This document provides details for a federal construction contract opportunity to renovate an unfinished specialty clinic and inpatient pharmacy located at a Veterans Affairs medical center. The scope of work involves renovating approximately 6,490 square feet of shell space on the third floor for a hematology/oncology outpatient clinic including exam rooms, infusion bays, support spaces, and waiting area. Additionally, approximately 6,290 square feet of the main inpatient pharmacy located in the basement will be renovated to comply with compounding guidelines including separating hazardous and non-hazardous material areas and constructing new spaces. The work will be conducted in phases to minimize disruption to ongoing pharmacy operations. The estimated price range for the project is $2,000,000 to $5,000,000. The solicitation number is 36C25521R0106 and responses are due on or around August 18, 2021. In accordance with public law, this opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
589A4-20-155 Complete Unfinished Specialty Clinic
Amendment 3 – Narrative
Description of Changes:
1. Sheet QH101 - In the equipment list, item “M2050 – Shelving, Storage, 75hx36wx14d” has been change to VC (Government Furnished, Contractor Installed).
2. Sheet QH102 - In the equipment list, items “M2050 – Shelving, Storage, 75hx36wx14d” / “E0954 – Crash Cart” / “M4020 – Scale, with wheelchair ramp” have been change to VC (Government Furnished, Contractor Installed).
3. Sheet QH102 – Item “X008 – Manufactured Wall Panels” shall be purchased (furnished) the contractor and installed by the contractor.
4. The basement pharmacy construction shall be completed during normal operating hours. However, the contractor shall need to account for some construction activities that will need to be completed during non-normal working hours. Examples include but are not limited to major utility tie ins, instances where utilities are required to be completely shut down for the construction activity, and instances where work is required out of the construction zone and will drastically effect normal work of the VA operations.
5. Wall height for detail 7 on sheet 01-AE700 shall be 62”.