Amendment 4 Update to Prebid Questions Plans and Specifications pages 1 to 26.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25525R0051
About this file
This document is an amendment to bid documents for a VA medical center HVAC systems correction project located in St. Louis, Missouri. The comprehensive set of technical drawings and specifications covers mechanical, plumbing, and life safety upgrades across multiple building levels, focusing on correcting HVAC systems to comply with VHA Directive 1116. The project involves modifying existing mechanical and plumbing infrastructure in rooms including storage areas, supply rooms, and clinical spaces on basement, first, fifth, and ninth floors.
The technical drawings detail precise piping modifications, steam humidification system installations, condensate drain routing, and mechanical equipment connections. Key systems being addressed include heating hot water piping, low-pressure steam, chilled water systems, and ventilation equipment. The project requires careful coordination with ongoing medical center operations, with specific notes emphasizing minimal disruption to facility functions and adherence to strict infection control protocols. Specific rooms targeted include storage areas (A539, A540, A940, B121), supply rooms (B147), and clinical spaces across different building levels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ICRA Details.pdf | ||
| Amendment 36C25525R0051 0005.docx | DOCX document | |
| Amendment 36C25525R0051 0004.docx | DOCX document | |
| 36C25525R0051 0003.docx | DOCX document | |
| Revised Technical Evaluation Factors 657-21-114JC 5-21-2025.docx | DOCX document | |
| Davis-Bacon Act WD MO20250080 05152025.docx | DOCX document | |
| Responses to questions 1-19 657-21-114JC A002.docx | DOCX document | |
| CB 18 Photos.pdf | ||
| CB 25 Photos.pdf | ||
| 36C25525R0051 0002.docx | DOCX document | |
| S04- Pre-bid visit agenda 657-21-114JC Correct HVAC.pdf | ||
| 36C25525R0051 0001.docx | DOCX document | |
| 657-21-114JC_Site Visit Check-In Sheet.pdf | ||
| 657-21-114JC_Specifications 1042 Pages.pdf | ||
| 36C25525R0051.docx | DOCX document | |
| Appendix 3- VAAR 852.219-75 VA Limitations on Subcontracting- NAICS 238220.pdf | ||
| 657-21-114JC Drawings 1-63pgs.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INFECTION CONTROL NOTES
INFECTION CONTROL GENERAL NOTES:
1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR
VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER
COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE
PRESSURE SYSTEMS. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR
TO DECK.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND
CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE
CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES.
THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST
MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR
MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL
AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING
TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE.
ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.
3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE
MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH
EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT
DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING
SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE.
PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND
N95 RESPIRATORS REQUIRED BY THE SAFETY SPECIFICATION.
4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN INFECTION
CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH
THE COR PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION AND
THE COR PRIOR TO IMPLEMENTATION.
7. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA,
IF EXISTING WALLS AND/OR PARTITIONS DO NOT EXTEND TO THE STRUCTURE ABOVE.
8. COORDINATE WITH MEP/FP.
9. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA
MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA
BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS REQUIRING
CONTAINMENT (ANTE ROOM, WALK-OFF MATS, ETC.) AIR-PRESSURIZATION CRITERIA, AND
IDENTIFICATION AS NOTED ON SHEET GI-103 TO GI-106.
ENVIRONMENTAL CONTROLS:
TYPE OF CONSTRUCTION ACTIVITY - TYPE C:
WORK THAT GENERATES MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING FOR WALL COVERING
• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.
INFECTION CONTROL PRECAUTIONS FOR CLASS II
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:1
:3
P
M
ICRA DETAILS
MAY 27, 2025
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-102
Revisions: Date:
Amendment #1 05/27/2025 c
High
IV
©2022 American Society for Health Care Engineering of the American Hospital Association
Infection Control Risk Assessment 2.0 Matrix of Precautions for Construction, Renovation and Operations
Step One:
Using Table 1, Identify the Activity Type (A-D).
Table 1 - Activity Type:
Type A
Inspection and non-invasive activities.
Includes but is not limited to:
Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
Clean plumbing activity limited in nature.
Type B
Small-scale, short duration activities that create minimal dust and debris.
Includes but is not limited to:
Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
Fan shutdown/startup.
Installation of electrical devices or new flooring that produces minimal dust and debris.
The removal of drywall where minimal dust and debris is created.
Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Type C
Large-scale, longer duration activities that create a moderate amount of dust and debris.
Includes but is not limited to:
Removal of preexisting floor covering, walls, casework or other building components.
New drywall placement.
Renovation work in a single room.
Non-existing cable pathway or invasive electrical work above ceilings.
The removal of drywall where a moderate amount of dust and debris is created.
Dry sanding where a moderate amount of dust and debris is created.
Work creating significant vibration and/or noise.
Any activity that cannot be completed in a single work shift.
Type D
Major demolition and construction activities.
Includes but is not limited to:
Removal or replacement of building system component(s).
Removal/installation of drywall partitions.
Invasive large-scale new building construction.
Renovation work in two or more rooms.
TYPE C
Step Two:
Using Table 2, identify the Patient Risk Group(s) that will be affected. If more than one risk group will be affected, select the higher risk group.
Table 2 - Patient Risk Group:
Low Risk
Non-patient care areas such as:
Medium Risk
Patient care support areas such as:
High Risk
Patient care areas such as:
Highest Risk
Procedural, invasive, sterile support and highly compromised patient care areas such as:
Public hallways and gathering areas not on clinical units.
Office areas not on clinical units.
Breakrooms not on clinical units.
Bathrooms or locker rooms not on clinical units.
Mechanical rooms not on clinical units.
EVS closets not on clinical units.
Waiting areas.
Clinical engineering.
Materials management.
Sterile processing department - dirty side.
Kitchen, cafeteria, gift shop, coffee shop, and food kiosks.
Patient care rooms and areas
All acute care units
Emergency department
Employee health
Pharmacy - general work zone
Medication rooms and clean utility rooms
Imaging suites:
diagnostic imaging
Laboratory.
All transplant and intensive care units.
All oncology units.
OR theaters and restricted areas.
Procedural suites.
Pharmacy compounding.
Sterile processing department
- clean side.
Transfusion services.
Dedicated isolation wards/units.
Imaging suites: invasive imaging.
Step Three:
Match the Patient Risk Group (Low, Medium, High, Highest) from Step Two with the planned Construction Activity Project Type (A, B, C, D) from Step One using Table 3 to find the Class of Precautions (I, II, III, IV or V) or level of infection control activities required. The activities are listed in Table 5 – Minimum Required Infection Control Precautions by Class.
Table 3 - Class of Precautions:
Construction Project Type
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
LOW Risk Group I II II III*
MEDIUM Risk Group I II III* IV
HIGH Risk Group I III IV V
HIGHEST Risk Group III IV V V
Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.
Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.
*Type C [Medium Risk groups] and Type D [Low Risk Groups] work areas [Class III precautions] that cannot be sealed and completely isolated from occupied patient care spaces should be elevated to include negative air exhaust requirements as listed in Class IV Precautions.
HIGH
TYPE C IV
Step Four:
Assess potential risk to areas surrounding the project. Using Table 4, identify the surrounding areas that will be affected and the type of impact that will occur. If more than one risk group will be affected, select the higher risk group using Table 2 - Patient Risk Group.
Table 4 - Surrounding Area Assessment
Unit Below: Unit Above: Unit Lateral: Unit Behind: Unit in Front:
Risk Group: Risk Group: Risk Group: Risk Group: Risk Group:
Contact: Contact: Contact: Contact: Contact:
Phone: Phone: Phone: Phone: Phone:
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Noise & Vibration Mitigation Strategies Use diamond drills instead of powder-actuated fasteners.
Schedule noise-making periods with adjacent spaces.
Use beam clamps instead of shot.
Prefab where possible.
Use tin snips to cut metal studs instead of using a chop saw.
Install metal decking with vent tabs, then use cellular floor deck hangers.
Consider compression style fittings instead of soldering, brazing or welding.
Wet core drill instead of dry core or percussion.
Instead of jackhammering concrete, use wet diamond saws.
Use HEPA vacuums instead of standard wet/dry vacuums.
Use mechanical joining system sprinkler fittings instead of threaded.
Where fumes are tolerated, use chemical adhesive remover (flooring glue) instead of mechanical.
To remove flooring, consider abrasive blasting instead of using a floor scraper.
Use electric sheers instead of reciprocating saw for ductwork cutting.
Install exterior man/material lifts.
Ventilation & Pressurization Mitigation Strategies
HEPA to exterior.
Install temporary ductwork.
Utilize temporary HVAC equipment.
Vacate the area.
Install temporary partitions.
Use carbon filtration to filter odors.
Impact to Other Systems Mitigation Strategies
Schedule outages.
Provide temporary systems.
Back-feed electricity or medical gases.
x x x x x x x x
Table 5 - Minimum Required Infection Control Precautions by Class | Before and During Work Activity
Class of Precautions
Mitigation Activities (Performed Before and During Work Activity)
Class I 1. Perform noninvasive work activity as to not block or interrupt patient care.
2. Perform noninvasive work activities in areas that are not directly occupied with patients.
3. Perform noninvasive work activity in a manner that does not create dust.
4. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
Class II
1. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
2. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
3. This Class of Precautions must never be used for construction or renovation activities.
Class III
1. Provide active means to prevent airborne dust dispersion into the occupied areas.
2. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
3. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
4. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
5. If work area is contained, then it must be neutrally to negatively pressurized at all times.
6. Seal all doors with tape that will not leave residue.
7. Contain all trash and debris in the work area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.
Adhesive mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
Class IV
1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling or, if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
4. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
5. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
7. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
8. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
9. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
10. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
11. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
12. Contain all trash and debris in the work area.
13. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
14. Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suits is acceptable.
15. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
16. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.
Adhesive mats must be changed routinely and when visibly soiled.
17. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Class V 1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling, or if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
4. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
5. Personnel will be required to wear disposable coveralls at all times during Class V work activities.
Disposable coveralls must be removed before leaving the anteroom.
6. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
7. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
8. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
9. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
10. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
11. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
12. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
13. Contain all trash and debris in the work area.
14. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
15. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
16. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
17. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.
Adhesive mats must be changed routinely and when visibly soiled.
18. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Table 6 - Minimum Required Infection Control Precautions | Upon Completion of Work Activity
Class of Precautions
Mitigation Activities (Performed upon Completion of Work Activity)
Classes I, II and III
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Classes III, IV and V
Class III (Type C Activities only), IV, and V precautions require inspection and documentation for downgraded ICRA precautions.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
i. Carefully remove screws and painter tape.
ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.
iii. Drywall cutting is prohibited during removal process.
iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
v. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
©2022 The American Society for Health Care Engineering of the American Hospital Association Disclaimer: This document is provided by ASHE as a service to its members. The information provided may not apply to a reader’s specific situation and is not a substitute for application of the reader’s own independent judgment or the advice of a competent professional. ASHE does not make any guaranty or warranty as to the accuracy or completeness of any information contained in this document. ASHE and the authors disclaim liability for personal injury, property damage, or other damages of any kind, whether special, indirect, consequential, or compensatory, that may result directly or indirectly from use of or reliance on this document.
SCOPE OF WORK
KEYNOTES
LIFE SAFETY LEGEND
PHASING PLAN & GENERAL NOTES
INFECTION CONTROL LEGEND
SPECIMEN
AUTOPSY
MECH DOCK
TOILET -
LOCKER
CLOSET
Room
CLOSET
CLOSET
WALK-IN
REF
VIEWING
RM.
BATTERY
CHARGING
MECH
CORRIDOR
CORRIDOR
ELEC
WASH RM.
STORAGE
REF
STORAGE
CLOSET
WASH RM.
MECH
STAIR 05
EQUIP.
STORAGE
GAS
STORAGE
CHEMICAL
STORAGE
VAULT
VAULT
SUPPLIES
H004
CORRIDOR
FOOD/ BEV
STORAGE
VESTIBULE
EMS
STORAGE
VOL
SERVICE
STORAGE
EMS
STORAGE
SERVICE
ELEVATOR
LOBBY
VESTIBULE
FOOD/ BEV
WALK-IN
REF.
STORAGE
STORAGE
SILVER
RECOV.
EMS
OFFICE 342
OFFICE
CORRIDOR
CORRIDOR
A002A
MECH. RM.
MECH. RM.
TOILET,
MALE
MAIL RM.
STAIR 02
F.E. CLOSET
A016A
ELEC
CORRIDOR
WAITING
RM.
OFFICE
EXAM
EXAM
OFFICE
CONTROL
SIMULATOR
RM.
OI&T
RECEPTION
TOILET
OFFICE
CORRIDOR
LOCKER
LOCKER
TOILET
WORK AREA
MAZE
THERAPY
ROOM 1
CONTROL
AREA
CONTROL
LINEAR
ACCELERATOR
MAZE
CORRIDOR
VESTIBULE
MOLD SHOP
MECH. RM.
ELEC
TOILET 381
OUT-PATIENT
WAITING
OFFICE
OFFICE
PATIENT
DRESSING/
TOILET
CORRIDOR
PATIENT
INJECTION
CORRIDOR
STORAGE
LABORATORY
CONTROL
RM.
PET/ CT
EXAM392
EXAM
MECH
WORK RM.
A020
ELEC. RM.
CONFERENCE
RM.
ELEC
STAIR 12
ELEC RM.
OI&T
ELEC. RM.
MECH. RM.
UTILITY
SERVICE
CORRIDOR
OFFICE
MECH
STAIR 11
STORAGE
B002
CLEAN
MEDICAL
SUPPLY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RECEPTION 421
VESTIBULE
CB27
ELEC
CB28
ELEC
STAIR 10
STORAGE
WORK RM.
OFFICE 428
OFFICE
MECH
STORAGE
OI&T
TOILET
TOILET
CORRIDOR
CORRIDOR
CORRIDOR
WAITING
RM.
CORRIDOR
MECH. RM.
TOILET,
MALE
SOUND
BOOTH
EXAM
SOUND
BOOTH 444
LOCKER
FEMALE
SOUND
BOOTH
CORRDOR
CORRIDOR
STORAGE
MANUAL
WASH
CB24
CART WASH
DETERGENT
& WATER
TREATMENT
ANTE RM.
ANTE RM.
CB13
LOCKER RM,
FEMALE
CB14
LOCKER RM,
MALE
HAC
CB17
Room
CB17A
SCOPE
PROCESSING
CB18
SCOPE
STORAGE
CB15A
SHOWER,
FEMALE
CB19
ANTE RM.
CB20
ANTE RM.
S007
STAIR 07
CB21A
SHOWER,
FEMALE
CB22A
SHOWER
MALE
CB25
HAC
CB23
OFFICE CB22
LOCKER
MALE
CB21
LOCKER
FEMALE
ETO
ETO
CASE CART
STORAGE
CB24
SURGICAL
STERILIZER
STORAGE
CB26
PREP/
STERILIZATION
PUMP RM.
OI&T
DECONTAMINATION
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
HAC
WAITING
RM.
OFFICE
EXAM
EXAM
EXAM
OFFICE
CB03
MECH. RM.
OFFICE
STAFF
ELEC
OI&T
OFFICE
BREAK RM.
STORAGE
CORRIDOR
CORRIDOR
STAIR 06
Room
CB02A
MECH. RM.
CB02
MECH. RM.
GENERATOR
CB03
MECH. RM.
BREAK
ROOM
BIOMED
SHOP
OFFICE
OFFICE
TECH
CB36
BIOMED
SHOP
CB35
EQUIPMENT
STORAGE
H015
ELEVATOR
LOBBY
CONFERENCE
RM.
CORRIDOR
ELEVATOR
LOBBY
STAIR 03
OFFICE
OFFICE
OI&T
LAUNDRY
ELEC
F.E. CLOSET
OFFICE
STORAGE
LOCKER
TOILET,
FEMALE
A017A
OI&T
A017
HAC
B682
F.E. CLOSET
S001
STAIR 01
A019
OFFICE
CLOSET
H008
MAIN
ELEVATOR
LOBBY
FOOD/ BEV.
WALK-IN
FREEZE
WAREHOUSE
WAREHOUSE
MECH.
SPACE
CORRIDOR
LIGHT RM.
TOILET
LOCKER
MACHINE
SHOP
PAINT
STORAGE
PLASTER
SHOP
PAINT SHOP
OFFICE
CARPENTER
SHOP
STORAGE
OFFICE
ELEC SHOP
OFFICE
PLUMB.
SHOP
STAIR 04
PLUMB.
SHOP
HVAC SHOP
CORRIDOR
OFFICE
CORRIDOR
CARPENTER
SHOP
HVAC SHOP
STERILIZER
RECESS
DECONTAMINATION
MECH
ELEV 3
E8
ELEV 8
CLOSET
TELEPHONE
SWITCHGEAR
SERVER RM.
A001
PHONE
A002
PATIENT
CLOTHING
A016
OFFICE /
STORAGE
ELEV 10
TELEPHONE
SWITCHGEAR
OFFICE
WAREHOUSE
CHASE
CHASE
CHASE
CH-CB-5
CHASE
CHASE
CH-CB-7
CHASE
CHASE
CHASE
CHASE
CH-CB-11
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CH-A-1
CHASE
STAIR 7
STAIR 08
STAIR 09
ELEV 1
ELEV 2
ELEV 4
ELEV 5
ELEV 6
E7
ELEV 7
E9
ELEV 9
STORAGE
SUPERVISOR
VAULT
CART
HOLDING
EMS
BREAK
AREA/
LOCKERS
OFFICE
CORRIDOR
RECEIVING
D10
D10
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
AREA OF WORK
GENERAL CONTRACTOR ACCESS/ROUTE
DEMO WALLS FOR INSPECTION SEE PLUMBING DWGS.
LIFE SAFETY NOTES
1. THIS PLAN IS FOR LIFE SAFETY INFORMATION ONLY.
2. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND IS PROTECTED WITH A
SUPERVISED AUTOMATIC SMOKE DETECTION SYSTEM.
3. THE LIFE SAFETY PLANS ARE DIAGRAMMATIC ONLY. THERE PURPOSE IS SOLELY TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT( AS INCLUDED IN THE CONSTRUCTION DOCUMENTS
PREPARED BY THE ARCHITECT, ENGINEERS. THE GENERAL CONTRACTOR SHALL USE THE
CONSTRUCTION DOCUMENTS (NOT THE LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE
REQUIRED LIFE SAFETY COMPONENTS OF THE PROJECT.
FIRE BARRIER, 1HR
FIRE BARRIER, 2HR
SMOKE BARRIER
CHUTE, 2HR
CONSTRUCTION OVERHEAD AND ROOMS
1. PRIOR TO ANY WORK COMMENCEMENT, THE GC IS TO IDENTIFY ALL OVERALL RISKS
THE PROJECT WILL CREATE FOR PATIENTS, STAFF, AND CONTRACTORS. THIS DATA IS
TO BE UTILIZED BY THE ONSITE VA TEAM THROUGH COLLABORATIVE CREATION OF A
PRE-CONSTRUCTION RISK ASSESSMENT (PCRA).
2. THE PURPOSE OF THE CONSTRUCTION PHASING NOTES AND DRAWINGS IS TO
PROVIDE THE GENERAL CONTRACTOR (GC) WITH GUIDANCE FOR THE CONSTRUCTION
SCHEDULE.
3. THE GC SHALL COORDINATE WITH THE CONTRACTING OFFICER REPRESENTATIVE
(COR) TO DEVELOP A CRITICAL PATH METHOD (CPM) SCHEDULE, SEQUENCING,
COMPLETION DATES FOR RENOVATION AND NEW CONSTRUCTION FOR THE PROJECT.
4. THE MEDICAL CENTER MUST REMAIN IN FULL OPERATION DURING CONSTRUCTION
WITH MINIMAL INTERRUPTION DUE TO ALL CONSTRUCTION ACTIVITIES FOR THE
PROJECT, INCLUDING NOISE, DUST, VIBRATION, ETC., CREATED BY CONSTRUCTION
ACTIVITIES RELATED TO THIS PROJECT.
5. THE GC’S SCHEDULES SHOULD INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING:
• ALL CONSTRUCTION-ACTIVITY-RELATED ISSUES WHICH MAY AFFECT THE
CONTINUAL OPERATIONS OF THE MEDICAL CENTER.
• SCHEDULES FOR SHUTTING DOWN EXISTING SYSTEMS OR ACCESS FOR TIE-INS
AND/OR REPLACEMENT.
• SCHEDULES FOR AFTER-HOURS CONSTRUCTION ACTIVITIES.
6. GENERAL CONTRACTOR TO PROVIDE TEMPORARY CHAIN LINK CONSTRUCTION
FENCING WITH GATES AND CONSTRUCTION BARRIERS AS REQUIRED TO SEPARATE
CONSTRUCTION ACTIVITIES FROM PUBLIC AREAS AND AREAS REQUIRING ACCESS
DURING CONSTRUCTION. FENCING AND BARRIERS SHOULD BE RELOCATED AS
REQUIRED AFTER EACH PORTION OF WORK IS COMPLETED TO ACCOMMODATE
ACCESS TO EXISTING FACILITIES AS CONSTRUCTION PROGRESSES.
7. IF MEDICAL CENTER ACCESS PATHWAYS IDENTIFIED ON THE PHASING PLANS ARE
REQUIRED TO BE BLOCKED TEMPORARILY TO ACCOMMODATE CONSTRUCTION,
COORDINATE ALTERNATE PATHWAYS WITH THE COR AND PROVIDE TEMPORARY
SIGNAGE AND TEMPORARY PROTECTIVE BARRIERS TO CREATE ALTERNATE PATHWAYS
AS REQUIRED. REFER TO THE PHASING DIAGRAMS FOR ADDITIONAL NOTES.
COORDINATE AND SCHEDULE ANY DOWNTIME FOR THESE ROUTES WITH THE COR.
8. THE GC SHALL SEEK FINAL APPROVAL OF THE LOCATION OF CONSTRUCTION FENCING,
TEMPORARY CONSTRUCTION AND INFECTION CONTROL BARRIERS, CONTRACTOR SITE
ACCESS AND DEBRIS AND MATERIAL HAUL ROUTES WITH THE COR.
9. MAINTAIN ACCESS TO ALL EXISTING BUILDINGS, UTILITIES AND FACILITIES WITHIN THE
CONSTRUCTION LIMITS TO ACCESS EQUIPMENT AND TO PROVIDE SERVICE OR
MAINTENANCE OF EXISTING FACILITIES AND EQUIPMENT SERVING THE MEDICAL
CENTER.
10. COORDINATE UTILITY SHUT DOWNS OR ANY CONSTRUCTION ACTIVITIES WHICH MAY
POTENTIALLY AFFECT THE EXISTING OPERATIONS OF THE MEDICAL CENTER WITH THE
COR. MAINTAIN UNINTERRUPTED OPERATION OF THE EXISTING FACILITIES, AND
MINIMIZE DISRUPTIONS TO THE MEDICAL CENTER FOR ALL SWITCH-OVER OF UTILITIES.
SCHEDULE THESE EVENTS AFTER-HOURS OR AS APPROVED BY THE COR.
11. THE GC HAS RESPONSIBILITY IN DETERMINING THE CORRECT PHASING TO MATCH THE
REQUIREMENTS OF THE CONSTRUCTION CONTRACT AS WELL AS THE ACTUAL
LOCATIONS AND THE METHODS THROUGH WHICH TO CONSTRUCT THE ICRA-
COMPLIANT CONSTRUCTION BARRIERS.
12. THE GC SHALL COORDINATE WITH THE COR TO LOCATE THE SAFETY SIGN AND
CONSTRUCTION SIGN.
13. THE GENERAL CONTRACTOR SHALL PROVIDE ISOLATION BARRIERS. COMPLETE ALL
CRITICAL BARRIERS BEFORE CONSTRUCTION WORK BEGINS.
14. MAINTAIN ALL FIRE BARRIERS AND DUST PARTITIONS AS REQUIRED TO PROVIDE A
DUST-FREE AND CLEAN ENVIRONMENT BETWEEN RENOVATED AREAS WITHIN THE
HOSPITAL AND AREAS ADJACENT TO RENOVATED AND NEW CONSTRUCTION.
15. MAINTAIN INSULATED AND WATERTIGHT EXTERIOR ENCLOSURE FOR EXISTING FACILITY
AT ALL TIMES.
16. ISOLATE HVAC SYSTEM WHERE WORK IS PERFORMED TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
17. ALL PERSONNEL ENTERING RENOVATION AREAS WITHIN OCCUPIED FLOORS OF THE
MEDICAL CENTER SHALL WEAR SHOE COVERS, AND THESE MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA. PROVIDE ADHESIVE WALK-OFF MATS AT
ENTRANCES TO THESE WORK AREAS. IF THERE IS AN ANTEROOM, A MAT SHOULD BE
WITHIN THIS AREA. REPLACE MATS DAILY OR WHEN THEY NO LONGER ARE ABLE TO
CONTAIN DUST AND DIRT. WET MOP AND/OR VACUUM WORK AREA WITH HEPA
FILTERED VACUUM BEFORE LEAVING WORK AREAS. CONTAIN CONSTRUCTION WASTE
IN TIGHTLY COVERED CONTAINERS BEFORE TRANSPORTING. REMOVE HVAC
ISOLATION FROM SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. REMOVE
BARRIER MATERIALS CAREFULLY TO MINIMIZE THE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED.
18. ALL EXISTING ROADWAYS TO REMAIN PUBLIC, FOR SHARED USAGE BY STAFF AND
PATIENTS AND ALL CONTRACTORS.
19. GENERAL CONTRACTOR TO COORDINATE WITH VA COR ALL REQUIRED PHASING PLANS
TO INCLUDE DURATION OF THE WORK. ALL WORK IN CORRIDORS, AND OTHER AREAS
DEEMED CRITICAL BY THE VA COR, TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS AND ON WEEKENDS TO MINIMIZE DISRUPTION TO THE FACILITY. GENERAL
CONTRACTOR TO COORDINATE WITH THE VA COR ANY REQUIRED INTERIM LIFE SAFETY
MEASURES(ILSM) DOCUMENTATION IN ACCORDANCE WITH FACILITY PROTOCOLS.
20. ICRA PLAN DENOTES TOTAL DEFINED ARES OF WORK ON ALL AFFECTED LEVELS. THE
VA MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER
PROJECTS, ETC..), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND
AREA ISZE OF ICRA BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME
REQUISITES PROVISIONS REQUIRING CONTAINMENT(ANTE ROOM, WALK-OFF MATS,
ETC.) AIR- PRESSURIZATION CRITERIA, AND IDENTIFICATION AS NOTED ON SHEET GI-102
AREA OF CONTROL
HAZARDOUS AREA
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:1
:3
P
M
LIFE SAFETY PLAN & INFECTION CONTROL -
BASEMENT
MAY 27, 2025
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-201
1/16" = 1'-0"
BASEMENT - LIFE SAFETY PLAN
Revisions: Date:
Amendment #1 05/27/2025
NO. DESCRIPTION
D10 PATCH AND REPAIR EXISTING CEILING UPON DEMOLITION OF MECHANICAL
EQUIPMENT. SEE MECHANICAL DRAWINGS
LIFE SAFETY LEGEND
PHASING PLAN & GENERAL NOTES
INFECTION CONTROL LEGEND
KEYNOTES
A120
EXAM
A162E
HEMO DIAL
TREAT BAY
H109B
CORRIDOR
A162F
HEMO DIAL
TREAT BAY
A162G
HEMO DIAL
TREAT BAY
A162H
HEMO DIAL
TREAT BAY
A162J
HEMO DIAL
TREAT BAY
A162A
HEMO DIAL
TREAT BAY
A162B
HEMO DIAL
TREAT BAY
A162C
HEMO DIAL
TREAT BAY
A162D
HEMO DIAL
TREAT BAY
A163A
EXAM
A163B
EXAM
A160
TOILET
A161
ELEC
A156
NURSE
STATION
A159
NOUR.
