36C25518R0342-003.pdf

PDF 11 MB Posted

Attached to
657-17-185JC Renovate Gastroenterology Procedure Room and Support Space
Solicitation number
36C25518R0342
Issued by

About this file

36C25518R0342 P09 - FINAL DRAWINGS - 657-17-185JC (16 PAGES).pdf

View the file

Other files

File Type Posted
36C25518C0158-000.docx DOCX document
36C25518R0342-A00003002.pdf PDF
36C25518R0342-A00003000.docx DOCX document
36C25518R0342-A00003001.pdf PDF
36C25518R0342-A00002003.pdf PDF
36C25518R0342-A00002005.pdf PDF
36C25518R0342-A00002002.pdf PDF
36C25518R0342-A00002000.docx DOCX document
36C25518R0342-A00002004.pdf PDF
36C25518R0342-A00002001.pdf PDF
36C25518R0342-A00001001.pdf PDF
36C25518R0342-A00001000.docx DOCX document
36C25518R0342-002.pdf PDF
36C25518R0342-001.docx DOCX document
36C25518R0342-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN

NORTH

ROOF

BELOW

ROOF BELOW

ROOF BELOW

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

Area of work

LAVATORY

LINEAR

FEET

LINTEL

KNEE BRACE

LAV

LF

LNTL

KB

BD

BL

BLDG

BLKG

BOD

BR

BTWN

ACT

ADJ

ADJC

AFF

ALT

ALUM

ARCH

AVG

REFER TO THE MATERIAL LEGEND FOR ABBREVIATIONS RELATED TO FINISHES NOT HERE LISTED

BOARD

BLINDS

BUILDING

BLOCKING

BOTTOM OF

DECK

BRICK

BETWEEN

ACOUSTIC CEILING

TILE

ADJUSTABLE

ADJACENT

ABOVE FINISHED

FLOOR

ALTERNATE

ALUMINUM

ARCHITECTURAL

AVERAGE

ABBREVIATIONS LIST

ON CENTER

OUTSIDE

FACE

OPENING

OPPOSITE

OC

OF

OPNG

OPP

NIC

NOM

NTS

NOT IN

CONTRACT

NOMINAL

NOT TO SCALE

R

RB

RD

REF

REINF

REQD

REV

RLG

RM

RO

RISER OR

RADIUS

RUBBER BASE

ROOF DRAIN

REFERENCE

REINFORCED

REQUIRED

REVISION

RAILING

ROOM

ROUGH OPENING

P

PBD

PLAM, PL

PLBG

PLS

PR

PREF

PROP

PT

PTD

PTN

PWD

PAINT

PARTICLE BOARD

PLASTIC LAMINATE

PLUMBING

PLASTIC

PAIR

PREFINISHED

PROPERTY

PRESSURE

TREATED

PAINTED

PARTITION

PLYWOOD

C

CAB

CB

CC

CG

CJ

CL

CLNG

CMU

COL

CONC

CONST

CONT

CP

CRT

CS

CSJ

CST

CT

CARPET

CABINET

CATCH BASIN

CONCRETE, COLORED

CORNER GUARD

CONTROL JOINT

CENTERLINE

CEILING

CONCRETE MASONRY

UNIT

COLUMN

CONCRETE

CONSTRUCTION

CONTINUOUS

COMMUNICATIONS PANEL

CATHODE RAY TUBE

CONSTRUCTION JOINT

CONCRETE, SEALED

CONCRETE, STAINED

CERAMIC TILE

EA

EJ

ELECT

ELEV

EP

EQ

EQUIP

EWC

EXT

EXTG

EACH

EXPANSION JOINT

ELECTRICAL

ELEVATION

ELECTRICAL PANEL

EQUAL

EQUIPMENT

ELECTRIC WATER

COOLER

EXTERIOR

EXISTING

DEMOLITION

DIAMETER

DIMENSION

DOWN

DOOR

DOWNSPOU

T

DETAIL

DRAWING

DEMO

DIA

DIM

DN

DR

DS

DTL

DWG

MAS

MAT

MAX

MDF

MECH

MFR

MH

MIN

MIR

MISC

MO

MTD

MTL

MASONRY

MATERIAL

MAXIMUM

MEDIUM DENSITY

FIBERBOARD

MECHANICAL

MANUFACTURER

MANHOLE

MINIMUM

MIRROR

MISCELLANEOUS

MASONRY OPENING

MOUNTED

METAL

T

TC

TEL

TGL

TJ

TS

TW

TYP

TREAD

TOP OF CONCRETE

TELEPHONE

TEMPERED GLASS

LITE

TOP OF JOIST

TOP OF STEEL

TOP OF WALL

TYPICAL

VB

VCT

VERT

VIF

YARDYD

W

W/

WCL

WD

WDW

WF

WO

WPG

WIDTH

WITH

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WITHOUT

WATERPROOFIN

G

VINYL BASE

VINYL COMPOSITION

TILE

VERTICAL

VERIFY IN FIELD

UF

UON

UR

UNFINISHED

UNLESS OTHERWISE

NOTED

URINAL

JOINT

IF

INSUL

JT

HC

HD

HDBD

HDW

HDWD

HM

HOR

HR

HT

HWH

INSIDE

FACE

INSULATION

HOLLOW CORE

HEAD

HARDBOARD

HARDWARE

HARDWOOD

HOLLOW METAL

HORIZONTAL

HANDRAIL

HEIGHT

HOT WATER

HEATER

GRANITE

GAUGE

GLASS

GRADE

GROUT

GYPSUM

WALLBOARD

G

GA

GL

GR

GT

GWB

FABRICATED

FAN COIL UNIT

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER CABINET

FINISH FLOOR

FINISH GRADE

FIRE HOSE CABINET

FINISH

FLOOR

FLASHING

FLOOR TILE

FIREPROOFING

FIRE RATING

FIBERGLASS REINFORCED

PANEL

FLOOR SINK

FEET

FOOTING

FIRE TREATED WOOD

FABRIC WRAPPED PANEL

SC

SCH

SECT

SHTH

SIM

SK

SM

SOF

SPEC

SQ

SSM

SST

STD

STL

STR

SUSP

SW

SYS

SOLID CORE

SCHEDULE

SECTION

SHEATHING

SIMILAR

SINK

SHEET METAL

SOFFIT

SPECIFICATIONS

SQUARE

SOLID SURFACING

MATERIAL

STAINLESS STEEL

STANDARD

STEEL

STRUCTURE

SUSPENDED

SLAT WALL

SYSTEM

FAB

FCU

FD

FDN

FEC

FF

FG

FHC

FIN

FLR

FLG

FLT

FPG

FR

FRP

FSK

FT

FTG

FTWD

FWP

LEGEND - SYMBOLS

T.O.

X'-X" A.F.F.

X

X

XXX

X

X

CONTROL POINT

KEYED NOTE

CENTER LINE MARK

REVISION NUMBER

X

ELEVATION DATUM

EXISTING COLUMN LINE

NEW COLUMN LINE

EXTERIOR ELEVATION

MARK

X = ELEVATION NUMBER

Y = SHEET NUMBER

NEW PARTITION

NEW DOOR

W/ DOOR NUMBER

ROOM NAME & NUMBER

WINDOW NUMBER

PARTITION TYPE

DEMOLISHED DOOR

EXISTING DOOR

DETAIL MARK

X = DETAIL

NUMBER

Y = SHEET

NUMBER

NORTH ARROW

SECTION MARK

X = SECTION

NUMBER

Y = SHEET NUMBER

EXISTING PARTITION

DEMOLISHED PARTITION

INTERIOR ELEVATION

MARK

X = ELEVATION NUMBER

Y = SHEET NUMBER

X

YY.Y

X

YY.Y

X

STEEL

CONCRET

E

ALUMINU

M

BRICK

WOOD

(FINISHED)

COMPACTED GRAN.

