and incubation times and temperatures. |
Response: Evansville, Marion and Poplar Bluff use the 4 tubes and incubate before sending. All other stations test in house, meaning they will not utilize this contract for those tests. Manufacturer may use alternative collection workflows (discussed with station). Contract on-site processors at Marion utilize contractor provided incubators and equipment. Poplar Bluff and Evansville utilize Government provided equipment.
| 44 |
| D.1: 0001KX and 0001KZ; D.2 |
| Will validated multiplex real-time PCR be accepted as an alternate to the RNA TMA and DNA SDA chlamydia/gonorrhea entries if clinical equivalence is demonstrated? Please specify required anatomical collection sites, specimen matrices, collection media, analytical performance criteria and validation evidence, including approval requirements for replacement collection devices. |
Response: Yes, alternate accepted. Collection sites: cervix, vaginal, urine, rectal and throat. Specimen matrices/collection media: Acceptable PCR medium that can accommodate swab or urine samples. Analytical performance criteria and validation evidence: Validation completed that is compliant with CLIA and CAP standards approved by a station laboratory director. Laboratory developed tests must be approved by the station laboratory director for sites that utilize contract for this testing. All replacement collection devices are validated and approved by the station laboratory director prior to use.
| 45 |
| D.1: 0002QR, 0003FC and 0005BO; D.2 |
| Please specify the required pathogen targets, subtypes and specimen matrices for Respiratory Virus PCR Panels I and IV. Will a validated multiplex real-time PCR panel with equivalent coverage be accepted? Must results identify each target individually, and is SARS-CoV-2 included or ordered separately under 0005BO? |
Response: The specimen matrices are going to be UTM, VTM, or comparable media. Targets for the respiratory panel follow: Adenovirus, Coronavirus 229E, Coronavirus HKU1, Coronavirus NL63, Coronavirus OC43, Severe Acute Respiratory Syndrome Coronavirus 2 (SARS-CoV2), Human Metapneumovirus, Human Rhinovirus/Enterovirus, Influenza A (including subtypes H1, H1-2009, and H3), Influenza B, Parainfluenza Virus 1, Parainfluenza Virus 2, Parainfluenza Virus 3, Parainfluenza Virus 4, Respiratory Syncytial Virus, Bordetella parapertussis (IS1001), Bordetella pertussis (ptxP), Chlamydia pneumoniae, and Mycoplasma pneumoniae. Yes, a validated multiplex real-time PCR panel with equivalent targets will be acceptable. Each target must be identified individually as listed above. SARS-CoV-2 should be included. 0005BO would be ordered separately for a screening test for asymptomatic patients.
46. B.2 Schedule of Services, Please confirm the contract start date?
Response: The award date is not stated in the solicitation. The base period begins January 1, 2027 (B.2). This date is a goal due to the implementation of the new Electronic Healthcare Record System (EHRM). The effective date may and most likely will move back. The contract will be for a base year starting on the effective date (assigned at contract award) and four option years. The solicitation does not provide a phase-in or transition period. The effective date will be no less than 10 days after the date of award. After award, the Contractor must contact the COR within five calendar days to coordinate supplies and equipment, and must deliver supplies within two work days after receiving a task order (PWS 4.4). The task order will contain the same effective date as the overriding contract. The solicitation does not address the expiration of incumbent task orders.
47. PWS, 2.2.1.10 Key Personnel, On-site processors assigned by VAMC (p. 10); The solicitation indicates that additional support staff required during contract performance will be executed via a bilateral contract modification. However, the solicitation does not specify the pricing mechanism or cost principles governing these additions. Because support personnel costs are currently built into the core service unit rates rather than priced as independent line items, adding staff without a defined pricing structure introduces significant risk and pricing contingencies for offerors.
To ensure a fair and transparent process, please confirm that:
| • | Any bilateral modification to add support staff beyond the baseline requirement will include an equitable cost adjustment to baseline service rates, or |
| • | The Government will establish Optional Contract Line Items (CLINs) with fixed, fully burdened labor rates (e.g., hourly or monthly FTE rates) that can be unilaterally or bilaterally activated to fund these additional personnel. |
Response: Additional support staff will only be required to new sites not listed in the solicitation due to VA restructuring. Planned restructuring into Heath Service Areas (HSA) may result in responsibility for more VAMC’s than legacy VISN 15 and this contract may pick up new VAMCs, some of which may require additional support staffing. Additional sites will increase the quantity of tests required. The contracting officer will work with the contractor to determine if the expected increase in volume of an additional VAMC(s) will justify additional staffing at the new location(s) and it will be done through bi-lateral modification. The goal is to not need an equitable adjustment due to the increased volume of orders. An FTE line item for staffing will not be added to this acquisition.
48. PWS, 8.4 Data Management/Transmission. What is the anticipated Cerner “go live” date?
Response: See response to Question #33.
49. Proposal Submission Information, Non-price response, Factor 1 – Technical Capability (p. 90). Offerors are to Complete the following fields in Test Schedule (Section D, D.1)… This document shall be returned as an Excel document (instructions provided in Test Schedule Instructions (Section D, D.2). This table will be provided to evaluators with the unit prices covered.
Since this is part of the Non-price response, do we provide this information in a separate Excel document from the Price response? Please clarify.
Response: Both. The D.1 workbook is completed in two versions. The non-price version contains the technical fields required by Sub-factor A (test code, maximum TAT, methodology, specimen type, testing site, STAT availability, and days and times performed), with the unit price column removed or blank, because the solicitation states that "all pricing will be blacked out for non-price evaluation" and the non-price response may not refer to price. The priced version is submitted with the price response.
50. D.1 Test Schedule – The Description for Item Numbers 0006, 1006, 2006, 3006, 4006 is “Additional Tests Not Listed”. Where should we put the information for the Additional Tests Not Listed.
Response: LINs 0006, 1006, etc, are specifically listed to allow potential addition of new tests after award and are a placeholder in the solicitation. Do not provide any information for those LINs at this time.
| 51. | D.1 Test Schedule – For the following test descriptions, referral lab tests and misc. allergen codes are utilized to capture various miscellaneous tests and do not correspond to a single, defined test code. Consequently, a fixed price cannot be assigned, as pricing varies based on specific test ordered. Due to this ambiguity, very small volume and no specific test information, we respectfully request that these items be removed from the RFP. |
| Description | Comment |
| MISC. ALLERGEN TESTING; | 99999 |
| Referral Lab Tests Group 1 | VARIES |
| Referral Lab Tests Group 2 | VARIES |
Referral Lab Tests Group 3
| Referral Lab Tests Group 4 | VARIES |
| Referral Lab Tests Group 5 | VARIES |
Response: 0003AR, 1003AR, 2003AR, 3003AR, 4003AR changed to RESERVED in D.1 Test Schedule_Amendment0001.
52. D.1 Test Schedule - For Item numbers 0002, 1002, 2002, 3002, 4002 LEUKEMIA/LYMPHOMA EVAL with CPT codes 88184, 88185, 88189, please confirm the price to be provided is for the total number of 16 markers that aligns with CPT code indicated, and not a per-marker price?
Response: Under CPT, 88184 is the first marker and 88185 is each additional marker, so the Government expects a single total price for the 16-marker panel rather than a per-marker price, unless D.1 states otherwise.
53. D.2 Test Schedule Instructions, item 1.K. – Column BZ “Item Part Number” Fill in (Copy and Paste from Column E), with applicable CPT codes. If the Offerors CPT code is different than what’s listed in Column E, should the Offeror put what they have as the CPT code for that test in column BZ?
Response: If the offeror’s CPT Codes are different than what is listed on D.1 Test Schedule in columns E and BZ, fill in the contractor’s CPT codes in both columns E and BZ (copying over what is currently listed in the test schedule).
54. D.2 Test Schedule Instructions, item 3 – How will you determine that a test is an equivalent alternate?
Response: In general, an alternate is equivalent when the Government's laboratory reviewers determine that it provides the same clinical information as the D.1 test, considering analytes, methodology, specimen type, and reference interval, and that it meets the quality requirements of PWS 4.1.2. The Government makes the equivalence determination, and the offeror must document the basis for its proposed alternate.
55. Paragraph 1.4 of the Performance Work Statement says all testing shall be performed on the Contractor's premises or within the Contractor's network of laboratories, including a qualified subcontractor, and that referrals to a subcontractor laboratory shall be kept to a minimum. Paragraph 1.6.1 says the Contractor or its subcontractor shall hold the College of American Pathologists accreditation and the Clinical Laboratory Improvement Amendments certification. May an offeror that does not own a laboratory perform this contract entirely through one qualified subcontractor laboratory, or does paragraph 1.4 require the prime contractor to perform some share of the testing itself?
Response: No. See updated PWS paragraph 1.4. The prime contractor must perform no less than 51% of the work.
56. If the answer to Question 55 allows full subcontracting, is there any minimum percentage of the work the prime contractor must self-perform under this unrestricted acquisition?
Response: See above answer.
57. Section 2 requires on-site specimen processors at four medical centers and names them as key personnel. May those processors be employees of the subcontractor laboratory rather than the prime contractor?
Response: Yes, provided the subcontractor's personnel meet all requirements. The background investigation requirements of PWS 8.18.1 apply to subcontractor personnel who require access, and PWS 2.2.8 requires CO written approval before any key personnel report to duty. VAAR 852.237-75 applies to key personnel regardless of employer. Key personnel must be listed on the D.7 roster, and any change requires Contracting Officer approval.
58. For the past performance factor, may an offeror submit the past performance of its proposed subcontractor laboratory in place of its own corporate experience?
Response: The solicitation does not expressly address subcontractor past performance. Factor 2 evaluates the offeror's record of past performance, and offerors must survey three references for relevant and similar referral laboratory services using D.8. If the prime contractor has no laboratory experience from which to base a past performance evaluation, it will receive a neutral rating. The subcontractor's relevant past performance may be considered if the subcontractor will perform major or critical aspects of this requirement and the proposal identifies the subcontractor, its role, and the work it will perform.
59. May a non-CLIA commercial firm bid as prime with a CAP/CLIA-accredited laboratory as a named subcontractor that performs all testing and on-site processing, or must the prime itself hold CAP and CLIA?
Response: See answer to #55 and #56.
60. For past performance evaluation, will the agency accept the laboratory partner's relevant VA or commercial referral-lab past performance when the prime is a new small business without prior lab contracts?
Response: See the response to Question 58.
61. Are the four on-site processor positions (John Cochran, Columbia, Kansas City, and Marion) mandatory key personnel at award, and may those individuals be employees of the laboratory subcontractor rather than the prime?
Response: The four on-site processor positions (St. Louis John Cochran, Columbia, Kansas City, and Marion) are key personnel under PWS 2.2.1 and must be listed on the D.7 roster. They must complete all training and background requirements, and no personnel may report to duty until the Contracting Officer provides written notice (PWS 2.2.8). Employment by a subcontractor is not prohibited, because PWS 8.18.1 applies background requirements to subcontractor personnel. Alternates are required at St. Louis and Columbia and at Kansas City, and Marion does not require an alternate (PWS 2.5.2.3).
62. Is electronic result interface with VA lab systems a firm requirement at start of performance, and is there a preferred interface standard or existing middleware vendors the VA will accept?
Response: Yes, electronic interface is a firm requirement, but it is phased. PWS 8.4.8 requires at least 95% of tests to be configured and compliant within six months after award, in three validation phases. PWS 8.4.6 requires compatibility with Data Innovations middleware and the associated driver and VistA/Oracle Health instances, and PWS 8.4.11.1 identifies the Generic Instrument Manager for the interface connection. Offerors must be on the approved Federal EHR VA Baseline list by offer submission (PWS 8.4.1), and must maintain an approved BPG ISA and MOU (PWS 8.4.3). The solicitation does not identify other acceptable middleware vendors.
63. Will answers to questions be posted as an amendment available to all offerors on SAM.gov?
Response: The Government intends to issue its answers as a solicitation amendment so that the same information is available to all offerors.
image1.emf
SendOutAapproxTest_2026.xlsx Columbia
Test Name Amount Sent Out in 2026
TESTOSTERONE,FREE,BIOAVAL 1,558
ALPHA GAL IGE 908
METHYLMALONIC ACID 872
ANA IFA, WITH REFLEX TO 857
LH, SERUM 714
FSH, SERUM 704
DM ASSESS COMP,QL,U 656
PROLACTIN (PRL) 594
PROTEIN ELECTROPHORESIS W 563
ALPHA-FETOPROTEIN TUMOR 529
CYCLIC CITRULLINATED 509
**DM FENTANYL,QN,U 469
TP IMAGING PAP/HPV E6/E7 425
VITAMIN B1 (THIAMINE) BL 395
ALLERGY FOOD PANEL #25 382
T3, FREE 366
HEREDITARY HEMOCHROMATO- 348
KAPPA/LAMBDA LIGHT CHAINS 336
HSV 1,2 IGG,HERPESELECT 300
ANA, TITER AND PATTERN 281
CULTURE FUNGUS, MISC. 280
CASCADING REFLEX 277
MYCOBACTERIA,CULT,SMEAR 276
ACTIN ANTIBODY (IGG) 262
IMMUNOFIXATION ELECT. 252
RICKETTSIA(RMSF) ABS 251
MPN CORE DX PANEL 247
STAGE II 245
CELIAC DISEASE COMPRE 245
MMR PROFILE #2 240
RED BLOOD CELL FOLIC ACID 236
ESTRADIOL 235
STAGE III 234
ERYTHROPOIETIN(EPO) 230
RESPIRATORY ALLERGY 227
THYROID PEROXIDASE AB 209
COLLAGEN TYPE I C-TELOPEP 205
VITAMIN B6, PLASMA 197
EHRLICHIA CHAFFEENSIS DNA 197
CERULOPLASMIN 194
STREPTOLYSIN O ANTIBODY 187
T3, TOTAL 186
MARIJUANA, CONF GCMS, URI 169
MTB & RIFAM RESIS NON-SPU 168
LEUK&LYMP EVAL,22 MARKR 166
PLASMA RENIN ACTIVITY 158
ALDOSTERONE, LC/MS 158
HCV, RNA, QUAN, PCR 158
CYSTATIN C W/EGFR 154
LYME DISEASE AB W/RFLX TO 152
THYROID STIMULATING IMMUN 144
O&P AND GIARDIA AG 143
LIPOPROTEIN A (LP(A)) 139
MITROCHONDRIAL M2 ANTIBO 137
BORRELIA SPP DNA, QL RT P 134
HELICOBACTER PYLORI ANTIG 133
ZINC 132
INSULIN 132
CA 19-9 127
HIV-1 RNA, QT, REAL-TIME 113
TESTOSTERONE,TOTAL 107
PROGESTERONE 106
THYROGLOBULIN PANEL 101
ANCA SCRN W/MPO AND PR3 101
ESTROGENS, TOTAL 98
DHEA SULFATE 94
IMMUNOGLOBULIN E 94
HEPATITIS A AB, TOTAL 91
PANCREATIC ELASTASE-1 89
ACTH, PLASMA 88
TTG AB, IGA 85
VITAMIN A (RETINOL) 84
ANCA VASCULITIDES 78
CALPROTECTIN, STOOL 77
ANTI-THYROGLOBULIN ANTIBO 72
MSA AB PANEL 72
METANEPHRINES, LC/MS/MS 71
STONE ANALYSIS 71
LYMPHOCYTE SUBSET PANEL 68
P210 BCR-ABL1 68
GRASS PANEL 67
COPPER 65
PSA, FREE AND TOTAL 64
DOG DANDER COMPONENT 62
LEVETIRACETAM IA 61
RPR, PROGRESSIVE 60
HEMOGLOBINOPATHY EVALUATI 60
**F. TULARENSIS AB, S 59
LEAD, BLOOD 56
IGF 1, LC/MS 55
THINPREP AUTOMATED PAP 55
TICKBORNE AB PNL RFL 54
CAT DANDER COMPONENT 54
HOMOCYSTEINE 53
URORISK(R) DIAGNOSTIC PRO 53
E.CHAFF(IGG,IGM) RFL 53
RMSF IGG TITER 53
DECALCIFICATION 47
C-PEPTIDE 47
BONE MARROW ASP INTERP 47
BONE MARROW EXAMINATION A 47
FACTOR V(LEIDEN)MUTATION 47
CD34, IHC W/INTERP 47
CD61, IHC W/INTERP 47
SPECIAL STAIN 46
SPECIAL STAIN BILL CODE 46
BONE MARROW INTERP. 46
CHROMOSOME ANALYSIS, HEMA 46
SJOGREN'S ANTIBODY (SS-A) 46
SJOGREN'S ANTIBODY (SS-B) 44
HISTOPLASMA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .