SIGN IN ROSTER (657A4-20-700) EHRM INFRASTRUCTURE UPGRADES.pdf

PDF 32 KB Posted

Attached to
Y1DZ--657A4-20-700, EHRM INFRASTRUCTURE UPGRADES Federal contract opportunity
Solicitation number
36C25521R0103
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document provides details for a federal contract opportunity for infrastructure upgrades at a VA medical center. The Statement of Work involves construction documents and performance of work associated with a project to upgrade the EHRM infrastructure at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The contractor will provide all services, materials, labor, supervision, safety certification and expertise for items described in the construction documents and specifications. The work will be phased to not disrupt medical center operations. The project includes construction of a new fiber backbone, a new server room for existing and new servers, renovation of IT closets including room modifications, HVAC cooling and controls upgrades, patch panel upgrades, CAT6A cabling upgrades, additional power and data drops for end user equipment, and power upgrades to IT closets and the telephone room. The period of performance is estimated at 365 calendar days after notice to proceed. The principal NAICS code is 236220 for commercial and institutional building construction and the FSC is Y1DZ for construction of other hospital buildings. The solicitation number is 36C25521R0103.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--657A4-20-700, EHRM INFRASTRUCTURE UPGRADES, newest first.
File Type Posted
Additional RFI (EHRM).pdf PDF
S02 36C25521R0103 0008.pdf PDF
Wage Determination (9-3-2021).pdf PDF
S02 36C25521R0103 0007.pdf PDF
020-2333 EHRM Geotech Report 111020.pdf PDF
36C25521R0103 0006.pdf PDF
36C25521R0103 0005.pdf PDF
657A4-20-700 EHRM Infrastructure Upgrades 36C25521R0103 0001.pdf PDF
S06 36C25521R0103 0003.pdf PDF
S06 36C25521R0103 0002.pdf PDF
S06 36C25521R0103 0004.pdf PDF
TP09 Final Specs Vol-01.pdf PDF
EHRM NCO15 Price Estimate Template V1.2.url.xlsx XLSX spreadsheet
00 VA OEHRM Site Infrastructure Requirements - 2 Signed.pdf PDF
S02 36C25521R0103_2.pdf PDF
TP09 Final Drawings 08 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Mechanical.pdf PDF
TP09 Final Drawings 10 657A4-20-700 Resubmitted SS 100 percent CD Drawings Technology.pdf PDF
TP09 Final Drawings 09 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Electrical.pdf PDF
TP09 Final Drawings 02 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Abatement.pdf PDF
36C25521R0103.pdf PDF
TP09 Final Drawings 01 657A4-20-700 Resubmitted SS 100 percent CD Drawings-General.pdf PDF
TP09 Final Drawings 04 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Structural.pdf PDF
TP01 Specs Vol-01.pdf PDF
TP09 Final Drawings 03 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Civil.pdf PDF
TP09 Final Drawings 06 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Fire Protection.pdf PDF
TP09 Final Drawings 07 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Plumbing.pdf PDF
TP09 Final Drawings 05 657A4-20-700 Resubmitted SS 100 percent CD Drawings-Architectural.pdf PDF
TP01 Specs Vol-02.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .