This is a Quality Assurance Surveillance Plan (QASP) for federal contract 36C25526R0066 with the Department of Veterans Affairs. The QASP establishes systematic methods to evaluate contractor performance on a pathology services contract, with the primary contractor representative identified as Ozlem Ulusarac, MD, Pathologist. The Government's oversight is managed by Contracting Officer Michael Carson (CO) at the VA NCO-15 in Leavenworth, Kansas, and Contracting Officer's Representative IlahRae Wyatt (Regional Technical Specialist) at Veterans Integrated Service Network (VISN) 15. The plan designates that the COR will provide quarterly progress reports to the CO reflecting performance against established standards and all other contractual aspects.

The QASP establishes nine key performance measures monitored quarterly through direct observation, periodic inspection, random sampling, and contractor-provided documentation and verification. Performance standards address specimen management including lost specimens (less than 3 per quarter), missed courier pickups (less than 3 per quarter), modified test results (less than 0.02% per quarter), published turnaround time (TAT) delays (fewer than 6 per month), transportation compliance with 49 CFR, DOT, and IATA standards, notification of lost or destroyed specimens within required timeframes, incident reporting timelines, chain-of-custody documentation, and Class A specimen losses. Contractor performance is rated using a five-level CPARS scale: Exceptional (exceeds requirements with few minor problems), Very Good (exceeds some requirements), Satisfactory (meets requirements), Marginal (does not meet some requirements), and Unsatisfactory (does not meet most requirements). Performance issues are documented through Contract Reports (CRs), which require contractor acknowledgment and corrective action plans reviewed by the CO. The document includes a sample QASP performance report template and Contract Report form for documenting and tracking performance deficiencies.

View the file

Other files

File Type Posted
D.9 Subcontracting Plan Template.docx DOCX document
36C25526R0066_1.docx DOCX document
D.4 Contractor Rules of Behavior.pdf PDF
D.10 Applicable Wage Determinations.pdf PDF
D.7 Key Personnel Roster.pdf PDF
D.2 Test Schedule Instructions.docx DOCX document
D.5 Organizational Conflict of Interest.pdf PDF
D.6 Immigration and Nationality Act.pdf PDF
D.8 Past Performance Questionnaire.pdf PDF
D.1 Test Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D.3 Quality Assurance Surveillance Plan (QASP) 36C25526R0066

The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How will monitoring take place?

• Who will conduct the monitoring?

• How will monitoring efforts and results be documented?

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO): The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Michael Carson, CO

Organization or Agency: Dept of Veterans Affairs NCO-15, Leavenworth, KS

b. Contracting Officer’s Representative (COR): The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: IlahRae Wyatt, Regional Technical Specialist

Organization or Agency: Veterans Integrated Service Network (VISN) 15

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract:

Primary: Ozlem Ulusarac, MD, Pathologist

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.)

b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. (Define what and how often it will be inspected. For example, ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)

c. VALIDATED USER/CUSTOMER COMPLAINTS. If this method is used, explain how data will be collected and reported.

d. RANDOM SAMPLING. If this method is used, define what and how often it will be sampled. (For example, ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)

e. Verification and/or documentation provided by Contractor. Review PWS and if this method of surveillance is selected, define how documentation will be verified and how assessment will be conducted. (For example, off-site contracts may require the contractor to provide information on services provided to patients).

6.SAMPLE QASP PERFORMANCE REPORT DATE:__________________

Measures PWS Reference

Performance Requirement

Standard Acceptable Quality Level

Surveillance Method

Met AQL/DID

NOT MEET

AQL-

CPAR

RATING/ADD

COMMENTS

1 – Lost specimens by vendor

7.3.1., 4.6.6, 4.6.7

< 3 per quarter < 3 per quarter < 3 per quarter Direct observation Quarterly

2 – Missed courier pickups

7.3.2, 4.3 < 3 per quarter < 3 per quarter < 3 per quarter Direct observation Quarterly

3 - Modified test results

7.3.3 <0.02% per quarter <0.02% per quarter <0.02% per quarter Direct observation/Verification and/or documentation provided by Contractor.

Quarterly

4 - Published TAT rates per month

7.3.4, 4.5 Less than 6 delays from published TAT rates per month

Less than 6 delays from published TAT rates per month

Less than 6 delays from published TAT rates per month

Verification and/or documentation provided by Contractor.

Quarterly

5 - Transportation and shipment of specimens

7.3.5, 4.3 Transportation and shipment of specimens shall be in accordance with 49 Code of Federal Regulation (CFR) (http://www.ecfr.go v/cgi-bin/ECFR?page=br owse), Department of Transportation (DOT), and International Air Transportation Association (IATA) Packing Instruction

Discrepancies shall not exceed 0 per quarter

Discrepancies shall not exceed 0 per quarter.

Direct observation Quarterly

6 - Notify ordering facility upon discovery of any irretrievably lost or destroyed specimen

4.6.6.2, 7.3.6

100% of notifications issued within required timeframes; zero

100% of notifications issued within required timeframes;

zero tolerance for unreported losses

100% of notifications issued within required timeframes; zero tolerance for unreported losses

Direct observation Quarterly tolerance for unreported losses

7 - Incident reports for all irretrievably lost or destroyed specimens

4.6.6.3, 7.3.7

100% completion;

clinically irreplaceable specimens within 4 hours, all others within 24 hours

100% completion; clinically irreplaceable specimens within 4 hours, all others within 24 hours

100% completion;

clinically irreplaceable specimens within 4 hours, all others within 24 hours

Direct observation Quarterly

8 - Chain-of-custody 4.6.9.2, 7.3.8

Enhanced chain-of-custody tracking to all clinically irreplaceable specimens

Zero undocumented custody gaps per quarter

Zero undocumented custody gaps per quarter

Direct observation Quarterly

9 - Class A irretrievable specimen losses

4.6.8, 4.6.10, 7.3.9

Zero Class A losses of clinically irreplaceable specimens per contract year

Fewer than 2 Class A losses of all other specimens per quarter

Fewer than 2 Class A losses of all other specimens per quarter

Direct observation Quarterly

7. CPARS RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/documents/CPARS- Guidance.pdf)

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.

However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract.

Also, there should have been NO significant weaknesses identified.

MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g.

Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTO

RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-https://www.cpars.gov/documents/CPARS-Guidance.pdf https://www.cpars.gov/documents/CPARS-Guidance.pdf element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

8.DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.

6. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

IlahRae Wyatt, COR DATE

SIGNED:

Contractor Representative DATE

CONTRACT REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY

3. TO: (Contracting Officer) 4. FROM: (Name of COR)

5. DATES

a. CR PREPARED

b. RETURNED BY

CONTRACTOR:

c. ACTION COMPLETE

6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR Date:

8. SIGNATURE OF CONTRACTING OFFICER Date:

9a. TO (Contracting Officer) 9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

COR

CONTRACTING

OFFICER

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.)
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYST...
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and p...