36C25518R0342-003.pdf
PDF 11 MB Posted
- Solicitation number
- 36C25518R0342
About this file
36C25518R0342 P09 - FINAL DRAWINGS - 657-17-185JC (16 PAGES).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518C0158-000.docx | DOCX document | |
| 36C25518R0342-A00003002.pdf | ||
| 36C25518R0342-A00003000.docx | DOCX document | |
| 36C25518R0342-A00003001.pdf | ||
| 36C25518R0342-A00002003.pdf | ||
| 36C25518R0342-A00002005.pdf | ||
| 36C25518R0342-A00002002.pdf | ||
| 36C25518R0342-A00002000.docx | DOCX document | |
| 36C25518R0342-A00002004.pdf | ||
| 36C25518R0342-A00002001.pdf | ||
| 36C25518R0342-A00001001.pdf | ||
| 36C25518R0342-A00001000.docx | DOCX document | |
| 36C25518R0342-002.pdf | ||
| 36C25518R0342-001.docx | DOCX document | |
| 36C25518R0342-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN
NORTH
ROOF
BELOW
ROOF BELOW
ROOF BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
Area of work
LAVATORY
LINEAR
FEET
LINTEL
KNEE BRACE
LAV
LF
LNTL
KB
BD
BL
BLDG
BLKG
BOD
BR
BTWN
ACT
ADJ
ADJC
AFF
ALT
ALUM
ARCH
AVG
REFER TO THE MATERIAL LEGEND FOR ABBREVIATIONS RELATED TO FINISHES NOT HERE LISTED
BOARD
BLINDS
BUILDING
BLOCKING
BOTTOM OF
DECK
BRICK
BETWEEN
ACOUSTIC CEILING
TILE
ADJUSTABLE
ADJACENT
ABOVE FINISHED
FLOOR
ALTERNATE
ALUMINUM
ARCHITECTURAL
AVERAGE
ABBREVIATIONS LIST
ON CENTER
OUTSIDE
FACE
OPENING
OPPOSITE
OC
OF
OPNG
OPP
NIC
NOM
NTS
NOT IN
CONTRACT
NOMINAL
NOT TO SCALE
R
RB
RD
REF
REINF
REQD
REV
RLG
RM
RO
RISER OR
RADIUS
RUBBER BASE
ROOF DRAIN
REFERENCE
REINFORCED
REQUIRED
REVISION
RAILING
ROOM
ROUGH OPENING
P
PBD
PLAM, PL
PLBG
PLS
PR
PREF
PROP
PT
PTD
PTN
PWD
PAINT
PARTICLE BOARD
PLASTIC LAMINATE
PLUMBING
PLASTIC
PAIR
PREFINISHED
PROPERTY
PRESSURE
TREATED
PAINTED
PARTITION
PLYWOOD
C
CAB
CB
CC
CG
CJ
CL
CLNG
CMU
COL
CONC
CONST
CONT
CP
CRT
CS
CSJ
CST
CT
CARPET
CABINET
CATCH BASIN
CONCRETE, COLORED
CORNER GUARD
CONTROL JOINT
CENTERLINE
CEILING
CONCRETE MASONRY
UNIT
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
COMMUNICATIONS PANEL
CATHODE RAY TUBE
CONSTRUCTION JOINT
CONCRETE, SEALED
CONCRETE, STAINED
CERAMIC TILE
EA
EJ
ELECT
ELEV
EP
EQ
EQUIP
EWC
EXT
EXTG
EACH
EXPANSION JOINT
ELECTRICAL
ELEVATION
ELECTRICAL PANEL
EQUAL
EQUIPMENT
ELECTRIC WATER
COOLER
EXTERIOR
EXISTING
DEMOLITION
DIAMETER
DIMENSION
DOWN
DOOR
DOWNSPOU
T
DETAIL
DRAWING
DEMO
DIA
DIM
DN
DR
DS
DTL
DWG
MAS
MAT
MAX
MDF
MECH
MFR
MH
MIN
MIR
MISC
MO
MTD
MTL
MASONRY
MATERIAL
MAXIMUM
MEDIUM DENSITY
FIBERBOARD
MECHANICAL
MANUFACTURER
MANHOLE
MINIMUM
MIRROR
MISCELLANEOUS
MASONRY OPENING
MOUNTED
METAL
T
TC
TEL
TGL
TJ
TS
TW
TYP
TREAD
TOP OF CONCRETE
TELEPHONE
TEMPERED GLASS
LITE
TOP OF JOIST
TOP OF STEEL
TOP OF WALL
TYPICAL
VB
VCT
VERT
VIF
YARDYD
W
W/
WCL
WD
WDW
WF
WO
WPG
WIDTH
WITH
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WITHOUT
WATERPROOFIN
G
VINYL BASE
VINYL COMPOSITION
TILE
VERTICAL
VERIFY IN FIELD
UF
UON
UR
UNFINISHED
UNLESS OTHERWISE
NOTED
URINAL
JOINT
IF
INSUL
JT
HC
HD
HDBD
HDW
HDWD
HM
HOR
HR
HT
HWH
INSIDE
FACE
INSULATION
HOLLOW CORE
HEAD
HARDBOARD
HARDWARE
HARDWOOD
HOLLOW METAL
HORIZONTAL
HANDRAIL
HEIGHT
HOT WATER
HEATER
GRANITE
GAUGE
GLASS
GRADE
GROUT
GYPSUM
WALLBOARD
G
GA
GL
GR
GT
GWB
FABRICATED
FAN COIL UNIT
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER CABINET
FINISH FLOOR
FINISH GRADE
FIRE HOSE CABINET
FINISH
FLOOR
FLASHING
FLOOR TILE
FIREPROOFING
FIRE RATING
FIBERGLASS REINFORCED
PANEL
FLOOR SINK
FEET
FOOTING
FIRE TREATED WOOD
FABRIC WRAPPED PANEL
SC
SCH
SECT
SHTH
SIM
SK
SM
SOF
SPEC
SQ
SSM
SST
STD
STL
STR
SUSP
SW
SYS
SOLID CORE
SCHEDULE
SECTION
SHEATHING
SIMILAR
SINK
SHEET METAL
SOFFIT
SPECIFICATIONS
SQUARE
SOLID SURFACING
MATERIAL
STAINLESS STEEL
STANDARD
STEEL
STRUCTURE
SUSPENDED
SLAT WALL
SYSTEM
FAB
FCU
FD
FDN
FEC
FF
FG
FHC
FIN
FLR
FLG
FLT
FPG
FR
FRP
FSK
FT
FTG
FTWD
FWP
LEGEND - SYMBOLS
T.O.
X'-X" A.F.F.
X
X
XXX
X
X
CONTROL POINT
KEYED NOTE
CENTER LINE MARK
REVISION NUMBER
X
ELEVATION DATUM
EXISTING COLUMN LINE
NEW COLUMN LINE
EXTERIOR ELEVATION
MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
NEW PARTITION
NEW DOOR
W/ DOOR NUMBER
ROOM NAME & NUMBER
WINDOW NUMBER
PARTITION TYPE
DEMOLISHED DOOR
EXISTING DOOR
DETAIL MARK
X = DETAIL
NUMBER
Y = SHEET
NUMBER
NORTH ARROW
SECTION MARK
X = SECTION
NUMBER
Y = SHEET NUMBER
EXISTING PARTITION
DEMOLISHED PARTITION
INTERIOR ELEVATION
MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
X
YY.Y
X
YY.Y
X
STEEL
CONCRET
E
ALUMINU
M
BRICK
WOOD
(FINISHED)
COMPACTED GRAN.
FILL
BATT
INSULATION
GYPSUM WALL
BOARD
(SMALL SCALE)
CONTINUOUS
WOOD
BLOCKING
HATCH INDICATIONS SHOWN AS GUIDE ONLY; HATCHING SCALES MAY NEED TO BE MODIFIED DEPENDING UPON SCALE USED
MATERIALS INDICATION
NON-
CONTINUOUS
WOOD BLOCKING
EARTH
GYPSUM WALL
BOARD
(LARGE SCALE)
PLYWOO
D
RIGID
INSULATION
SAND
PRECAS
T
ASPHAL
T
XX
X
X
YY.Y
X
YY.Y
Project Number
Drawing Number
DrawnCheckedDate
Location
Project TitleDrawing Title
ARCHITECT/ENGINEERS:
VA Project #
CONSULTANTS:
Revisions: Date:
VA FORM 08-6231 OCT 1978
on e ei gh th in ch o ne fo ot qu ar te r th re ig ht s on e h al f i nc h f oo t th re qu ar te rs
6" on e i nc h f oo t
6" a nd h al f
6" th re e i nc he s f oo t
6" 6"
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
SHEET INDEX
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel
Fax
314.621.4343 314.621.0261
18207 Edison Avenue Chesterfield, MO 63005
Tel
Fax
636.530.7770 636.530.7877
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Electrical Engineer
Department of Veteran's Affairs Medical Center John Cochran
Division
#1 6th FloorApproved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR
3/26/2018 4:20:13 PM
VAJC Renovate GI Procedure Room
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
Department of Veterens Affairs Department of Veterans Affairs Medical Center
657-17-185JC
RD HT
1-G-100
Bid Documents
657-17-185JCVAJC Renovate GI Procedure
Room
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Cover
7A
W
Bell Ave
Enright Ave
Delmar Blvd
N o rt h G ra n d B lv d
N o rt h S p ri n g A ve
N
Location Map Not To Scale
N
Campus Map Not To Scale
Project Location
Project Location
Architectural
Hazardous Abatement 1-HA-100 Abatement Plans, 5th & 6th
Mechanical MQ001 Mechanical Notes & Abbreviations MH101A Demo Plan & Revised Plan - HVAC
Plumbing PQ101 Plumbing Schedules Abreviations PD101 Demo Plan & Floor Plan - Plumbing PP101 Medical Gas 2nd Floor Demolition & Renovation Plans
Electrical 1-E-001 Electrical Symbols, Legends & Notes 1-E-002 Electrical Panel Schedules and Details 1-E-100 Electrical 6th Floor Lighting, Power & Systems
Plan - Demolition/Renovation
1-A-100 Demo Plan, Demo RCP
1-A-101 Plan, RCP
1-A-102 5th Floor RCP
1-A-200 Door and Misc. Details
1-A-301 Finish / Equipment Plans
1-G-100 Cover
1-G-101 General Index
1" = 40'-0"1 Overall 6th Floor Floor Plan htaylor HT MO Seal - Sig and Date
GENERAL NOTES
THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) WILL PERFORM FIELD
VERIFICATION AS REQUIRED FOR THE DURATION OF THE PROJECT TO MONITOR
PROJECT PROGRESS.
UTILITY SHUT DOWNS WILL BE COORDINATED BY IPT (INTEGRATED PROJECT TEAM)
INCLUDING: COR, VA FACILITY OPERATIONS, AND GENERAL CONTRACTOR.
ANY INTEGRATED PROJECT TEAM MEMBER (IPT) INCLUDING BUT NOT LIMITED TO:
CONTRACTORS / SUB-CONTRACTORS, ARCHITECTS AND/OR ENGINEERS WHO ENTER
THE PROJECT BOUNDARY SHALL WEAR ALL PROPER PERSONAL PROTECTIVE
EQUIPMENT (PPE’S: CERTIFIED BY OSHA) AT ALL TIMES. SUCH PPE’S INCLUDE: HARD
HATS, SAFETY GLASSES, PROPER SHOES, HIGH VISIBILITY SHIRTS, ETC.
IF THE PROJECT AREA AND AREAS AFFECTED BY THE PROJECT INCLUDE EXISTING
EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, THE
CONTRACTOR MUST PROTECT THIS EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC.
THE CONTRACTOR MUST ALSO CLEAN THESE ITEMS/SURFACES TO THE ORIGINAL
CONDITION FOUND AT THE START OF THE PROJECT PRIOR TO FINAL INSPECTION.
PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED
SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH
ADJACENT MATERIALS, COLORS, AND FINISHES. WALL SURFACES THAT ARE
PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.)
REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.
UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO
MATCH SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME
COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT
HAVE VINYL WALL COVERING (VWC) SHALL HAVE THE VWC COMPLETELY REMOVED
AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND COLOR.
CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR FIRE /
SMOKE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED
ACCORDINGLY WITH UL APPROVED FIRE STOPPING MATERIAL THE SAME DAY THE
PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS AND
STAIRWELLS SHALL BE CONSIDERED 2 HOUR FIRE / SMOKE RATED SEPARATIONS
AND SHALL BE SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN.
PENETRATIONS THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.
IF EXISTING WALLS ARE TO BE USED AS DUST OR SMOKE BARRIERS SEPARATING
THE CONSTRUCTION AREA FROM THE MEDICAL CENTER, THE CONTRACTOR IS
RESPONSIBLE FOR SEALING ALL EXISTING PENETRATIONS IN THIS WALL, EXTENDING
WALL TO CEILING SLAB AND ANY OTHER WORK TO ENSURE THE WALL MEETS THE
REQUIREMENTS IN THE GENERAL REQUIREMENTS SPECIFICATIONS FOR
CONSTRUCTION BARRIERS.
WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE
REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS,
FOUNDATIONS, ETC., UNLESS NOTED OTHERWISE. AFTER REMOVAL; FLOORS,
WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH ADJOINING SURFACES.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE WILL BE
DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO
THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE COR.
ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED
ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR
CONCRETE CONSTRUCTION, SHALL BE ENCLOSED IN METAL STUDS AND DRYWALL
CHASE WALLS AS DETAILED IN THE DRAWINGS AND FINISHED TO MATCH THE ROOM
FINISH.
WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE MEDICAL CENTER OR
DISRUPT A MEDICAL CENTER FUNCTION, WILL BE DONE AT TIMES OTHER THAN
NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK
MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER.
CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER
OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR
OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.
ALL NEW PARTITIONS, UNLESS OTHERWISE SHOWN, SHALL BE 20 GA. MTL STUDS
ALL GYPSUM BOARD USED IN THIS PROJECT SHALL BE TYPE "X"
CONTRACTORS SHALL VISIT THE SITE TO FAMILARIZE THEMSELVES WITH THE
EXISTING CONDITIONS AND INCLUDE THE WORK NECESSARY TO COMPLY WITH THE
SCOPE OF THE WORK. ADDITIONAL COMPENSATION WILL NOT BE CONSIDERED FOR
EXTRA WORK WHEN SUCH WORK COULD HAVE BEEN REASONABLY ASCERTAINED
FROM THE PRE BID SITE VISIT REVIEW OF THE EXISTING CONDITIONS AND THE WORK
SCOPE DESCRIBED IN THE DOCUMENTS.
ALL WOOD USED IN THIS PROJECT SHALL BE FIRE-RETARDANT TREATED
ALL DIMENSIONS ARE FROM COLUMN CENTER LINE TO FACE OF PARTITION U.O.N.
UNDER NO CIRCUMSTANCES SHALL ANY MEASUREMENT BE SCALED FROM THE
DRAWINGS. ANY MEASUREMENTS NOT GIVEN AN ACTUAL NUMBER DIMENSION
SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECTS BEFORE
PROCEEDING
PROVIDE FULLY SEALED DUST PARTITIONS AS REQUIRED AT ALL LOCATIONS WHERE
CONSTRUCTION MEETS THE EXISTING BUILDING IN ORDER TO MAINTAIN A CLEAN
DUST-FREE ENVIRONMENT INSIDE THE BUILDING.
ACCESS TO EMPLOYEE ENTRY AND EXIT DOORS MUST BE MAINTAINED
THROUGHOUT CONSTRUCTION. PROVIDE ALL VA REQUIRED BARRIERS AND
SIGNAGE AT THE LIMITS OF THE CONSTRUCTION SITE
ITEMS TO BE DEMOLISHED, REMOVED, OR RELOCATED ARE SHOWN DASHED.
EXISTING ITEMS TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION BY
CONTRACTOR. PATCH & REPAIR ALL RESULTING SURFACES TO REMAIN.
PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL
PANELS, ACCESS PANELS, ETC., TO MATCH WALL FINISH UNLESS OTHERWISE
NOTED.
PROJECT LIMIT LINES INDICATES THE AREA OF A MAJORITY OF THE PROJECT WORK.
BUT SOME WORK WILL BE REQUIRED OUTSIDE OF THE PROJECT LIMITS. REFER TO
DRAWINGS AND SPECIFICATIONS FOR INFORMATION.
CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND
PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY
OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED
IN THIS SCOPE.
ALL MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NON-
COMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND
A SMOKE DEVELOPED INDEX OF NOT MORE THAN 50 AS DETERMINED IN
ACCORDANCE WITH ASTM E-84
IMMEDIATELY REPORT DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND
FIELD CONDITIONS, CONFIRM THE WORK IS BUILDABLE AS SHOWN.
COORDINATED ALL WORK BETWEEN TRADES AS REQUIRED TO INSURE TIMELY &
PROPER INSTALLATION OF ALL BUILDING SYSTEMS.
PERFORM WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS,
AND ORDINANCES HAVING JURISDICTION
ALL INSULATING MATERIALS WITHIN WALLS & IN UNCONCEALED SPACES SHALL HAVE
A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF
NOT MORE THAN 450
COORDINATION OF ALL WORK AS DESCRIBED ON THE DOCUMENTS IS THE GENERAL
CONTRACTOR'S RESPONSIBILITY.
COORDINATE & PROVIDE BLOCKING AS REQUIRED FOR MILLWORK & ITEMS
ATTACHED OR MOUNTED TO WALLS & CEILINGS
PHASE ALL DEMOLITION & CONSTRUCTION TO BE SEQUENCED & COORDINATED TO
INSURE THAT THE BUILDING OWNER'S OPERATIONS ARE CONTINUOUSLY
MAINTAINED.
THESE PLANS REFLECT INFORMATION GATHERED FROM EXISTING CONDITIONS
DRAWINGS & ARCHITECT'S FIELD VERIFICATION. CONTRACTOR SHALL VERIFY
ACCURACY OF INFORMATION PRIOR TO COMMENCEMENT OF ANY DEMOLITION AND
/OR CONSTRUCTION ACTIVITIES AND REPORT ANY DISCREPANCIES TO COR.
BEFORE THE CONTRACTOR BEGINS WORK CONTRACTOR SHALL RECORD
ANY EXISTING SYSTEM INFORMATION SUCH AS TEMPERATURE, FLOW RATE,
PRESSURE, CURRENT, VOLTAGE, OR ANY OTHER INFORMATION NECESSARY
FOR HIM TO RETURN THE AFFECTED SYSTEM TO ORIGINAL OPERATING
CONDITION. UNLESS NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS
(HVAC, ELECTRICAL, PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY
MANNER AT THE BEGINNING OF THE PROJECT. THE CONTRACTOR'S
RECORDED MEASUREMENTS MUST BE SUBMITTED TO THE PROJECT
ENGINEER FOR REVIEW AND ACCEPTANCE BEFORE ANY DEMOLITION OR
OTHER RELATED WORK CAN PROCEED.
THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING
ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND
ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS
AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION
ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR
REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, DOOR
REPAIR, ETC.
CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF
MATERIALS, EQUIPMENT AND TRASH. THIS INCLUDES CARTS FOR REMOVAL
OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO
OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC. CONTRACTOR
MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.
SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED DURING NORMAL
WORKING HOURS AND MUST BE SCHEDULED WITH THE VA PROJECT
ENGINEER FOR OTHER TIMES. THIS INCLUDES JACK-HAMMERING CONCRETE,
SAW-CUTTING CONCRETE, REPETITIVE HAMMER DRILLING OF CONCRETE,
ETC.
THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE
CONTRACTOR’S RESPONSIBILITY TO COVER THE COSTS OF THE
INSTALLATION OF A TEMPORARY LAND LINE PHONE. THE CONTRACTOR
SHALL CONTACT THE PHONE COMPANY TO HAVE THIS PHONE INSTALLED.
ALL ELECTRICAL CIRCUITRY TO BE CONCEALED UNLESS OTHERWISE
SPECIFIED. CIRCUITING FOR ELECTRIC DOOR HOLD OPENS IN MASONRY
WALLS SHALL BE SURFACE RACEWAY.
DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL
ARRANGEMENT OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS
IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL BRANCHES, OFFSETS,
FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED.
CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH
CONDITIONS AFFECTING ALL WORK, FURNISHING SUCH FITTINGS, TRAPS,
VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE REQUIRED.
LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN
ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD
VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING
CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS,
EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM
SHALL BE PROVIDED AT NO ADDITIONAL COST.
ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE
TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. PRIOR TO
ANY DEMOLITION AND CONSTRUCTION WORK, THE CONTRACTOR SHALL
FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT,
DUCTWORK, PIPING, ETC. AND REPORT ANY DISCREPANCIES TO THE COR.
IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF
PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY
OF THE ROOF, THIS WORK MUST BE DONE BY A CONTRACTOR LICENSED BY
THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE APPROVED BY
THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT
EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.
IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND
OTHER MECHANICAL ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED
MUST BE RE-INSULATED WITH MATERIALS ACCORDING TO THE
SPECIFICATIONS.
WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER THE
CONTRACTOR CANNOT LEAVE TOOLS, EQUIPMENT, LADDERS, ETC.,
UNATTENDED WHERE THEY ARE ACCESSIBLE TO PATIENTS, STAFF, VISITORS,
ETC. CEILING TILES AND CEILING ACCESS PANELS MUST ALSO BE REPLACED
WHEN UNATTENDED, FOR SAFETY REASONS.
WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH
NEW OR EXISTING DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES.
REMOVE AND REPLACE ANY DRYWALL THAT HAS COME INTO CONTACT WITH
WATER OR OTHER LIQUIDS.
LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR
SLABS AND THERE IS NO RECORD OF THE EXACT LOCATIONS. THE
CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER THE CONTRACTOR
PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE
THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REPAIR ANY CIRCUIT
THAT HAS BEEN CUT OR DAMAGED.
WHEN AN EXIT IS CLOSED BECAUSE OF THIS PROJECT THE CONTRACTOR
MUST INSTALL BARRICADES AND SIGNAGE AT THE EXIT DOOR. THE
CONTRACTOR MUST ALSO COVER OR REMOVE THE LIGHTED EXIT SIGN.
CONTRACTOR SHALL PROVIDE BOXES, CONDUIT, WIRE, AND
RECONNECTIONS AS REQUIRED TO RECONNECT ANY AND ALL EXISTING
LIGHT FIXTURES, RECEPTACLES, OR DEVICES REMAINING IN USE. REMOVAL
OF ANY ELECTRICAL EQUIPMENT SHALL NOT AFFECT THE OPERATION OF
EQUIPMENT REMAINING IN USE.
CONTINUITY OF ALL SERVICES TO AND FROM THE FACILITIES IN THE EXISTING
BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION, EXCEPT FOR
SUCH PERIODS OF TIME WHICH THE V.A. MAY DESIGNATE. IF TEMPORARY
CONNECTIONS, ETC. ARE NECESSARY TO ASSURE THE CONTINUITY OF
SERVICE, THEY SHALL BE FURNISHED WITHOUT ADDITIONAL CHARGE TO THE
V.A. AND SHALL BE REMOVED WHEN NO LONGER NECESSARY.
ALL EXISTING CONDUIT AND WIRING MADE ABANDONED BY THIS PROJECT OR
FOUND TO BE ABANDONED DURING DEMOLITION SHALL BE REMOVED.
COORDINATE THE PROVISION AND INSTALLATION OF ALL CONTROL WIRING
FOR MECHANICAL EQUIPMENT WITH THE GENERAL CONTRACTOR AND
MECHANICAL CONTRACTOR.
FOR SAFETY PURPOSES THE CONTRACTOR WILL NOT WORK ON ANY
ELECTRICAL EQUIPMENT HOT. ALL SHUTDOWNS WILL BE SCHEDULED IN
ADVANCED WITH THE VA.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN
WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A
QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS CONTRACTOR. ALL
CONDUITS IN WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS.
CONTRACTOR SHALL COORDINATE ‘IN-WALL’ & ‘OVERHEAD CEILING’
INSPECTIONS WITH VA COR PRIOR TO THE INSTALLATION OF FINISHES. IN-
WALL INSPECTIONS REQUIRE 24 HOUR NOTIFICATION. OVERHEAD CEILING
INSPECTIONS REQUIRE 48 HOUR NOTIFICATION. CONTRACTOR TO SUPPLY A
CART WITH A LOG SHEET AND FULL SET OF HARD COPY DRAWINGS FOR ALL
INSPECTIONS. LOG SHEET SHALL BE ITEMIZED BY TYPE OF INSPECTION AND
BY ROOM. NO SUCH FINISHES SHALL BE INSTALLED WITHOUT INSPECTION
APPROVAL FROM PROJECT ENGINEER.
CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH
OPERATIONS. IF THE CONSTRUCTION ACTIVITIES INTERFERES WITH TYPICAL
FUNCTIONS DURING TYPICAL OPERATING HOURS, CONSTRUCTION WILL
OCCUR OUTSIDE OF TYIPICAL OPERATING HOURS. REFER TO THE
SPECIFIATIONS FOR MORE INFORMATION
A.
B.
C.
D.
E.
F.
G.
H.
I
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.
X.
Y.
Z.
AA.
AB.
AC.
AD.
AE.
AF.
AG.
AH.
AI.
AJ.
AK.
AL.
AM.
AN.
AO.
AP.
AQ.
AR.
AS.
AT.
AU.
AV.
AW.
AX.
AY.
AZ.
BA.
BB.
BC.
BD
1' - 9"
M A
X . H
E
IG
H T
F
O R
A C
C E
S S
IB
LE
S
T O
R A
G E
S
P A
C E
S
M
IN
M A
X
1' - 9"
MAX.
10" MIN.
MAX.
OF SHELVES
WHEN WHEEL CHAIR DISTANCE IS >10", ABOVE HEIGHTS APPLY
NOTE:
PROJECT-STANDARD PLACEMENT
SWITCH, THERMOSTAT,
HORN/STROBE
FLOOR
CEILING
OPTIONAL LOCATION, F.A.
HORN/STROBE (WHEN OCCURS)
EDGE OF DOOR FRAME
CL
NOTE:
F.A. HORN/STROBE PREFERRED
INSTALLATION IS AT CEILING
LIGHT SWITCH
THERMOSTAT
CL
CL
8" MIN. - 12" MAX
3'
CL
CL
POWER/COMM RECEPTACLE
1'
CLEARANCES FOR DOORS IN SERIES
4' - 0" 4' - 0"
1' - 6"
1' - 0"
W/ LATCH
& CLOSER
4' - 6" MIN.
M
IN
W/ LATCH
& CLOSER
M
IN
(I
F A
3' - 0" MIN. (THEN, A)
M
IN
(I
F B
3' - 6" MIN. (THEN, B)
MIN.
2' - 0"
W
C L
O S
E R
M
IN
MIN.
2' - 0"
W /C
L O
S E
R
PULL SIDE PUSH SIDE
TOILET PAPER
DISPENSER
WATER CLOSET URINAL GRAB BAR
PAPER TOWEL
DISPENSER & TRASH
RECEPTACLE
TRASH
RECEPTACLE
SEAT COVER
DISPENSER
NAPKIN
DISPENSER
NAPKIN
DISPOSAL
LAVATORY
M A
X
M
IN
M
IN
H
.C
HIGHEST POINT
OF OPERATION
M
IN
. K N
E E
C
LE
A R
A N
C E
T O
P O
F R
IM
TOP OF
REFLECTIVE
SURFACE
BOTTOM OF
REFLECTIVE
SURFACE
TOP OF BAR
FLUSH CONTROL
44" MAX.
TOP OF
RIM
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
#1 6th FloorApproved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Department of Veteran's Affairs Medical Center John Cochran
Division
1/31/2018 2:38:39 PM
General Index VAJC Renovate GI Procedure Room
1-G-101
657-17-185JC
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Bid Documents
RD HT
1/4" = 1'-0"4 ADA - Shelves & Clothes Rod Requirements
1/2" = 1'-0"5 DETAIL - TYP. MOUNTING LOCATIONS
1/8" = 1'-0"15 MANEUVERING CLEARANCES
APPLICABLE CODES
CODE SUMMARY
BUILDING CODE
FIRE CODE
PLUMBING CODE
MECHANICAL CODE
ELECTRICAL CODE
ENERGY
LIFE SAFETY
ACCESSIBILITY
SEISMIC
2015 International Building Code 2015 International Fire Code 2015 Uniform Plumbing Code 2015 International Mechanical Code 2015 National Electric Code 2015 International Energy Conservation Code 2015 NFPA 101 Life Safety Code AMERICANS with DISABILITY ACT (ADA) - ICC/ANSI 117.1-20092000 VA Seismic Design Requirements H-18-8
TYPE OF CONSTRUCTION
A. USE GROUP CLASSIFICATION
IBC - INSTITUTIONAL GROUP I-2 - HOSPITALS
NFPA - HEALTHCARE (NEW AND EXISTING)
B. CONSTRUCTION TYPE (ASSUMED BASED ON 1950 CONSTRUCTION)
IBC - TYPE I-A
NFPA - TYPE I (332)
JURISDICTION
DEPARTMENT OF VETERAN AFFAIRS (VA)
JOINT COMMISSION ON THE ACCREDITATION OF HEALTHCARE
ORGANIZATIONS (JCAHO)
US DEPARTMENT OF HEALTH AND HUMAN SERVICES
FIRE RESISTIVE REQUIREMENTS
A. INTERNATIONAL BUILDING CODE - TABLE 601 - TYPE I-B (ASSUMED)
STRUCTURAL FRAME (COLUMNS, GIRDERS, TRUSSES)
SUPPORTING FLOOR 3 HOUR
SUPPORTING ROOF ONLY 1 1/2 HOUR
BEARING WALLS
EXTERIOR (NOT LESS THAN FIRE SEPERATION) 3HOUR
INTERIOR 3 HOUR
INTERIOR (SUPPORT ROOF ONLY) 2 HOUR
NONBEARING WALLS AND PARTITIONS
INTERIOR (EXCEPT AS NOTED BELOW) 0 HOUR
FIRE WALLS (TABLE 705.4) 3 HOUR
FIRE BARRIERS (TABLE 706.3.7) 2 HOUR
SHAFT ENCLOSURE (FIGURE 707.4)
CONNECTING 4 OR MORE STORIES 2 HOUR
CONNECTING 3 OR LESS STORIES 1 HOUR
FIRE PARTITIONS (708.3) 1 HOUR
SMOKE BARRIERS (709.3) 1 HOUR
SMOKE PARTITIONS (403.3 & 710.3) 0 HOUR
CORRIDORS (WITH FIRE SPRINKLERS TABLE 1016.1) 0 HOUR
VERTICAL EXIT ENCLOSURES (SECTION 1019.1)
CONNECTING 4 OR MORE STORIES 2 HOUR
CONNECTING 3 OR LESS STORIES 1 HOUR
EXIT PASSAGEWAYS (SECT 1020.3)
WALLS / FLOOR / CEILING (SEPARATELY) 1 HOUR
WALLS / FLOOR / CEILING CONNECT.(EXIT ENCL) 2 HOUR
HORIZONTAL EXITS (FIGURE 1021.1) 2 HOUR
FLOOR CONSTRUCT (INCL SUPPORT BEAMS & JOISTS) 2 HOUR
ROOF CONSTRUCT (INCL SUPPORT BEAMS & JOISTS) 2 HOUR
B. NFPA 101 / SAFETY CODE - TABLE A.8.2.1.2 - TYPE I (3,3,2) (ASSUMED)
EXTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR ONLY 3 HOUR
SUPPORTING ROOF ONLY 3 HOUR
INTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR ONLY 2 HOUR
SUPPORTING ROOF ONLY 2 HOUR
COLUMNS
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR ONLY 2 HOUR
SUPPORTING ROOFS ONLY 2 HOUR
BEAMS, GIRDERS, TRUSSES, AND ARCHES
SUPPORTING MORE THAN ONE FLOOR 3 HOUR
SUPPORTING ONE FLOOR ONLY 2 HOUR
SUPPORTING ROOFS ONLY 2 HOUR
FLOOR CONSTRUCT (INCLU SUPPORT BEAMS & JOISTS) 2 HOUR
ROOF CONSTRUCT (INCLU SUPPORT BEAMS & JOISTS) 1 1/2 HOUR
EXTERIOR NON-BEARING WALLS 0 HOUR
PROJECT DESCRIPTION: RENOVATION AND EXPANSION OF EXISTING
PROCEDURE ROOM AND REFINISHING OF
EXISTING OFFICE
AREA OF WORK: 300 S.F.
AREA OF FLOOR: 39,500 S.F.
1/4" = 1'-0"1 Standard Room Accessory Mounting
Bid Alternates
• Base Bid: All work shown represents the base bid.
• Alternate 1: In Support Space 610A - Do not remove and infill the existing door and do not provide new floors, ceiling, lights, elec/data or signage. Abatement only.
• Alternate 2: No work in Support Space 610A including abatement.
U.S. Department of Veterans Affairs
Approved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR
C
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veteran's Affairs
Medical Center
John Cochran
Division
657-17-185-JC
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Bid Documents
HA100
N
1/4" = 1'-0"
6th FLOOR ABATEMENT PLAN
N
1/4" = 1'-0"
5th FLOOR ABATEMENT PLAN
THE SCOPE OF THE ABATEMENT WORK ON THE 5TH FLOOR CONSISTS OF
REMOVING NON-ASBESTOS PLASTER, ASBESTOS PIPE AND FITTING INSULATION,
AND PIPING / HANGER ASSEMBLIES WITH LEAD-BASED PAINT. THE SCOPE OF
THE ABATEMENT WORK ON THE 6TH FLOOR CONSISTS OF REMOVING LEAD
CONTAINING CERAMIC TILE AND UNDERLYING DRYWALL WITH POTENTIAL MOLD,
PIPING AND ASSOCIATED HANGER ASSEMBLIES WITH LEAD-BASED PAINT, AND
WATER DAMAGED FIBERGLASS PIPE INSULATION WITH POTENTIAL MOLD. ALL
WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE, AND
LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK SHALL BE CONDUCTED DURING REGULAR BUSINESS
HOURS (7:00 AM - 4:00 PM) EXCEPT THE HALLWAY WORK THAT SHALL BE
CONDUCTED ON OFF-HOURS 5:00 PM - 7:00 AM MON-FRI OR 5:00 PM FRI - 6 PM
SUNDAY. WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES OF ALL ABATEMENT SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR WITH THE GENERAL CONTRACTOR. THE
LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED
WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW
REPRESENTATIVE LOCATIONS OF PIPING.
A FULL DECONTAMINATION UNIT IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS SHALL BE REQUIRED FOR THE 6TH FLOOR CONTAINMENTS AND
A SINGLE CHAMBER DECONTAMINATION UNIT EQUIPPED WITH A HEPA VACUUM
SHALL BE REQUIRED FOR THE 5TH FLOOR MINI-CONTAINMENTS.
THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK PLAN AND
ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY CHANGES TO
THE PROCEDURES OR CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA
COR AND VPIH FOR APPROVALS.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE
OF THE FIRE RETARDANT TYPE.
ABATED PIPE INSULATION AND ASBESTOS FITTINGS, EXCLUDING PIPING THAT
WILL BE REMOVED, SHALL BE PROPERLY RE-INSULATED WITH EQUIVALENT
INSULATING PROPERTIES PER VA SPECIFICATION SECTION 23 07 11 HVAC,
PLUMBING AND BOILER PLANT INSULATION, OR SECTION 22 07 11 PLUMBING
INSULATION.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE
DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR AND
VPIH.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING WILL BE
CONDUCTED BY THE VPIH.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED
PAINT WERE IDENTIFIED IN THE DEMOLITION AREAS. IT SHOULD BE NOTED THAT
OSHA DOES NOT RECOGNIZE THE EPA HUD THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION
ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER WORK AREA
CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE
BASED AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH AIR
MONITORING OR BIOLOGICAL EXPOSURE MONITORING (BLOOD LEAD TESTING), IF
REQUIRED. UNLESS THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR SAMPLING SHALL BE
CONDUCTED BY THE CPIH OF REPRESENTATIVE TASKS, TO DOCUMENT THE
EXPOSURE TO LEAD.
ABATEMENT GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ABATEMENT KEYNOTES
REMOVE NON-ASBESTOS PLASTER CEILINGS AND ABATE ASBESTOS PIPE
INSULATION AND ASBESTOS FITTINGS BY GLOVEBAG REMOVAL METHODS
INSIDE A NEGATIVE PRESSURE CONTAINMENT.
- 40 LF OF ASBESTOS PIPE INSULATION AND FITTINGS TOTAL, 2 LOCATIONS
- 60 SF OF NON-ASBESTOS PLASTER CEILING
FIBERGLASS INSULATION IS PRESENT ABOVE THE CHASE WALLS, WITH
ASBESTOS INSULATION PRESENT BELOW THE CHASE WALLS. ALL
DISCONNECTS OR CHANGES TO THE EXISTING PIPING SHOULD BE LIMITED TO
THE FIBERGLASS LINES. ASBESTOS INSULATION SHALL BE PROTECTED FROM
ANY DISTURBANCE.
WINDOW FRAMES AND TRIM (SILLS, QUARTER ROUND, ETC.) WITH
LEAD-BASED PAINT. PROTECT AS REQUIRED.
PIPES, HANGER ASSEMBLIES, AND EMBEDS WITH LEAD-BASED PAINT
PRESENT. PROTECT AS REQUIRED.
REMOVE LEAD-CONTAINING CERAMIC TILES AND UNDERLYING DRYWALL WITH
POTENTIAL MOLD GROWTH USING MANUAL REMOVAL METHODS INSIDE A
NEGATIVE PRESSURE CONTAINMENT. THE REMAINING SURFACES SHALL BE
CLEANED USING AN EPA APPROVED ANTI-MICROBIAL SOLUTION. ONCE THE
WALL CAVITY IS OPEN, ANY ADJACENT DRYWALL THAT MAY BE IMPACTED
SHALL BE REMOVED ACCORDINGLY AND MAY REQUIRE THE CONTAINMENT TO
BE EXTENDED.
- RM A608: 15 SF OF LEAD-CONTAINING CERAMIC WALL TILE & WALLBOARD
- RM A608A: 240 SF OF LEAD-CONTAINING CERAMIC WALL TILE & WALLBOARD
- RM A610A: 170 SF OF LEAD-CONTAINING CERAMIC WALL TILE & WALLBOARD
DISMANTLE AND REMOVE PIPES, HANGERS AND BRACKETS CONTAINING
ORANGE LEAD-BASED PAINT IN CONJUNCTION WITH MECHANICAL PIPING
REMOVAL. IF THE HANGERS AND BRACKETS CAN BE DISMANTLED AND
REMOVED WITHOUT DISTURBING THE LEAD-BASED PAINT, THE USE OF A
NEGATIVE PRESSURE CONTAINMENT OR GLOVEBAG WILL NOT BE REQUIRED,
PROVIDED THE ABATEMENT CONTRACTOR HAS AN APPROVED NEGATIVE
EXPOSURE ASSESSMENT SUBMITTED AS PART OF THEIR WORK PLAN.
OTHERWISE ALL WORK SHALL BE CONDUCTED INSIDE A NEGATIVE PRESSURE
CONTAINMENT OR GLOVEBAG. THE INSERTS, EMBEDS OR INTACT ORANGE
PAINT ON THE CONCRETE SHALL REMAIN IN PLACE. MECHANICAL PIPING
SHALL BE TEMPORARILY SUPPORTED AS REQUIRED IF THE HANGERS ARE
REMOVED WHILE THE LINES REMAIN ACTIVE.
- 15 EA ORANGE PAINTED HANGER ASSEMBLIES TOTAL, 3 LOCATIONS
- 60 LF OF ORANGE PANTED PIPES TOTAL, 3 LOCATIONS
INSIDE A NEGATIVE PRESSURE MINI-CONTAINMENT, REMOVE FIBERGLASS
PIPE INSULATION WITH MOLD GROWTH AND WATER STAINS USING WET
METHODS. THOROUGHLY CLEAN THE PIPES AND SURROUNDING AREAS
INSIDE THE CONTAINMENT USING AN EPA REGISTERED ANTI-MICROBIAL
SOLUTION. RE-INSULATE THE HALLWAY PIPING IN ACCORDANCE WITH VA
SPECIFICATION SECTIONS 02 22 11 PLUMBING INSULATION AND 23 07 11 HVAC
AND BOILER PLANT INSULATION.
- 5 LF OF FIBERGLASS PIPE INSULATION WITH POTENTIAL MOLD TOTAL,
2 LOCATIONS
ABATEMENT LEGEND:
REMOVE ASBESTOS PIPE INSULATION AND/OR PIPES WITH
LEAD-BASED PAINT AS INDICATED IN THE KEYNOTES
REMOVE LEAD-CONTAINING CERAMIC WALLS AS INDICATED
IN THE KEYNOTES
A1A1A1
L1
L2
L3
L4
M1
A1A1A1 A1A1A1
L1
L2
L2
L2
L4L4
L4
M1
M1
L3
L3
L3
L3
L3
L2
REMOVE NON-ASBESTOS PLASTER CEILING TO ALLOW FOR
ABATEMENT OF PIPES AS INDICATED IN THE KEYNOTES
L2L2
A2
L2 jhecht VAJC GI Seal (1-30-18)
5 E2 1
E3
E4
E4
H H
G
G
F
F
GI Procedure Room
A608
GI Procedure Room
A608
Existing Procedure Room
NIC
Support Space
A610A
Corridor
H601
Nurse Station
A606
Nour.
H612
Procedure Room
A610
Chase
CH-A-6
Procedure Room
A611
Clean Utility
A611A
Procedure Room
A612
Toilet
A613B
Ante Room
A613A
Scope Cleaning
613Room
H609
Room
H610
E x is ti n g
C ra m ic
T ile
E x is ti n g
V C
T
8 8
7 7
11 11
8' - 1"
8' - 1"
7' - 2"
8' - 0"
GI Procedure Room
A608 Existing Toilet
A608A Existing Procedure Room
NIC
Support Space
A610A
8' - 1"
Corridor
H601
8' - 0"
D1 D1
D1 Nurse Station
A606
Nour.
H612
Procedure Room
A610
Procedure Room
A611 Clean Utility
A611A
Procedure Room
A612
Toilet
A613B
Ante Room
A613A
Scope Cleaning
Room
H609
8' - 0"
8' - 0"8' - 0"7' - 7" 7' - 6"
7' - 6"
7' - 6"
8' - 0"
8' - 1"
7' - 11"
8' - 0"
7' - 5"
D1
11 11 m in c le a r
Remove existing plumbing fixture. Return and cap at nearest tee or main. RE: Plumbing drawings for more information
Keyed Notes - Demolition
Existing hazardous material to be removed. See MEP and Abatement Plans.
Remove existing transisiton strip and existing flooring as required to recieve new flooring. See finish plan.
Existing radiator to be removed. Prep surfaces as required to receive new finishes. See MEP drawings.
Carefully remove restroom accessories and return to owner. Coordinate with COR items to be turned over.
Exisiting door and frame to remain. Protect during construction.
Remove existing railing.7
Existing door & frame to be removed. Turn over to owner, Salvage existing window treatemt for reuse. See Specificatons.
Remove existing flooring and prepare for installation of new floors.
Temporary construction barrier. See spec for ante room requirements
Legend - Demolition Plans
Existing Wall to Remain
Existing Door to Remain
Existing Wall to be Removed
Existing Door to be Removed
Existing hazardous material to be removed.
See Abatement Plans.
Remove existing ceilng GWB Soffits, ACT Grid, ACT Pads, LIghts, Curtain Track, HVAC Diffusers/Grilles, and all other associated hardware or accessories. Coordinate with COR regardingitems to be turned over to owner
D1
Keyed Notes - Demolition RCP
N
1/4" = 1'-0"1 Demo Plan - Endoscopy
N
1/4" = 1'-0"3 Demo Ceiling Plan - Endoscopy
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
#1 6th FloorApproved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Department of Veteran's Affairs Medical Center John Cochran
Division
3/27/2018 8:21:14 AM
Demo Plan, Demo RCP VAJC Renovate GI Procedure Room
1-A-100
657-17-185JC
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Bid Documents
RD HT
General Notes - Demolition Plans
A Demolition and construction must be sequenced and coordinated to ensure that the building owner's operations are continuously mantained.
B This demolition plan reflects information gathered from existing conditions drwawings and architects field observations. Contractor to verify accuracy of information and include all required demolition in their bid & report any discrepancies to the architect.
C Items to be demolished, removed, or relocated are shown dashed. Existing items to remain shall be protected during construction by contractor. Patch and repair any surfaces disturbed by demolition that are to remain.
D Remove all flooring finishes and base unless otherwise noted. Prepare slab and existing walls that are to remain for new finishes.
E Remove ceiling tile, grids, lights, associated hardward and panels. Refer to RCP Drawings for existing ceiling to remain.
F Remove all mounted wire mould and recepticles. Pull wire back to electrical panel. RE: Electrical drawings for additional information.
G Remove all existing phone/data lines back to nearest patch panel. RE: Electrical drawings for additional information.
H Protect all medical equipment and associated medical items during construction.
I All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.
J GC is to coordinate construciton and abatement with operations. Any work that interferes with operations will need to occur after hours.
Bid Alternates :
• Base Bid: All work shown represents the base bid.
• Alternate 1: In Support Space 610A - Do not remove and infill the existing door and do not provide new floors, ceiling, lights, elec/data or signage. Abatement only.
• Alternate 2: No work in Support Space 610A including abatement.
5 E2 1E3E4
H H
G
G
F
F
E x is t.
GI Procedure Room
A608
Existing Procedure Room
NIC
Support Space
A610A
Corridor
H601
Nurse Station
A606
Procedure Room
A610
Procedure Room
A611
Clean Utility
A611A
Procedure Room
A612
Toilet
A613B
Ante Room
A613A
Scope Cleaning
Room
H609
Room
H610
C
C
C
1-A-200 3
/4
1-A-2002 8
11 11 m in c le a r m in c le a r
New 4'-0" wide door1
Infill wall at removed door3
Install vinyl handrail & guardrail to match existing adjacent. See detail on 4/1-A-200.
New flooring RE Finish sheet5
Existing Med gasses to remain. RE: MEP6
Keyed Notes - Plan
G.C. to provide & install wall mounted hand sink in previous location w/ manual operated paddle handles, gooseneck faucet and eyewash. See Plumbing drawings
4'-0" x 7'-0" x 1 3/4" type F WD door in HM frame. Paint PT-2. Hardware: 1 1/2 pair butts, closer, hospital latching push/pull and wall stop to match existing doors on this floor. See spec.
New Med gasses. RE: MEP8
Existing handrail and guardrail to remain9
8' - 1"
8' - 1"
7' - 2"
8' - 0"
7' - 6"
ME ME
ME
GI Procedure Room
A608 Existing
Procedure Room
NIC
Support Space
A610A
Corridor
H601
249 SF
Nurse Station
A606
301 SF
Procedure Room
A610
286 SF
Procedure Room
A611
80 SF
Clean Utility
A611A
149 SF
Procedure Room
A612
72 SF
Toilet
A613B
29 SF
Ante Room
A613A119 SF
Scope Cleaning
60 SF
Room
H609
7' - 0" A.F.F.
1' - 1 1/2"
7' - 0" A.F.F.
GYP BD Soffit
GYP BD Soffit
1' - 1 1/2"
58' - 1"
2'-0" x 2'-0" Lay-In Light Fixture (RE: Electrical)
6" Recessed Can Light Fixture (RE: Electrical)
Exit Sign (RE: Electrical)
Suspended Acoustical Ceiling Tile System
Gypsum Wall Board Ceiling System
2'-0" x 4'-0" Lay-In Light Fixture (RE: Electrical)
Reflected Ceiling Plan Legend
Sprinkler Head (RE: Fire Protection)
Air Return Diffuser (RE: Mechanical)
Air Supply Diffuser (RE: Mechanical)
ACT Ceiling Grid & Pads. Match existing height. RE Finish Sheet
Existing Med Gasses (RE: Mechanical)3
New Med Gasses (RE: Mechanical)4
Monitor on ceiling mounted boom. G.C to provide structural support for VA provided monitor and support arm. See details 9 & 10/A200 (Steris G Sries-Accessory Arm or approved equal). GC to coordinate with the equipment manufacturer and biomed department for installation requirements.
Keyed Notes - Reflected Ceiling Plan
New curtain track2
Temporary construction barrier. Adjust ceiling devices to accomodate partition. Coordinate in field. See spec for ante room requirements
Remove and replace exsiting ceilng as required to allow for above ceilgin mechanical work.
Legend - Floor Plans
New Wall
Existing Wall to Remain
New Door
Existing Door to Remain
Existing Smoke Partition
45°
(2) 12 GAGE
HANGAR
WIRES @ OPPOSITE
CORNERS TO
STRUCTURE
ACT & GRID
12 GAGE HANGAR WIRE
ELECTRICAL FIXTURE-
MECHANICALLY
FASTENED TO
SUSPENSION SYSTEM
ELECTRICAL/HVAC
FIXTURE
-MECHANICALLY FASTEN
TO SUSPENSION
SYSTEM
LFB
LATERAL FORCE BRACE
EC
EXPANSION CLIP
SJCG CLIP
MAIN GRID RUN
AT LAY-IN FIXTURE
AT RECESSED DOWNLIGHT
REQUIREMENTS:
-ATTACHED ON (2) ADJACENT WALLS WITH THE BERC2.
NOTE-ATTACHING BERC2 CLIP TO THE WALL SECURES
THE GRID AND ELIMINATES THE NEED FOR POP RIVITS
THROUGH THE VISIBLE PART OF THE WALL MOLDING.
-BERC2 CLIP WITH 3/4" CLEARANCE ON UNATTACHED ENDS.
-BERC2 CLIP ON ALL (4) WALLS
-HEAVY-DUTY GRID
-LATERAL BRACING
-PERIMETER SUPPORT WIRE
-EXPANSION CLIP EVERY X S.F.
BERC2 CLIP
ATTACHED WALL
NOTE: POP RIVITS ARE ACCEPTABLE
UNATTACHED WALL
7/8"
1/2"
7/8"
8" MAX.
8" MAX.
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
#1 6th FloorApproved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Department of Veteran's Affairs Medical Center John Cochran
Division
3/2/2018 9:05:26 AM
Plan, RCP VAJC Renovate GI Procedure Room
1-A-101
657-17-185JC
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Bid Documents
RD HT
N
1/4" = 1'-0"1 Floor Plan
N
1/4" = 1'-0"2 Ceiling Plan - Endoscopy
General Notes - Floor Plans
A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.
B All Partitions to be type "D" unless otherwise noted.
C All dimensions are from column ceter line to face of partiiton UON under no sircumstances shall any measurement be scaled from the drawings. Any measurment not given an actual number dimension should be brouth to the architect's attention before proceeding.
D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.
E GC is to coordinate construciton and abatement with operations. Any work that interferes with operations will need to occur after hours.
General Notes - Reflected Ceiling Plans
A Refer to Electrical drawings for engineering information. i.e. Circuiting, fixture schedule, ect.
These architectural drawings will take precident for fixure location, exiting, and egress pathway.
B Refer to Seismic Bracing requirements on this sheet.
C All Gridded Ceilings to be ACT-1 UON
D All building core and shell shown greyed out are existing UNO.
E All ceiling and fixture dimensions noted above finish floor (AFF) are from bottom of the fixture and ceiling pads
F Per specification, submit shop drawings on all special ceiling items for architectrual review of seams, joints, and layout.
G If any ceilng elements cannot be installed as shown due to conflicts with existing piping, ductwork, or structure, contact architect for direction before proceding with the installation.
H Louvers, grills, and diffusers shall be prefinished to match ceiling. In cases where these items are not available from the manufacturer in a prefinished color to match the ceiling, provide automotive paint finish or electrostatic painted finish to match the ceiling. Follow finish schedule and notes for selected color.
I Respective contractors shall coordinate and review locations of access panels in new GWB ceilings / soffits required to provide accces to new and existing valves, junction / pull boxes, dampers, ect.
J For all electrical ceiling device locations RE: electrical drawings.
K GC is to coordinate construction and abatement with operations. Any work that interferes with operations will need to occur after hours.
1 1/2" = 1'-0"3 DETAIL - SEISMIC LIGHT FIXTURE
1" = 1'-0"4 DETAIL - SEISMIC RESTRAINTS @ SUSPENDED CEILINGS
Bid Alternates:
• Base Bid: All work shown represents the base bid.
• Alternate 1: In Support Space 610A - Do not remove and infill the existing door and do not provide new floors, ceiling, lights, elec/data or signage. Abatement only.
• Alternate 2: No work in Support Space 610A including abatement.
Area of ceiling work on 5th floor. Remove and patch GWB as required for work above.
OFFICE / EXAM
A508
OFFICE / EXAM
A509
OFFICE / EXAM
A510
OFFICE / EXAM
A507
OFFICE
A506
CORRIDOR
H501
NOUR.
A505
TOILET, FEMALE
A506A
OFFICE / EXAM
A514
OFFICE / EXAM
A513
OFFICE / EXAM
A512
OFFICE / EXAM
A515
OFFICE / EXAM
A516
OFFICE / EXAM
A517
STORAGE
A504
SOILED UTILITY
A519
STORAGE
A518
CORRIDOR
H502
CONFERENCE
RM.
A502
OFFICE / EXAM
A511
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
#1 6th FloorApproved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Department of Veteran's Affairs Medical Center John Cochran
Division
1/31/2018 2:38:25 PM
5th Floor RCP VAJC Renovate GI Procedure Room
1-A-102
657-17-185JC
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Bid Documents
RD HT
N
1/4" = 1'-0"1 5th Floor Ceiling PLan
MAX
0' - 7"0' - 6 1/32" Requirement
Per MFR
MAX
0' - 7"
/3
Resilient Contact Surface Bumper
Ancorage Shall be Located to Miss Studs;
Provide Backing Supoort.
MFR Standard End Closure Corner Guard; See Plan for Locations
Wall Assembly; See Plan for P-Type
Door Frame; See Plan for More Information
MFR Standard End Closer
0' - 4 1/16"1-A-200
Sim
R e D o o r s c h e d u le
Notes:
1. Head Similar
2. Provide (3) Anchors MIN per Jamb; (4) at Rated Partitions
3. Refer to Door Schedule for Ratings Required
4. HM Jamb Throat 1/8" Larger than Partition, Caulk and Paint , TYP
Double Stud @ Jamb
Welded HM Frame
X
P-Type;
REF: Plan
Line Of Adjacent Partition (Where
Occurs)
/1
0' - 0 1/2"
/3
0' - 1 13/16" ±Varies
REF:
Schedule
Wall Assembly;
RE: Plan for P-
Type
Stainless Steel Corner Guard
0' - 3 1/2"
/2
F Flush
REF: Schedule
R E
F S c h e d u le
HM
0' - 2" REF: Door Schedule 0' - 2"
R E
F D o o r S c h e d u le
1-A-200
Sim
Hollow Metal
Partition Type Not to Scale
C 3-5/8" Studs
Decking
5/8" GWB
Ceiling Line; RE: RCP
FIN Floor; REF: Schedule
Wall Base; REF: Schedule
MTL Studs @ 16" OC
Sub-floor / Slab
Room Side: GWB 6" Above CLG Corridor Side: GWB Extend to Underside of Decking; Cope Tight to Structure
Sliptrack at Structure TYP
(C2) 7 1/4"
(C) 0' - 4 7/8"
CORRIDOR
SIDE
ROOM
SIDE
Sound Batts
± 0' - 3 1/32"
/2
MIN.
0' - 1 17/32"
Wall Base; RE: Room Finish Schedule
Bottom of Lower Wall Guard to be Flush with Top of Wall Base
Fasteners per MRF Requirements
Continuous Aluminum Retainer
Continuous Impact Bumper
Vinyl Cover; RE: Finish Schedule for More Information
5/8" GWB, TYP.
MTL Stud Blocking per MFR Requirements
± 0' - 1 1/4"
Fasteners Per MFR Requirements
Continuous Aluminum Retainer
Continuous Impact Bumper
Vinyl Cover; RE: Finish schedule for More Information
5/8" GWB, TYP.
MTL Stud Blocking per MFR Requirements
LOWER GUARDRAIL
UPPER HANDRAIL
Note: See Detail for Termination
G
SS1 countertop w/ 4" SS1 backsplash
2' - 6"
1-A-200
Lockable PLAM Cabinet w/ (2) adjustable shelves.
1-A-200
Integral coved base RE: Finish info
Lockable PLAM base cabinet w/ (1) adjustable shelf
SS1 - SEE FINISH SCHEDULE
CABINET PULLS
(VERTICAL
MOUNT; BRUSHED
STAINLESS STEEL
WIRE)
PLAM
DRAWER UNIT
LOCKABLE PLAM BASE CABINET
SCHEDULED BASE
NOTE: DRAWER, CABINET
INTERIOR, & ADJUSTABLE
SHELF TO BE WHITE
MELAMINE
2'-1" U.O.N.
/2
/8
2'-0"
3"
1"
R E
E
L E
V A
T
IO
N
2X FTWD BLOCKING
SEALANT
4" SS1
PLAM Cabinet, Scribe to Wall
/2
Sealant
Extend Side panel at Exposed Ends
Blocking where Required
Clear
10 7/8"
Clear glass in PLAM Frame. Provide concealed lock
F
.V
ACT CLG grid & pads RE: Material Schedule
5/8" GWB on 3 5/8" Mtl Studs
Note: Glass cabinet doors are to be secured with concealed locks. Verify lock type with VA.
1' - 0" 1" 1/2"
HHH
Lockable PLAM Cabinet w/ (2) adjustable shelves.
1-A-200
1" 2' - 6"
E27
Endoscopy Equipment provided and installed by the VA. See Equipment plan
TYP
0' - 0 1/2"
T Y
P
/2
BRACING ABOVE
PER DETAIL ____
L3x3 VERTICAL
ANGLE STRUTS
EACH CORNER
PER DETAIL ____
HOLE IN PLATE
FOR MEP ROUTING
BY EQUIP. MFG.
1" MOUNTING
PLATE BY
EQUIPMENT
MFG.
L6x6x1/2 SUPPORT ANGLE
L3x3x1/4 VERTICAL
ANGLE HANGERS TYP
EA. CORNER OF FRAME
L2x2x3/8 ANGLES TYP
EA SIDE OF FRAME
1" STEEL PLATE
BY BOOM MFG.
L3x3x1/4 CLIP HANGER
W/ (2)-3/4" ANCHORS TYP
SINGLE SIDED CONNECTIONS
USE HILTI HY200 ANCHORS
DRILL AND EPOXY W/3 1/2"
EMBEDMENT MIN.
DOUBLE SIDED
CONNECTION USE THRU
BOLTS.
3/16
3-SIDES
TYP
3/16
3-SIDES
TYP
3/16
TYP
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
#1 6th FloorApproved: Chief of Service
Approved: Service Line Nurse Mgr.
Approved: Projects Chief
Approved: Infection Control
Approved: Safety Officer
Approved: COR o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel Fax
317.464.9090 317.464.9393
Department of Veteran's Affairs Medical Center John Cochran
Division
1/31/2018 2:38:27 PM
Door and Misc. Details VAJC Renovate GI Procedure Room
1-A-200
657-17-185JC
915 NORTH GRAND BLVD. SAINT
LOUIS, MISSOURI 63106
January 30, 2018
Bid Documents
RD HT
1 1/2" = 1'-0"4 Detail - Crash Rail Termination
3" = 1'-0"1 Detail - HM Door Jamb
3" = 1'-0"5 Detail - Stainless Steel Corner Guard
Door Types Frame Types
3" = 1'-0"6 Detail - Handrail & Crashrail
1/4" = 1'-0"3 Interior Elevation - East
1 1/2" = 1'-0"8 Detail - Base Cabinet w/ Drawer
1 1/2" = 1'-0"7 Detail - Upper Cabinet
1/4" = 1'-0"2 Elevation 1 - a
3/4" = 1'-0"9 TYPICAL PLAN VIEW OF MEDICAL BOOM SUPPORT FRAME
3/4" = 1'-0"10 TYPICAL SECTION @ MEDICAL BOOM SUPPORT FRAME
GI Procedure Room
A608
Existing Procedure Room
NIC
Support Space
A610A
Corridor
H601
A
Procedure Room
A610
Procedure Room
A611
Clean Utility
A611A
Procedure Room
A612
Toilet
A613B
Ante Room
A613A
Scope Cleaning
Room
H609
Room
H610
Nurse Station
A606
Nour.
H612
Chase
CH-A-6
1-A-200 3
1-A-2002
GI Procedure Room
A608
149 SF
Existing Procedure Room
NIC
430 SF
Corridor
H601
A
31 SF
Nour.
H612
1-A-200 3
E27
E16
E25
E28
E15
E5
E18
E19
E17
Existing
E18
E19
E17
E6
E24 E1
E22
E7
E4 E3
E23
E30 E20
E8
E29 E2
E14
E21
1-A-2002
E10
E10
E12
E31 above
Finish Plan Symbol Legend
XXX
XXX
Floor Finish Symbol X = Material Code # = Material Number
Wall Finish Symbol X = Material Code # = Material Number
Floor Transition See Room Finish Schedule
ACT1 Accoustical Ceiling Tile
Armstrong ULTIMA Health Zone Square lay-In 1938 24" x 48" x 3/4"
6,8
P1 Paint Sherwin Williams SW7009, Pearly White 1
WSF1 Welded Sheet Flooring
Armstrong Decor Art CORLON 88731 Light Gold
4, 5
Code Item Manufacturer Description Remarks
Material Schedule
Remarks - Material Schedule:
1. Wall Finish:…