This document is an Infection Control and Risk Assessment (ICRA) Details specification for a Veterans Affairs (VA) project to correct HVAC systems at the St. Louis VA Medical Center. The file provides comprehensive guidelines for construction activities, specifically focusing on Type C construction work that generates moderate to high dust levels, including tasks like wall sanding, floor and ceiling removal, new wall construction, and electrical work above ceilings.

The document outlines stringent infection control precautions, including sealing HVAC systems, controlling dust dispersion, using dust mats, maintaining clean construction zones, and implementing Class IV ICRA barriers with mandatory ante rooms. Key requirements include daily HEPA vacuuming, wet mopping with disinfectant, using personal protective equipment, obtaining an infection control permit, and adhering to strict traffic control and cleaning protocols. The specification includes detailed requirements for ICRA barriers, such as using metal, wipeable doors, maintaining negative air pressure, and implementing alternative indoor exhaust procedures with continuous particulate monitoring.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFECTION CONTROL NOTES

INFECTION CONTROL GENERAL NOTES:

1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR

VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER

COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE

PRESSURE SYSTEMS. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR

TO DECK.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND

CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE

CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES.

THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST

MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR

MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL

AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING

TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE.

ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.

3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE

MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH

EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT

DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING

SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE.

PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND

N95 RESPIRATORS REQUIRED BY THE SAFETY SPECIFICATION.

4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN INFECTION

CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH

THE COR PRIOR TO CONSTRUCTION.

6. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION AND

THE COR PRIOR TO IMPLEMENTATION.

7. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA,

IF EXISTING WALLS AND/OR PARTITIONS DO NOT EXTEND TO THE STRUCTURE ABOVE.

8. COORDINATE WITH MEP/FP.

9. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA

MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA

BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS REQUIRING

CONTAINMENT (ANTE ROOM, WALK-OFF MATS, ETC.) AIR-PRESSURIZATION CRITERIA, AND

IDENTIFICATION AS NOTED ON SHEET GI-103 TO GI-106.

ENVIRONMENTAL CONTROLS:

TYPE OF CONSTRUCTION ACTIVITY - TYPE C:

WORK THAT GENERATES MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.

INCLUDES, BUT IT NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING FOR WALL COVERING

• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

• NEW WALL CONSTRUCTION

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

• MAJOR CABLING ACTIVITIES

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.

INFECTION CONTROL PRECAUTIONS FOR CLASS II

DURING CONSTRUCTION PROJECT:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

UPON COMPLETION OF PROJECT:

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

S t L o u is C o rr e c t H

V A

C t o m e e t D ir e c ti v e

/S tL

M O

-A C

S

-1

J C

M

E P

V

.r v t

/2

/2

:0

:5

P

M

ICRA DETAILS

MAY 27, 2025

657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR

VHA DIRECTIVE 1116 (2)

JB MR

657 - ST. LOUIS, MO

915 NORTH GRAND BLVD., ST. LOUIS, MO 63106

01-GI-102

Revisions: Date:

Amendment #1 05/27/2025 c

High

IV

ICRA barriers shall not be built during Medical Center business hours 8:00am-4:30pm M-F. Some areas may have additional time restrictions.

ICRA barriers at all rooms shall be Class IV. There must be an ante room.

ICRA barriers at locations that will be active for less than 30 calendar days and have minimal dust generating activity may be allowed to have a plastic zippered door separating the ante room and construction zone. The contractor shall provide a written proposal for VA Infection Prevention personnel to review but must be prepared to provide a more restrictive barrier per ICRA requirements at no cost to the government.

ICRA barriers at some locations may be allowed to be a mobile containment unit or other similar mobile or modular containment system. The contractor shall provide a written proposal for VA Infection Prevention personnel to review but must be prepared to provide a more restrictive barrier per ICRA requirements at no cost to the government.

All gaps in the containment barrier must be taped and sealed. Taping is to be done in a manner as to not be destructive to existing infrastructure or the contractor is responsible for repair. Taping is to be inspected daily and any gaps resealed or retaped to maintain the required negative air pressure. Negative air outlet shall use a piece of hard flat material in the window with a hole in it for the tubing and use a round flange and attach the tubing with a band clamp or similar VA approved method.

Doors into ICRA barriers shall be:

• Metal and wipeable to maintain a dust free clean surface. No wood allowed.

• Pre-manufactured temporary wall systems are allowed per VA approval.

• ADA compliant threshold, or no threshold.

• Have a door closer.

• Door must close and latch on its own power while the negative air is operational.

• A door latch and lock compatible with the VA key core.

• CL3357 NZD 626 RH CT6 (LFIC LESS CONST. CORE) (Storeroom function) Lock set for JC Large Format Interchangeable Core.

• A potential supplier - IDN-H Hoffman Inc. 314-692-8391.

ICRA BARRIER ADDITIONAL NOTES

Appendix A: Alternative To Outdoor Exhaust Requirements

This appendix provides and equivalent ICRA control measure to requirements detailed in VHA ICRA template that would allow interior construction space exhaust.

Interior Construction Space Exhaust:

If the facility is not able to exhaust to the building exterior, the Healthcare Environment and Facilities program office has identified an alternate industry-recognized standard interior exhaust procedure that is accepted as providing an equivalent level of infection prevention and control(IPC), and safety. The alternate interior exhaust procedure is implemented by completing the following:

a. If exhaust is directed indoors, then the system must be HEPA filtered Prior to start of work, including assembly of the ICRA barriers, initial baseline air sampling measurement for particulate levels must be taken in the planned are of discharge. Once containment is erected and completed HEPA filtration must then be verified by particulate measurement, using a particulate counter with multi-channel capabilities to measure down to 0.3 microns, to confirm that the discharge of the HEPA unit does not exceed the baseline particulate count of the area to which exhaust is directed. Verification must continue at least three times per day (once every 8 hours), 7 days a week during the use of the negative air machine and HEPA filter. Any exeedance must trigger a work stoppage and an immediate response and resolution. All particulate measurements, including the baseline measurement, must be documented and retrievable.

b. To accommodate the sampling, the negative air pressure machine must be fitted with 2 ft section of ridged ductwork at the discharge. The sample port for monitoring must be in the ridged ductwork section.

c. Vapor Generating process must be assessed and appropriate filtration must be installed to mitigate transmission to the facility.

d. Engineering must do a complete flow and pressure analysis and document the are to which the air is being discharged to ensure the flow and pressure relationship in that area not being adversely impacted by the additional flow. Ideally this is done as part of the construction package to ensure the design is implementable and no additional HVAC changes are required to accommodate the exhaust from the negative air equipment.

e. Install device on exterior of work containment to continually monitor negative pressurization. To ensure proper pressure is continuously maintained, the device(s) shall have a visual pressure indicator, data collection and alarm.

f. Exhaust must be directed to Low Risk areas as defined on page 4 in this ICRA Template. Ideally this discharge must be located so as not to impringe on high traffic areas or create a nuisance with noise or excessive airflow.

NOTE: Exhaust into shared or recirculating HVAC systems, other shared exhaust systems (e.g.,bathroom exhaust), chases or above ceiling is not acceptable.