A158
OFFICE
A157
MED. PREP.
A164
PATIENT
ISO.
A164A
TOILET
A165A
TOILET
S105
STAIR 05
A165
PATIENT
ISO.
A155
MECH. RM.
A154
SOILED
H108
CORRIDOR H108B
SCALE
A166
HAC
A167
EQUIPMENT
REPAIR
A168
PERITONEAL
DIALYSIS
A169A
EXAM
A169B
EXAM
A170A
OFFICE
A170C
DIETITIAN
A170B
IV
TREATMENT
A170D
IV
TREATMENT
A154A
CLEAN
A174A
TOILET
A173A
TOILET
A153
CONFERENCE
RM.
A170F
OFFICE
A170E
SUPPLY
H109C
CORRIDOR
H108D
CORRIDOR
H109A
CORRIDOR
A173B
COATS
A168A
STORAGE
A172A
LOCKER RM.
A173
RECEPTION
A171
DECONTAMINATION
A170G
OFFICE
A172
LOUNGE
A174
WAITING
H109
CORRIDOR
A100
WAITING
RM.
A100A
RECEPTION
A100B
COFFEE
SHOP
A100C
STORAGE
A101A
TOILET
A101
VESTIBULE
A101B
TOILET
A101C
RELEASE
OF
INFORMATION
A101D
OPTICAL
SHOP
H105
CORRIDOR
A177
NEPHROLOGY
A177A
OFFICE
A177B
OFFICE
A177C
OFFICE
A177D
STORAGE
A177E
OFFICE
A177F
CLOSET
A177G
OFFICE
A102
ALARM
PANEL
A103
OFFICE
A135
RECEPTION
A134
WAITING
RM.
A104
SCREEN
A105
SCREEN
A106
LEAD
NURSE
A107
EXAM
A108
OFFICE
A109
OFFICE A110
BREAK
A111
EXAM
A112
EXAMA113
EXAM
A114
EXAM
A115
EXAM
A116
EXAM
A117
TOILET
A118
HAC
A119
ELEC
A110A
TOILET
H101
CORRIDOR
H102
CORRIDOR
A121
EXAM
A122
EXAM
A123
EXAM
A124
OPHTH.
CHIEF
RESIDENT
A125
OPHTH.
CHIEF
RESIDENT
A126
EXAM
A127
LASER
TREATMENT
A128
PROCEDURE
A129
EXAM
A130
EXAM
A131
CLINICAL
MANAGER
A132
EXAM
A133
IMAGING
SUPPLY
A132A
OFFICE,
CHIEF
A131A
ELEC
S102
STAIR 02
H103
CORRIDOR
A137A
ELEC
A136
OI&T
A136A
FIRE ALARM
SYSTEM
S101
STAIR 01A139
NEUROLOGY
CLINICA139F
WAITING
RM.
H123
CORRIDOR
A139E
NURSE
STATION
A139D
EXAM
A139C
EXAM
A139G
EXAM
A139H
EXAM
A139J
EXAM
A139K
EXAM
A139B
EXAM
A139A
EXAM
B100
AMBASSADOR
SUITE
B100A
MECH. RM.
B100B
OFFICE
B100D
OFFICE
B100E
OFFICE
B100F
OFFICE
B100G
OFFICE
B100H
OFFICE
B100I
ELEC.
CLOSET
B100J
OI&T S112
STAIR 12
H100A
INFORMATION
H100
LOBBY
B102B
MED. PREP.
B102A
MED. PREP.
B102
WAITING
RM.
B102D
ALCOVE
B102E
OFFICE
B102F
AGENT
CASHIER
H118
CORRIDOR
B103C
EQUIPMENT
STORAGE
B106
CONFERENCE
RM.
B107
ARMORY
B108
OFFICE,
CHIEF
C101
LOCKER RM.
C102
EVIDENCE
C103
OFFICE
C104
OFFICE
C105
OFFICE
C106
OFFICE
C107
HOLDING
CELL
C108
CONTROL
H122
ELEVATOR
LOBBY
H120
CORRIDOR
C146
TOILET,
MALE
B105
OI&T
B103
HAC
B104
CHUTE
A180
OFFICE
A181
OFFICE
A182
MECH. RM.
A183
OFFICE
A184
OFFICE
A185
OFFICE
A186
OFFICE
A187
OFFICEA188
OFFICEA189
EXAMA190
EXAM
A191
STORAGE
A192
STORAGE
A193
FIRE ALARM
A148
STORAGE
A149
OI&T
A149A
STORAGE
H111A
STORAGE
H111
ELEVATOR
LOBBY
H110
ELEVATOR
LOBBY
A140
OFFICE
A141
INTAKE
A142
INTAKE
A143
OFFICE
A144
EXAM A145
OFFICE
A146
OFFICE
A147
OFFICE
A151
TOILET
A150
OFFICE
H113
CORRIDOR
B145
OFFICE
B146
WAITING
RM.
B147
SUPPLY
B148
BREAK RM.
B149
OFFICE
B150
CONSULT
RM.
B149A
OFFICE
B149B
OFFICE
B121
STORAGEB122
TOILET,
FEMALE
S103
STAIR 03
B122A
TOILET
B124
PROCEDURE
RM.
B125
OFFICE
B126
EXAM
B127
EXAM
B128
EXAM
B129
EXAM
B130
MECH. RM.
B131
EXAM
B132
EXAM
B133
EXAM
B134
EXAM
B135
EXAM
B136
EXAM
B137
TOILET
B138
EXAM
B139
EXAM
B140
EXAM
B141
EXAM
B142
EXAM
B143
OFFICE
B144
OFFICE
S104
STAIR 04
B142A
ELEC
H117
CORRIDOR
B119A
WAITING
ROOM
B119
WAITING
ROOM
B111
OFFICE
H124
CORRIDOR
B112
EXAM
B113
EXAM
B114
EXAM
B116
EXAM
B117
EXAM
B118
EXAM
B117A
OFFICE
C149
OFFICE
C138
LOCKER RM.
C140
ELIGIBILITY
C141
OFFICE
C141A
OFFICE
H125
CORRIDOR
C110
WAITING
RM.
C109
OFFICE
C109A
TRIAGE
C112
CONTROL
RM.
C113
TRIAGE
E125
TRIAGE
E126
TOILET
E127
ANTE RM.
E128
PATIENT
ISO.
E133
EXAM
TREATMENT
E101
EXAM
TREAT.
BAYS
E102
EXAM
E103
NURSE
STATION
E104
EXAM
E105
EXAM
E106
EXAM
E107
EXAM
E108
CLEAN
EQUIPMENT
E109
EXAM
E110
EXAM
E111
TOILET
E112
CLEAN
UTILITY
E113
SOIL
UTILITY
E114
CLEAN
LINEN
E115
AMBUL.
ATTEND.
E116
MED. PREP.
E117
OFFICE /
NOUR.
E118
LOCKER RM.
E119
TOILET
E120
LOCKER RM.
E121
HAC
E122
SECURE
HOLD
E123
SECURE
HOLD
C115
TOILET
C118
TOILET
C117
ELEC
E124
WAITING
RM.
E134
NURSE
STATION
E135
TOILET
E121A
ALCOVE
H134
CORRIDOR
H135
CORRIDOR
H132
CORRIDOR
H126
CORRIDOR
C111B
EXAM
C111A
EXAM
C114
CONFERENCE
RM.
C116
OFFICE
C119
OFFICE
C120
OFFICE
H128
CORRIDOR
C121
OFFICE
C122
FILE RM.
C123
OFFICE
C124
OFFICE
C125
OFFICE
C126
OFFICE
C127
OFFICE
C128
WAITING
C129
OFFICE
C122A
OFFICE
C130
OFFICE
C131
OFFICE
C132
OFFICE
C134
OFFICE
H133
CORRIDOR
C136
OI&T
C137
STORAGE
C148
OFFICE
C150
EXAM
C151
EXAM
C152
EXAM
H127
CORRIDOR
H130
CORRIDOR
H131
CORRIDOR
S106
STAIR 06
C173
OFFICE
C173A
TOILET
D143
EXAM
D120
EXAM
D121
EXAM
D122
EXAM
D123
OFFICE
D124
OFFICE D125
EXAM
D126
EXAM
D127
EXAM
D128
TOILET
D129
OFFICE C180
OFFICE
C179
OFFICE
C178
OFFICE
C177
TOILET
C176
EXAM
D174
EXAM
H141
CORRIDOR
H142
CORRIDOR
H140
CORRIDOR
S109
STAIR 09
D130
EXAM
D131
EXAM
D132
OFFICE
D133
OFFICE
D134
OFFICE
D135
OFFICE
D136A
OFFICE
D142
EXAM
D136B
CLEAN
SUPPLIES
D141
EXAM
D140
HAC
D139
EXAM
D138
EXAM
D137
EXAM
D136
NURSE
STATION
D101A
WAITING
RM.
D116
OFFICE
D117
OFFICE
D118
EXAM
H139
CORRIDOR
D112
OFFICE
D102
EXAM
D119
OFFICE
D111
OFFICE D110
OFFICE
CH-D-1
CHASE
S110
STAIR 10
H137
CORRIDOR
D144
ELEC
D145
OI&T
D146
OFFICE
H136
CORRIDOR
D103
BREAK RM.
D104
TOILET
D105
WORK RM.
D115
TOILET
D114
EXAM
D113
EXAM
D106
HAC
D107
EXAM
D108
EXAM
S108
STAIR 08
H138
CORRIDOR
E110A
STORAGEE110B
STORAGE
D147
OFFICE
D148
OFFICE,
CHIEF
H138A
CORRIDOR
D109
OFFICE
E112A
OXYGEN
STORAGE
C114A
STORAGE
H127A
CORRIDOR
H114A
CORRIDOR
H119
CORRIDOR
H113C
CORRIDOR
C146A
HAC
B120A
ELEC
H113A
CORRIDOR
A101E
BREAK RM.
H109E
CORRIDOR
H109D
CORRIDOR
A170I
OI&T
A103A
TOILET
H110B
F.E. CLOSET
A139I
STORAGE
H125B
ENTRYWAY
C109B
VESTIBULE
C175
EXAM
H125A
VESTIBULE
D101
NURSE
STATION
ELEV 10
S107A
VESTIBULE
S107
STAIR 07
H113B
F.E. CLOSET
H103A
F.E. CLOSET
A175
SUPPLY
F.E. CLST
H117A
F.E. CLOSET
C178A
CLOSET
Room
ELEV 1
ELEV 2
ELEV 3
ELEV 4
ELEV 5
ELEV 6
ELEV 7
ELEV 8
ELEV 9
CH-C-1
CHASE
CH-C-2
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CH-B-3
CHASE
CH-B-1
CHASE
CH-B-2
CHASE
CH-B-4
CHASE
CH-B-5
CHASE CH-B-6
CHASE
CH-A-12
CHASE
CH-B-7
CHASE
CH-C-3
CHASE
CH-B-8
CHASE
CH-B-9
CHASE
CH-C-4
CHASE
CH-C-5
CHASE
CH-D-5
CHASE
CH-D-2
CHASE
CH-C-7
CHASE
CH-C-8
CHASE CH-E-1
CHASE
CH-C-6
CHASE
CH-D-3
CHASE
CH-D-4
CHASE
CH-E-2
CHASE
PATIENT NON-SLEEPING
SUITE: 5,769 SF
(ED) PATIENT NON-SLEEPING
SUITE: 6,364 SF
D10
D10
D10
D10
D10
D10
D10
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
AREA OF WORK
GENERAL CONTRACTOR ACCESS/ROUTE
DEMO WALLS FOR INSPECTION SEE PLUMBING DWGS.
LIFE SAFETY NOTES
1. THIS PLAN IS FOR LIFE SAFETY INFORMATION ONLY.
2. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND IS PROTECTED WITH A
SUPERVISED AUTOMATIC SMOKE DETECTION SYSTEM.
3. THE LIFE SAFETY PLANS ARE DIAGRAMMATIC ONLY. THERE PURPOSE IS SOLELY TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT( AS INCLUDED IN THE CONSTRUCTION DOCUMENTS
PREPARED BY THE ARCHITECT, ENGINEERS. THE GENERAL CONTRACTOR SHALL USE THE
CONSTRUCTION DOCUMENTS (NOT THE LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE
REQUIRED LIFE SAFETY COMPONENTS OF THE PROJECT.
FIRE BARRIER, 1HR
FIRE BARRIER, 2HR
SMOKE BARRIER
CHUTE, 2HR
CONSTRUCTION OVERHEAD AND ROOMS
1. PRIOR TO ANY WORK COMMENCEMENT, THE GC IS TO IDENTIFY ALL OVERALL RISKS
THE PROJECT WILL CREATE FOR PATIENTS, STAFF, AND CONTRACTORS. THIS DATA IS
TO BE UTILIZED BY THE ONSITE VA TEAM THROUGH COLLABORATIVE CREATION OF A
PRE-CONSTRUCTION RISK ASSESSMENT (PCRA).
2. THE PURPOSE OF THE CONSTRUCTION PHASING NOTES AND DRAWINGS IS TO
PROVIDE THE GENERAL CONTRACTOR (GC) WITH GUIDANCE FOR THE CONSTRUCTION
SCHEDULE.
3. THE GC SHALL COORDINATE WITH THE CONTRACTING OFFICER REPRESENTATIVE
(COR) TO DEVELOP A CRITICAL PATH METHOD (CPM) SCHEDULE, SEQUENCING,
COMPLETION DATES FOR RENOVATION AND NEW CONSTRUCTION FOR THE PROJECT.
4. THE MEDICAL CENTER MUST REMAIN IN FULL OPERATION DURING CONSTRUCTION
WITH MINIMAL INTERRUPTION DUE TO ALL CONSTRUCTION ACTIVITIES FOR THE
PROJECT, INCLUDING NOISE, DUST, VIBRATION, ETC., CREATED BY CONSTRUCTION
ACTIVITIES RELATED TO THIS PROJECT.
5. THE GC’S SCHEDULES SHOULD INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING:
• ALL CONSTRUCTION-ACTIVITY-RELATED ISSUES WHICH MAY AFFECT THE
CONTINUAL OPERATIONS OF THE MEDICAL CENTER.
• SCHEDULES FOR SHUTTING DOWN EXISTING SYSTEMS OR ACCESS FOR TIE-INS
AND/OR REPLACEMENT.
• SCHEDULES FOR AFTER-HOURS CONSTRUCTION ACTIVITIES.
6. GENERAL CONTRACTOR TO PROVIDE TEMPORARY CHAIN LINK CONSTRUCTION
FENCING WITH GATES AND CONSTRUCTION BARRIERS AS REQUIRED TO SEPARATE
CONSTRUCTION ACTIVITIES FROM PUBLIC AREAS AND AREAS REQUIRING ACCESS
DURING CONSTRUCTION. FENCING AND BARRIERS SHOULD BE RELOCATED AS
REQUIRED AFTER EACH PORTION OF WORK IS COMPLETED TO ACCOMMODATE
ACCESS TO EXISTING FACILITIES AS CONSTRUCTION PROGRESSES.
7. IF MEDICAL CENTER ACCESS PATHWAYS IDENTIFIED ON THE PHASING PLANS ARE
REQUIRED TO BE BLOCKED TEMPORARILY TO ACCOMMODATE CONSTRUCTION,
COORDINATE ALTERNATE PATHWAYS WITH THE COR AND PROVIDE TEMPORARY
SIGNAGE AND TEMPORARY PROTECTIVE BARRIERS TO CREATE ALTERNATE PATHWAYS
AS REQUIRED. REFER TO THE PHASING DIAGRAMS FOR ADDITIONAL NOTES.
COORDINATE AND SCHEDULE ANY DOWNTIME FOR THESE ROUTES WITH THE COR.
8. THE GC SHALL SEEK FINAL APPROVAL OF THE LOCATION OF CONSTRUCTION FENCING,
TEMPORARY CONSTRUCTION AND INFECTION CONTROL BARRIERS, CONTRACTOR SITE
ACCESS AND DEBRIS AND MATERIAL HAUL ROUTES WITH THE COR.
9. MAINTAIN ACCESS TO ALL EXISTING BUILDINGS, UTILITIES AND FACILITIES WITHIN THE
CONSTRUCTION LIMITS TO ACCESS EQUIPMENT AND TO PROVIDE SERVICE OR
MAINTENANCE OF EXISTING FACILITIES AND EQUIPMENT SERVING THE MEDICAL
CENTER.
10. COORDINATE UTILITY SHUT DOWNS OR ANY CONSTRUCTION ACTIVITIES WHICH MAY
POTENTIALLY AFFECT THE EXISTING OPERATIONS OF THE MEDICAL CENTER WITH THE
COR. MAINTAIN UNINTERRUPTED OPERATION OF THE EXISTING FACILITIES, AND
MINIMIZE DISRUPTIONS TO THE MEDICAL CENTER FOR ALL SWITCH-OVER OF UTILITIES.
SCHEDULE THESE EVENTS AFTER-HOURS OR AS APPROVED BY THE COR.
11. THE GC HAS RESPONSIBILITY IN DETERMINING THE CORRECT PHASING TO MATCH THE
REQUIREMENTS OF THE CONSTRUCTION CONTRACT AS WELL AS THE ACTUAL
LOCATIONS AND THE METHODS THROUGH WHICH TO CONSTRUCT THE ICRA-
COMPLIANT CONSTRUCTION BARRIERS.
12. THE GC SHALL COORDINATE WITH THE COR TO LOCATE THE SAFETY SIGN AND
CONSTRUCTION SIGN.
13. THE GENERAL CONTRACTOR SHALL PROVIDE ISOLATION BARRIERS. COMPLETE ALL
CRITICAL BARRIERS BEFORE CONSTRUCTION WORK BEGINS.
14. MAINTAIN ALL FIRE BARRIERS AND DUST PARTITIONS AS REQUIRED TO PROVIDE A
DUST-FREE AND CLEAN ENVIRONMENT BETWEEN RENOVATED AREAS WITHIN THE
HOSPITAL AND AREAS ADJACENT TO RENOVATED AND NEW CONSTRUCTION.
15. MAINTAIN INSULATED AND WATERTIGHT EXTERIOR ENCLOSURE FOR EXISTING FACILITY
AT ALL TIMES.
16. ISOLATE HVAC SYSTEM WHERE WORK IS PERFORMED TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
17. ALL PERSONNEL ENTERING RENOVATION AREAS WITHIN OCCUPIED FLOORS OF THE
MEDICAL CENTER SHALL WEAR SHOE COVERS, AND THESE MUST BE CHANGED EACH
TIME THE WORKER EXITS THE WORK AREA. PROVIDE ADHESIVE WALK-OFF MATS AT
ENTRANCES TO THESE WORK AREAS. IF THERE IS AN ANTEROOM, A MAT SHOULD BE
WITHIN THIS AREA. REPLACE MATS DAILY OR WHEN THEY NO LONGER ARE ABLE TO
CONTAIN DUST AND DIRT. WET MOP AND/OR VACUUM WORK AREA WITH HEPA
FILTERED VACUUM BEFORE LEAVING WORK AREAS. CONTAIN CONSTRUCTION WASTE
IN TIGHTLY COVERED CONTAINERS BEFORE TRANSPORTING. REMOVE HVAC
ISOLATION FROM SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. REMOVE
BARRIER MATERIALS CAREFULLY TO MINIMIZE THE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED.
18. ALL EXISTING ROADWAYS TO REMAIN PUBLIC, FOR SHARED USAGE BY STAFF AND
PATIENTS AND ALL CONTRACTORS.
19. GENERAL CONTRACTOR TO COORDINATE WITH VA COR ALL REQUIRED PHASING PLANS
TO INCLUDE DURATION OF THE WORK. ALL WORK IN CORRIDORS, AND OTHER AREAS
DEEMED CRITICAL BY THE VA COR, TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS AND ON WEEKENDS TO MINIMIZE DISRUPTION TO THE FACILITY. GENERAL
CONTRACTOR TO COORDINATE WITH THE VA COR ANY REQUIRED INTERIM LIFE SAFETY
MEASURES(ILSM) DOCUMENTATION IN ACCORDANCE WITH FACILITY PROTOCOLS.
20. ICRA PLAN DENOTES TOTAL DEFINED ARES OF WORK ON ALL AFFECTED LEVELS. THE
VA MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER
PROJECTS, ETC..), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND
AREA ISZE OF ICRA BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME
REQUISITES PROVISIONS REQUIRING CONTAINMENT(ANTE ROOM, WALK-OFF MATS,
ETC.) AIR- PRESSURIZATION CRITERIA, AND IDENTIFICATION AS NOTED ON SHEET GI-102
AREA OF CONTROL
HAZARDOUS AREA
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:1
:3
P
M
LIFE SAFETY PLAN & INFECTION CONTROL -
LEVEL 01
MAY 27, 2025
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-202
1/16" = 1'-0"
LEVEL 01 - LIFE SAFETY PLAN
Revisions: Date:
Amendment #1 05/27/2025
NO. DESCRIPTION
PHASING PLAN & GENERAL NOTES
INFECTION CONTROL LEGEND
KEYNOTES
D502B
CART
ELEVATOR
EQUIPMENT
D502A
CART
ELEVATOR
EQUIPMENT
D502L
STORAGE
D502J
STORAGE
PLUMBING
SHOP
D502H
STORAGE
MASON
SHOP
S508
STAIR 08
D502G
STORAGE
CARPENTRY
SHOP
D502K
STORAGE
IHCG SHOP
D502F
STORAGE
ELECTRIC
SHOP D502E
STORAGE
PIPE SHOP
D502D
STORAGE
A/C SHOP
H517
CORRIDOR
STORAGE
A/C SHOP
B538
MECH. RM.
D505A
Room
D505
MECH. RM.
A554
ELEC
A571A
NOUR.
A565A
ANTE RM.
A556A
OFFICE
A556
OFFICE
A557
CONFERENCE
RM.
A556B
HALLWAY
A555A
TOILET
A558A
TOILET
A558
OFFICE
A555
OFFICE
A553
OFFICE
A553A
TOILET
A552A
STRETCH
A559
OFFICE
A552
OFFICE
A560
HAC
A559A
TOILET
A561
OFFICE
S505
STAIR 05
A550
OFFICE
A549A
TOILET
A549
WAITING
A548
WAITING
A548A
TOILET
A547
OFFICE,
DIETICIAN
A572
OFFICE
A573
MED. PREP.
A570
OFFICE
A569
OFFICE
A570A
ANTE RM.
A570B
TOILET
A568
OFFICE
A569A
TOILET
A568A
OFFICE
HALLWAY
A567B
OFFICE
A567
OFFICEA566A
TOILET
A567A
HALLWAY
A566
OFFICEA565B
TOILET
A565
OFFICE
A562
CLEAN
A564
SOILED
A564A
CRASH
CART
A563
ELEC
H505
CORRIDOR
H504
CORRIDOR
A571
NURSE
STATION
A578
TLT
A577A
TOILET
A576
OFFICE
A574
TOILET
A575
OFFICE
A544C
TOILET
H507
SERVICE
ELEVATOR
LOBBY
H503
CORRIDOR
A544B
LOCKER
A544
PHYSICIAN
WORK RM.
A501A
OFFICE
A501
OFFICE
A502
OFFICE
A509
OFFICE
A510
OFFICE
A511
OFFICE
A510A
TOILET
A512
OFFICE
A513
OFFICE
A512A
TOILET
A542
LAB
A541
STORAGE
B546
OFFICE
B544
OFFICE
B545
TOILET
A536B
ELEC
A544A
CLOSET
H506
ELEVATOR
LOBBY
B502
OFFICE
B501
OFFICE
A540A
STORAGE
A539
STORAGE
A535
OFFICE
S501
STAIR 01
A538
PHYSICIAN
WORK RM.
A536
ELECA536A
OI&T
A535A
TOILET
A537A
DATA
H501
CORRIDOR
A508A
TOILET
A508
OFFICE
A507A
TOILET
A507
OFFICE
A504
COPY
A503
HAC
A506A
TOILET
A505
NOUR.
A506
OFFICE
A517
OFFICE
A516
OFFICE
A515
OFFICE
A514
OFFICE
A516A
TOILET
A514A
TOILET
A521
STRG
A519
SOILED
A520
ELEC
A517A
TOILET
A518
STORAGE
A532
TOILET
A531
OFFICE
A533
OFFICE
B524D
EXAM
A524C
EXAM
A524A
EXAM
A524B
EXAM
B524
WAITING
RM. B524E
RECEPTION
A522
OFFICE
A523A
OFFICE
A523
HALLWAY
A523B
OFFICE
A527
HAC
S502
STAIR 02
A525
TOILET,
MALE
A526
OFFICE
H502A
F.E. CLOSET
A530
OFFICE
A529
OFFICE
H502
CORRIDOR
A543
PULMONARY
RESPIRATORY
THERAPY
A543B
OFFICE
B542
OFFICE
B541
OFFICE
H508
CORRIDOR
B503
BRONCHOSCOPY
SUITE
CORRIDOR
B528
STORAGE
B529
TOILET
B530
TOILET
B526
PREP /
RECOVERY
B527
MECH
B525
CONTROL
B523
EP LAB
H516
CORRIDOR
ELECTRO-
PHYSIOLOGY
C513
STERILIZER
C528
HAC
B532
MALE
LOCKER
HAC
B538A
TOILET
LOCKER
FEMALE
B533
OFFICE
B534
CATHETER
READING
B537
SOILED
B536
ELEC
S503
STAIR 03
H508A
F.E. CLOSET
B504
BREAK RM.
B522
TOILET
B520
WAITING
RM.
B521
HOLDING
B519
CONSULT
B511
CONTROL 1
B512
CONTROL 2
B509
SCRUB
B513
STORAGE
B510
CARDIAC
CATH. LAB 1
B508
PREP
B505
STORAGE
B506
MECH
B507
OI&T
B504B
Room
H509
CORRIDOR
H510A
CORRIDOR
H514
ELEVATOR
LOBBY
B531
TOILET
H513A
CORRIDOR
H513
CORRIDOR
H512A
SUPPLY
C520
LOCKER
C520A
TOILET
C519
BREAK
C518A
TOILET
C518
LOCKERC516
SOILED
C500B
STORAGE
C500C
OFFICE
C500D
HAC
C501A
ANTE RM.
C501
RECOVERY
ISOLATION
H510B
CORRIDOR
C500A
STORAGE
C504
RECOVERY
C503
RECOVERY
C502
RECOVERY
C510A
ANTE
C510
ISOLATION
RECOVERY
C509
RECOVERY
H511
CORRIDOR
C507
RECOVERY
C506
RECOVERY
C505
RECOVERY
C511A
TOILET
C511
TOILET
H512
CORRIDOR
C512
STORAGE
C524
OI&T
C514A
SCRUB
C522
OI&T
C521
ELEC
C515
CLEAN RM.
C514
STORAGE
B543
TOILET
B517
STORAGE
B518
HAC
H506A
F.E. CLOSET
B514
SCRUB
C508
RECOVERY
H510
CORRIDOR
H515
CORRIDOR
S506
STAIR 06
D502
MECH. RM.
STORAGE
D502C
STORAGE
BMET
S507
STAIR 07
ELEV 1
ELEV 2
ELEV 3
ELEV 4
ELEV 5
ELEV 6
ELEV 7
ELEV 8
ELEV 9
S509
STAIR 09
A577
STOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .