36C25518R0342 A00002 S05 - PRE-BID RFI'S-ANSWERS - ICRA ILSM.pdf

View the file

Other files

File Type Posted
36C25518C0158-000.docx DOCX document
36C25518R0342-A00003002.pdf PDF
36C25518R0342-A00003000.docx DOCX document
36C25518R0342-A00003001.pdf PDF
36C25518R0342-A00002003.pdf PDF
36C25518R0342-A00002005.pdf PDF
36C25518R0342-A00002000.docx DOCX document
36C25518R0342-A00002004.pdf PDF
36C25518R0342-A00002001.pdf PDF
36C25518R0342-A00001001.pdf PDF
36C25518R0342-A00001000.docx DOCX document
36C25518R0342-003.pdf PDF
36C25518R0342-002.pdf PDF
36C25518R0342-001.docx DOCX document
36C25518R0342-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Title: Project/WO#

Description:

Drawing Link:

COR/Frm/PM: Phone:

Ctr Rep: Phone:

Type Construction Activities Risk Service Area

Low Risk

Medium Risk

Type B

Small scale, short duration activities that create minimal dust.

Include, but are not limited to:

☐ Installation of telephone and computer cabling.

☐ Access to chase spaces using doors or hatches (not cutting).

High Risk

Type C

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies.

Includes, but is not limited to:

☐ Sanding or cutting of walls or ceilings.

☐ Removal of floor coverings, ceiling tiles, and casework.

☐ New wall construction.

☐ Minor duct work or electrical work above ceilings.

☐ Major cabling activities.

☐ Any activity that cannot be completed within a single k h f

Highest Risk

Low Med High Highest Type A I I I II Type B II II II III/IV Type C II III III/IV III/IV Type D III/IV IV IV IV

Class I

Class II

Class III

Emergency Room; Kitchen or Food Preparation / Dining / Canteen;

Echocardiography; Radiology/MRI; Respiratory Therapy; Nuclear Medicine; Senior Mental Health (In Patient or Senior); Community Living Center (CLC); Clean Supply; Other

Infection Control Risk Assessment (ICRA) Renovate GI Procedure Room 657-17-185JC

TBD

Type A

Inspection and Non-Invasive Activities.

Include, but are not limited to:

☐ Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet.

☐ Painting (but not sanding).

☐ Wall covering, electrical trim work, minor plumbing, and activities that do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.

Office areas; Out Doors; Electrical or Mechanical Rooms; Social Work; Retail Store; Stage, Recreation, Theater; Stairwells;

Conference Rooms; Other

Physical and Occupational Therapy; Outpatient Clinics; Waiting Rooms; Sleep Lab; Mental Health (outpatient only); Prosthetics / Orthotics; Domiciliary; Other

Renovate GI Procedure Room

May-24Chad Markus

ICRA Classification

During construction, perform following daily: Upon completion, performed the following:

11. Construct anteroom and require all personnel to pass through this room to be vacuumed using a HEPA vacuum cleaner before leaving work site OR they can wear cloth or paper coveralls that are removed each time they leave the work site.

12. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

1. Clean up ceiling tile and flooring surfaces below with HEPA filtered vacuum or damp mop.

3. Provide active means to prevent dust from dispersing. Dust left on the floors, clothing and/or body is not allowed in order to prevent spreading and tracking. “Active means” are:

a. Vacuum attachments on tools with HEPA vacuum when generating dust, or

b. HEPA vacuuming immediately as the dust is generated.

c. Remove or isolate HVAC system in areas where work is being performed.

d. Water mist work surfaces to control dust while cutting.

e. Seal unused doors with duct tape.

f. Block off and seal all HVAC air vents.

g. Place +tacky mat at inside of entrance of work area and change frequently or when ineffective.

h. Wet mop and/or vacuum with +HEPA-filtered vacuum the work area before leaving the site.

Brooming is not sufficient.

4. Whenever transporting outside of construction site, wipe materials, equipment and work surfaces with EPA registered, unscented +disinfectant, which has manufacturer’s labeling as a bactericide, tuberculocide, virucide, and fungicide.

5. There shall be no standing, uncovered water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.

Cardiac Cath, EP Lab or Cardiology; Sterile Processing Service (SPS);

All inpatient medical or surgical units; Care Units: PACU, MICU, SICU, TCU; Spinal Cord Injury (SCI); Negative pressure isolation rooms;

Outpatient chemotherapy or Oncology areas; Operating Rooms;

Endoscopy; Dialysis; Bronchoscopy; Pharmacy; Clinical Laboratories;

Other

Type D

Major demolition and construction projects.

Includes, but is not limited to:

☐ Activities that require consecutive work shifts.

☐ Requires heavy demolition or removal of a complete cabling system.

☐ New construction.

Risk Group Const Type

2. Wet mop and/or vacuum with HEPA-filtered vacuum before leaving work area and wipe work surfaces with disinfectant.

3. Contain construction waste before transport in tightly covered containers. Tape may be used to ensure a tight cover.

4. Remove isolation of HVAC system in areas when work and area cleanup has been completed.

6. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method before construction begins.

7. Maintain Negative Pressure Ventilation (NPV) at 0.01” Water Column (WC) within the work site utilizing NPV machine.

8. NPV monitoring devices should be visible from outside the worksite and readings shall be documented daily or more often as needed. Keep tracking monitoring device and tracking log at outside of entrance at the site.

9. Contain construction waste before transport in tightly covered containers. Tape covering, unless using form-fitting solid lid.

5. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

6. Do not remove barriers from work area until completed project is thoroughly and inspected by COR, Safety and Infection Control.

10. Seal holes, pipes, conduits, and punctures. All above

Class IV

1. Execute work by methods to minimize dust dispersal from minor flooring or surface disruptions.

2. For visual inspection only, dampen ceiling tile with water spray before removing. Replace a ceiling tile immediately after inspection; do not leave unattended.

Project Title: Project/WO #

Office areas

Endoscopy

Endoscopy

Out Doors

Corridors

NO

Hard Walls

NO

YES

NO

NO

NO

Does this work remove any of the following from service?

-isolation/negative airflow rooms?

-hand hygiene sinks?

-clean or soiled utility rooms ?

Containment size and location shall be coordinated with the service to allow for normal operations to continue.

Does the work need to be performed during patient-care hours?

Barrier Types:

Note: Renovation/construction area

- shall be isolated from the occupied areas during const. and shall be negative with respect to surrounding areas.

To be coordinated through the shutdown process

To be coordinated through the shutdown process

To be coordinated through the shutdown process

Plumbing:

Potable Water:

Electrical:

Identify containment measures:

Above 85 Db shall be performed outside normal business hours.

To be coordinated through the shutdown process

ICRA - Operations Steps Renovate GI Procedure Room 657-17-185JC

- boundary shared with public or patient care areas must have hard walls.

Highest Risk

Highest Risk

Noise:

HVAC:

Low Risk

Is the work area in or adjacent to an isolation room?

Identify containment issues with the project team: traffic flow, housekeeping, and debris removal (if not on dwg).

Also, Insert any EXCEPTIONS or ADDITIONS to above items here.

- using hard walls must use door with door closer and lock; otherwise, plastic walls may use zipper door.

Is there a risk of compromising structural integrity (e.g., wall, ceiling, etc.) due to potential of water damage?

Identify the areas surrounding the project area, assessing potential impact.

Unit Below Unit Above

East West North South

Risk Group:

Risk Group:

Risk Group:

Risk Group:

Risk Group:

Risk Group: Low Risk

Identify impact issues (probable disruptions/outages, and describe their corresponding corrective actions).

Low Risk

IP Signature Not Required for Class I or

Class II

X Infection Prevention Representative

X PM/COR/Shop Representative

5 E2 1

E3

E4

E4

H H

G

G

F

F

GI Procedure Room

A608

GI Procedure Room

A608

Existing Procedure Room

NIC

Office

A610A

Corridor

H601

Nurse Station

A606

Nour.

H612

Procedure Room

A610

Chase

CH-A-6

Procedure Room

A611

Clean Utility

A611A

Procedure Room

A612

Toilet

A613B

Ante Room

A613A

Scope Cleaning

613Room

H609

Room

H610

E x is ti n g

C e ra m ic

T ile

E x is ti n g

V C

T

8 8

7 7

8' - 1"

8' - 1"

7' - 2"

8' - 0"

GI Procedure Room

A608 Existing Toilet

A608A Existing Procedure Room

NIC

Office

A610A

8' - 1"

Corridor

H601

8' - 0"

D1 D1

D1 Nurse Station

A606

Nour.

H612

Procedure Room

A610

Procedure Room

A611 Clean Utility

A611A

Procedure Room

A612

Toilet

A613B

Ante Room

A613A

Scope Cleaning

Room

H609

8' - 0"

8' - 0"8' - 0"7' - 7" 7' - 6"

7' - 6"

7' - 6"

8' - 0"

8' - 1"

7' - 11"

8' - 0"

7' - 5"

D1

Remove existing plumbing fixture. Return and cap at nearest tee or main. RE: Plumbing drawings for more information

Keyed Notes - Demolition

Existing hazardous material to be removed. See MEP and Abatement Plans.

Remove existing transisiton strip and existing flooring as required to recieve new flooring. See finish plan.

Existing radiator to be removed. Prep surfaces as required to receive new finishes. See MEP drawings.

Carefully remove restroom accessories and return to owner. Coordinate with COR items to be turned over.

Exisiting door and frame to remain. Protect during construction.

Remove existing railing.7

Existing door & frame to be removed. Turn over to owner, Salvage existing window treatemt for reuse. See Specificatons.

Legend - Demolition Plans

Existing Wall to Remain

Existing Door to Remain

Existing Wall to be Removed

Existing Door to be Removed

Existing hazardous material to be removed.

See Abatement Plans.

Remove existing ceilng GWB Soffits, ACT Grid, ACT Pads, LIghts, Curtain Track, HVAC Diffusers/Grilles, and all other associated hardware or accessories. Coordinate with COR regardingitems to be turned over to owner

D1

Keyed Notes - Demolition RCP

N

1/4" = 1'-0"1 Demo Plan - Endoscopy

N

1/4" = 1'-0"3 Demo Ceiling Plan - Endoscopy

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

#1 6th FloorApproved: Chief of Service

Approved: Service Line Nurse Mgr.

Approved: Projects Chief

Approved: Infection Control

Approved: Safety Officer

Approved: COR o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Department of Veteran's Affairs Medical Center John Cochran

Division

1/12/2018 10:56:24 AM

Demo Plan, Demo RCP VAJC Renovate GI Procedure Room

1-A-100

657-17-185JC

915 NORTH GRAND BLVD. SAINT

LOUIS, MISSOURI 63106

December 18, Bid Documents

RD HT

General Notes - Demolition Plans

A Demolition and construction must be sequenced and coordinated to ensure that the building owner's operations are continuously mantained.

B This demolition plan reflects information gathered from existing conditions drwawings and architects field observations. Contractor to verify accuracy of information and include all required demolition in their bid & report any discrepancies to the architect.

C Items to be demolished, removed, or relocated are shown dashed. Existing items to remain shall be protected during construction by contractor. Patch and repair any surfaces disturbed by demolition that are to remain.

D Remove all flooring finishes and base unless otherwise noted. Prepare slab and existing walls that are to remain for new finishes.

E Remove ceiling tile, grids, lights, associated hardward and panels. Refer to RCP Drawings for existing ceiling to remain.

F Remove all mounted wire mould and recepticles. Pull wire back to electrical panel. RE: Electrical drawings for additional information.

G Remove all existing phone/data lines back to nearest patch panel. RE: Electrical drawings for additional information.

H Protect all medical equipment and associated medical items during construction.

I All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

htaylor HT MO Seal - Sig and Date

VHASTLMARKUC

Polygonal Line

VHASTLMARKUC

Rectangle

VHASTLMARKUC

Rectangle

VHASTLMARKUC

Rectangle

VHASTLMARKUC

Oval

VHASTLMARKUC

Typewritten Text Ante-room requirements: (in addition to the ICRA requirements)

- Size of room shall be coordinated to facilitate operations

- Tacky mats shall be installed

- Wet and dry mats shall be installed

- HEPA vacuum shall be inside ante-room for use

- Ante-room shall have proper lighting

- Doors in ante room shall have self closers

VHASTLMARKUC

Polygonal Line

VHASTLMARKUC

Oval

VHASTLMARKUC

Rectangle

VHASTLMARKUC

Rectangle

VHASTLMARKUC

Rectangle

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

Yes / No

All outages and proper procedures are to be coordinated with the safety department.

Required Actions: If designated smoking areas are impacted or closed due to construction, temporary areas may need to be established.

Specific Actions (confirm with Safety Dept):

G. COMBUSTIBLE LOAD LEVELS: Does the project involve the storage of flammable or combustible materials?

Does the project have the potential for creating flammable or combustible debris?

Required Actions: Surveillance of construction sites will need to be increased to prevent the accumulation of excess flammable or combustible debris. The fire load of the construction area must be kept to a minimum.

Specific Actions (confirm with Safety Dept):

Project will maintain a clean project site and all extra material not being used will be stored offsite.

A. EXITS: Does the project/repair have the potential of affecting an exit or other means of egress?

Will the affected exit be used by other than the contractor’s/maintenance personnel?

B. EMERGENCY ACCESS: Does the project/repair have the potential of obstructing access for fire department vehicles, fire fighters, suppression connections, hydrants, or fire lanes?

Required Actions: An alternate exit must be designated and training is required for those persons affected. Safety office will conduct/coordinate training. Means of exiting construction/repair areas must be inspected and documented by contractor/shop designee on a daily basis to prevent blockages due to debris.

Specific Actions (confirm with Safety Dept):

Specific Actions (confirm with Safety Dept):Required Actions: An alternate means of access must be designated and the St.

Louis City (JC)/St. Louis County (JB) Fire Department and VA Police must be notified by the Safety Office of the alternative.

C. FIRE PROTECTION: Does the project/repair have the potential of impairing existing fire alarm, detection, or suppression systems?

Required Actions: If the fire load of a particular area is significantly increased over normal due to construction, additional firefighting equipment (such as fire extinguishers) will be required. If any of this additional firefighting equipment is of a different type than that already available in the affected area, training in the use of this equipment for staff or contractor personnel is required.

Specific Actions (confirm with Safety Dept):

F. SMOKING POLICY: Will variance to existing medical center smoking policy be permitted?

E. ADDITIONAL FIRE FIGHTING EQUIPMENT AND TRAINING: Does the area affected by the project warrant placement of additional fire protection equipment?

Will additional firefighting training be required by affected personal?

Required Actions: If construction/repair involves major breaches in fire or smoke barriers, the contractor must erect temporary walls around the construction area to have fire and smoke ratings equal, or better, to the barrier rating that has been compromised.

Specific Actions (confirm with Safety Dept):

If sprinkler systems are take out of service serving the space under construction the ICRA containments must be a 1 hour rated assembly.

Required Actions: If a fire protection or alarm system is to be rendered non-operational for more than 4 hours out of a 24-hour period, either a substitute system or a fire watch must be initiated. If neither of these methods can be implemented, the area must be closed down and evacuated. All of these measures must be coordinated with the Safety Office, VA Police, and the affected staff.

Specific Actions (confirm with Safety Dept):

Interim Life Safety Measures (ILSM) Renovate GI Procedure Room 657-17-185JC

D. TEMPORARY PARTITIONS: Will construction involve the use of temporary fire or smoke partitions or barriers?

Will temporary fire protection systems be required as part this project/repair?

H. FIRE DRILLS: Does the project warrant additional fire drills within the affected areas?

Required Actions: If the life safety features of a particular area are adversely impacted by construction, then the frequency of fire drills must be increased to two per shift per quarter for healthcare/lodger occupancies. Adverse impacts would include blocked fire exits, impaired fire alarm or sprinkler systems, or major compromises in fire or smoke barriers or compartments.

Specific Actions (confirm with Safety Dept):

Yes / No

Yes / No

Yes / No

Yes / No

K. ADDITIONAL PERSONNEL TRAINING: Does the project have the potential of affecting structural features of the fire safety systems?

L. FACILITY-WIDE TRAINING: Does the project present life safety code deficiencies or construction hazards which warrant facility-wide education of personnel concerning the interim life safety measures?

Does the project present occupational health deficiencies which warrant facility-wide education of personnel concerning those procedures?

Required Actions: Training must be provided facility wide to educate staff, patients and visitors to any life safety system that is impaired throughout the entire building. In addition, the St. Louis City (JC)/St. Louis County (JB) Fire Department and VA Police will be notified.

Specific Actions (confirm with Safety Dept):

Interim Life Safety Measures (ILSM) (con't) Renovate GI Procedure Room 657-17-185JC

Required Actions: Any construction activities that adversely affect occupational health issues must be reviewed to minimize the effects. If negative pressurization is required for “special ventilation”, then include a daily reporting of the pressure measurement as part of the the daily ILSM log.

Specific Actions (confirm with Safety Dept):

The ICRA requirements identify the containment precautions required for these activities. Domestic water lines will have work performed and require flushing/testing be performed by VA

J. OCCUPATIONAL HEALTH ISSUES: Do construction workers need to be restricted to dedicated corridors, elevators, or exits?

Will the construction activities be hazardous to immune-compromised patients?

Will any disruptions of the water/plumbing system affect the purity of potable water?

Is special ventilation required for the area during construction?

I. HAZARD SURVEILLANCE: Does the project present additional hazards, such as excavations, construction storage or field offices, crane work, high voltage, confined spaces, scaffolding, etc., which warrant increased hazard surveillance?

Required Actions: If yes, then a Qualified Person as defined by OSHA must perform the work and additional project surveillance is warranted to identify potential life safety issues.

Specific Actions (confirm with Safety Dept):

Safety Representative Signature Not Required:

Class I or II & no Exit/Emergency Access Issues

Does the project have the potential for negatively affecting infection control procedures?

Does the project have the potential of affecting compartmentalization features of the fire safety systems?

Required Actions: Affected personnel must be notified when fire safety systems or infection control procedures are compromised and trained in temporary changes in procedures to compensate for the impaired systems. Examples are the need for alternate fire exits, alarm or sprinkler systems or to evacuate behind secondary fire barriers or compartments due to fire or smoke partition compromises.

Specific Actions (confirm with Safety Dept):

X Safety Dept Representative

ICRA, ILSM