36C25518R0342-A00002003.pdf

PDF 36 KB Posted

Attached to
657-17-185JC Renovate Gastroenterology Procedure Room and Support Space
Solicitation number
36C25518R0342
Issued by

About this file

36C25518R0342 A00002 S05 - PRE-BID RFI'S-ANSWERS - STATEMENT OF WORK.pdf

View the file

Other files

File Type Posted
36C25518C0158-000.docx DOCX document
36C25518R0342-A00003002.pdf PDF
36C25518R0342-A00003000.docx DOCX document
36C25518R0342-A00003001.pdf PDF
36C25518R0342-A00002005.pdf PDF
36C25518R0342-A00002002.pdf PDF
36C25518R0342-A00002000.docx DOCX document
36C25518R0342-A00002004.pdf PDF
36C25518R0342-A00002001.pdf PDF
36C25518R0342-A00001001.pdf PDF
36C25518R0342-A00001000.docx DOCX document
36C25518R0342-003.pdf PDF
36C25518R0342-002.pdf PDF
36C25518R0342-001.docx DOCX document
36C25518R0342-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate GI Procedure Room VA Project No. 657-17-185JC

Statement of Work:

This project is an interior renovation project to consolidate and renovate an existing Endoscopy Procedure Room and adjacent toilet into a single GI Procedure Room on the 6th floor of Building #1 at the Veterans Administration (VA) Medical Center, John Cochran Division located in St.

Louis, Missouri. The project also includes the refinishing of a nearby existing scope procedure room. The GI department will remain in operation during the duration of the construction of both project areas. Construction will take place during normal working hours (7am – 5pm).

Hazardous materials have been identified within the project scope. The gypsum board ceiling in the 5th floor below (Rooms A506 & A507) will need to be removed and replaced to accommodate new work above. The asbestos insulation on the steam pipes and asbestos fittings above the 5th floor ceiling will be abated. Lead based painted pipes that are abandoned will be removed back to the main riser and the hangers removed. Lead-containing ceramic wall tiles in the project areas are to be removed. The abatement scope will also include the removal or sections of pipe insulation observed to contain possible mold. EPA approved anti-microbial solution will be applied to remaining building materials to prevent potential mold spore migration after the lead-containing ceramic tiles and drywall walls have been removed.

The existing toilet will be removed including the existing fixtures and flooring to create on GI procedure room. All the existing doors in the new procedure doors will be removed and infilled to match existing conditions. Finishes on the side of the corridor and adjacent rooms are to match exiting conditions. A new 4’ x 7’ wood door will be installed to access the procedure room from the corridor. The existing corridor railings will need to be replaced and reworked accordingly. Abandoned pipes will be removed to the main or nearest tee. One of the sinks will be replaced in the same location and will include an eyewash. The existing radiator in both rooms will be removed. The fan coil in A608 will be removed. Existing doors to be removed will be infilled to match existing construction. New sheet vinyl flooring with integral cove base and scrubable acoustical ceiling tile will be installed in the procedure room. The scope room will receive welded sheet vinyl with vinyl base and acoustical ceiling tile. The disturbed drywall in the ceilings on the 5th floor will be replaced. The procedure room equipment will be owner supplied and contractor installed.

The mechanical work for this project will install new ductwork and components tied into the existing system. Existing fan coil and wall fin radiation will remain. The ventilation air and the exhaust air will be rebalanced to provide the proper ventilation and positive pressurization of the procedure room.

Plumbing work includes removal of existing plumbing fixtures including hot and cold piping to the main. An eye wash will be added to a new sink to replace an existing sink. The procedure room will new med gasses at the exterior wall and the existing med gasses will remain. The existing sprinkler heads will be relocated to accommodate the new ceiling grid with concealed type.

The project includes new recessed LED troffers and downlights in the procedure room and will be fed from both normal and emergency critical power. All procedure lights to be dimmable.

Power and low-voltage rough-in is to be provided for VA supplied equipment. All new data cabling will be routed to the exiting OI & T closet. A new patch pane in the existing rack ist o be provided as required for new data outlets. New low-voltage cabling will be routed in existing cable trays above the ceiling where feasible.