657-21-114JC Drawings 1-63pgs.pdf
PDF 40 MB Posted
- Solicitation number
- 36C25525R0051
About this file
The file is a set of detailed architectural and engineering drawings for a VA hospital HVAC system improvement project at the John Cochran Division of the VA St. Louis Healthcare System. The project, numbered 657-21-114JC, aims to correct HVAC systems to comply with VHA Directive 1116(2), specifically focusing on Sterile Processing Service (SPS) and Reusable Medical Equipment (RME) storage rooms. The scope involves modifying HVAC systems in multiple rooms across different building levels, including CB18 Scope Storage, CB25 HAC, A131 Supply Room, B121 Storage, B147 Supply, A539/A540 Storage, and A940 Storage.
The comprehensive drawing set includes architectural, mechanical, electrical, plumbing, and fire protection plans spanning basement, levels 1, 5, and 9 of the facility. The project involves installing new air handling units, exhaust fans, supply fans, variable air volume terminals, steam humidifiers, and associated electrical and control systems. The work is designed to ensure proper air changes, temperature control, and pressurization for critical medical storage and processing areas. Romanyk Consulting Corp. is the project's architectural and engineering firm, and the project is being executed for the Department of Veterans Affairs Network Contracting Office, with the St. Louis VAMC as the specific facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ICRA Details.pdf | ||
| Amendment 36C25525R0051 0005.docx | DOCX document | |
| Amendment 4 Update to Prebid Questions Plans and Specifications pages 1 to 26.pdf | ||
| Amendment 36C25525R0051 0004.docx | DOCX document | |
| 36C25525R0051 0003.docx | DOCX document | |
| Revised Technical Evaluation Factors 657-21-114JC 5-21-2025.docx | DOCX document | |
| Davis-Bacon Act WD MO20250080 05152025.docx | DOCX document | |
| Responses to questions 1-19 657-21-114JC A002.docx | DOCX document | |
| CB 18 Photos.pdf | ||
| CB 25 Photos.pdf | ||
| 36C25525R0051 0002.docx | DOCX document | |
| S04- Pre-bid visit agenda 657-21-114JC Correct HVAC.pdf | ||
| 36C25525R0051 0001.docx | DOCX document | |
| 657-21-114JC_Site Visit Check-In Sheet.pdf | ||
| 657-21-114JC_Specifications 1042 Pages.pdf | ||
| 36C25525R0051.docx | DOCX document | |
| Appendix 3- VAAR 852.219-75 VA Limitations on Subcontracting- NAICS 238220.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAPGENERAL NOTES
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A
COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW
ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE
SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE
PROVIDED PRIOR TO CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES
AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH
RESPECT TO DELIVERY DATE, QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S
MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL
EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA
REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.
ANNOTATION DRAWING SYMBOLS
GRID / COLUMN LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
WALL TYPE
WINDOW TYPE
ROOM NAME / NUMBER
REVISION TAG
PLAN NORTH
TRUE NORTH
NORTH
NORTH ARROW WITH TRUE
NORTH INDICATION
EGRESS ROUTE ID AND
SECTION LENGTH
EGRESS : ?
ROOM OCCUPANCY & AREA
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
FLOOR LEVEL &
NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET KEYNOTE
EXTERIOR ELEVATION
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
INDEX OF DRAWINGS
01-AE101
DISCIPLINE:
G - GENERAL
A - ARCHITECTURE
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
SHEET TYPE
DESIGNATOR
BUILDING NUMBER
SHEET NUMBER
WITHIN SERIES
PROJECT TEAM
ENRIGHT AVE
DELMAR BLVD G
R
A N
D B
L V
D
N S
PRIN
G A
VE
BELL AVE
WINDSOR
BUILDING NO. TAG01
5T
1T
PROJECT INFORMATION
THE VA ST. LOUIS HEALTH CARE SYSTEM, JOHN COCHRAN DIVISION, WILL CORRECT VARIOUS HVAC SYSTEMS WITHIN BUILDING 01 AT THE JOHN COCHRAN DIVISION OF THE VA ST. LOUIS HEALTHCARE SYSTEM TO ENSURE THEY ARE COMPLIANT WITH VHA DIRECTIVE 1116(2). VHA DIRECTIVE 1116(2) IS RELATED TO STERILE PROCESSING SERVICE (SPS) AND THE STORAGE OF REUSABLE MEDICAL EQUIPMENT (RME). RME IS EQUIPMENT INTENDED FOR REPEATED USE ON DIFFERENT PATIENTS WITH
APPROPRIATE DECONTAMINATION AND OTHER PROCESSING BETWEEN USES.
PROJECT NAME: CORRECT HVAC SYSTEMS FOR VHA DIRECTIVE 1116
PROJECT NUMBER: 657-21-114JC
PROJECT LOCATION: ST. LOUIS VAMC – JOHN COCHRAN DIVISION, 915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
PROJECT PURPOSE/USE: HVAC IMPROVEMENTS
ROOMS IN SCOPE:
• CB18 - SCOPE STORAGE
• CB25 - CLEAN HOUSEKEEPING CLOSET
• A131 - SUPPLY ROOM
• B121 - STORAGE
• A147 - SUPPLY
SCOPE OF WORK SUMMARY:
PROJECT MANAGER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wiezcorek, PE arlo.wieczorek@romanykconsulting.com
P: 855.424.3838 ext 324 C: 319.721.4986
MECHANICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
ELECTRICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Yumei Wang P.E, RCDD, CTS, LEED AP Yumei.Wang@RomanykConsulting.com
855.424.3838 x311
402.321.3766 cell
OWNER:
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway, Leavenworth KS 6604
CONTRACTING OFFICER REPRESENTATIVE:
St. Louis VAMC – John Cochran Division 915 North Grand Blvd.
St. Louis, MO 63106
Walter Staas Walter.Staas@va.gov
314.652.4100 x58723
PLUMBING ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
FIRE PROTECTION ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cellBUILDING SUMMARY
PLAN NORTH
TRUE NORTH
NORTH
ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Jim Booher AIA NCARD ASHE LEED AP Jim.Booher@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
• A540 - RME STORAGE
• A539(A) - STORAGE
• A940 - STORAGE
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:
U.S. Department of Veterans Affairs
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMP
NOT FOR
PERMITTING OR
CONSTRUCTION
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:5
P
M
PROJECT COVER SHEET
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
SEPTEMBER 28, 2023
01-GI-100
657-21-114JC
PROJECT NUMBER - 657-21-114JC
CORRECT HVAC SYSTEMS FOR VHA DIRECTIVE 1116 (2)
100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
100% BID DOCUMENTS
SEPTEMBER 28, 2023
Revisions: Date:
R
EG
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
ES D. BOOHER
1 3 2 67
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:0
P
M
DRAWING INDEX & ABBREVIATIONS
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-101
SHEET # SHEET TITLE
GENERAL
01-GI-100 PROJECT COVER SHEET
01-GI-101 DRAWING INDEX & ABBREVIATIONS
01-GI-102 ICRA DETAILS
01-GI-103 ICRA DETAILS CLASS 1 & 2
01-GI-104 ICRA DETAILS CLASS 3
01-GI-105 CLASS IV ICRA DETAILS
01-GI-106 CLASS IV ALT ICRA DETAILS
01-GI-107 BASEMENT - OVERALL PLAN
01-GI-108 LEVEL 01 - OVERALL PLAN
01-GI-109 LEVEL 05 - OVERALL PLAN
01-GI-110 LEVEL 09 - OVERALL PLANS
01-GI-201 LIFE SAFETY PLAN & INFECTION CONTROL - BASEMENT
01-GI-202 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 01
01-GI-203 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 05
01-GI-204 LIFE SAFETY PLAN & INFECTION CONTROL - LEVEL 09
ARCHITECTURAL
01-AE-101 OVERALL CEILING PLAN - BASEMENT
01-AE-102 OVERALL CEILING PLAN - LEVEL 01
01-AE-103 OVERALL CEILING PLAN - LEVEL 05
01-AE-104 OVERALL CEILING PLAN - LEVEL 09
01-AE-401 BASEMENT - ENLARGED PLANS
01-AE-402 LEVEL 01 - ENLARGED PLANS
01-AE-403 LEVEL 01 - ENLARGED DEMOLITION PLAN
01-AE-404 LEVEL 01 - ENLARGED PLAN
01-AE-405 LEVELS 05 & 09 - ENLARGED DEMOLITION PLANS
01-AE-406 LEVELS 05 & 09 - ENLARGED PLANS
01-AE-500 CEILING DETAILS & WALL TYPES
01-AE-501 CEILING DETAILS
FIRE PROTECTION
01-FG-001 FIRE PROTECTION LEGENDS, NOTES, AND ABBREVIATIONS
01-FP-101 FIRE PROTECTION ENLARGED PLAN - LEVELS 00, 01, 05 & 09
PLUMBING
01-PG-001 PLUMBING LEGENDS, SCHEDULES AND ABBREVIATIONS
01-PG-002 PLUMBING DETAILS
01-PP-101 PLUMBING ENLARGED PLANS - LEVEL 01
01-PP-102 PLUMBING ENLARGED PLANS - LEVELS 05 & 09
MECHANICAL
01-MG-001 MECHANICAL NOTES, LEGENDS, AND ABBREVIATIONS
01-MG-002 MECHANICAL DETAILS
01-MG-003 MECHANICAL DETAILS
01-MG-004 MECHANICAL SCHEDULES
01-MG-005 MECHANICAL SCHEDULES
01-MG-006 CONTROLS SEQUENCES
01-MG-007 CONTROLS SEQUENCES
01-MG-008 CONTROLS SEQUENCES
01-MG-009 CONTROL SEQUENCES
MECHANICAL
01-MH-101 MECHANICAL ENLARGED HVAC PLANS - LEVEL 00
01-MH-102 MECHANICAL ENLARGED HVAC PLANS - LEVEL 00
01-MH-103 MECHANICAL ENLARGED HVAC PLANS - LEVEL 01
01-MH-104 MECHANICAL ENLARGED HVAC PLANS - LEVEL 01
01-MH-105 MECHANICAL ENLARGED HVAC PLANS - LEVELS 05 & 09
01-MP-101 MECHANICAL ENLARGED PIPING PLANS - LEVEL 00
01-MP-102 MECHANICAL ENLARGED PIPING PLANS - LEVEL 01
01-MP-103 MECHANICAL ENLARGED PIPING PLANS - LEVEL 01
01-MP-104 MECHANICAL ENLARGED PIPING PLANS - LEVEL 01
01-MP-105 MECHANICAL ENLARGED PIPING PLANS - LEVELS 05 & 09
ELECTRICAL
01-EG-001 ELECTRICAL LEGENDS, SCHEDULES, AND ABBREVIATIONS
01-EG-500 ELECTRICAL ONE LINE DIAGRAM
01-EG-501 ELECTRICAL SCHEDULES
01-EG-502 ELECTRICAL SCHEDULES
ELECTRICAL
01-EP-101 ELECTRICAL ENLARGED PLANS - LEVEL 00
01-EP-102 ELECTRICAL ENLARGED PLANS - LEVEL 00
01-EP-103 ELECTRICAL ENLARGED PLANS - LEVEL 01
01-EP-104 ELECTRICAL ENLARGED PLANS - LEVEL 01
01-EP-105 ELECTRICAL ENLARGED PLANS - LEVEL 01
01-EP-106 ELECTRICAL ENLARGED PLANS - LEVEL 05
01-EP-107 ELECTRICAL ENLARGED PLANS - LEVEL 09
Grand total: 63
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
INFECTION CONTROL NOTES
INFECTION CONTROL GENERAL NOTES:
1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR
VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER
COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE
PRESSURE SYSTEMS. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR
TO DECK.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND
CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE
CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES.
THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST
MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR
MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL
AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING
TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE.
ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.
3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE
MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH
EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT
DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING
SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE.
PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND
N95 RESPIRATORS REQUIRED BY THE SAFETY SPECIFICATION.
4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN INFECTION
CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH
THE COR PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION AND
THE COR PRIOR TO IMPLEMENTATION.
7. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA,
IF EXISTING WALLS AND/OR PARTITIONS DO NOT EXTEND TO THE STRUCTURE ABOVE.
8. COORDINATE WITH MEP/FP.
9. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA
MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA
BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS REQUIRING
CONTAINMENT (ANTE ROOM, WALK-OFF MATS, ETC.) AIR-PRESSURIZATION CRITERIA, AND
IDENTIFICATION AS NOTED ON SHEET GI-103 TO GI-106.
ENVIRONMENTAL CONTROLS:
TYPE OF CONSTRUCTION ACTIVITY - TYPE C:
WORK THAT GENERATES MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING FOR WALL COVERING
• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.
INFECTION CONTROL PRECAUTIONS FOR CLASS II
DURING CONSTRUCTION PROJECT:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
UPON COMPLETION OF PROJECT:
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:0
P
M
ICRA DETAILS
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-102
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
ES D. BOOHER
1 3 2 67
VHASTLSTAASW
Text Box Appendix A: Alternative To Outdoor Exhaust Requirements This Appendix provides an equivalent ICRA control measure to requirements detailed in this VHA ICRA template that would allow interior construction space exhaust.
Interior Construction Space Exhaust:
If the facility is not able to exhaust to the building exterior, the Healthcare Environment and Facilities program office has identified an alternate industry-recognized standard interior exhaust procedure that is accepted as providing an equivalent level of infection prevention and control (IPC), and safety. The alternate interior exhaust procedure is implemented by completing the following:
a.If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, including assembly of the ICRA barriers, initial baseline air sampling measurements for particulate levels must be taken in the planned area of discharge. Once containment is erected and completed, HEPA filtration must then be verified by particulate measurement, using a particle counter with multi-channel capabilities to measure down to 0.3 microns, to confirm that the discharge of the HEPA unit does not exceed the baseline particulate count of the area to which the exhaust is directed. Verification must continue at least three times per day (once every 8 hours), 7 days per week, during the use of the negative air machine and HEPA filter. Any exceedance must trigger a work stoppage and an immediate response and resolution. All particulate measurements, including the baseline measurement, must be documented and retrievable.b.To accommodate the sampling, the negative air pressure machine must be fitted with a 2 ft section of ridged ductwork at the discharge. The sample port for monitoring must be in the ridged ductwork section.c.Vapor generating processes must be assessed and appropriate filtration must be installed to mitigate transmission to the facility.d.Engineering must do a complete flow and pressure analysis and document the area to which the air is being discharged to ensure the flow and pressure relationships in that area are not being adversely impacted by the additional flow. Ideally, this is done as part of the construction package to ensure the design is implementable and no additional HVAC changes are required to accommodate the exhaust from the negative air equipment.e.Install device on exterior of work containment to continually monitor negative pressurization. To ensure proper pressure is continuously maintained, the device(s) shall have a visual pressure indicator, data collection and alarm.f.Exhaust must be directed to Low Risk areas as defined on page 4 in this ICRA template. Ideally this discharge must be located so as not to impinge on high traffic areas or create a nuisance with noise or excessive airflow.NOTE: Exhaust into shared or recirculating HVAC systems, other shared exhaust systems (e.g., bathroom exhaust), chases or above ceiling is not acceptable.
VHASTLSTAASW
Text Box ICRA barriers shall not be built during Medical Center business hours 8:00am-4:30pm M-F. Some areas may have additional time restrictions.
ICRA barriers at all rooms shall be Class IV. There must be an ante room.
All gaps in the containment barrier must be taped and sealed. Taping is to be done in a manner as to not be destructive to existing infrastructure or the contractor is responsible for repair. Taping is to be inspected daily and any gaps resealed or retaped to maintain the required negative air pressure. Negative air outlet shall use a piece of hard flat material in the window with a hole in it for the tubing and use a round flange and attach the tubing with a band clamp or similar VA approved method.
ICRA barriers at long piping runs may be allowed Class II depending on location, length of schedule, and contractors means and methods. Contractor to provide a written proposal for IP to review, but must be prepared to provide a more restrictive barrier at no cost to the government. Work in corridors or common areas shall not be done during Medical Center business hours 8:00am-4:30pm M-F. Some areas may have additional time restrictions.
Doors into ICRA barriers shall be:
· Metal and wipeable to maintain a dust free clean surface. No wood allowed.
· Pre-manufactured temporary wall systems are allowed per VA approval.
· ADA compliant threshold, or no threshold.
· Have a door closer.
· Door must close and latch on its own power while the negative air is operational.
· A door latch and lock compatible with the VA key core.
CL3357 NZD 626 RH CT6 (LFIC LESS CONST. CORE) (Storeroom function) Lock set for JC Large Format Interchangeable Core.
A potential supplier - IDN-H Hoffman Inc. ~314-692-8391.
OUTSIDE OF BUILDING
COVER ALL
RETURNS AT
GRATE
/DIFFUSERS
E
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE
DIFFUSERS)
TAPE ALL SERVICES TO
PROTECT CONTAMINATION
A
O
V
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE
THAN ONE).
PROVIDE STICKY MATS
( CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS)>
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
PROVIDE STICKY MATS
( CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS)
INDICATOR MUST BE AT -0.01 OR GREATER
(VERIFY DAILY), IF NOT VERIFY ALL OPENINGS
SUCH AS DOORS ARE CLOSED AND /OR
CHANGE OUT NEGATIVE AIR - PRE FILTER.
F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
E R
IE
S
C E
IL
IN
G H
E
IG
H T
2X4 SUSPENDED
CEILING AS SCHEDULED
3 5/8" INSULATED WALL WITH 16
GA. METAL STUDS AT 16" O.C.
WITH 5/8" GYPSUM BOARD EACH
SIDE. WALL TO EXTEND TO ROOF
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE A
F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
E R
IE
S
C E
IL
IN
G H
E
IG
H T
2X4 SUSPENDED
CEILING AS SCHEDULED
3 5/8" INSULATED WALL WITH 16
GA. METAL STUDS AT 16" O.C.
WITH 5/8" GYPSUM BOARD EACH
SIDE. WALL TO EXTEND TO ROOF
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE B
SUSPENDED PLASTIC
ZIPPER WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
A P
P R
O X
A
.F .F
INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE (VERIFY DAILY). IF NOT VERIFY ALL
OPENING SUCH AS DOORS ARE CLOSED AND/OR
CHANGED OUT NEGATIVE AIR PRE FILTER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER CADDY
INDICATOR (REFER TO
PLAN & ELEVATION)
C.O.R. WITH
CONTACT
INFORMATION
XXXX XXX XXXX
XXXX XXX XXXX
XXXX XXX XXXX
XXXX XXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE XXXX FIRE
EMERGENCY DIAL 911
THIS IS A
RESTRICTED AREA
AREA UNDER
CONSTRUCTION
PERSONNEL ENTERING MUST HAVE : HARD HAT, SAFETY GLASSES, AND PROPER I.D.
COMING SOON!!!!
-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:1
P
M
ICRA DETAILS CLASS 1 & 2
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-103
1/4" = 1'-0"
TYPICAL CONSTRUCTION LAYOUT - CLASS I & CLASS II
1" = 1'-0"
ICRA WALL TYPES
1/4" = 1'-0"
ICRA ELEVATION
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
CROSS-SECTION 'A-A'
SCALE:
1/2"=1'-0"
CLASS III
EXISTING CONCRETE SLAB
FLOORING
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
PRIOR TO CONSTRUCTION
EXISTING SPRINKLER
SYSTEM
EXISTING
WINDOW FRAME
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
PRIOR TO CONSTRUCTION
FIRE RATED PLYWOOD
(TEMP GLASS PANEL)
HEPA NEGATIVE
AIR UNIT
HEATED
DETECTOR
CUT-OFF
FINISHED FLOORING TO BE
KEPT CLEAN. FLOORS NOT
BEING REPLACED TO BE
PROTECTED OR COVERED
WITH ROSEN PAPER/FIRE
RATED PLYWOOD
EXISTING WALLEXISTING WALL
COVER ALL RETURNS AT
THE GRATE/DIFFUSERS
A
O
V
E
F L E
A
D U C
OUTSIDE BUILDING
MONTHLY CHANGE
HEPA FILTER
HEPA
NEGATIVE AIR
UNIT
PRE-FILTER
WEEKLY
CHANGED( OR
MORE AS NEEDED)
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
OPTIONAL EXHAUST
DUCTS (COVER THE
GRATES AND THE
DIFFUSERS)
A
SUPPLY, CLOSE OR
COVER WHEN IN USE
TO KEEP DUST OUT
INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE (VERIFY DAILY), IF NOT VERIFY
ALL OPENING SUCH AS DOORS ARE
CLOSED AND/OR CHANGE OUT NEGATIVE
AIR PRE-FILTER. (TYP REGULATOR
INSTALLATION).
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
SUSPENDED PLASTIC
WALL CURTAIN
SHEETS VISIBLE TO
PUBLIC POST ICRA, ILSM, FIRE
INSPECTION
ABC TYPE FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE MORE
THAN ONE OR WALL MOUNTED). NEED
INSPECTION TAG AND MONTHLY INSPECTION).
(INITIALS/DATED).
TAPE ALL SERVICES TO
PROTECT AGAINST
CONTAMINATION
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST (INSTALL PRIOR TO
CONSTRUCTION)
EXISTING WALL
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED OR COVERED WITH ROSEN
PAPER/FIRE RATED PLYWOOD
HEATED DETECTOR CUT-OFF
HEPA NEGATIVE AIR UNIT
EXISTING WALL
NEGATIVE AIR DUCT
DAMPEREXISTING FIRE SPRINKLER SYSTEM
EXISTING FLOOR
A
O
V
E
F L E X
D U C T
SUPPLY, CLOSE OR
COVER WHEN IN USE
TO KEEP DUST OUT
OPTIONAL EXHAUST
DUCTS (COVER THE
GRATES AND THE
DIFFUSERS)
COVER ALL RETURNS WITH
FIRE RATED PLASTIC AT THE
GRATE/DIFFUSERS SHEETING
AND SECURE WITH DUCT
TAPE.
FIRE RATED PLYWOOD
(REFER TO ELEVATION)
OUTSIDE OF
BUILDING
HEPA FILTER
(MONTHLY
CHANGED)
HEPA NEGATIVE AIR UNIT
PRE-FILTER WEEKLY
CHANGED (OR MORE AS
NEEDED)
TAPE ALL SERVICES TO
PROTECT AGAINST
CONTAMINATION
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
ABC TYPE FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE MORE
THAN ONE OR WALL MOUNTED). NEED
INSPECTION TAG AND MONTHLY INSPECTION).
(INITIALS/DATED).
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE (VERIFY DAILY), IF NOT VERIFY
ALL OPENING SUCH AS DOORS ARE
CLOSED AND/OR CHANGE OUT NEGATIVE
AIR PRE-FILTER. (TYP REGULATOR
INSTALLATION).
a a
SUSPENDED PLASTC WALL
SHEETS VISIBLE TO
PUBLIC POST ICRA, ILSM, FIRE
INSPECTION
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:1
P
M
ICRA DETAILS CLASS 3
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-104
NTS
CLASS 3 SECTION B NTS
CLASS 3 ALT
NTS
CLASS 3 SECTION A
NTS
CLASS 3 ICRA PLANS
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
TEMP. ANTE
ROOM
HARD
BARRIER
COVER ALL RETURNS WITH FIRE
RATED PLASTIC AT THE
GRATE/DIFFUSERS SHEETING
AND SECURE WITH DUCT TAPE.
HEPA NEGATIVE
AIR UNIT
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
ABC TYPE FIRE EXTINGUISHER
ON PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE THAN
ONE OR WALL MOUNTED). NEED
INSPECTION TAG AND MONTHLY
INSPECTION). (INITIALS/DATED).
FIRE RATED
PLYWOOD
(REFER TO
ELEVATION)
A
O
V
PRE-FILTER
WEEKLY CHANGED
(OR MORE AS
NEEDED)
HEPA FILTER
(MONTHLY
CHANGED)
SUPPLY DUCTS - EITHER KEEP
RUNNING OR COVER WITH FIRE
RATED PLASTIC SHEETING AND
SECURE WITH DUCT TAPE TO
KEEP DUST OUT.
SHEETS VISIBLE TO
PUBLIC POST ICRA, ILSM,
FIRE INSPECTION
E
OPTIONAL EXHAUST
DUCTS (COVER THE
GRATES AND THE
DIFFUSERS)
TYPICAL IDEAL CONSTRUCTION LAYOUT CLASS IV
INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE (VERIFY DAILY), IF NOT VERIFY ALL
OPENING SUCH AS DOORS ARE CLOSED
AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER. (TYP REGULATOR INSTALLATION).
BLUE CORE
LOCKSET
(LOCKED AT ALL
TIMES)
OUTSIDE OF
BUILDING
ELEVATION
(REFER TO ELEV.
DETAIL)
PROVIDE STICKY MATS
(CHANGED END OF SHIFT OR
MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
TYPE B
TYPE A
A A
EXISTING WINDOW FRAME
FIRE RATED PLYWOOD
(TEMP. REMOVE GLASS
PANEL)
HEPA NEGATIVE AIR UNIT
EXISTING FIRE SPRINKLER SYSTEM
EXISTING CONCRETE SLAB
FLOORING
EXISTING WALL
FINISHED FLOORING TO BE
KEPT CLEAN. FLOORS NOT
BEING REPLACED TO BE
PROTECTED OR COVERED
WITH ROSEN PAPER/FIRE
RATED PLYWOOD.
FLEX DUCT
PLASTIC
WINDOW
HEPA NEGATIVE
AIR UNIT
MOBILE CONTAINMENT
CART WITH CANVAS/
ZIPPER SIDE
ENTRY, 1-1/4" SQUARE
TUBE FRAME
FLEX
DUCT
CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART
FIRE/U.L. RATED
PLASTIC TO PREVENT
DUST (INSTALL PRIOR TO
CONSTRUCTION.)
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:2
P
M
CLASS IV ICRA DETAILS
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-105
1/4" = 1'-0"
CLASS 4 PLAN
1/2" = 1'-0"
CLASS 4 SECTIONS
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:2
P
M
CLASS IV ALT ICRA DETAILS
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-106
1/2" = 1'-0"
CLASS IV ALT ICRA DETAILS
COMMITTEE.
BASIS
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
S P
S P
SCOPE OF WORK
GENERAL NOTES
SPECIMEN
AUTOPSY
MECH DOCK
TOILET -
LOCKER
Room
CLOSET
WALK-IN
REF
VIEWING
RM.
BATTERY
CHARGING
MECH
CORRIDOR
CORRIDOR
ELEC
WASH RM.
STORAGE
REF
STORAGE
CLOSET
WASH RM.
MECH
STAIR 05
EQUIP.
STORAGE
GAS
STORAGE
CHEMICAL
STORAGE
VAULT
VAULT
SUPPLIES
H004
CORRIDOR
FOOD/ BEV
STORAGE
VESTIBULE
EMS
STORAGE
VOL
SERVICE
STORAGE
EMS
STORAGE
SERVICE
ELEVATOR
LOBBY
VESTIBULE
FOOD/ BEV
WALK-IN
REF.
STORAGE
STORAGE
SILVER
RECOV.
EMS
OFFICE 342
OFFICE
CORRIDOR
CORRIDOR
A002A
MECH. RM.
MECH. RM.
TOILET,
MALE
MAIL RM.
STAIR 02
A016A
ELEC
CORRIDOR
WAITING
RM.
OFFICE
EXAM
EXAM
OFFICE
CONTROL
SIMULATOR
RM.
OI&T
RECEPTION
TOILET
OFFICE
CORRIDOR
LOCKER
LOCKER
TOILET
WORK AREA
MAZE
THERAPY
ROOM 1
CONTROL
AREA
CONTROL
LINEAR
ACCELERATOR
MAZE
CORRIDOR
VESTIBULE
MOLD SHOP
MECH. RM.
ELEC
TOILET
OUT-PATIENT
WAITING
OFFICE
OFFICE
PATIENT
DRESSING/
TOILET
CORRIDOR
PATIENT
INJECTION
CORRIDOR
STORAGE
LABORATORY
CONTROL
RM.
PET/ CT
EXAM392
EXAM
MECH
WORK RM.
A020
ELEC. RM.
CONFERENCE
RM.
ELEC
STAIR 12
ELEC RM.
OI&T
ELEC. RM.
MECH. RM.
UTILITY
SERVICE
CORRIDOR
OFFICE
MECH
STAIR 11
STORAGE
B002
CLEAN
MEDICAL
SUPPLY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RECEPTION 421
VESTIBULE
CB27
ELEC
CB28
ELEC
STAIR 10
STORAGE
WORK RM.
OFFICE 428
OFFICE
MECH
STORAGE
OI&T
TOILET
TOILET
CORRIDOR
CORRIDOR
CORRIDOR
WAITING
RM.
CORRIDOR
MECH. RM.
TOILET,
MALE
SOUND
BOOTH
EXAM
SOUND
BOOTH 444
LOCKER
FEMALE
SOUND
BOOTH
CORRDOR
CORRIDOR
STORAGE
MANUAL
WASH
CB24
CART WASH
DETERGENT
& WATER
TREATMENT
ANTE RM.
ANTE RM.
CB13
LOCKER RM,
FEMALE
CB14
LOCKER RM,
MALE
HAC
CB17
Room
CB17A
SCOPE
PROCESSING
CB18
SCOPE
STORAGE
CB15A
SHOWER,
FEMALE
CB19
ANTE RM.
CB20
ANTE RM.
S007
STAIR 07
CB21A
SHOWER,
FEMALE
CB22A
SHOWER
MALE
CB25
HAC
CB23
OFFICE CB22
LOCKER
MALE
CB21
LOCKER
FEMALE
ETO
ETO
CASE CART
STORAGE
CB24
SURGICAL
STERILIZER
STORAGE
CB26
PREP/
STERILIZATION
PUMP RM.
OI&T
DECONTAMINATION
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
HAC
WAITING
RM.
OFFICE
EXAM
EXAM
EXAM
OFFICE
CB03
MECH. RM.
OFFICE
STAFF
ELEC
OI&T
OFFICE
BREAK RM.
STORAGE
CORRIDOR
CORRIDOR
STAIR 06
CB02A
MECH. RM.
CB02
MECH. RM.
GENERATOR
CB03
MECH. RM.
BREAK
ROOM
BIOMED
SHOP
OFFICE
OFFICE
TECH
CB36
BIOMED
SHOP
CB35
EQUIPMENT
STORAGE
H015
ELEVATOR
LOBBY
CONFERENCE
RM.
CORRIDOR
ELEVATOR
LOBBY
STAIR 03
OFFICE
OFFICE
OI&T
LAUNDRY
ELEC
F.E. CLOSET
OFFICE
STORAGE
LOCKER
TOILET,
FEMALE
A017A
OI&T
A017
HAC
B682
F.E. CLOSET
S001
STAIR 01
A019
OFFICE
CLOSET
H008
MAIN
ELEVATOR
LOBBY
FOOD/ BEV.
WALK-IN
FREEZE
WAREHOUSE
WAREHOUSE
MECH.
SPACE
CORRIDOR
LIGHT RM.
TOILET
LOCKER
MACHINE
SHOP
PAINT
STORAGE
PLASTER
SHOP
PAINT SHOP
OFFICE
CARPENTER
SHOP
STORAGE
OFFICE
ELEC SHOP
OFFICE
PLUMB.
SHOP
STAIR 04
PLUMB.
SHOP
HVAC SHOP
CORRIDOR
OFFICE
CORRIDOR
CARPENTER
SHOP
HVAC SHOP
STERILIZER
RECESS
DECONTAMINATION
MECH
ELEV 3
E8
ELEV 8
TELEPHONE
SWITCHGEAR
SERVER RM.
A001
PHONE
A002
PATIENT
CLOTHING
A016
OFFICE /
STORAGE
ELEV 10
TELEPHONE
SWITCHGEAR
OFFICE
WAREHOUSE
CH-CB-5
CHASE
CHASE
CH-CB-7
CHASE
CH-CB-11
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CH-A-1
CHASE
STAIR 7
STAIR 08
STAIR 09
ELEV 1
ELEV 2
ELEV 4
ELEV 5
ELEV 6
E7
ELEV 7
E9
ELEV 9
STORAGE
SUPERVISOR
VAULT
CART
HOLDING
EMS
BREAK
AREA/
LOCKERS
OFFICE
CORRIDOR
RECEIVING
01-AE-401
01-AE-401
01-MH-101
01-MH-101
01-EP-101
01-EP-101
01-EP-101
01-EP-102
01-EP-102
01-EP-102
01-EP-101
01-MH-101
01-MH-101
01-MH-101
01-MH-101
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
AREA OF WORK
GENERAL CONTRACTOR ACCESS/ROUTE
DEMO WALLS FOR INSPECTION SEE PLUMBING DWGS.
1. G.C. SHALL VERIFY DIMENSIONS OF OWNER FURNISHED EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE REQUIRED.
2. EXTEND ALL RATED WALLS TO DECK PER UL ASSEMBLY REQUIREMENTS.
3. G.C. SHALL INSTALL IN-WALL METAL BACKING FOR ALL PARTITION-MOUNTED
EQUIPMENT, ACCESSORIES, PARTITION STOPS, ETC.
4. G.C. SHALL INSTALL FIRE-RETARDANT WOOD BLOCKING WITHIN WALLS BASED
ON CASEWORK ELEVATIONS AND ALL INTERIOR PARTITION ELEVATIONS.
5. ALL INTERIOR WALLS SHALL RECEIVE 5/8" TYPE 'X' GYPSUM BOARD.
6. G.C. SHALL PROVIDE UL APPROVED FIRE- RESISTIVE PENETRATION SYSTEMS
WHERE PLUMBING IS LOCATED IN A FIRE-RATED PARTITION ASSEMBLY.
7. ALL CORRIDOR WALLS SHALL BE CONSTRUCTED AS NON-RATED SMOKE
PARTITIONS.
8. CONTRACTOR CANNOT WORK IN THE PROJECT AREA MONDAY - FRIDAY
BETWEEN THE HOURS OF 7AM-5PM. EXCEPTIONS MAY BE MADE BUT
PROPOSALS MUST BE SUBMITTED TO THE COR IN WRITING 21 CALENDAR DAYS
IN ADVANCE OF DOING WORK. COR RESERVES THE RIGHT TO ACCEPT OR DENY
ANY PROPOSALS. COR RESERVES THE RIGHT TO STOP WORK DURING THIS TIME
THAT IS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE AT NO COST TO
THE GOVERNMENT. WORK DURING REGULAR BUSINESS HOURS WILL BE
ALLOWED WITH WORK ASSOCIATED WITHIN ROOMS A539, A539A, AND A540.
WORK ADJACENT TO THESE ROOMS MAY BE RESTRICTED TO AFTER BUSINESS
HOURS. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION
CONTAINMENT BARRIER ABOVE 85 DECIBELS SHALL BE COORDINATED WITH
THE COR. THE COR RESERVES THE RIGHT TO DELAY WORK FOR 1-2 HOURS
SHOULD EXCESSIVE NOISE, VIBRATIONS, OR ANYTHING THE COR HAS DEEMED
EXCESSIVE OR DISRUPTIVE TO A PATIENT CARE PROCEDURE IN PROXIMITY TO
THE CONSTRUCTION CONTAINMENT BARRIER. A PLAN OF ACTION WILL BE
IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION
SCHEDULE.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:4
P
M
BASEMENT - OVERALL PLAN
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-107
1/16" = 1'-0"
BASEMENT - OVERALL PLAN
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
DN
S
S P
SCOPE OF WORK
GENERAL NOTES
A120
EXAM
A162E
HEMO DIAL
TREAT BAY
H109B
CORRIDOR
A162F
HEMO DIAL
TREAT BAY
A162G
HEMO DIAL
TREAT BAY
A162H
HEMO DIAL
TREAT BAY
A162J
HEMO DIAL
TREAT BAY
A162A
HEMO DIAL
TREAT BAY
A162B
HEMO DIAL
TREAT BAY
A162C
HEMO DIAL
TREAT BAY
A162D
HEMO DIAL
TREAT BAY
A163A
EXAM
A163B
EXAM
A160
TOILET
A161
ELEC
A156
NURSE
STATION
A159
NOUR.
A158
OFFICE
A157
MED. PREP.
A164
PATIENT
ISO.
A164A
TOILET
A165A
TOILET
S105
STAIR 05
A165
PATIENT
ISO.
A155
MECH. RM.
A154
SOILED
H108
CORRIDOR H108B
SCALE
A166
HAC
A167
EQUIPMENT
REPAIR
A168
PERITONEAL
DIALYSIS
A169A
EXAM
A169B
EXAM
A170A
OFFICE
A170C
DIETITIAN
A170B
IV
TREATMENT
A170D
IV
TREATMENT
A154A
CLEAN
A174A
TOILET
A173A
TOILET
A153
CONFERENCE
RM.
A170F
OFFICE
A170E
SUPPLY
H109C
CORRIDOR
H108D
CORRIDOR
H109A
CORRIDOR
A173B
COATS
A168A
STORAGE
A172A
LOCKER RM.
A173
RECEPTION
A171
DECONTAMINATION
A170G
OFFICE
A172
LOUNGE
A174
WAITING
H109
CORRIDOR
A100
WAITING
RM.
A100A
RECEPTION
A100B
COFFEE
SHOP
A100C
STORAGE
A101A
TOILET
A101
VESTIBULE
A101B
TOILET
A101C
RELEASE
OF
INFORMATION
A101D
OPTICAL
SHOP
H105
CORRIDOR
A177
NEPHROLOGY
A177A
OFFICE
A177B
OFFICE
A177C
OFFICE
A177D
STORAGE
A177E
OFFICE
A177F
CLOSET
A177G
OFFICE
A102
ALARM
PANEL
A103
OFFICE
A135
RECEPTION
A134
WAITING
RM.
A104
SCREEN
A105
SCREEN
A106
LEAD
NURSE
A107
EXAM
A108
OFFICE
A109
OFFICE A110
BREAK
A111
EXAM
A112
EXAMA113
EXAM
A114
EXAM
A115
EXAM
A116
EXAM
A117
TOILET
A118
HAC
A119
ELEC
A110A
TOILET
H101
CORRIDOR
H102
CORRIDOR
A121
EXAM
A122
EXAM
A123
EXAM
A124
OPHTH.
CHIEF
RESIDENT
A125
OPHTH.
CHIEF
RESIDENT
A126
EXAM
A127
LASER
TREATMENT
A128
PROCEDURE
A129
EXAM
A130
EXAM
A131
CLINICAL
MANAGER
A132
EXAM
A133
IMAGING
SUPPLY
A132A
OFFICE,
CHIEF
A131A
ELEC
S102
STAIR 02
H103
CORRIDOR
A137A
ELEC
A136
OI&T
A136A
FIRE ALARM
SYSTEM
S101
STAIR 01A139
NEUROLOGY
CLINICA139F
WAITING
RM.
H123
CORRIDOR
A139E
NURSE
STATION
A139D
EXAM
A139C
EXAM
A139G
EXAM
A139H
EXAM
A139J
EXAM
A139K
EXAM
A139B
EXAM
A139A
EXAM
B100
AMBASSADOR
SUITE
B100A
MECH. RM.
B100B
OFFICE
B100D
OFFICE
B100E
OFFICE
B100F
OFFICE
B100G
OFFICE
B100H
OFFICE
B100I
ELEC.
CLOSET
B100J
OI&T S112
STAIR 12
H100A
INFORMATION
H100
LOBBY
B102B
MED. PREP.
B102A
MED. PREP.
B102
WAITING
RM.
B102D
ALCOVE
B102E
OFFICE
B102F
AGENT
CASHIER
H118
CORRIDOR
B103C
EQUIPMENT
STORAGE
B106
CONFERENCE
RM.
B107
ARMORY
B108
OFFICE,
CHIEF
C101
LOCKER RM.
C102
EVIDENCE
C103
OFFICE
C104
OFFICE
C105
OFFICE
C106
OFFICE
C107
HOLDING
CELL
C108
CONTROL
H122
ELEVATOR
LOBBY
H120
CORRIDOR
C146
TOILET,
MALE
B105
OI&T
B103
HAC
B104
CHUTE
A180
OFFICE
A181
OFFICE
A182
MECH. RM.
A183
OFFICE
A184
OFFICE
A185
OFFICE
A186
OFFICE
A187
OFFICEA188
OFFICEA189
EXAMA190
EXAM
A191
STORAGE
A192
STORAGE
A193
FIRE ALARM
A148
STORAGE
A149
OI&T
A149A
STORAGE
H111A
STORAGE
H111
ELEVATOR
LOBBY
H110
ELEVATOR
LOBBY
A140
OFFICE
A141
INTAKE
A142
INTAKE
A143
OFFICE
A144
EXAM A145
OFFICE
A146
OFFICE
A147
OFFICE
A151
TOILET
A150
OFFICE
H113
CORRIDOR
B145
OFFICE
B146
WAITING
RM.
B147
SUPPLY
B148
BREAK RM.
B149
OFFICE
B150
CONSULT
RM.
B149A
OFFICE
B149B
OFFICE
B121
STORAGEB122
TOILET,
FEMALE
S103
STAIR 03
B122A
TOILET
B124
PROCEDURE
RM.
B125
OFFICE
B126
EXAM
B127
EXAM
B128
EXAM
B129
EXAM
B130
MECH. RM.
B131
EXAM
B132
EXAM
B133
EXAM
B134
EXAM
B135
EXAM
B136
EXAM
B137
TOILET
B138
EXAM
B139
EXAM
B140
EXAM
B141
EXAM
B142
EXAM
B143
OFFICE
B144
OFFICE
S104
STAIR 04
B142A
ELEC
H117
CORRIDOR
B119A
WAITING
ROOM
B119
WAITING
ROOM
B111
OFFICE
H124
CORRIDOR
B112
EXAM
B113
EXAM
B114
EXAM
B116
EXAM
B117
EXAM
B118
EXAM
B117A
OFFICE
C149
OFFICE
C138
LOCKER RM.
C140
ELIGIBILITY
C141
OFFICE
C141A
OFFICE
H125
CORRIDOR
C110
WAITING
RM.
C109
OFFICE
C109A
TRIAGE
C112
CONTROL
RM.
C113
TRIAGE
E125
TRIAGE
E126
TOILET
E127
ANTE RM.
E128
PATIENT
ISO.
E133
EXAM
TREATMENT
E101
EXAM
TREAT.
BAYS
E102
EXAM
E103
NURSE
STATION
E104
EXAM
E105
EXAM
E106
EXAM
E107
EXAM
E108
CLEAN
EQUIPMENT
E109
EXAM
E110
EXAM
E111
TOILET
E112
CLEAN
UTILITY
E113
SOIL
UTILITY
E114
CLEAN
LINEN
E115
AMBUL.
ATTEND.
E116
MED. PREP.
E117
OFFICE /
NOUR.
E118
LOCKER RM.
E119
TOILET
E120
LOCKER RM.
E121
HAC
E122
SECURE
HOLD
E123
SECURE
HOLD
C115
TOILET
C118
TOILET
C117
ELEC
E124
WAITING
RM.
E134
NURSE
STATION
E135
TOILET
E121A
ALCOVE
H134
CORRIDOR
H135
CORRIDOR
H132
CORRIDOR
H126
CORRIDOR
C111B
EXAM
C111A
EXAM
C114
CONFERENCE
RM.
C116
OFFICE
C119
OFFICE
C120
OFFICE
H128
CORRIDOR
C121
OFFICE
C122
FILE RM.
C123
OFFICE
C124
OFFICE
C125
OFFICE
C126
OFFICE
C127
OFFICE
C128
WAITING
C129
OFFICE
C122A
OFFICE
C130
OFFICE
C131
OFFICE
C132
OFFICE
C134
OFFICE
H133
CORRIDOR
C136
OI&T
C137
STORAGE
C148
OFFICE
C150
EXAM
C151
EXAM
C152
EXAM
H127
CORRIDOR
H130
CORRIDOR
H131
CORRIDOR
S106
STAIR 06
C173
OFFICE
C173A
TOILET
D143
EXAM
D120
EXAM
D121
EXAM
D122
EXAM
D123
OFFICE
D124
OFFICE D125
EXAM
D126
EXAM
D127
EXAM
D128
TOILET
D129
OFFICE C180
OFFICE
C179
OFFICE
C178
OFFICE
C177
TOILET
C176
EXAM
D174
EXAM
H141
CORRIDOR
H142
CORRIDOR
H140
CORRIDOR
S109
STAIR 09
D130
EXAM
D131
EXAM
D132
OFFICE
D133
OFFICE
D134
OFFICE
D135
OFFICE
D136A
OFFICE
D142
EXAM
D136B
CLEAN
SUPPLIES
D141
EXAM
D140
HAC
D139
EXAM
D138
EXAM
D137
EXAM
D136
NURSE
STATION
D101A
WAITING
RM.
D116
OFFICE
D117
OFFICE
D118
EXAM
H139
CORRIDOR
D112
OFFICE
D102
EXAM
D119
OFFICE
D111
OFFICE D110
OFFICE
CH-D-1
CHASE
S110
STAIR 10
H137
CORRIDOR
D144
ELEC
D145
OI&T
D146
OFFICE
H136
CORRIDOR
D103
BREAK RM.
D104
TOILET
D105
WORK RM.
D115
TOILET
D114
EXAM
D113
EXAM
D106
HAC
D107
EXAM
D108
EXAM
S108
STAIR 08
H138
CORRIDOR
E110A
STORAGEE110B
STORAGE
D147
OFFICE
D148
OFFICE,
CHIEF
H138A
CORRIDOR
D109
OFFICE
E112A
OXYGEN
STORAGE
C114A
STORAGE
H127A
CORRIDOR
H114A
CORRIDOR
H119
CORRIDOR
H113C
CORRIDOR
C146A
HAC
B120A
ELEC
H113A
CORRIDOR
A101E
BREAK RM.
H109E
CORRIDOR
H109D
CORRIDOR
A170I
OI&T
A103A
TOILET
H110B
F.E. CLOSET
A139I
STORAGE
H125B
ENTRYWAY
C109B
VESTIBULE
C175
EXAM
H125A
VESTIBULE
D101
NURSE
STATION
ELEV 10
S107A
VESTIBULE
S107
STAIR 07
H113B
F.E. CLOSET
H103A
F.E. CLOSET
A175
SUPPLY
F.E. CLST
H117A
F.E. CLOSET
C178A
CLOSET
Room
ELEV 1
ELEV 2
ELEV 3
ELEV 4
ELEV 5
ELEV 6
ELEV 7
ELEV 8
ELEV 9
CH-C-1
CHASE
CH-C-2
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CH-B-3
CHASE
CH-B-1
CHASE
CH-B-2
CHASE
CH-B-4
CHASE
CH-B-5
CHASE CH-B-6
CHASE
CH-A-12
CHASE
CH-B-7
CHASE
CH-C-3
CHASE
CH-B-8
CHASE
CH-B-9
CHASE
CH-C-4
CHASE
CH-C-5
CHASE
CH-D-5
CHASE
CH-D-2
CHASE
CH-C-7
CHASE
CH-C-8
CHASE CH-E-1
CHASE
CH-C-6
CHASE
CH-D-3
CHASE
CH-D-4
CHASE
CH-E-2
CHASE
01-AE-403
01-AE-404
01-AE-402
01-AE-402
01-MH-104
01-MH-104
01-MH-104
01-MH-103
01-MH-103
01-EP-103
01-EP-103
01-EP-103
01-EP-105
01-EP-105
01-EP-104
01-EP-104
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
AREA OF WORK
GENERAL CONTRACTOR ACCESS/ROUTE
DEMO WALLS FOR INSPECTION SEE PLUMBING DWGS.
1. G.C. SHALL VERIFY DIMENSIONS OF OWNER FURNISHED EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE REQUIRED.
2. EXTEND ALL RATED WALLS TO DECK PER UL ASSEMBLY REQUIREMENTS.
3. G.C. SHALL INSTALL IN-WALL METAL BACKING FOR ALL PARTITION-MOUNTED
EQUIPMENT, ACCESSORIES, PARTITION STOPS, ETC.
4. G.C. SHALL INSTALL FIRE-RETARDANT WOOD BLOCKING WITHIN WALLS BASED
ON CASEWORK ELEVATIONS AND ALL INTERIOR PARTITION ELEVATIONS.
5. ALL INTERIOR WALLS SHALL RECEIVE 5/8" TYPE 'X' GYPSUM BOARD.
6. G.C. SHALL PROVIDE UL APPROVED FIRE- RESISTIVE PENETRATION SYSTEMS
WHERE PLUMBING IS LOCATED IN A FIRE-RATED PARTITION ASSEMBLY.
7. ALL CORRIDOR WALLS SHALL BE CONSTRUCTED AS NON-RATED SMOKE
PARTITIONS.
8. CONTRACTOR CANNOT WORK IN THE PROJECT AREA MONDAY - FRIDAY
BETWEEN THE HOURS OF 7AM-5PM. EXCEPTIONS MAY BE MADE BUT
PROPOSALS MUST BE SUBMITTED TO THE COR IN WRITING 21 CALENDAR DAYS
IN ADVANCE OF DOING WORK. COR RESERVES THE RIGHT TO ACCEPT OR DENY
ANY PROPOSALS. COR RESERVES THE RIGHT TO STOP WORK DURING THIS TIME
THAT IS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE AT NO COST TO
THE GOVERNMENT. WORK DURING REGULAR BUSINESS HOURS WILL BE
ALLOWED WITH WORK ASSOCIATED WITHIN ROOMS A539, A539A, AND A540.
WORK ADJACENT TO THESE ROOMS MAY BE RESTRICTED TO AFTER BUSINESS
HOURS. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION
CONTAINMENT BARRIER ABOVE 85 DECIBELS SHALL BE COORDINATED WITH
THE COR. THE COR RESERVES THE RIGHT TO DELAY WORK FOR 1-2 HOURS
SHOULD EXCESSIVE NOISE, VIBRATIONS, OR ANYTHING THE COR HAS DEEMED
EXCESSIVE OR DISRUPTIVE TO A PATIENT CARE PROCEDURE IN PROXIMITY TO
THE CONSTRUCTION CONTAINMENT BARRIER. A PLAN OF ACTION WILL BE
IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION
SCHEDULE.
PLAN NORTH
TRUE NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
S t L o u is C o rr e c t H
V A
C t o m e e t D ir e c ti v e
/S tL
M O
-A C
S
-1
J C
M
E P
V
.r v t
/2
/2
:0
:1
P
M
LEVEL 01 - OVERALL PLAN
SEPTEMBER 28, 2023
657-21-114JC100% BID DOCUMENTS CORRECT HVAC SYSTEMS FOR
VHA DIRECTIVE 1116 (2)
JB MR
657 - ST. LOUIS, MO
915 NORTH GRAND BLVD., ST. LOUIS, MO 63106
01-GI-108
1/16" = 1'-0"
LEVEL 01 - OVERALL PLAN
ISTERED ARCHITECT
S
TATE OF TEXAS
J
AM
SP SP
SCOPE OF WORK
GENERAL NOTES
D502B
CART
ELEVATOR
EQUIPMENT
D502A
CART
ELEVATOR
EQUIPMENT
D502L
STORAGE
D502J
STORAGE
PLUMBING
SHOP
D502H
STORAGE
MASON
SHOP
S508
STAIR 08
D502G
STORAGE
CARPENTRY
SHOP
D502K
STORAGE
IHCG SHOP
D502F
STORAGE
ELECTRIC
SHOP D502E
STORAGE
PIPE SHOP
D502D
STORAGE
A/C SHOP
H517
CORRIDOR
STORAGE
A/C SHOP
B538
MECH. RM.
D505A
Room
D505
MECH. RM.
A554
ELEC
A571A
NOUR.
A565A
ANTE RM.
A556A
OFFICE
A556
OFFICE
A557
CONFERENCE
RM.
A556B
HALLWAY
A555A
TOILET
A558A
TOILET
A558
OFFICE
A555
OFFICE
A553
OFFICE
A553A
TOILET
A552A
STRETCH
A559
OFFICE
A552
OFFICE
A560
HAC
A559A
TOILET
A561
OFFICE
S505
STAIR 05
A550
OFFICE
A549A
TOILET
A549
WAITING
A548
WAITING
A548A
TOILET
A547
OFFICE,
DIETICIAN
A572
OFFICE
A573
MED. PREP.
A570
OFFICE
A569
OFFICE
A570A
ANTE RM.
A570B
TOILET
A568
OFFICE
A569A
TOILET
A568A
OFFICE
HALLWAY
A567B
OFFICE
A567
OFFICEA566A
TOILET
A567A
HALLWAY
A566
OFFICEA565B
TOILET
A565
OFFICE
A562
CLEAN
A564
SOILED
A564A
CRASH
CART
A563
ELEC
H505
CORRIDOR
H504
CORRIDOR
A571
NURSE
STATION
A578
TLT
A577A
TOILET
A576
OFFICE
A574
TOILET
A575
OFFICE
A544C
TOILET
H507
SERVICE
ELEVATOR
LOBBY
H503
CORRIDOR
A544B
LOCKER
A544
PHYSICIAN
WORK RM.
A501A
OFFICE
A501
OFFICE
A502
OFFICE
A509
OFFICE
A510
OFFICE
A511
OFFICE
A510A
TOILET
A512
OFFICE
A513
OFFICE
A512A
TOILET
A542
LAB
A541
STORAGE
B546
OFFICE
B544
OFFICE
B545
TOILET
A536B
ELEC
A544A
CLOSET
H506
ELEVATOR
LOBBY
B502
OFFICE
B501
OFFICE
A540A
STORAGE
A539
STORAGE
A535
OFFICE
S501
STAIR 01
A538
PHYSICIAN
WORK RM.
A536
ELECA536A
OI&T
A535A
TOILET
A537A
DATA
H501
CORRIDOR
A508A
TOILET
A508
OFFICE
A507A
TOILET
A507
OFFICE
A504
COPY
A503
HAC
A506A
TOILET
A505
NOUR.
A506
OFFICE
A517
OFFICE
A516
OFFICE
A515
OFFICE
A514
OFFICE
A516A
TOILET
A514A
TOILET
A521
STRG
A519
SOILED
A520
ELEC
A517A
TOILET
A518
STORAGE
A532
TOILET
A531
OFFICE
A533
OFFICE
B524D
EXAM
A524C
EXAM
A524A
EXAM
A524B
EXAM
B524
WAITING
RM. B524E
RECEPTION
A522
OFFICE
A523A
OFFICE
A523
HALLWAY
A523B
OFFICE
A527
HAC
S502
STAIR 02
A525
TOILET,
MALE
A526
OFFICE
H502A
F.E. CLOSET
A530
OFFICE
A529
OFFICE
H502
CORRIDOR
A543
PULMONARY
RESPIRATORY
THERAPY
A543B
OFFICE
B542
OFFICE
B541
OFFICE
H508
CORRIDOR
B503
BRONCHOSCOPY
SUITE
CORRIDOR
B528
STORAGE
B529
TOILET
B530
TOILET
B526
PREP /
RECOVERY
B527
MECH
B525
CONTROL
B523
EP LAB
H516
CORRIDOR
ELECTRO-
PHYSIOLOGY
C513
STERILIZER
C528
HAC
B532
MALE
LOCKER
HAC
B538A
TOILET
LOCKER
FEMALE
B533
OFFICE
B534
CATHETER
READING
B537
SOILED
B536
ELEC
S503
STAIR 03
H508A
F.E. CLOSET
B504
BREAK RM.
B522
TOILET
B520
WAITING
RM.
B521
HOLDING
B519
CONSULT
B511
CONTROL 1
B512
CONTROL 2
B509
SCRUB
B513
STORAGE
B510
CARDIAC
CATH. LAB 1
B508
PREP
B505
STORAGE
B506
MECH
B507
OI&T
B504B
Room
H509
CORRIDOR
H510A
CORRIDOR
H514
ELEVATOR
LOBBY
B531
TOILET
H513A
CORRIDOR
H513
CORRIDOR
H512A
SUPPLY
C520
LOCKER
C520A
TOILET
C519
BREAK
C518A
TOILET
C518
LOCKERC516
SOILED
C500B
STORAGE
C500C
OFFICE
C500D
HAC
C501A
ANTE RM.
C501
RECOVERY
ISOLATION
H510B
CORRIDOR
C500A
STORAGE
C504
RECOVERY
C503
RECOVERY
C502
RECOVERY
C510A
ANTE
C510
ISOLATION
RECOVERY
C509
RECOVERY
H511
CORRIDOR
C507
RECOVERY
C506
RECOVERY
C505
RECOVERY
C511A
TOILET
C511
TOILET
H512
CORRIDOR
C512
STORAGE
C524
OI&T
C514A
SCRUB
C522
OI&T
C521
ELEC
C515
CLEAN RM.
C514
STORAGE
B543
TOILET
B517
STORAGE
B518
HAC
H506A
F.E. CLOSET
B514
SCRUB
C508
RECOVERY
H510
CORRIDOR
H515
CORRIDOR
S506
STAIR 06
D502
MECH. RM.
STORAGE
D502C
STORAGE
BMET
S507
STAIR 07
ELEV 1
ELEV 2
ELEV 3
ELEV 4
ELEV 5
ELEV 6
ELEV 7
ELEV 8
ELEV 9
S509
STAIR 09
A577
STORAGE
CHASE
CHASE
CHASE
CHASE
CHASE
C512A
ENTRY
CHASE
A544D
CLOSET
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE 164
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
A525A
MECH
CHASE
CHASE
B515
PREP/RECOV
B516
CARDIAC
CATH LAB 2
01-AE-405
01-AE-406
01-MH-105
01-MH-105
01-EP-106
01-EP-106
01-EP-106
A539
STORAGE
01-MP-105
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
AREA OF WORK
GENERAL CONTRACTOR ACCESS/ROUTE
DEMO WALLS FOR INSPECTION SEE PLUMBING DWGS.
1. G.C. SHALL VERIFY DIMENSIONS OF OWNER FURNISHED EQUIPMENT AND
COORDINATE INSTALLATION WITH ALL TRADES WHERE REQUIRED.
2. EXTEND ALL RATED WALLS TO DECK PER UL ASSEMBLY REQUIREMENTS.
3. G.C. SHALL INSTALL IN-WALL METAL BACKING FOR ALL PARTITION-MOUNTED
EQUIPMENT, ACCESSORIES, PARTITION STOPS, ETC.
4. G.C. SHALL INSTALL FIRE-RETARDANT WOOD BLOCKING WITHIN WALLS BASED
ON CASEWORK ELEVATIONS AND ALL INTERIOR PARTITION ELEVATIONS.
5. ALL INTERIOR WALLS SHALL RECEIVE 5/8" TYPE 'X' GYPSUM BOARD.
6. G.C. SHALL PROVIDE UL APPROVED FIRE- RESISTIVE PENETRATION SYSTEMS
WHERE PLUMBING IS LOCATED IN A FIRE-RATED PARTITION ASSEMBLY.
7. ALL CORRIDOR WALLS SHALL BE CONSTRUCTED AS NON-RATED SMOKE
PARTITIONS.
8. CONTRACTOR CANNOT WORK IN THE PROJECT AREA MONDAY - FRIDAY
BETWEEN THE HOURS OF 7AM-5PM. EXCEPTIONS MAY BE MADE BUT
PROPOSALS MUST BE SUBMITTED TO THE COR IN WRITING 21 CALENDAR DAYS
IN ADVANCE OF DOING WORK. COR RESERVES THE RIGHT TO ACCEPT OR DENY
ANY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .