36C25521R0106 0001- Amendment 1.pdf

PDF 353 KB Posted

Attached to
Z2DA--Complete Unfinished Specialty Clinic P/N: 589A4-20-155
Solicitation number
36C25521R0106
Issued by

About this file

This is a presolicitation notice for a construction project to renovate approximately 12,780 square feet of unfinished specialty clinic space and inpatient pharmacy space at the VA Harry S. Truman Memorial Hospital in Columbia, Missouri. The project scope includes demolishing and constructing new architectural features, mechanical and electrical systems, plumbing fixtures, and interior finishes. The estimated price range for completion is $2,000,000 to $5,000,000. The solicitation will utilize the LPTA source selection process and be set aside for SDVOSBs under NAICS 236220. Proposals are due by August 18, 2021 in response to solicitation number 36C25521R0106. The base period of performance is up to 300 calendar days. The third floor work will occur in one phase while the basement work will have four phases to allow continued pharmacy operations.

View the file

Other files

File Type Posted
36C25521R0106 0003 Amendment 3.pdf PDF
QH101 - BASEMENT EQUIPMENT PLAN.pdf PDF
Amendment 3 Narrative.docx DOCX document
QH102 - THIRD FLOOR EQUIPMENT PLAN.pdf PDF
36C25521R0106 0002 Amendment 2.pdf PDF
Amendment 2-ATTENDANCE ROSTER- Complete Unfinished Specialty Clinic_08032021.xlsx XLSX spreadsheet
090600 Schedule for Finishes_amendment 1.pdf PDF
066060 Plastic Fabrications amendment 1.pdf PDF
077100 Roof Specialties_amendment 1.pdf PDF
072200 Roof and Deck Insulation amendment 1.pdf PDF
077200 Roof Accessories_amendment 1.pdf PDF
083459 Vaults and Day Gates_amendment 1.pdf PDF
111736 Package Transfer Units_amendment 1.pdf PDF
076000 Flashing and Sheet Metal_amendment 1.pdf PDF
Revised Columbia USC Amendment 1 - Combined Drawings.pdf PDF
075423 Thermoplastic Polyolefin -TPO- Roofing_amendment 1.pdf PDF
072727 Fluid-Applied Membrane Air Barrier- Vapor amendment 1.pdf PDF
224000 Plumbing Fixtures amendment 1.pdf PDF
096723_20 Resinous with Vinyl Chip Broadcast_amendment 1.pdf PDF
149200 Pneumatic Tube System amendment 1.pdf PDF
Complete Unfinished Specialty Clinics Specifications VOL 1- 486 pages.pdf PDF
589A4-20-155-Final Drawings 072121 VOL 1 - 47 pages.pdf PDF
Complete Unfinished Specialty Clinics-589A4-20-155 Specifications VOL 2-742 pages.pdf PDF
36C25521R0106.docx DOCX document
589A4-20-155-Final Drawings 072121 VOL 2 - 60 Pages.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 25

589A4-20-155

36C255

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway

Leavenworth KS 66048

36C255

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway

Leavenworth KS 66048

To all Offerors/Bidders

36C25521R0106

08-20-2021

X

X X

August 30, 2021 by 2:00 PM CDT

Complete Unfinished Specialty Clinic, 589A4-20-155

This amendment provides the following information:

a. Sign in sheet for those contractors that attended the Prebid meeting and walk through of the project.

b. Questions and Answers, Narrative of Specification and Drawing changes.

c. Changed Drawings and Specifications.

All other terms andd conditions remain unchanged.

CONTINUATION PAGE

Complete Unfinished Specialty Clinic

Project No: 589A4-20-155

Columbia VAMC

Columbia, Missouri

Date: August 20, 2021

QUestions and Answers

Item Description

1 Question: Please advise if the designated SSHO and Competent Person role can be fulfilled by the site superintendent?

Answer: Yes, SSHO and superintendent duties could be performed by one individual if that individual has the “separate and additional” required SSHO training and experience over and beyond the OSHA 30 certification and documentation is provided with the technical proposal. No, the superintendent cannot hold more than 2 positions. The Competent Person is a subcontractor position per specification 01 35 26 section 1.7. Each subcontractor shall designate a minimum of one CP in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs. Further, all specialized Competent Persons for the work crews will be supplied by the respective contractor as required by 29 CFR 1926 (i.e. Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations). These Competent Persons can have collateral duties as the subcontractor’s superintendent and/or work crew lead persons as well as fill more than one specialized CP role (i.e. Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations).

2 Question: Will the SSHO be full time separate person?

Answer: Please see response to question item 1 above .

3 Question: Patient lifts who furnishes and installs?

Answer: The Contractor shall furnish patient lifts and provide the install of patient lifts.

4 Question: Patient lift support steel or Unistrut who furnishes and installs?

Answer: The Contractor shall furnish and install patient lift support infrastructure furnishing.

5 Question: Is the project taxable?

Answer: Missouri Sales and Use Tax Exemption certificate will be provided.

6 Question: Are the manufacturers called out in specification 09 06 00 for reference only and as equal products can be bid?

Answer: As noted, the products listed in 09 06 00 Schedule of Finishes are the “Basis of Design.” Yes, equal products can be bid and they must meet all salient characteristics.

7 Question: Specification 090600 sheet 11 item #4 marble window stools. Is inpro window stools required or is equal product acceptable?

Answer: As noted, the products listed in 09 06 00 Schedule of Finishes are the “Basis of Design.” Yes, equal products can be bid, and they must meet all salient characteristics.

8 Question: Door E001A Vault door, are we to reuse existing door? If this is a new door please provide specifications and manufacturer.

Answer: Door E001A is to be replaced. Refer to specification section 08 34 59 Vaults and Day Gates and sheet AE601 Door & Window Schedules included in this Amendment 1.

9 Question: Please advise to the location of relocated dumb waiter.

Answer: The dumb waiter is to be demoed and is not being replaced. Refer to sheet AD101 Basement Demolition Plan included in this amendment.

10 Question: Please provide epoxy resinous specification.

Answer: Please see new specification section 09 67 23.20 Resinous (Epoxy Base) with Vinyl Chip Broadcast included in this Amendment 1.

11 Question: Drawing 01-GI107 note 5 and 7 mention chain link fencing, does this apply to this project if so what is the location?

Answer: Refer to specification section 01 57 19 Temporary Environmental Controls, page 01 57 19-4, section 1.5 Protection of environmental resources, B. 1. Provide fencing at any areas that require protection.

12 Question: Drawing 01-AD101 item 13, dumb waiter and pneumatic tube station. Note says design build? This is not a design build project. Please provide routing of pneumatic tube system from basement to where?

Answer: As noted on the plans, the dumb waiter and pneumatic tube station will be demoed, and the relocation of the pneumatic tube and station shall be the responsibility of the contractor to design a replacement system from the demoed location to the new station location (contractor to submit proposed shop drawings for route and materials for the proposed system) and to install said system. Refer to keynote #13 on sheet AD101 Basement Demolition Plan for demolition of dumb waiter and pneumatic tube station.

Refer to sheets AE103 Basement Enlarged Plan and AE104 Third Floor Enlarged Plan for new location of pneumatic tube station. These revised sheets are included in this Amendment 1.

13 Question: Please provide specification for pneumatic tube system.

Answer: Please see new specification section 14 92 00 Pneumatic Tube included in this

14 Question: Drawing 01-AD101 item 13, dumb waiter and pneumatic tube station. Is the dumb waiter being removed and abandoned? Does this affect other floors above, demo and or floor infills?

Answer: The dumb waiter is to be demoed and not replaced. The pneumatic tube station is to be relocated. The work on the pneumatic tube station relocation is not anticipated to affect the floor above.

15 Question: Drawing 01-AE105, partitions called out as R04 should this not be RO3?

Answer: Yes, partitions will be R-03. Refer to revised sheet AE105 Basement Dimension Plan showing updated partition types included in this Amendment 1.

16 Question: Drawing 01-AE105, room E001H north wall shown as existing, this wall gets demoed should this not also be R03?

Answer: Refer to revised sheet AE105 Basement Dimension Plan showing updated partition types included in this Amendment 1.

17 Question: Drawing 01-AE105 room E002K north wall, what partition type is that wall?

Answer: The North partition type is R-03.

18 Question: Drawing 01-AE106 room F383 north wall is labeled as P07 which is a 3-5/8” wall but drawing scales as a 6” wall, please confirm type of wall.

Answer: Refer to revised sheet AE106 Third Floor Dimension Plan showing updated

19 Question: Drawing 01-AE106 room F381 north wall labeled as V2, what is V2?

Answer: V2 in Room F391 label will be revised to reflect P04. Refer to revised sheet AE106 Third Floor Dimension Plan showing updated partition types included in this

20 Question: Drawing 01-AE106, what are the partition types in the infusion bay rooms?

partition types included in this Amendment 1. Refer to Sheet AE403 Enlarged Plans, AE405 Third Floor Interior Elevations, AE500 Partition Types for new partition P10 and AE700 Millwork Sections and Details for the detail of the privacy wall between the infusion bays. These revised sheets are included in this Amendment 1 and provide clarification to the wall types, the privacy wall and casework.

21 Question: Drawing 01-AF101 There are 4 corner guards around a rectangle in the middle of the room E001, this does not show up on 01-AE103. What are these corner guard protecting? Is this the dumb waiter that is to be demoed?

Answer: Refer to revised sheet AE103 Third Floor Enlarged Plan for locations of corner guards included in this Amendment 1.

22 Question: Drawing 01-AE104 shows note 27 right outside of room F353, handrail bumper rail, this does not show up on 01-AF102 finish plan. Please confirm if there is handrail on both walls of corridor F358.

Answer: As shown on sheet 01-AE104, there is a handrail on both walls of corridor F358.

23 Question: Specification 090600-15 specialties wall guard handrail, please provide specific handrail product type and number?

Answer: Refer to specification sections 09 06 00 Schedule of Finishes and 10 26 00 Wall and Door Protection for Basis of Design.

24 Question: Drawing 01-AE403 detail 2, patient privacy screen at F366, Is this provided by the VA if not please provide specification and details.

Answer: The patient privacy screen is provided by the contractor. See Response to Item 20 above.

25 Question: Drawing 01-AE405 detail 34 has HPDL-1pointing to what casework could be, is this casework if so please provide details.

Answer: See response to Item 20 above.

26 Question: Drawing 01-AE405 detail 2 shows WP-2 on south wall but spec section 090600-30 calls out for only the east wall to have WP-2, is there WP-2 on the south wall?

Answer: The WP-2 shown on detail is the location of that finish.

27 Question: Drawing 01-QH101, please verify that the equipment listed is owner furnished contractor installed VC not VV?

Answer: Refer to the Furnished/ Installed note below the Equipment Schedule on sheet QH101 Basement Equipment Plan included in the Amendment 1.

• VV is Government Furnished, Government Installed

• VC is Government Furnished, Contractor Furnished

• CC is Contractor Furnished, Contractor Furnished

28 Question: Drawing 01-QH102, please verify that the equipment listed is owner furnished contractor installed VC not VV?

Answer: Refer to the Furnished/ Installed note below the Equipment Schedule on sheet QH102 Third Floor Equipment Plan included in the Amendment 1.

• VV is Government Furnished, Government Installed

• VC is Government Furnished, Contractor Furnished

• CC is Contractor Furnished, Contractor Furnished

29 Question: Drawing 01-MH141 shows exhaust fans with possible roof patching. Is the existing roof still under warranty? Who is the manufacturer? If roof is not currently under warranty, please provide roofing specification.

Answer: The existing roof is currently under warranty. Refer to specifications 07 22 00 Roof and Deck Insulation, 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding, 07 54 23 Thermoplastic Polyolefin (TPO) Roofing, 07 60 00 Flashing and Sheet Metal, 07 71 00 Roof Specialties and 07 72 00 Roof Accessories included in this Amendment 1.

30 Question: Drawing 01-MH101 notes 4 and 5 exhaust duct. The routing of this duct appears to go through a room west of existing bathrooms. Does this room have a mechanical chase in it or will there be saw cutting of concrete flooring on each floor in order to get this duct to the room?

Answer: Yes, this is a designed rated shaft “Chase”. Yes, the work will require penetrations at the 1st Level FF and interstitial space FF of the ACA building. The exhaust duct routing from the pharmacy up to the roof is routing through an existing rated duct shaft. Scope will require penetrating 1st Level finished floor and interstitial space finished floor. Scope will also require fire proofing at rated penetrations and repair of walls for access to maintain shaft fire rating.

31 Question: Specification 275223-16 2.0, please advise if Nurse call system is owner furnish owner installed and we are to included rough in only- conduit and pull string?

Answer: The nurse call system will be contractor furnished and contractor installed.

32 Question: The plumbing fixtures shown on the drawings and load/connection schedule do not match the plumbing fixtures in the specifications. Please provide an updated plumbing fixture specification for bidding?

Answer: Refer to sheet P001 Plumbing Legend, Schedules and Abbreviations included in this addendum 1 for the update plumbing fixture schedule. Refer to updated specification 22 24 00 Plumbing Fixtures included in this Amendment 1.

33 Question: Can you provide clarifications on the W&V piping materials for the different areas of the project? Can the below grade in the basement be PVC? Prior to the new work, it appears the basement is return air plenum. However, with this project it looks to be changed to ducted return. Can the sanitary piping in the basement be PVC now? Do the hub drains off the steam humidifiers in both the basement and 3rd floor need to be CI?

Is the interstitial area considered to be a mechanical space? If so, the sanitary piping should then be CI, correct??

Answer: Waste and Vent PVC piping shall only be used above the 3rd Level Finished Floor where applicable per specifications 221300 Facility Sanitary and Vent Piping. PVC shall not be used anywhere else. Steam humidifiers require cast iron drain piping throughout. The interstitial space is considered mechanical space and should have cast iron pipe.

34 Question: Can you provide additional information/details on MGO-1? Are they all separate outlets? Part of a combined headwall/artwall? Furnished by the VA or the contractor??

Answer: Refer to revised sheet P001 Plumbing Legend, Schedules and Abbreviations included in this Amendment 1 for the additional medical gas outlet information. Refer to specification section 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities, 22 63 00 Gas Systems for Laboratory and Healthcare Facilities and 23 09 23 Direct- Digital Control System for HVAC for medical gas outlet information. Per specifications medical gas outlets are to be separate outlets, to match existing station terminal connections, and furnished by contractor.

35 Question: Are the walls on plan north/east of 3rd floor supposed to have drywall installed to the deck? Currently there are studs with insulation installed in the cavity.

Answer: Refer to the revised wall type designations on Sheet AE106 Third Floor Dimension Plan included in this Amendment 1.

36 Question: Reference 3rd floor plan north/east. is anything supposed to be installed at the window sills of this location?

Answer: Refer to detail 8/AE601 Window Sill @ Exterior Wall on sheet AE601 Door & Window Schedules included in this Amendment 1.

37 Question: In the specifications under the finish schedule section it notes AT-1 and AT-3.

All the rooms in the finish schedule call out AT-2 which is not noted on the schedule itself.

Can AT-2 ceiling type be provided?

Answer: Refer to Section 2.4 DIVISION 09 – FINISHES, B. SECTION 09 51 00, ACOUSTICAL CEILINGS on page 09 06 00 – 12 in specification section Schedule for Finishes for the updated ACT designation included in this Amendment 1.

38 Question: Ceilings shown in the basement RCP are shown as 2x4 tiles but the finish schedule only notes 2x2 tile. What size is the tile supposed to be?

Answer: All new ceiling tiles in the basement shall be 2 x 2 Mesa 680. Refer to sheet AE107 Basement Reflected Ceiling Plan for revised tiles and Specification section 09 06 00 Schedule for finishes included in this Amendment 1.

39 Question: What is the height of the WP-1 in the 3rd floor corridors supposed to be?

Answer: WP-1 on the 3rd floor is the wall guard. Specification 10 26 00 provides the dimension of WP-1.

40 Question: Can detail 6/AE503 be drawn more clear? It is difficult to see how the lift system is built.

Answer: Lift systems will be built in accordance with manufacturer specifications. The purpose of detail 6/AE503 is to communicate the design intent of the lift system. It is the contractor responsibility to create shop drawings of how the system will be built.

41 Question: Where does detail 5/AE601 occur?

Answer: Detail 5/AE601 of the window shade occurs at all exterior windows. Refer to sheet AE104 Third Floor Enlarged Plan included in this Amendment 1.

42 Question: What page can I find the definition of VC vs. VV on equipment?

Answer: Refer to the Furnished/ Installed note below the Equipment Schedule on sheets QH101 Basement Equipment Plan and QH102 Third Floor Equipment Plan included in the Amendment 1.

• VV is Government Furnished, Government Installed

• VC is Government Furnished, Contractor Furnished

• CC is Contractor Furnished, Contractor Furnished

43 Question: Walls separating the Infusion Bay offices on the 3rd floor are not called out but are supposed to receive corner guards. Can you provide more detail on wall types for these areas?

Answer: Refer to revised sheet AE103 Third Floor Enlarged Plan for locations of corner guards included in this Amendment 1.

44 Question: AE106 3rd Floor Dimension plan wall V2 between Exam Rooms F361 and F362. Wall type V2 is not called out on the partition page. Can this wall type be provided?

45 Question: Does the drywall extend 6" above ceiling and the studs extend to the structure above on walls P02, P04, P06, P07 or do the studs stop at 6" above ceiling as well?

Answer: Refer to sheet AE500 Partition Types.

46 Question: Does the contractor need to install (2) 4 plex power outlets in E305 IT Closet on NORMAL branch circuits?

Answer: Yes, the contractor will need to install (2) 4 plex power outlets in E305 IT Closet on Normal branch circuits.

47 Question: Does all Telecommunications, IT, BAS, nurse call, and security systems wiring, and cabling need to be CAT 6a?

Answer: Yes, all Telecommunications, IT, BAS, nurse call wiring and cabling shall be CAT 6a.

48 Question: Does the contractor need to provide IT, and PA switches to accommodate the new demand?

Answer: Yes, the contractor needs to provide IT switches to accommodate the new demand.

49 Question: Does the contractor need to repair the pipe insulation in the E305 IT closet?

Answer: Yes, the contractor needs to repair the pipe insulation in the E305 IT closet.

50 Question: Does the contractor need to purchase and install all tv’s?

Answer: Yes, the contractor shall purchase and install all tv’s. Refer to the Equipment Schedule on sheets QH101 Basement Equipment Plan and QH102 Third Floor Equipment Plan.

51 Question: Does the Doors in the basement CBE2 and E001E need to be 7’ 8” tall?

Answer: Refer to door heights in Door Schedule on sheet AE601 Door & Window Schedule.

52 Question: In the basement (AE105) Calls out wall type R04 is called out on several walls.

On the partition type page it calls this wall out as a 1HR wall but only notes one layer of rock. Should this wall type have 2 layers to complete the rating?

Answer: Refer to sheet AE500 Partition Types. Wall Type R04 references UL 465.

Columbia VAMC

Complete Unfinished Specialty Clinic

Project No: 589A4-20-155

Date: August 13, 2021

AMENDMENT 1:

LISTED BELOW ARE ALL THE AMENDMENT 1 CHANGES AND ADJUSTMENTS TO THE DRAWINGS IN

THE 100% FINAL CONSTRUCTION DOCUMENTS DATED, 06/25/21

NARRATIVE DESCRIPTION FOR AMENDMENT 1 DRAWINGS

Drawing Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

Architectural

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-AD101

(Issued)

1 08/13/21 Basement Demolition Plan

1. Update keynote 13 regarding demolition of existing dumb waiter and Pneumatic tube station.

2. Update Vault door to be demoed.

01-AE103

(Issued)

1 08/13/21 Basement Enlarged Plan

1. Added note to identify location of new pneumatic tube station

2. Revised corner guard location and heights.

3. Revised walls labeled as R04 to R02.

4. E-001H North Partition will be demoed and the new partition will be R03.

5. Revised plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

01-AE104

(Issued)

1 08/13/21 Third Floor Enlarged Plan

1. Added note to identify location of new pneumatic tube station

2. Revised layout of the following 3 rooms:

F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

01-AE105

(Issued)

1 08/13/21 Basement Dimension Plan

1. Revised wall types in multiple locations.

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-AE106

(Issued)

1 08/13/21 Third Floor Dimension Plan

1. Updated wall types at multiple locations.

2. Revised partition type V2 in Room F391 to

P04.

3. The partitions that wrap the columns will be

P01 & P00.

01-AE107

(Issued)

1 08/13/21 Basement Reflected Ceiling Plan

1. Revised Reflected Ceiling Plan to show 2x2 ceiling tile.

2. Revised reflected ceiling plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

01-AE108

(Issued)

1 08/13/21 Third Floor Reflected Ceiling Plan

1. Revised layout of the following 3 rooms:

F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

2. Detail reference 5/AE601 typ added at exterior window in walls of Exam Room F352, to be called out.

01-AE403

(Issued)

1 08/13/21 Enlarged Plans

1. Updated 2/AE403 Enlarged IV Prep Storage, Med Room and Infusion Bay by adding notes and detail reference 7/AE700 to clarify the privacy wall. Privacy wall is provided and installed by the contractor.

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-AE405

(Issued)

1 08/13/21 Third Floor Interior Elevations

1. Revised Elevation 12 Infusion Bay Alcove due to lowering of wall and eliminate the upper cabinets.

2. Revised Elevations 5 Clean Dispatch F362.

3. Revised Elevations 33 and 34 Infusion Bay

F366.

01-AE500

(Issued)

1 08/13/21 Partition Types

1. Added new partition type P10 for low height wall that surround alcoves.

01-AE503

(Issued)

1 08/13/21 Ceiling Details

1. Added typical Patient Lift Support details.

01-AE601

(Issued)

1 08/13/21 Door & Window Schedules

1. Added detail 8/AE601 for the Window sill at the exterior wall. This detail 8/AE601 occurs at every exterior window.

2. Revised Door E001A (Vault door) on the Door Schedule. The Vault door manufacturer will provide all associated parts and hardware for the Vault door.

01-AE700

(Issued)

1 08/13/21 Millwork Sections and Details

1. Added details 7/ AE700 and 8/ AE700 for the privacy screen in the infusion bays.

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-QH101

(Issued)

1 08/13/21 Basement Equipment Plan

1. Revised Basement Equipment Schedule

2. Added a legend below the equipment schedule to identify Furnished/ Installed.

VV is Government Furnished/ Government Installed; VC is Government furnished/ Contractor installed; CC is Contractor Furnished/ Contractor installed.

01-QH102

(Issued)

1 08/13/21 Third Floor Equipment Plan

1. Revised plan at infusion bays F372, F371, F369, F377, F376, F375 and F386 to identify manufactured panel walls with X008 label.

2. Revised Third Floor Equipment Schedule.

3. Added a legend below the equipment schedule to identify Furnished/ Installed.

VV is Government Furnished/ Government Installed; VC is Government furnished/ Contractor installed; CC is Contractor Furnished/ Contractor installed.

Sprinkler

01-FS101

(Issued)

1 08/13/21 Basement Plan - Sprinkler

1. Updated keynotes 4, 5 and 6.

2. Revised keynotes at updated plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-FS131

(Issued)

1 08/13/21 Level 03 Plan - Sprinkler

1. Updated keynotes 4, 5 and 6.

2. Revised layout of the following 3 rooms:

F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

Mechanical

01-MH101

(Issued)

1 08/13/21 Basement Plan - HVAC

1. Updated HVAC for updated plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

2. Revised keynotes at updated plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

01-MH131

(Issued)

1 08/13/21 Level 03 Plan - HVAC

1. Updated HVAC for updated plan layout of the following 3 rooms: F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

2. Revised keynotes for updated plan layout of the following 3 rooms: F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-MH400

(Issued)

1 08/13/21 HVAC Schedules

1. Revised Single Duct Air Terminal Unit Schedule

2. Revised 1-1-AFVC: Air Flow Control Valve Schedule

3. Revised 3-8-AFVC: Air Flow Control Valve Schedule

01-MH401

(Issued)

1 08/13/21 HVAC Schedules

1. Revised Air Device Schedules.

01-MH402

(Issued)

1 08/13/21 HVAC Schedules

1. Revised Room Cooling and Heating Loads Output Data Summary Schedule Table 2-2.

01-MI101

(Issued)

1 08/13/21 Basement Plan – Mechanical Instrumentation

1. Revised keynotes at updated plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

01-MI131

(Issued)

1 08/13/21 Level 03 Plan – Mechanical Instrumentation

1. Revised keynotes at updated plan layout of the following 3 rooms: F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

Plumbing

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-P001

(Issued)

1 08/13/21 Plumbing Legend, Schedules and Abbreviations

1. Revised Plumbing Fixture Schedule.

2. Revised Zone Valve Box Table

3. Revised Medical Gas Outlet Table.

4. Revised Area Alarm Panel Schedule.

01-PP001

(Issued)

1 08/13/21 Under Floor Plan – Plumbing DWV

1. Revised keynotes and updated plan layout of the following 5 rooms: E001K Neg HD Storage Room, E001H Pos ISO Non-HD Buffer Room, E001L POS ISO Anteroom, E001F Storage Room and E001J Neg ISO Haz Buffer.

01-PP101

(Issued)

1 08/13/21 Basement Plan – Plumbing DWV

1. Revised keynotes at updated plan layout of the following 2 rooms: E001L POS ISO Anteroom and E001F Storage Room.

01-PP125

(Issued)

1 08/13/21 Interstitial Plan – Plumbing DWV

1. Revised Plan at locations on updated sheet.

01-PP131

(Issued)

1 08/13/21 Level 03 Plan – Plumbing DWV

1. Revised keynotes and layout for the changes associated with the following 3 rooms: F359 Anteroom, F360 Hazardous IV Prep/ Storage and F361 Non-Hazardous IV Prep.

01-PP201

(Issued)

1 08/13/21 Basement Plan – Plumbing Distribution

1. Revised keynotes and layout at updated plan layout of the 2 rooms POS ISO Anteroom and E001F Storage Room.

Number

Revision Number

Revision Date

Referenc e Sheet

General Description

(See drawings for complete information.)

01-PP231

(Issued)

1 08/13/21 Level 03 Plan – Plumbing Distribution

1. Revised layout at F363 Soiled Dispatch, F357 Work Room and F359 Anteroom.

01-P300

(Issued)

1 08/13/21 Plumbing Riser Diagram

1. Revised Plumbing Riser Diagram from changes made on sheets PP201 and

PP231.

01-P400

(Issued)

1 08/13/21 Plumbing Details

1. Added detail 8/P400 Zone Control Detail.

Electrical

01-EP131

(Not Issued)

1 08/13/21 Level 03 Plan – Power

1. Add 120V power for medical gas alarm zone panels.

01-EP132

(Not Issued)

1 08/13/21 Level 03 Plan – Mechanical Power

1. Add power to fan powered diffusers in anteroom F359.

End of Amendment 1 Drawing Narrative

Columbia VAMC Complete Unfinished Specialty Clinic

Project No: 589A4-20-155

Date: August 13, 2021

AMENDMENT 1:

LISTED BELOW ARE ALL THE AMENDMENT 1 CHANGES AND ADJUSTMENTS TO THE

SPECIFICATIONS IN THE 100% FINAL CONSTRUCTION DOCUMENTS DATED, 06/25/21

NARRATIVE DESCRIPTION FOR AMENDMENT 1 SPECIFICATIONS

Item Specification Section

Revision Date

General Description

1 Section 00 01 10 Table of Contents

(Issued)

08/13/21 1. Revised specification section 00 01 10 Table of Contents for Volume 1 and Volume 2 to add 11 (eleven) new specification sections:

a. 06 06 60.33 Plastic Fabrications

b. 07 22 00 Roof and Deck Insulation

c. 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding

d. 07 54 23 Thermoplastic Polyolefin (TPO)

Roofing

e. 07 60 00 Flashing and Sheet Metal

f. 07 71 00 Roof Specialties

g. 07 72 00 Roof Accessories

h. 08 34 59 Vaults and Day Gates

i. 09 67 23.20 Resinous (Epoxy Base) with

Vinyl Chip Broadcast.

j. 11 17 36 Package Transfer Units

k. 14 92 00 Pneumatic Tube System

2 Section 06 06

60.33 Plastic

Fabrications

(Issued)

08/13/21 1. New specification section added.

3 Section 07 22 00 Roof and Deck

Insulation

Section

Revision

4 Section 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor

Retarding

5 07 54 23 Thermoplastic

Polyolefin (TPO) Roofing

6 Section 07 60 00 Flashing and Sheet Metal

7 Section 07 71 00 Roof Specialties

8 Section 07 72 00 Roof Accessories

9 Section 08 34 59 Vaults and Day

Gates

10 Section 09 06 00 Schedule for

Finishes

(Issued)

08/13/21 1. Updated number from 19 to 18; page 09 06 00-9.

2. Added DIVISION 06 – FINISHES; page 09 06 00- 10.

3. Added DIVISION 08 – OPENINGS; page 09 06 00-10.

4. Revised finish code and dimension of Mesa 680 acoustical ceiling tile; page 09 06 00-12, 2.4 B

Section

Revision

5. Updated formatting and subsequent numbering in document as indicated in updated specification section 09 06 00 Schedule for Finishes.

11 Section 09 67 23.20

Resinous (Epoxy Base) with Vinyl Chip Broadcast

12 Section 11 17 36 Package Transfer

Units

13 Section 14 92 00 Pneumatic Tube

System

14 Section 22 40 00 Plumbing Fixtures

08/13/21 1. Revised specification section per attached.

End of Amendment 1 Specification Narrative

See attached document: ATTENDANCE ROSTER- Complete Unfinished Specialty Clinic_08032021.

See attached document: 066060 Plastic Fabrications_amendment 1.

See attached document: 072200 Roof and Deck Insulation_amendment 1.

See attached document: 072727 Fluid-Applied Membrane Air Barrier, Vapor_amendment 1.

See attached document: 075423 Thermoplastic Polyolefin (TPO) Roofing_amendment 1.

See attached document: 076000 Flashing and Sheet Metal_amendment 1.

See attached document: 077200 Roof Accessories_amendment 1.

See attached document: 077100 Roof Specialties_amendment 1.

See attached document: 083459 Vaults and Day Gates_amendment 1.

See attached document: 090600 Schedule for Finishes_amendment 1.

See attached document: 096723_20 Resinous with Vinyl Chip Broadcast_amendment 1.

See attached document: 111736 Package Transfer Units_amendment 1.

See attached document: 149200 Pneumatic Tube System_amendment 1.

See attached document: 224000 Plumbing Fixtures_amendment 1.

See attached document: Revised Columbia USC Amendment 1 - Combined Drawings.

QUestions and Answers
Description
General Description
Columbia VAMC
General Description