FILL

BATT

INSULATION

GYPSUM WALL

BOARD

(SMALL SCALE)

CONTINUOUS

WOOD

BLOCKING

HATCH INDICATIONS SHOWN AS GUIDE ONLY; HATCHING SCALES MAY NEED TO BE MODIFIED DEPENDING UPON SCALE USED

MATERIALS INDICATION

NON-

CONTINUOUS

WOOD BLOCKING

EARTH

GYPSUM WALL

BOARD

(LARGE SCALE)

PLYWOO

D

RIGID

INSULATION

SAND

PRECAS

T

ASPHAL

T

XX

X

X

YY.Y

X

YY.Y

Project Number

Drawing Number

DrawnCheckedDate

Location

Project TitleDrawing Title

ARCHITECT/ENGINEERS:

VA Project #

CONSULTANTS:

Revisions: Date:

VA FORM 08-6231 OCT 1978

on e ei gh th in ch o ne fo ot qu ar te r th re ig ht s on e h al f i nc h f oo t th re qu ar te rs

6" on e i nc h f oo t

6" a nd h al f

6" th re e i nc he s f oo t

6" 6"

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

SHEET INDEX

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel

Fax

314.621.4343 314.621.0261

18207 Edison Avenue Chesterfield, MO 63005

Tel

Fax

636.530.7770 636.530.7877

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Electrical Engineer

Department of Veteran's Affairs Medical Center John Cochran

Division

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR

3/26/2018 4:20:13 PM

VAJC Renovate GI Procedure Room

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

Department of Veterens Affairs Department of Veterans Affairs Medical Center

657-17-185JC

RD HT

1-G-100

Bid Documents

657-17-185JCVAJC Renovate GI Procedure

Room

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Cover

7A

W

Bell Ave

Enright Ave

Delmar Blvd

N o rt h G ra n d B lv d

N o rt h S p ri n g A ve

N

Location Map Not To Scale

N

Campus Map Not To Scale

Project Location

Project Location

Architectural

Hazardous Abatement 1-HA-100 Abatement Plans, 5th & 6th

Mechanical MQ001 Mechanical Notes & Abbreviations MH101A Demo Plan & Revised Plan - HVAC

Plumbing PQ101 Plumbing Schedules Abreviations PD101 Demo Plan & Floor Plan - Plumbing PP101 Medical Gas 2nd Floor Demolition & Renovation Plans

Electrical 1-E-001 Electrical Symbols, Legends & Notes 1-E-002 Electrical Panel Schedules and Details 1-E-100 Electrical 6th Floor Lighting, Power & Systems

Plan - Demolition/Renovation

1-A-100 Demo Plan, Demo RCP

1-A-101 Plan, RCP

1-A-102 5th Floor RCP

1-A-200 Door and Misc. Details

1-A-301 Finish / Equipment Plans

1-G-100 Cover

1-G-101 General Index

1" = 40'-0"1 Overall 6th Floor Floor Plan htaylor HT MO Seal - Sig and Date

GENERAL NOTES

THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) WILL PERFORM FIELD

VERIFICATION AS REQUIRED FOR THE DURATION OF THE PROJECT TO MONITOR

PROJECT PROGRESS.

UTILITY SHUT DOWNS WILL BE COORDINATED BY IPT (INTEGRATED PROJECT TEAM)

INCLUDING: COR, VA FACILITY OPERATIONS, AND GENERAL CONTRACTOR.

ANY INTEGRATED PROJECT TEAM MEMBER (IPT) INCLUDING BUT NOT LIMITED TO:

CONTRACTORS / SUB-CONTRACTORS, ARCHITECTS AND/OR ENGINEERS WHO ENTER

THE PROJECT BOUNDARY SHALL WEAR ALL PROPER PERSONAL PROTECTIVE

EQUIPMENT (PPE’S: CERTIFIED BY OSHA) AT ALL TIMES. SUCH PPE’S INCLUDE: HARD

HATS, SAFETY GLASSES, PROPER SHOES, HIGH VISIBILITY SHIRTS, ETC.

IF THE PROJECT AREA AND AREAS AFFECTED BY THE PROJECT INCLUDE EXISTING

EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, THE

CONTRACTOR MUST PROTECT THIS EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC.

THE CONTRACTOR MUST ALSO CLEAN THESE ITEMS/SURFACES TO THE ORIGINAL

CONDITION FOUND AT THE START OF THE PROJECT PRIOR TO FINAL INSPECTION.

PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED

SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH

ADJACENT MATERIALS, COLORS, AND FINISHES. WALL SURFACES THAT ARE

PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.)

REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.

UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO

MATCH SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME

COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT

HAVE VINYL WALL COVERING (VWC) SHALL HAVE THE VWC COMPLETELY REMOVED

AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND COLOR.

CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR FIRE /

SMOKE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED

ACCORDINGLY WITH UL APPROVED FIRE STOPPING MATERIAL THE SAME DAY THE

PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS AND

STAIRWELLS SHALL BE CONSIDERED 2 HOUR FIRE / SMOKE RATED SEPARATIONS

AND SHALL BE SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN.

PENETRATIONS THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.

IF EXISTING WALLS ARE TO BE USED AS DUST OR SMOKE BARRIERS SEPARATING

THE CONSTRUCTION AREA FROM THE MEDICAL CENTER, THE CONTRACTOR IS

RESPONSIBLE FOR SEALING ALL EXISTING PENETRATIONS IN THIS WALL, EXTENDING

WALL TO CEILING SLAB AND ANY OTHER WORK TO ENSURE THE WALL MEETS THE

REQUIREMENTS IN THE GENERAL REQUIREMENTS SPECIFICATIONS FOR

CONSTRUCTION BARRIERS.

WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE

REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS,

FOUNDATIONS, ETC., UNLESS NOTED OTHERWISE. AFTER REMOVAL; FLOORS,

WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH ADJOINING SURFACES.

UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE WILL BE

DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO

THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE COR.

ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED

ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR

CONCRETE CONSTRUCTION, SHALL BE ENCLOSED IN METAL STUDS AND DRYWALL

CHASE WALLS AS DETAILED IN THE DRAWINGS AND FINISHED TO MATCH THE ROOM

FINISH.

WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE MEDICAL CENTER OR

DISRUPT A MEDICAL CENTER FUNCTION, WILL BE DONE AT TIMES OTHER THAN

NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK

MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER.

CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER

OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR

OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.

ALL NEW PARTITIONS, UNLESS OTHERWISE SHOWN, SHALL BE 20 GA. MTL STUDS

ALL GYPSUM BOARD USED IN THIS PROJECT SHALL BE TYPE "X"

CONTRACTORS SHALL VISIT THE SITE TO FAMILARIZE THEMSELVES WITH THE

EXISTING CONDITIONS AND INCLUDE THE WORK NECESSARY TO COMPLY WITH THE

SCOPE OF THE WORK. ADDITIONAL COMPENSATION WILL NOT BE CONSIDERED FOR

EXTRA WORK WHEN SUCH WORK COULD HAVE BEEN REASONABLY ASCERTAINED

FROM THE PRE BID SITE VISIT REVIEW OF THE EXISTING CONDITIONS AND THE WORK

SCOPE DESCRIBED IN THE DOCUMENTS.

ALL WOOD USED IN THIS PROJECT SHALL BE FIRE-RETARDANT TREATED

ALL DIMENSIONS ARE FROM COLUMN CENTER LINE TO FACE OF PARTITION U.O.N.

UNDER NO CIRCUMSTANCES SHALL ANY MEASUREMENT BE SCALED FROM THE

DRAWINGS. ANY MEASUREMENTS NOT GIVEN AN ACTUAL NUMBER DIMENSION

SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECTS BEFORE

PROCEEDING

PROVIDE FULLY SEALED DUST PARTITIONS AS REQUIRED AT ALL LOCATIONS WHERE

CONSTRUCTION MEETS THE EXISTING BUILDING IN ORDER TO MAINTAIN A CLEAN

DUST-FREE ENVIRONMENT INSIDE THE BUILDING.

ACCESS TO EMPLOYEE ENTRY AND EXIT DOORS MUST BE MAINTAINED

THROUGHOUT CONSTRUCTION. PROVIDE ALL VA REQUIRED BARRIERS AND

SIGNAGE AT THE LIMITS OF THE CONSTRUCTION SITE

ITEMS TO BE DEMOLISHED, REMOVED, OR RELOCATED ARE SHOWN DASHED.

EXISTING ITEMS TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION BY

CONTRACTOR. PATCH & REPAIR ALL RESULTING SURFACES TO REMAIN.

PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL

PANELS, ACCESS PANELS, ETC., TO MATCH WALL FINISH UNLESS OTHERWISE

NOTED.

PROJECT LIMIT LINES INDICATES THE AREA OF A MAJORITY OF THE PROJECT WORK.

BUT SOME WORK WILL BE REQUIRED OUTSIDE OF THE PROJECT LIMITS. REFER TO

DRAWINGS AND SPECIFICATIONS FOR INFORMATION.

CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND

PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY

OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED

IN THIS SCOPE.

ALL MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NON-

COMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND

A SMOKE DEVELOPED INDEX OF NOT MORE THAN 50 AS DETERMINED IN

ACCORDANCE WITH ASTM E-84

IMMEDIATELY REPORT DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND

FIELD CONDITIONS, CONFIRM THE WORK IS BUILDABLE AS SHOWN.

COORDINATED ALL WORK BETWEEN TRADES AS REQUIRED TO INSURE TIMELY &

PROPER INSTALLATION OF ALL BUILDING SYSTEMS.

PERFORM WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS,

AND ORDINANCES HAVING JURISDICTION

ALL INSULATING MATERIALS WITHIN WALLS & IN UNCONCEALED SPACES SHALL HAVE

A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF

NOT MORE THAN 450

COORDINATION OF ALL WORK AS DESCRIBED ON THE DOCUMENTS IS THE GENERAL

CONTRACTOR'S RESPONSIBILITY.

COORDINATE & PROVIDE BLOCKING AS REQUIRED FOR MILLWORK & ITEMS

ATTACHED OR MOUNTED TO WALLS & CEILINGS

PHASE ALL DEMOLITION & CONSTRUCTION TO BE SEQUENCED & COORDINATED TO

INSURE THAT THE BUILDING OWNER'S OPERATIONS ARE CONTINUOUSLY

MAINTAINED.

THESE PLANS REFLECT INFORMATION GATHERED FROM EXISTING CONDITIONS

DRAWINGS & ARCHITECT'S FIELD VERIFICATION. CONTRACTOR SHALL VERIFY

ACCURACY OF INFORMATION PRIOR TO COMMENCEMENT OF ANY DEMOLITION AND

/OR CONSTRUCTION ACTIVITIES AND REPORT ANY DISCREPANCIES TO COR.

BEFORE THE CONTRACTOR BEGINS WORK CONTRACTOR SHALL RECORD

ANY EXISTING SYSTEM INFORMATION SUCH AS TEMPERATURE, FLOW RATE,

PRESSURE, CURRENT, VOLTAGE, OR ANY OTHER INFORMATION NECESSARY

FOR HIM TO RETURN THE AFFECTED SYSTEM TO ORIGINAL OPERATING

CONDITION. UNLESS NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS

(HVAC, ELECTRICAL, PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY

MANNER AT THE BEGINNING OF THE PROJECT. THE CONTRACTOR'S

RECORDED MEASUREMENTS MUST BE SUBMITTED TO THE PROJECT

ENGINEER FOR REVIEW AND ACCEPTANCE BEFORE ANY DEMOLITION OR

OTHER RELATED WORK CAN PROCEED.

THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING

ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND

ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS

AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION

ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR

REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, DOOR

REPAIR, ETC.

CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF

MATERIALS, EQUIPMENT AND TRASH. THIS INCLUDES CARTS FOR REMOVAL

OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO

OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC. CONTRACTOR

MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.

SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED DURING NORMAL

WORKING HOURS AND MUST BE SCHEDULED WITH THE VA PROJECT

ENGINEER FOR OTHER TIMES. THIS INCLUDES JACK-HAMMERING CONCRETE,

SAW-CUTTING CONCRETE, REPETITIVE HAMMER DRILLING OF CONCRETE,

ETC.

THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE

CONTRACTOR’S RESPONSIBILITY TO COVER THE COSTS OF THE

INSTALLATION OF A TEMPORARY LAND LINE PHONE. THE CONTRACTOR

SHALL CONTACT THE PHONE COMPANY TO HAVE THIS PHONE INSTALLED.

ALL ELECTRICAL CIRCUITRY TO BE CONCEALED UNLESS OTHERWISE

SPECIFIED. CIRCUITING FOR ELECTRIC DOOR HOLD OPENS IN MASONRY

WALLS SHALL BE SURFACE RACEWAY.

DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL

ARRANGEMENT OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS

IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL BRANCHES, OFFSETS,

FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED.

CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH

CONDITIONS AFFECTING ALL WORK, FURNISHING SUCH FITTINGS, TRAPS,

VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE REQUIRED.

LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN

ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD

VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING

CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS,

EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM

SHALL BE PROVIDED AT NO ADDITIONAL COST.

ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE

TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. PRIOR TO

ANY DEMOLITION AND CONSTRUCTION WORK, THE CONTRACTOR SHALL

FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT,

DUCTWORK, PIPING, ETC. AND REPORT ANY DISCREPANCIES TO THE COR.

IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF

PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY

OF THE ROOF, THIS WORK MUST BE DONE BY A CONTRACTOR LICENSED BY

THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE APPROVED BY

THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT

EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.

IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND

OTHER MECHANICAL ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED

MUST BE RE-INSULATED WITH MATERIALS ACCORDING TO THE

SPECIFICATIONS.

WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER THE

CONTRACTOR CANNOT LEAVE TOOLS, EQUIPMENT, LADDERS, ETC.,

UNATTENDED WHERE THEY ARE ACCESSIBLE TO PATIENTS, STAFF, VISITORS,

ETC. CEILING TILES AND CEILING ACCESS PANELS MUST ALSO BE REPLACED

WHEN UNATTENDED, FOR SAFETY REASONS.

WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH

NEW OR EXISTING DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES.

REMOVE AND REPLACE ANY DRYWALL THAT HAS COME INTO CONTACT WITH

WATER OR OTHER LIQUIDS.

LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR

SLABS AND THERE IS NO RECORD OF THE EXACT LOCATIONS. THE

CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER THE CONTRACTOR

PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE

THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REPAIR ANY CIRCUIT

THAT HAS BEEN CUT OR DAMAGED.

WHEN AN EXIT IS CLOSED BECAUSE OF THIS PROJECT THE CONTRACTOR

MUST INSTALL BARRICADES AND SIGNAGE AT THE EXIT DOOR. THE

CONTRACTOR MUST ALSO COVER OR REMOVE THE LIGHTED EXIT SIGN.

CONTRACTOR SHALL PROVIDE BOXES, CONDUIT, WIRE, AND

RECONNECTIONS AS REQUIRED TO RECONNECT ANY AND ALL EXISTING

LIGHT FIXTURES, RECEPTACLES, OR DEVICES REMAINING IN USE. REMOVAL

OF ANY ELECTRICAL EQUIPMENT SHALL NOT AFFECT THE OPERATION OF

EQUIPMENT REMAINING IN USE.

CONTINUITY OF ALL SERVICES TO AND FROM THE FACILITIES IN THE EXISTING

BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION, EXCEPT FOR

SUCH PERIODS OF TIME WHICH THE V.A. MAY DESIGNATE. IF TEMPORARY

CONNECTIONS, ETC. ARE NECESSARY TO ASSURE THE CONTINUITY OF

SERVICE, THEY SHALL BE FURNISHED WITHOUT ADDITIONAL CHARGE TO THE

V.A. AND SHALL BE REMOVED WHEN NO LONGER NECESSARY.

ALL EXISTING CONDUIT AND WIRING MADE ABANDONED BY THIS PROJECT OR

FOUND TO BE ABANDONED DURING DEMOLITION SHALL BE REMOVED.

COORDINATE THE PROVISION AND INSTALLATION OF ALL CONTROL WIRING

FOR MECHANICAL EQUIPMENT WITH THE GENERAL CONTRACTOR AND

MECHANICAL CONTRACTOR.

FOR SAFETY PURPOSES THE CONTRACTOR WILL NOT WORK ON ANY

ELECTRICAL EQUIPMENT HOT. ALL SHUTDOWNS WILL BE SCHEDULED IN

ADVANCED WITH THE VA.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN

WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A

QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS CONTRACTOR. ALL

CONDUITS IN WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS.

CONTRACTOR SHALL COORDINATE ‘IN-WALL’ & ‘OVERHEAD CEILING’

INSPECTIONS WITH VA COR PRIOR TO THE INSTALLATION OF FINISHES. IN-

WALL INSPECTIONS REQUIRE 24 HOUR NOTIFICATION. OVERHEAD CEILING

INSPECTIONS REQUIRE 48 HOUR NOTIFICATION. CONTRACTOR TO SUPPLY A

CART WITH A LOG SHEET AND FULL SET OF HARD COPY DRAWINGS FOR ALL

INSPECTIONS. LOG SHEET SHALL BE ITEMIZED BY TYPE OF INSPECTION AND

BY ROOM. NO SUCH FINISHES SHALL BE INSTALLED WITHOUT INSPECTION

APPROVAL FROM PROJECT ENGINEER.

CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH

OPERATIONS. IF THE CONSTRUCTION ACTIVITIES INTERFERES WITH TYPICAL

FUNCTIONS DURING TYPICAL OPERATING HOURS, CONSTRUCTION WILL

OCCUR OUTSIDE OF TYIPICAL OPERATING HOURS. REFER TO THE

SPECIFIATIONS FOR MORE INFORMATION

A.

B.

C.

D.

E.

F.

G.

H.

I

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

X.

Y.

Z.

AA.

AB.

AC.

AD.

AE.

AF.

AG.

AH.

AI.

AJ.

AK.

AL.

AM.

AN.

AO.

AP.

AQ.

AR.

AS.

AT.

AU.

AV.

AW.

AX.

AY.

AZ.

BA.

BB.

BC.

BD

1' - 9"

M A

X . H

E

IG

H T

F

O R

A C

C E

S S

IB

LE

S

T O

R A

G E

S

P A

C E

S

M

IN

M A

X

1' - 9"

MAX.

10" MIN.

MAX.

OF SHELVES

WHEN WHEEL CHAIR DISTANCE IS >10", ABOVE HEIGHTS APPLY

NOTE:

PROJECT-STANDARD PLACEMENT

SWITCH, THERMOSTAT,

HORN/STROBE

FLOOR

CEILING

OPTIONAL LOCATION, F.A.

HORN/STROBE (WHEN OCCURS)

EDGE OF DOOR FRAME

CL

NOTE:

F.A. HORN/STROBE PREFERRED

INSTALLATION IS AT CEILING

LIGHT SWITCH

THERMOSTAT

CL

CL

8" MIN. - 12" MAX

3'

CL

CL

POWER/COMM RECEPTACLE

1'

CLEARANCES FOR DOORS IN SERIES

4' - 0" 4' - 0"

1' - 6"

1' - 0"

W/ LATCH

& CLOSER

4' - 6" MIN.

M

IN

W/ LATCH

& CLOSER

M

IN

(I

F A

3' - 0" MIN. (THEN, A)

M

IN

(I

F B

3' - 6" MIN. (THEN, B)

MIN.

2' - 0"

W

C L

O S

E R

M

IN

MIN.

2' - 0"

W /C

L O

S E

R

PULL SIDE PUSH SIDE

TOILET PAPER

DISPENSER

WATER CLOSET URINAL GRAB BAR

PAPER TOWEL

DISPENSER & TRASH

RECEPTACLE

TRASH

RECEPTACLE

SEAT COVER

DISPENSER

NAPKIN

DISPENSER

NAPKIN

DISPOSAL

LAVATORY

M A

X

M

IN

M

IN

H

.C

HIGHEST POINT

OF OPERATION

M

IN

. K N

E E

C

LE

A R

A N

C E

T O

P O

F R

IM

TOP OF

REFLECTIVE

SURFACE

BOTTOM OF

REFLECTIVE

SURFACE

TOP OF BAR

FLUSH CONTROL

44" MAX.

TOP OF

RIM

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Department of Veteran's Affairs Medical Center John Cochran

Division

1/31/2018 2:38:39 PM

General Index VAJC Renovate GI Procedure Room

1-G-101

657-17-185JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Bid Documents

RD HT

1/4" = 1'-0"4 ADA - Shelves & Clothes Rod Requirements

1/2" = 1'-0"5 DETAIL - TYP. MOUNTING LOCATIONS

1/8" = 1'-0"15 MANEUVERING CLEARANCES

APPLICABLE CODES

CODE SUMMARY

BUILDING CODE

FIRE CODE

PLUMBING CODE

MECHANICAL CODE

ELECTRICAL CODE

ENERGY

LIFE SAFETY

ACCESSIBILITY

SEISMIC

2015 International Building Code 2015 International Fire Code 2015 Uniform Plumbing Code 2015 International Mechanical Code 2015 National Electric Code 2015 International Energy Conservation Code 2015 NFPA 101 Life Safety Code AMERICANS with DISABILITY ACT (ADA) - ICC/ANSI 117.1-20092000 VA Seismic Design Requirements H-18-8

TYPE OF CONSTRUCTION

A. USE GROUP CLASSIFICATION

IBC - INSTITUTIONAL GROUP I-2 - HOSPITALS

NFPA - HEALTHCARE (NEW AND EXISTING)

B. CONSTRUCTION TYPE (ASSUMED BASED ON 1950 CONSTRUCTION)

IBC - TYPE I-A

NFPA - TYPE I (332)

JURISDICTION

DEPARTMENT OF VETERAN AFFAIRS (VA)

JOINT COMMISSION ON THE ACCREDITATION OF HEALTHCARE

ORGANIZATIONS (JCAHO)

US DEPARTMENT OF HEALTH AND HUMAN SERVICES

FIRE RESISTIVE REQUIREMENTS

A. INTERNATIONAL BUILDING CODE - TABLE 601 - TYPE I-B (ASSUMED)

STRUCTURAL FRAME (COLUMNS, GIRDERS, TRUSSES)

SUPPORTING FLOOR 3 HOUR

SUPPORTING ROOF ONLY 1 1/2 HOUR

BEARING WALLS

EXTERIOR (NOT LESS THAN FIRE SEPERATION) 3HOUR

INTERIOR 3 HOUR

INTERIOR (SUPPORT ROOF ONLY) 2 HOUR

NONBEARING WALLS AND PARTITIONS

INTERIOR (EXCEPT AS NOTED BELOW) 0 HOUR

FIRE WALLS (TABLE 705.4) 3 HOUR

FIRE BARRIERS (TABLE 706.3.7) 2 HOUR

SHAFT ENCLOSURE (FIGURE 707.4)

CONNECTING 4 OR MORE STORIES 2 HOUR

CONNECTING 3 OR LESS STORIES 1 HOUR

FIRE PARTITIONS (708.3) 1 HOUR

SMOKE BARRIERS (709.3) 1 HOUR

SMOKE PARTITIONS (403.3 & 710.3) 0 HOUR

CORRIDORS (WITH FIRE SPRINKLERS TABLE 1016.1) 0 HOUR

VERTICAL EXIT ENCLOSURES (SECTION 1019.1)

CONNECTING 4 OR MORE STORIES 2 HOUR

CONNECTING 3 OR LESS STORIES 1 HOUR

EXIT PASSAGEWAYS (SECT 1020.3)

WALLS / FLOOR / CEILING (SEPARATELY) 1 HOUR

WALLS / FLOOR / CEILING CONNECT.(EXIT ENCL) 2 HOUR

HORIZONTAL EXITS (FIGURE 1021.1) 2 HOUR

FLOOR CONSTRUCT (INCL SUPPORT BEAMS & JOISTS) 2 HOUR

ROOF CONSTRUCT (INCL SUPPORT BEAMS & JOISTS) 2 HOUR

B. NFPA 101 / SAFETY CODE - TABLE A.8.2.1.2 - TYPE I (3,3,2) (ASSUMED)

EXTERIOR BEARING WALLS

SUPPORTING MORE THAN ONE FLOOR 3 HOUR

SUPPORTING ONE FLOOR ONLY 3 HOUR

SUPPORTING ROOF ONLY 3 HOUR

INTERIOR BEARING WALLS

SUPPORTING MORE THAN ONE FLOOR 3 HOUR

SUPPORTING ONE FLOOR ONLY 2 HOUR

SUPPORTING ROOF ONLY 2 HOUR

COLUMNS

SUPPORTING MORE THAN ONE FLOOR 3 HOUR

SUPPORTING ONE FLOOR ONLY 2 HOUR

SUPPORTING ROOFS ONLY 2 HOUR

BEAMS, GIRDERS, TRUSSES, AND ARCHES

SUPPORTING MORE THAN ONE FLOOR 3 HOUR

SUPPORTING ONE FLOOR ONLY 2 HOUR

SUPPORTING ROOFS ONLY 2 HOUR

FLOOR CONSTRUCT (INCLU SUPPORT BEAMS & JOISTS) 2 HOUR

ROOF CONSTRUCT (INCLU SUPPORT BEAMS & JOISTS) 1 1/2 HOUR

EXTERIOR NON-BEARING WALLS 0 HOUR

PROJECT DESCRIPTION: RENOVATION AND EXPANSION OF EXISTING

PROCEDURE ROOM AND REFINISHING OF

EXISTING OFFICE

AREA OF WORK: 300 S.F.

AREA OF FLOOR: 39,500 S.F.

1/4" = 1'-0"1 Standard Room Accessory Mounting

Bid Alternates

• Base Bid: All work shown represents the base bid.

• Alternate 1: In Support Space 610A - Do not remove and infill the existing door and do not provide new floors, ceiling, lights, elec/data or signage. Abatement only.

• Alternate 2: No work in Support Space 610A including abatement.

U.S. Department of Veterans Affairs

Approved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR

C

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of

Veteran's Affairs

Medical Center

John Cochran

Division

657-17-185-JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Bid Documents

HA100

N

1/4" = 1'-0"

6th FLOOR ABATEMENT PLAN

N

1/4" = 1'-0"

5th FLOOR ABATEMENT PLAN

THE SCOPE OF THE ABATEMENT WORK ON THE 5TH FLOOR CONSISTS OF

REMOVING NON-ASBESTOS PLASTER, ASBESTOS PIPE AND FITTING INSULATION,

AND PIPING / HANGER ASSEMBLIES WITH LEAD-BASED PAINT. THE SCOPE OF

THE ABATEMENT WORK ON THE 6TH FLOOR CONSISTS OF REMOVING LEAD

CONTAINING CERAMIC TILE AND UNDERLYING DRYWALL WITH POTENTIAL MOLD,

PIPING AND ASSOCIATED HANGER ASSEMBLIES WITH LEAD-BASED PAINT, AND

WATER DAMAGED FIBERGLASS PIPE INSULATION WITH POTENTIAL MOLD. ALL

WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE, AND

LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK SHALL BE CONDUCTED DURING REGULAR BUSINESS

HOURS (7:00 AM - 4:00 PM) EXCEPT THE HALLWAY WORK THAT SHALL BE

CONDUCTED ON OFF-HOURS 5:00 PM - 7:00 AM MON-FRI OR 5:00 PM FRI - 6 PM

SUNDAY. WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES OF ALL ABATEMENT SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR WITH THE GENERAL CONTRACTOR. THE

LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW

REPRESENTATIVE LOCATIONS OF PIPING.

A FULL DECONTAMINATION UNIT IN ACCORDANCE WITH THE PROJECT

SPECIFICATIONS SHALL BE REQUIRED FOR THE 6TH FLOOR CONTAINMENTS AND

A SINGLE CHAMBER DECONTAMINATION UNIT EQUIPPED WITH A HEPA VACUUM

SHALL BE REQUIRED FOR THE 5TH FLOOR MINI-CONTAINMENTS.

THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK PLAN AND

ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY CHANGES TO

THE PROCEDURES OR CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA

COR AND VPIH FOR APPROVALS.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE

OF THE FIRE RETARDANT TYPE.

ABATED PIPE INSULATION AND ASBESTOS FITTINGS, EXCLUDING PIPING THAT

WILL BE REMOVED, SHALL BE PROPERLY RE-INSULATED WITH EQUIVALENT

INSULATING PROPERTIES PER VA SPECIFICATION SECTION 23 07 11 HVAC,

PLUMBING AND BOILER PLANT INSULATION, OR SECTION 22 07 11 PLUMBING

INSULATION.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE

DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR AND

VPIH.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING WILL BE

CONDUCTED BY THE VPIH.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED

PAINT WERE IDENTIFIED IN THE DEMOLITION AREAS. IT SHOULD BE NOTED THAT

OSHA DOES NOT RECOGNIZE THE EPA HUD THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER WORK AREA

CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED PERFORMANCE

BASED AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH AIR

MONITORING OR BIOLOGICAL EXPOSURE MONITORING (BLOOD LEAD TESTING), IF

REQUIRED. UNLESS THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR SAMPLING SHALL BE

CONDUCTED BY THE CPIH OF REPRESENTATIVE TASKS, TO DOCUMENT THE

EXPOSURE TO LEAD.

ABATEMENT GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ABATEMENT KEYNOTES

REMOVE NON-ASBESTOS PLASTER CEILINGS AND ABATE ASBESTOS PIPE

INSULATION AND ASBESTOS FITTINGS BY GLOVEBAG REMOVAL METHODS

INSIDE A NEGATIVE PRESSURE CONTAINMENT.

- 40 LF OF ASBESTOS PIPE INSULATION AND FITTINGS TOTAL, 2 LOCATIONS

- 60 SF OF NON-ASBESTOS PLASTER CEILING

FIBERGLASS INSULATION IS PRESENT ABOVE THE CHASE WALLS, WITH

ASBESTOS INSULATION PRESENT BELOW THE CHASE WALLS. ALL

DISCONNECTS OR CHANGES TO THE EXISTING PIPING SHOULD BE LIMITED TO

THE FIBERGLASS LINES. ASBESTOS INSULATION SHALL BE PROTECTED FROM

ANY DISTURBANCE.

WINDOW FRAMES AND TRIM (SILLS, QUARTER ROUND, ETC.) WITH

LEAD-BASED PAINT. PROTECT AS REQUIRED.

PIPES, HANGER ASSEMBLIES, AND EMBEDS WITH LEAD-BASED PAINT

PRESENT. PROTECT AS REQUIRED.

REMOVE LEAD-CONTAINING CERAMIC TILES AND UNDERLYING DRYWALL WITH

POTENTIAL MOLD GROWTH USING MANUAL REMOVAL METHODS INSIDE A

NEGATIVE PRESSURE CONTAINMENT. THE REMAINING SURFACES SHALL BE

CLEANED USING AN EPA APPROVED ANTI-MICROBIAL SOLUTION. ONCE THE

WALL CAVITY IS OPEN, ANY ADJACENT DRYWALL THAT MAY BE IMPACTED

SHALL BE REMOVED ACCORDINGLY AND MAY REQUIRE THE CONTAINMENT TO

BE EXTENDED.

- RM A608: 15 SF OF LEAD-CONTAINING CERAMIC WALL TILE & WALLBOARD

- RM A608A: 240 SF OF LEAD-CONTAINING CERAMIC WALL TILE & WALLBOARD

- RM A610A: 170 SF OF LEAD-CONTAINING CERAMIC WALL TILE & WALLBOARD

DISMANTLE AND REMOVE PIPES, HANGERS AND BRACKETS CONTAINING

ORANGE LEAD-BASED PAINT IN CONJUNCTION WITH MECHANICAL PIPING

REMOVAL. IF THE HANGERS AND BRACKETS CAN BE DISMANTLED AND

REMOVED WITHOUT DISTURBING THE LEAD-BASED PAINT, THE USE OF A

NEGATIVE PRESSURE CONTAINMENT OR GLOVEBAG WILL NOT BE REQUIRED,

PROVIDED THE ABATEMENT CONTRACTOR HAS AN APPROVED NEGATIVE

EXPOSURE ASSESSMENT SUBMITTED AS PART OF THEIR WORK PLAN.

OTHERWISE ALL WORK SHALL BE CONDUCTED INSIDE A NEGATIVE PRESSURE

CONTAINMENT OR GLOVEBAG. THE INSERTS, EMBEDS OR INTACT ORANGE

PAINT ON THE CONCRETE SHALL REMAIN IN PLACE. MECHANICAL PIPING

SHALL BE TEMPORARILY SUPPORTED AS REQUIRED IF THE HANGERS ARE

REMOVED WHILE THE LINES REMAIN ACTIVE.

- 15 EA ORANGE PAINTED HANGER ASSEMBLIES TOTAL, 3 LOCATIONS

- 60 LF OF ORANGE PANTED PIPES TOTAL, 3 LOCATIONS

INSIDE A NEGATIVE PRESSURE MINI-CONTAINMENT, REMOVE FIBERGLASS

PIPE INSULATION WITH MOLD GROWTH AND WATER STAINS USING WET

METHODS. THOROUGHLY CLEAN THE PIPES AND SURROUNDING AREAS

INSIDE THE CONTAINMENT USING AN EPA REGISTERED ANTI-MICROBIAL

SOLUTION. RE-INSULATE THE HALLWAY PIPING IN ACCORDANCE WITH VA

SPECIFICATION SECTIONS 02 22 11 PLUMBING INSULATION AND 23 07 11 HVAC

AND BOILER PLANT INSULATION.

- 5 LF OF FIBERGLASS PIPE INSULATION WITH POTENTIAL MOLD TOTAL,

2 LOCATIONS

ABATEMENT LEGEND:

REMOVE ASBESTOS PIPE INSULATION AND/OR PIPES WITH

LEAD-BASED PAINT AS INDICATED IN THE KEYNOTES

REMOVE LEAD-CONTAINING CERAMIC WALLS AS INDICATED

IN THE KEYNOTES

A1A1A1

L1

L2

L3

L4

M1

A1A1A1 A1A1A1

L1

L2

L2

L2

L4L4

L4

M1

M1

L3

L3

L3

L3

L3

L2

REMOVE NON-ASBESTOS PLASTER CEILING TO ALLOW FOR

ABATEMENT OF PIPES AS INDICATED IN THE KEYNOTES

L2L2

A2

L2 jhecht VAJC GI Seal (1-30-18)

5 E2 1

E3

E4

E4

H H

G

G

F

F

GI Procedure Room

A608

GI Procedure Room

A608

Existing Procedure Room

NIC

Support Space

A610A

Corridor

H601

Nurse Station

A606

Nour.

H612

Procedure Room

A610

Chase

CH-A-6

Procedure Room

A611

Clean Utility

A611A

Procedure Room

A612

Toilet

A613B

Ante Room

A613A

Scope Cleaning

613Room

H609

Room

H610

E x is ti n g

C ra m ic

T ile

E x is ti n g

V C

T

8 8

7 7

11 11

8' - 1"

8' - 1"

7' - 2"

8' - 0"

GI Procedure Room

A608 Existing Toilet

A608A Existing Procedure Room

NIC

Support Space

A610A

8' - 1"

Corridor

H601

8' - 0"

D1 D1

D1 Nurse Station

A606

Nour.

H612

Procedure Room

A610

Procedure Room

A611 Clean Utility

A611A

Procedure Room

A612

Toilet

A613B

Ante Room

A613A

Scope Cleaning

Room

H609

8' - 0"

8' - 0"8' - 0"7' - 7" 7' - 6"

7' - 6"

7' - 6"

8' - 0"

8' - 1"

7' - 11"

8' - 0"

7' - 5"

D1

11 11 m in c le a r

Remove existing plumbing fixture. Return and cap at nearest tee or main. RE: Plumbing drawings for more information

Keyed Notes - Demolition

Existing hazardous material to be removed. See MEP and Abatement Plans.

Remove existing transisiton strip and existing flooring as required to recieve new flooring. See finish plan.

Existing radiator to be removed. Prep surfaces as required to receive new finishes. See MEP drawings.

Carefully remove restroom accessories and return to owner. Coordinate with COR items to be turned over.

Exisiting door and frame to remain. Protect during construction.

Remove existing railing.7

Existing door & frame to be removed. Turn over to owner, Salvage existing window treatemt for reuse. See Specificatons.

Remove existing flooring and prepare for installation of new floors.

Temporary construction barrier. See spec for ante room requirements

Legend - Demolition Plans

Existing Wall to Remain

Existing Door to Remain

Existing Wall to be Removed

Existing Door to be Removed

Existing hazardous material to be removed.

See Abatement Plans.

Remove existing ceilng GWB Soffits, ACT Grid, ACT Pads, LIghts, Curtain Track, HVAC Diffusers/Grilles, and all other associated hardware or accessories. Coordinate with COR regardingitems to be turned over to owner

D1

Keyed Notes - Demolition RCP

N

1/4" = 1'-0"1 Demo Plan - Endoscopy

N

1/4" = 1'-0"3 Demo Ceiling Plan - Endoscopy

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Department of Veteran's Affairs Medical Center John Cochran

Division

3/27/2018 8:21:14 AM

Demo Plan, Demo RCP VAJC Renovate GI Procedure Room

1-A-100

657-17-185JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Bid Documents

RD HT

General Notes - Demolition Plans

A Demolition and construction must be sequenced and coordinated to ensure that the building owner's operations are continuously mantained.

B This demolition plan reflects information gathered from existing conditions drwawings and architects field observations. Contractor to verify accuracy of information and include all required demolition in their bid & report any discrepancies to the architect.

C Items to be demolished, removed, or relocated are shown dashed. Existing items to remain shall be protected during construction by contractor. Patch and repair any surfaces disturbed by demolition that are to remain.

D Remove all flooring finishes and base unless otherwise noted. Prepare slab and existing walls that are to remain for new finishes.

E Remove ceiling tile, grids, lights, associated hardward and panels. Refer to RCP Drawings for existing ceiling to remain.

F Remove all mounted wire mould and recepticles. Pull wire back to electrical panel. RE: Electrical drawings for additional information.

G Remove all existing phone/data lines back to nearest patch panel. RE: Electrical drawings for additional information.

H Protect all medical equipment and associated medical items during construction.

I All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

J GC is to coordinate construciton and abatement with operations. Any work that interferes with operations will need to occur after hours.

Bid Alternates :

• Base Bid: All work shown represents the base bid.

• Alternate 1: In Support Space 610A - Do not remove and infill the existing door and do not provide new floors, ceiling, lights, elec/data or signage. Abatement only.

• Alternate 2: No work in Support Space 610A including abatement.

5 E2 1E3E4

H H

G

G

F

F

E x is t.

GI Procedure Room

A608

Existing Procedure Room

NIC

Support Space

A610A

Corridor

H601

Nurse Station

A606

Procedure Room

A610

Procedure Room

A611

Clean Utility

A611A

Procedure Room

A612

Toilet

A613B

Ante Room

A613A

Scope Cleaning

Room

H609

Room

H610

C

C

C

1-A-200 3

/4

1-A-2002 8

11 11 m in c le a r m in c le a r

New 4'-0" wide door1

Infill wall at removed door3

Install vinyl handrail & guardrail to match existing adjacent. See detail on 4/1-A-200.

New flooring RE Finish sheet5

Existing Med gasses to remain. RE: MEP6

Keyed Notes - Plan

G.C. to provide & install wall mounted hand sink in previous location w/ manual operated paddle handles, gooseneck faucet and eyewash. See Plumbing drawings

4'-0" x 7'-0" x 1 3/4" type F WD door in HM frame. Paint PT-2. Hardware: 1 1/2 pair butts, closer, hospital latching push/pull and wall stop to match existing doors on this floor. See spec.

New Med gasses. RE: MEP8

Existing handrail and guardrail to remain9

8' - 1"

8' - 1"

7' - 2"

8' - 0"

7' - 6"

ME ME

ME

GI Procedure Room

A608 Existing

Procedure Room

NIC

Support Space

A610A

Corridor

H601

249 SF

Nurse Station

A606

301 SF

Procedure Room

A610

286 SF

Procedure Room

A611

80 SF

Clean Utility

A611A

149 SF

Procedure Room

A612

72 SF

Toilet

A613B

29 SF

Ante Room

A613A119 SF

Scope Cleaning

60 SF

Room

H609

7' - 0" A.F.F.

1' - 1 1/2"

7' - 0" A.F.F.

GYP BD Soffit

GYP BD Soffit

1' - 1 1/2"

58' - 1"

2'-0" x 2'-0" Lay-In Light Fixture (RE: Electrical)

6" Recessed Can Light Fixture (RE: Electrical)

Exit Sign (RE: Electrical)

Suspended Acoustical Ceiling Tile System

Gypsum Wall Board Ceiling System

2'-0" x 4'-0" Lay-In Light Fixture (RE: Electrical)

Reflected Ceiling Plan Legend

Sprinkler Head (RE: Fire Protection)

Air Return Diffuser (RE: Mechanical)

Air Supply Diffuser (RE: Mechanical)

ACT Ceiling Grid & Pads. Match existing height. RE Finish Sheet

Existing Med Gasses (RE: Mechanical)3

New Med Gasses (RE: Mechanical)4

Monitor on ceiling mounted boom. G.C to provide structural support for VA provided monitor and support arm. See details 9 & 10/A200 (Steris G Sries-Accessory Arm or approved equal). GC to coordinate with the equipment manufacturer and biomed department for installation requirements.

Keyed Notes - Reflected Ceiling Plan

New curtain track2

Temporary construction barrier. Adjust ceiling devices to accomodate partition. Coordinate in field. See spec for ante room requirements

Remove and replace exsiting ceilng as required to allow for above ceilgin mechanical work.

Legend - Floor Plans

New Wall

Existing Wall to Remain

New Door

Existing Door to Remain

Existing Smoke Partition

45°

(2) 12 GAGE

HANGAR

WIRES @ OPPOSITE

CORNERS TO

STRUCTURE

ACT & GRID

12 GAGE HANGAR WIRE

ELECTRICAL FIXTURE-

MECHANICALLY

FASTENED TO

SUSPENSION SYSTEM

ELECTRICAL/HVAC

FIXTURE

-MECHANICALLY FASTEN

TO SUSPENSION

SYSTEM

LFB

LATERAL FORCE BRACE

EC

EXPANSION CLIP

SJCG CLIP

MAIN GRID RUN

AT LAY-IN FIXTURE

AT RECESSED DOWNLIGHT

REQUIREMENTS:

-ATTACHED ON (2) ADJACENT WALLS WITH THE BERC2.

NOTE-ATTACHING BERC2 CLIP TO THE WALL SECURES

THE GRID AND ELIMINATES THE NEED FOR POP RIVITS

THROUGH THE VISIBLE PART OF THE WALL MOLDING.

-BERC2 CLIP WITH 3/4" CLEARANCE ON UNATTACHED ENDS.

-BERC2 CLIP ON ALL (4) WALLS

-HEAVY-DUTY GRID

-LATERAL BRACING

-PERIMETER SUPPORT WIRE

-EXPANSION CLIP EVERY X S.F.

BERC2 CLIP

ATTACHED WALL

NOTE: POP RIVITS ARE ACCEPTABLE

UNATTACHED WALL

7/8"

1/2"

7/8"

8" MAX.

8" MAX.

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Department of Veteran's Affairs Medical Center John Cochran

Division

3/2/2018 9:05:26 AM

Plan, RCP VAJC Renovate GI Procedure Room

1-A-101

657-17-185JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Bid Documents

RD HT

N

1/4" = 1'-0"1 Floor Plan

N

1/4" = 1'-0"2 Ceiling Plan - Endoscopy

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "D" unless otherwise noted.

C All dimensions are from column ceter line to face of partiiton UON under no sircumstances shall any measurement be scaled from the drawings. Any measurment not given an actual number dimension should be brouth to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

E GC is to coordinate construciton and abatement with operations. Any work that interferes with operations will need to occur after hours.

General Notes - Reflected Ceiling Plans

A Refer to Electrical drawings for engineering information. i.e. Circuiting, fixture schedule, ect.

These architectural drawings will take precident for fixure location, exiting, and egress pathway.

B Refer to Seismic Bracing requirements on this sheet.

C All Gridded Ceilings to be ACT-1 UON

D All building core and shell shown greyed out are existing UNO.

E All ceiling and fixture dimensions noted above finish floor (AFF) are from bottom of the fixture and ceiling pads

F Per specification, submit shop drawings on all special ceiling items for architectrual review of seams, joints, and layout.

G If any ceilng elements cannot be installed as shown due to conflicts with existing piping, ductwork, or structure, contact architect for direction before proceding with the installation.

H Louvers, grills, and diffusers shall be prefinished to match ceiling. In cases where these items are not available from the manufacturer in a prefinished color to match the ceiling, provide automotive paint finish or electrostatic painted finish to match the ceiling. Follow finish schedule and notes for selected color.

I Respective contractors shall coordinate and review locations of access panels in new GWB ceilings / soffits required to provide accces to new and existing valves, junction / pull boxes, dampers, ect.

J For all electrical ceiling device locations RE: electrical drawings.

K GC is to coordinate construction and abatement with operations. Any work that interferes with operations will need to occur after hours.

1 1/2" = 1'-0"3 DETAIL - SEISMIC LIGHT FIXTURE

1" = 1'-0"4 DETAIL - SEISMIC RESTRAINTS @ SUSPENDED CEILINGS

Bid Alternates:

• Base Bid: All work shown represents the base bid.

• Alternate 1: In Support Space 610A - Do not remove and infill the existing door and do not provide new floors, ceiling, lights, elec/data or signage. Abatement only.

• Alternate 2: No work in Support Space 610A including abatement.

Area of ceiling work on 5th floor. Remove and patch GWB as required for work above.

OFFICE / EXAM

A508

OFFICE / EXAM

A509

OFFICE / EXAM

A510

OFFICE / EXAM

A507

OFFICE

A506

CORRIDOR

H501

NOUR.

A505

TOILET, FEMALE

A506A

OFFICE / EXAM

A514

OFFICE / EXAM

A513

OFFICE / EXAM

A512

OFFICE / EXAM

A515

OFFICE / EXAM

A516

OFFICE / EXAM

A517

STORAGE

A504

SOILED UTILITY

A519

STORAGE

A518

CORRIDOR

H502

CONFERENCE

RM.

A502

OFFICE / EXAM

A511

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Department of Veteran's Affairs Medical Center John Cochran

Division

1/31/2018 2:38:25 PM

5th Floor RCP VAJC Renovate GI Procedure Room

1-A-102

657-17-185JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Bid Documents

RD HT

N

1/4" = 1'-0"1 5th Floor Ceiling PLan

MAX

0' - 7"0' - 6 1/32" Requirement

Per MFR

MAX

0' - 7"

/3

Resilient Contact Surface Bumper

Ancorage Shall be Located to Miss Studs;

Provide Backing Supoort.

MFR Standard End Closure Corner Guard; See Plan for Locations

Wall Assembly; See Plan for P-Type

Door Frame; See Plan for More Information

MFR Standard End Closer

0' - 4 1/16"1-A-200

Sim

R e D o o r s c h e d u le

Notes:

1. Head Similar

2. Provide (3) Anchors MIN per Jamb; (4) at Rated Partitions

3. Refer to Door Schedule for Ratings Required

4. HM Jamb Throat 1/8" Larger than Partition, Caulk and Paint , TYP

Double Stud @ Jamb

Welded HM Frame

X

P-Type;

REF: Plan

Line Of Adjacent Partition (Where

Occurs)

/1

0' - 0 1/2"

/3

0' - 1 13/16" ±Varies

REF:

Schedule

Wall Assembly;

RE: Plan for P-

Type

Stainless Steel Corner Guard

0' - 3 1/2"

/2

F Flush

REF: Schedule

R E

F S c h e d u le

HM

0' - 2" REF: Door Schedule 0' - 2"

R E

F D o o r S c h e d u le

1-A-200

Sim

Hollow Metal

Partition Type Not to Scale

C 3-5/8" Studs

Decking

5/8" GWB

Ceiling Line; RE: RCP

FIN Floor; REF: Schedule

Wall Base; REF: Schedule

MTL Studs @ 16" OC

Sub-floor / Slab

Room Side: GWB 6" Above CLG Corridor Side: GWB Extend to Underside of Decking; Cope Tight to Structure

Sliptrack at Structure TYP

(C2) 7 1/4"

(C) 0' - 4 7/8"

CORRIDOR

SIDE

ROOM

SIDE

Sound Batts

± 0' - 3 1/32"

/2

MIN.

0' - 1 17/32"

Wall Base; RE: Room Finish Schedule

Bottom of Lower Wall Guard to be Flush with Top of Wall Base

Fasteners per MRF Requirements

Continuous Aluminum Retainer

Continuous Impact Bumper

Vinyl Cover; RE: Finish Schedule for More Information

5/8" GWB, TYP.

MTL Stud Blocking per MFR Requirements

± 0' - 1 1/4"

Fasteners Per MFR Requirements

Continuous Aluminum Retainer

Continuous Impact Bumper

Vinyl Cover; RE: Finish schedule for More Information

5/8" GWB, TYP.

MTL Stud Blocking per MFR Requirements

LOWER GUARDRAIL

UPPER HANDRAIL

Note: See Detail for Termination

G

SS1 countertop w/ 4" SS1 backsplash

2' - 6"

1-A-200

Lockable PLAM Cabinet w/ (2) adjustable shelves.

1-A-200

Integral coved base RE: Finish info

Lockable PLAM base cabinet w/ (1) adjustable shelf

SS1 - SEE FINISH SCHEDULE

CABINET PULLS

(VERTICAL

MOUNT; BRUSHED

STAINLESS STEEL

WIRE)

PLAM

DRAWER UNIT

LOCKABLE PLAM BASE CABINET

SCHEDULED BASE

NOTE: DRAWER, CABINET

INTERIOR, & ADJUSTABLE

SHELF TO BE WHITE

MELAMINE

2'-1" U.O.N.

/2

/8

2'-0"

3"

1"

R E

E

L E

V A

T

IO

N

2X FTWD BLOCKING

SEALANT

4" SS1

PLAM Cabinet, Scribe to Wall

/2

Sealant

Extend Side panel at Exposed Ends

Blocking where Required

Clear

10 7/8"

Clear glass in PLAM Frame. Provide concealed lock

F

.V

ACT CLG grid & pads RE: Material Schedule

5/8" GWB on 3 5/8" Mtl Studs

Note: Glass cabinet doors are to be secured with concealed locks. Verify lock type with VA.

1' - 0" 1" 1/2"

HHH

Lockable PLAM Cabinet w/ (2) adjustable shelves.

1-A-200

1" 2' - 6"

E27

Endoscopy Equipment provided and installed by the VA. See Equipment plan

TYP

0' - 0 1/2"

T Y

P

/2

BRACING ABOVE

PER DETAIL ____

L3x3 VERTICAL

ANGLE STRUTS

EACH CORNER

PER DETAIL ____

HOLE IN PLATE

FOR MEP ROUTING

BY EQUIP. MFG.

1" MOUNTING

PLATE BY

EQUIPMENT

MFG.

L6x6x1/2 SUPPORT ANGLE

L3x3x1/4 VERTICAL

ANGLE HANGERS TYP

EA. CORNER OF FRAME

L2x2x3/8 ANGLES TYP

EA SIDE OF FRAME

1" STEEL PLATE

BY BOOM MFG.

L3x3x1/4 CLIP HANGER

W/ (2)-3/4" ANCHORS TYP

SINGLE SIDED CONNECTIONS

USE HILTI HY200 ANCHORS

DRILL AND EPOXY W/3 1/2"

EMBEDMENT MIN.

DOUBLE SIDED

CONNECTION USE THRU

BOLTS.

3/16

3-SIDES

TYP

3/16

3-SIDES

TYP

3/16

TYP

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Department of Veteran's Affairs Medical Center John Cochran

Division

1/31/2018 2:38:27 PM

Door and Misc. Details VAJC Renovate GI Procedure Room

1-A-200

657-17-185JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

January 30, 2018

Bid Documents

RD HT

1 1/2" = 1'-0"4 Detail - Crash Rail Termination

3" = 1'-0"1 Detail - HM Door Jamb

3" = 1'-0"5 Detail - Stainless Steel Corner Guard

Door Types Frame Types

3" = 1'-0"6 Detail - Handrail & Crashrail

1/4" = 1'-0"3 Interior Elevation - East

1 1/2" = 1'-0"8 Detail - Base Cabinet w/ Drawer

1 1/2" = 1'-0"7 Detail - Upper Cabinet

1/4" = 1'-0"2 Elevation 1 - a

3/4" = 1'-0"9 TYPICAL PLAN VIEW OF MEDICAL BOOM SUPPORT FRAME

3/4" = 1'-0"10 TYPICAL SECTION @ MEDICAL BOOM SUPPORT FRAME

GI Procedure Room

A608

Existing Procedure Room

NIC

Support Space

A610A

Corridor

H601

A

Procedure Room

A610

Procedure Room

A611

Clean Utility

A611A

Procedure Room

A612

Toilet

A613B

Ante Room

A613A

Scope Cleaning

Room

H609

Room

H610

Nurse Station

A606

Nour.

H612

Chase

CH-A-6

1-A-200 3

1-A-2002

GI Procedure Room

A608

149 SF

Existing Procedure Room

NIC

430 SF

Corridor

H601

A

31 SF

Nour.

H612

1-A-200 3

E27

E16

E25

E28

E15

E5

E18

E19

E17

Existing

E18

E19

E17

E6

E24 E1

E22

E7

E4 E3

E23

E30 E20

E8

E29 E2

E14

E21

1-A-2002

E10

E10

E12

E31 above

Finish Plan Symbol Legend

XXX

XXX

Floor Finish Symbol X = Material Code # = Material Number

Wall Finish Symbol X = Material Code # = Material Number

Floor Transition See Room Finish Schedule

ACT1 Accoustical Ceiling Tile

Armstrong ULTIMA Health Zone Square lay-In 1938 24" x 48" x 3/4"

6,8

P1 Paint Sherwin Williams SW7009, Pearly White 1

WSF1 Welded Sheet Flooring

Armstrong Decor Art CORLON 88731 Light Gold

4, 5

Code Item Manufacturer Description Remarks

Material Schedule

Remarks - Material Schedule:

1. Wall Finish:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.